{"id":20227,"date":"2026-02-02T15:23:34","date_gmt":"2026-02-02T14:23:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20227"},"modified":"2026-09-12T19:53:39","modified_gmt":"2026-09-12T17:53:39","slug":"superstructure","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/superstructure","title":{"rendered":"Superstructure"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The term superstructure in construction refers to the primary and secondary load-bearing components of a structure located above the bearings and piers. Especially in bridge construction, it comprises the deck slab, main girders, cross girders, edge beams, parapet caps, as well as attached equipment. For planning, repair, and deconstruction, a precise understanding of the superstructure is crucial: load paths, material properties, and construction stages influence structural analysis, construction sequence, and the selection of suitable tools. In practice, selective concrete demolition frequently employs <em>concrete splitters<\/em> and <em>hydraulic wedge splitters<\/em> to separate or split components in a controlled manner &#8211; low-vibration, precise, and with attention to environmental protection and occupational safety. In addition, clearly defined interfaces with bearings, joints, and utilities form the basis for safe interventions and compliant permits.<\/p>\n<h2>Definition: What is meant by the superstructure?<\/h2>\n<p>The superstructure is the entirety of load-bearing components above the supports of a structure. In bridge construction, it specifically refers to the construction between abutments and\/or piers that takes up and transfers traffic loads. The superstructure can be configured as a beam-and-slab system, a box girder, a composite cross-section, or a solid slab, and contains reinforcement, prestressing tendons where applicable, built-in components, and deck surfacing. It is distinct from the substructure (abutments, piers, foundations) and adjacent earthworks. In buildings, the term is sometimes used for floor systems supported over bearings; in civil and structural engineering, bridges are the most common application. Typical deck build-ups comprise waterproofing, drainage layers, and wearing courses, while composite action is ensured via connectors and shear transfer along interfaces.<\/p>\n<h2>Configuration, materials, and typical elements of the superstructure<\/h2>\n<p>Superstructures are predominantly made of reinforced concrete, prestressed concrete, steel, or composite cross-sections. The structural form determines stiffness, dynamic behavior, durability, and the deconstruction concept. Typical elements include deck slabs with crossfall, main (longitudinal) girders, cross girders, edge beams, and parapet caps with guardrails. Built-in components such as bearing brackets, expansion joints, drainage, utility lines, and surfacing complement the configuration. Durability-relevant details include joints, coatings, concrete cover, crack width control, and corrosion protection. Accessibility for inspection and maintenance, internal ventilation of box sections, and robust detailing at transitions further extend the service life.<\/p>\n<ul>\n<li><strong>Design drivers<\/strong>: span arrangement and geometry, boundary conditions for construction stages, and service loads including traffic and thermal actions.<\/li>\n<li><strong>Durability<\/strong>: waterproofing systems, drainage concepts, and protective coatings to mitigate chloride ingress and fatigue-sensitive details.<\/li>\n<li><strong>Deconstruction readiness<\/strong>: separable layers, accessible tendons, and clearly documented interfaces support selective demolition.<\/li>\n<\/ul>\n<h3>Overview of construction methods<\/h3>\n<p>For reinforced and prestressed concrete bridges, cast-in-place concrete, precast elements, or combined approaches are common. Box girders are suitable for long spans and allow internal access; beam-and-slab systems are prevalent for medium spans. Composite bridges connect steel girders with a concrete deck slab. Each construction method entails specific maintenance and deconstruction requirements, such as exposing prestressing tendons or cutting thick steel plates. Segmental construction, balanced cantilever, and incremental launching broaden the feasible span ranges and impose specific sequencing and temporary support strategies. For steel superstructures, orthotropic decks and braced girders require attention to fatigue details and plate cutting procedures during replacement.<\/p>\n<h3>Reinforcement and prestressing<\/h3>\n<p>Reinforcement (longitudinal and transverse bars, stirrups) ensures load-bearing capacity and crack width limitation. Prestressing (internal\/external) reduces deflections and cracking. During deconstruction, safely locating and carefully exposing these elements is essential. Tools such as <strong>concrete pulverizers<\/strong> are suitable for crushing concrete and exposing reinforcement, while <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> or multi cutters sever reinforcing steel and rolled sections. Stored energy in tendons and anchor zones requires defined release procedures; as-built documentation, cover meters, and radar scanning help to verify tendon paths and reinforcement density before starting selective cuts.<\/p>\n<h2>Inspection, damage, and repair in the superstructure<\/h2>\n<p>Frequent damage mechanisms include chloride-induced corrosion, concrete carbonation, fatigue, and crack formation. In addition, surfacing defects, leakage at joints, as well as edge beam and parapet cap damage occur. Before repair or deconstruction, a condition assessment is performed: visual inspection, low-destructive testing, material testing, and structural analysis. The results determine whether partial repair (e.g., edge beam replacement) or complete replacement is required. For partial deconstruction, precise cutting and splitting methods are needed to protect the remaining superstructure. Complementary methods such as cover measurement, ground-penetrating radar, half-cell potential, and ultrasonic testing refine the diagnosis and reduce uncertainty in planning.<\/p>\n<ul>\n<li><strong>Typical repair strategies<\/strong>: patch repair with delamination removal, waterproofing renewal and joint replacement, concrete replacement in anchor zones, and targeted strengthening of fatigue-critical details.<\/li>\n<\/ul>\n<h2>Deconstruction of superstructures: methods and demolition sequence<\/h2>\n<p>Selective deconstruction follows the principle of preserving load paths, relieving components in a controlled manner, and minimizing risks for traffic, residents, and the environment. The demolition sequence considers shoring, load redistribution, and protective scaffolding. In confined, sensitive, or operational areas, <em>low-vibration<\/em> methods offer particular advantages. Early coordination of traffic phases, utilities, and material logistics enables clean separation of fractions and supports circular economy goals.<\/p>\n<h3>Low-vibration methods<\/h3>\n<p><strong>Hydraulic wedge splitters<\/strong> create controlled cracking along pre-drilled lines. This makes it possible to divide massive cross-sections into manageable segments without strong vibrations or secondary damage. <strong>Concrete pulverizers<\/strong> crush components and are suitable for parapet caps, edge beams, slab edges, and secondary breakage. Noise, dust emissions, and effects on adjacent structural components must be measured for these methods and compared with a defined percussive-tool method under equivalent conditions. Practical parameters include defined borehole diameters and grid spacing, staged pressurization, and alignment of splitting lines with reinforcement to avoid unintended load transfer.<\/p>\n<h3>Cutting reinforcement and built-in components<\/h3>\n<p>Once reinforcement is exposed, steel shears or combination shears are used to cut rebar, sheet piles, or angle sections. Multi cutters support universal cutting of heterogeneous materials, for example in composite cross-sections with steel profiles. The result is a structured process: splitting or breaking the concrete, exposing the reinforcement, then cutting the steel. Where hot cutting is unavoidable, control measures for sparks, fume extraction, and fire watch complement the otherwise low-emission approach.<\/p>\n<h3>Power supply and mobility<\/h3>\n<p>Hydraulic power packs supply pulverizers, shears, and splitting cylinders with the required drive power. Compact <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> and modular hose systems allow access to hard-to-reach areas such as the undersides of superstructures, cantilevers, or the interiors of box sections. This facilitates the use on work platforms, suspended scaffolds, or during night closures. Hose management, coded quick couplings, and spill containment ensure safe operation and environmental protection even with extended hose lengths.<\/p>\n<h3>Dust, noise, and vibration management<\/h3>\n<p>Water spray systems, localized protective enclosures, and coordinated cutting\/splitting sequences minimize emissions. Low-vibration procedures protect sensitive installations, utility lines, and ongoing traffic beneath the structure. Coordinated construction logistics avoids bottlenecks in material flow and reduces idle time. Monitoring with threshold values for dust, noise, and vibration, together with controlled water runoff and sediment capture, closes the loop on compliance.<\/p>\n<h2>Tools and methods at a glance<\/h2>\n<p>The choice of method depends on cross-section, reinforcement density, accessibility, and permissible environmental impacts. The following tools and systems are commonly used in the context of superstructures:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: Crushing concrete components, exposing reinforcement, deconstruction of edge beams, parapet caps, and slab edges.<\/li>\n<li><strong>Hydraulic wedge splitters<\/strong>: Controlled, low-vibration splitting of massive cross-sections along pre-drilled grids; ideal under sensitive boundary conditions.<\/li>\n<li><strong>Rock wedge splitters<\/strong>: Precise initiation of separation cracks in thick components and natural stone masonry.<\/li>\n<li><strong>Concrete pulverizers and multi cutters<\/strong>: Secondary breakage and universal cutting of heterogeneous construction materials in composites.<\/li>\n<li><strong>Steel shears<\/strong>: Cutting reinforcement, structural steel sections, and plates in composite or steel superstructures.<\/li>\n<li><strong>Combination shears<\/strong>: Flexible switching between cutting and crushing, suitable for mixed deconstruction tasks.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Power supply for mobile and stationary tools, designed for continuous load, working pressure, and hose lengths.<\/li>\n<li><strong>Tank cutters<\/strong>: <em>Special application<\/em> for steel tank or pipe-bridge elements and for industrial superstructures with hollow bodies.<\/li>\n<\/ul>\n<h2>Fields of application: bridges, slabs, and frame structures<\/h2>\n<p>The superstructure is relevant in numerous application areas. In <strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/strong>, the focus is on replacing or dismantling slabs, parapet caps, cantilevers, and composite components. In <strong>strip-out and cutting<\/strong>, the emphasis is on openings, strengthening, and replacement of individual elements. In <strong>special applications<\/strong>, complex falsework, temporary bridges, or industrial pipe bridges with steel superstructures may be affected. In the context of <strong>rock excavation and tunnel construction<\/strong>, portal areas and bearing zones are often particularly sensitive, favoring low-vibration methods. Integral bridges and monolithic frame corners also benefit from controlled splitting and precise cutting to protect restraints and reduce secondary cracking.<\/p>\n<h3>Examples from practice<\/h3>\n<p>Typical tasks include dismantling edge beams and parapet caps under live traffic, splitting thick deck slabs prior to lifting with mobile cranes, selectively releasing composite joints between steel girders and the concrete slab, and replacing individual spans under auxiliary shoring. Methods using <strong>concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> support a controlled sequence, reduce residual damage, and facilitate disposal and recycling of separated fractions. Further examples include stepwise segmentation of launched or cantilevered spans to maintain stability and minimize disruption to traffic phases.<\/p>\n<h2>Planning and sequence of selective deconstruction<\/h2>\n<p>A systematic sequence reduces risks, costs, and construction time. A clear workflow from investigation to aftercare has proven effective:<\/p>\n<ol>\n<li>Condition analysis and structural assessment of the superstructure, including material properties and reinforcement layout.<\/li>\n<li>Definition of demolition limits, shoring, protective scaffolds, and traffic phases.<\/li>\n<li>Selection of methods (splitting, crushing, cutting) with consideration of noise control, dust suppression, and low vibration levels.<\/li>\n<li>Trial area or pilot axis to validate performance and optimize parameters.<\/li>\n<li>Serial deconstruction in defined segments, with ongoing monitoring of construction stages.<\/li>\n<li>Finishing works: edges, joints, composite interfaces; disposal and recycling of fractions.<\/li>\n<\/ol>\n<p>Comprehensive documentation, coordinated logistics, and proper sizing of hydraulic power packs and tools secure performance in step with crane and transport capacities. Clear responsibilities, permit lead times, and stakeholder communication plans stabilize the schedule and reduce interface risks.<\/p>\n<h2>Safety, environment, and permits<\/h2>\n<p>Safety takes precedence. Demolition and installation concepts consider fall protection at workplaces, load cases in temporary states, cutting and crushing hazards, and utility lines. Environmental aspects concern dust exposure, noise emission, low vibration levels, water protection, and handling of hazardous substances. Permits and coordination with authorities, checking engineers, and site supervision must be clarified depending on the context. The information in this article is general in nature and does not replace project-specific verifications. Particular care is required when handling prestressing systems, exclusion zones during tendon release, and water management for drilling and cutting slurry.<\/p>\n<h2>Avoiding common mistakes: practice-oriented guidance<\/h2>\n<ul>\n<li>Unidentified tendons or insufficiently exposed reinforcement lead to uncontrolled fracture patterns &#8211; careful investigation is essential.<\/li>\n<li>Inappropriate cutting sequences cause load redistribution &#8211; the demolition sequence must be structurally justified.<\/li>\n<li>Excessive impact energy causes secondary damage &#8211; <em>hydraulic wedge splitters<\/em> and <em>concrete pulverizers<\/em> can be considered where vibration and secondary damage are to be limited; any environmental comparison requires project-specific data.<\/li>\n<li>Underestimated emissions in urban environments &#8211; define water spray systems, protective enclosures, and the work schedule at an early stage.<\/li>\n<li>Incorrect connection of hydraulic power packs &#8211; match working pressure, flow rate, and hose line lengths to the tool.<\/li>\n<li>Insufficient protection of bearings and joints &#8211; install covers and drip trays to prevent debris ingress and contamination.<\/li>\n<li>Overlooking temporary torsional stiffness &#8211; verify bracing and edge restraint when segmenting asymmetrical cross-sections.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The term superstructure in construction refers to the primary and secondary load-bearing components of a structure located above the bearings and piers. Especially in bridge construction, it comprises the deck slab, main girders, cross girders, edge beams, parapet caps, as well as attached equipment. For planning, repair, and deconstruction, a <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/superstructure\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20227","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Superstructure in Bridge Construction<\/title>\n<meta name=\"description\" content=\"Bridge construction guide to superstructure design, damage assessment &amp; low-vibration deconstruction \u2713 safety tips.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/superstructure\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Superstructure in Bridge Construction\" \/>\n<meta property=\"og:description\" content=\"Bridge construction guide to superstructure design, damage assessment &amp; low-vibration deconstruction \u2713 safety tips.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/superstructure\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:39+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/superstructure\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/superstructure\",\"name\":\"Superstructure in Bridge Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-02-02T14:23:34+00:00\",\"dateModified\":\"2026-09-12T17:53:39+00:00\",\"description\":\"Bridge construction guide to superstructure design, damage assessment & low-vibration deconstruction \u2713 safety tips.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/superstructure#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/superstructure\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/superstructure#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Superstructure\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Superstructure in Bridge Construction","description":"Bridge construction guide to superstructure design, damage assessment & low-vibration deconstruction \u2713 safety tips.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/superstructure","og_locale":"en_US","og_type":"article","og_title":"Superstructure in Bridge Construction","og_description":"Bridge construction guide to superstructure design, damage assessment & low-vibration deconstruction \u2713 safety tips.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/superstructure","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:39+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/superstructure","url":"https:\/\/www.darda.de\/en\/knowledge\/superstructure","name":"Superstructure in Bridge Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-02-02T14:23:34+00:00","dateModified":"2026-09-12T17:53:39+00:00","description":"Bridge construction guide to superstructure design, damage assessment & low-vibration deconstruction \u2713 safety tips.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/superstructure#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/superstructure"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/superstructure#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Superstructure"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20227"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20227\/revisions"}],"predecessor-version":[{"id":29173,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20227\/revisions\/29173"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}