{"id":20222,"date":"2026-02-02T12:53:33","date_gmt":"2026-02-02T11:53:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20222"},"modified":"2026-06-22T13:21:02","modified_gmt":"2026-06-22T11:21:02","slug":"oil-separators","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators","title":{"rendered":"Oil separators"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Oil separators are a central element of water protection wherever work is carried out on a construction site, in yard depots, or during deconstruction with hydraulic equipment. When using concrete demolition shear, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Hydraulic Rock and Concrete Splitters<\/a>, Steel Shears, Multi Cutters, Tank Cutters, as well as associated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a>, leaks, maintenance operations, or cleaning of attachments can result in oil-bearing wastewater. A suitable oil separator separates such light liquids from water before it is routed into the local sewer system or to further treatment. This reduces the risk of contamination of soil, surface water, and groundwater and supports construction site safety. In coordinated site logistics, correctly sized and properly operated separators complement spill prevention measures and help maintain regulatory compliance during varying weather and loading conditions.<\/p>\n<h2>Definition: What is meant by an oil separator?<\/h2>\n<p>An oil separator (also light-liquid separator or coalescence separator) is a system that is based on the density difference between water and light liquids such as mineral oils, diesel, or lubricants. It collects and separates floating substances as well as settleable solids, often in combination with a preceding sludge trap. Coalescence elements enlarge the droplets so that oil settles more efficiently. Oil separators are built in different performance levels (e.g., separator class I\/II) and are used stationary in wash bays and yard depots as well as temporarily on the construction site and in special demolition. Depending on the jurisdiction, residual concentrations, discharge conditions, and monitoring requirements vary and must be addressed in planning and operation.<\/p>\n<h2>Function and design<\/h2>\n<p>Oil separators operate predominantly on physical principles. The wastewater flows calmly through the separator; lighter substances rise, heavy particles sink into the sludge trap. Coalescence inserts promote agglomeration of finely dispersed oil droplets. A sampling or inspection point enables visual checks. Optionally, a level indicator warns of overfilling. For reliable performance, sufficient hydraulic residence time, low turbulence, and avoidance of strong surfactant inputs are critical; temperature and viscosity also influence separation behavior.<\/p>\n<ul>\n<li><strong>Sludge trap:<\/strong> captures sediments and protects the separator from silting.<\/li>\n<li><strong>Separation chamber:<\/strong> tranquil flow zone in which light liquids float to the surface.<\/li>\n<li><strong>Coalescence insert:<\/strong> increases separation efficiency, especially with fine emulsions.<\/li>\n<li><strong>Retention and removal:<\/strong> the floating phase is collected and disposed of properly.<\/li>\n<li><strong>Inspection\/sampling chamber:<\/strong> for inspection, sampling, and maintenance.<\/li>\n<li><strong>Automatic shut-off device:<\/strong> closes the outlet when the oil layer reaches a defined thickness to prevent discharge of light liquids.<\/li>\n<li><strong>Ventilation and backwater protection:<\/strong> proper venting and protection against backflow stabilize flow conditions and enhance safety.<\/li>\n<\/ul>\n<h2>Application areas on construction sites and in deconstruction<\/h2>\n<p>Wherever hydraulic drives are operated, maintained, or cleaned, oil-bearing wastewater is possible. This applies to the deconstruction of concrete structures as well as to natural stone extraction and tunnel construction. Oil separators serve here as an interface between efficient construction logistics and environmental protection. Rain events, sump pump operation, and cleaning work can cause fluctuating inflows; buffer concepts and calm hydraulics support stable separation outcomes under these conditions.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>When using concrete demolition shear, Steel Shears, Multi Cutters, and Tank Cutters, oil-bearing drip water and cleaning volumes can potentially occur (e.g., after uncoupling, when changing hoses, in the event of hose defects). A wash or service area with oil separator and sludge trap receives flushing and cleaning water; sediments from concrete debris remain in the sludge trap, light liquids are retained in the separator. Coordination with equipment scheduling reduces peak loads and helps maintain consistent performance.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>In building gutting projects, attachments are cleaned regularly before they move to another area. A temporarily established, liquid-tight cleaning area with inflow to a mobile oil separator helps safely control leaks from Hydraulic Power Units and attachments. Clearly separated zones for clean and contaminated water reduce the risk of cross-contamination during relocation logistics.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel construction and underground tunneling, water that accrues is often collected and discharged. If lubricants from hydraulic hoses enter this water, an upstream oil separator may be necessary before discharge or further treatment. Adequate pre-treatment via a sludge trap is important to retain fine particles from drilling or blasting works. Where abrasive fines are persistent, staged settling or pre-screens can protect the coalescence insert from premature fouling.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>During the extraction and processing of natural stone, stone and concrete splitters as well as stone splitting cylinders are used. Maintenance and cleaning areas with oil separators reduce the risk of hydraulic oils entering rainwater drainage. Robust designs with generously sized sludge traps are advantageous, as abrasive fine dust is generated. Periodic checks of wear parts and targeted sweeping before washing further reduce sediment inputs.<\/p>\n<h3>Special deployments<\/h3>\n<p>For deployments with the <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a> or when working in sensitive areas (e.g., near water bodies), restrained, safe water routing is crucial. Temporary containment surfaces, pumping systems, and mobile oil separators form a coordinated chain to retain light liquids in a controlled manner. Additional barriers, such as temporary berms or absorbent socks outside the work area, can provide a secondary safeguard.<\/p>\n<h2>Sizing and selection criteria<\/h2>\n<p>The selection of an oil separator depends on the type and quantity of water, the light liquids to be expected, and local conditions. The goal is stable separation even when peak loads occur. Where inflow characteristics are highly variable, buffer tanks and controlled feed pumps can improve hydraulic conditions for the separator.<\/p>\n<ul>\n<li><strong>Wastewater volume:<\/strong> design based on peak inflow (e.g., wash bay, rain inflow, sump pumps).<\/li>\n<li><strong>Pre-dimensioning of the sludge trap:<\/strong> sufficient volume to bind sediments from concrete and rock abrasion.<\/li>\n<li><strong>Separation efficiency:<\/strong> coalescence technology (Class I) for fine droplets; with coarse loading, Class II can sometimes suffice with a preceding sludge trap.<\/li>\n<li><strong>Chemical resistance:<\/strong> materials and seals suitable for mineral oils, temperatures, and outdoor conditions.<\/li>\n<li><strong>Stationary or mobile:<\/strong> mobile, transportable systems are suitable for construction sites; stationary systems with permanent connection are preferred in yard depots.<\/li>\n<li><strong>Maintenance accessibility:<\/strong> good access to coalescence insert, sludge trap, and removal openings.<\/li>\n<li><strong>Discharge conditions:<\/strong> align design with applicable discharge permits, local limits, and monitoring requirements.<\/li>\n<li><strong>Hydraulic pattern:<\/strong> account for peak-to-average ratios; provide buffering where shock loads are expected.<\/li>\n<li><strong>Cleaning agents and emulsions:<\/strong> minimize surfactants; verify that selected technology handles anticipated emulsification tendencies.<\/li>\n<\/ul>\n<p><em>Note:<\/em> For concrete design, local requirements and recognized rules of the art must be taken into account; requirements can vary by location. Early coordination with the authority responsible for water protection helps ensure that selection, installation, and monitoring align with site-specific conditions.<\/p>\n<h2>Operation, inspection, and maintenance<\/h2>\n<p>An oil separator operates reliably when the system is used properly and inspected regularly. This includes visual inspections, measuring the separated oil and sludge quantities, and timely emptying by a certified disposal company. Coalescence elements are cleaned or replaced when separation efficiency declines. Optional warning devices support operational monitoring. Training of the operating team in sampling technique, documentation, and emergency response raises operational reliability.<\/p>\n<ol>\n<li>Keep the inlet calm; avoid shock loads.<\/li>\n<li>Remove solids from the sludge trap regularly.<\/li>\n<li>Collect the floating phase in suitable containers and dispose of it properly.<\/li>\n<li>Clean coalescence inserts and verify function.<\/li>\n<li>Document results and adjust intervals to loading.<\/li>\n<\/ol>\n<p>Information on inspection intervals, leakage test requirements, and documentation obligations depends on location and applicable rules and should be coordinated in advance with the competent authorities. Typical warning signs of malfunction include persistent surface sheen downstream of the sampling point, rapid clogging of the coalescence insert, or recurring high oil layer alarms after short operating periods.<\/p>\n<h2>Special technical aspects for hydraulic attachments<\/h2>\n<p>Hydraulic Power Units and attachments such as concrete demolition shear, rock and concrete splitters, Multi Cutters, or Steel Shears operate with pressure oil. In practice, a combination of prevention and separation has proven effective for reliably retaining light liquids.<\/p>\n<ul>\n<li><strong>Liquid-tight service areas:<\/strong> perform maintenance, lubrication, and cleaning only on areas connected to a sludge trap and oil separator.<\/li>\n<li><strong>Leakage prevention:<\/strong> check hoses and couplings regularly; use protective caps to minimize residual oil when uncoupling.<\/li>\n<li><strong>Cleaning in moderation:<\/strong> use the high-pressure washer only as intensively as necessary to avoid emulsification; first wipe mechanically, then rinse with water.<\/li>\n<li><strong>Immediate measures:<\/strong> secure drip points immediately with absorbents; dispose of absorbents properly and do not introduce them via the separator.<\/li>\n<li><strong>Media selection:<\/strong> use hydraulic oils according to the equipment manufacturer\u2019s specifications; for rapidly biodegradable oils, consider their behavior in the separator.<\/li>\n<li><strong>Connection management:<\/strong> provide drip trays beneath quick couplings and store hoses to prevent residual oil release when components are disconnected.<\/li>\n<li><strong>Spare parts readiness:<\/strong> keep critical seals and hoses available to reduce downtime and prevent improvised repairs that may increase leakage risk.<\/li>\n<\/ul>\n<h2>Temporary and mobile oil separators<\/h2>\n<p>On changing construction sites or in special demolition, mobile oil separators are useful. They can be operated as compact units with a sludge trap and supplied by pump or gravity. A stable setup, frost-proof routing of lines, and a clear separation between clean and contaminated water are important. Where relocation is frequent, modular hose sets and quick-fit connections accelerate setup while maintaining tightness.<\/p>\n<ul>\n<li><strong>Setup:<\/strong> catch pan or area, preliminary screening\/sludge trap, coalescence separator, control point.<\/li>\n<li><strong>Proximity to hydraulics:<\/strong> locate near maintenance zones for concrete demolition shear and rock and concrete splitters to keep distances short.<\/li>\n<li><strong>Load management:<\/strong> provide intermediate storage (buffer tanks) for high peak inflows.<\/li>\n<li><strong>Weather and winterization:<\/strong> protect equipment from freezing and heavy rain; ensure safe access even in adverse conditions.<\/li>\n<li><strong>Power and control:<\/strong> verify energy supply for pumps and alarms; test function after each relocation.<\/li>\n<\/ul>\n<h2>Downstream treatment and disposal<\/h2>\n<p>The separated light liquids and sludges must be collected separately and sent for appropriate disposal. Specialist contractors handle transport and treatment. Depending on the location, further steps may be provided for the pretreated water, such as discharge into the local sewer system after approval or additional filtration. The specific requirements are governed by local regulations. Chain-of-custody documentation and volume records for sludge and oil fractions support verifiable compliance and optimize service intervals.<\/p>\n<h2>Planning and integration into the construction process<\/h2>\n<p>Early planning facilitates safe operation of an oil separator. This includes a logistically favorable location, sufficient access for disposal vehicles, frost-proof installation, protection against mechanical damage, and clearly marked water routing. In work planning, maintenance windows and disposal intervals are taken into account so that the separator remains fully functional at all times. Coordination with adjacent trades ensures that inflow sources and cleaning activities are harmonized with separator capacity.<\/p>\n<h3>Interfaces to products and areas of application<\/h3>\n<p>Whether in concrete demolition with concrete demolition shear, in deconstruction with Steel Shears and Multi Cutters, in rock excavation with rock and concrete splitters, or in special deployments with Tank Cutters: oil separators provide the technical basis for safe treatment of cleaning and surface water. This allows demanding tasks in deconstruction, building gutting, tunnel construction, and natural stone extraction to be combined with a high level of environmental protection. Clearly defined responsibilities for setup, inspection, and disposal across teams close the loop between equipment use, water protection, and documentation.<\/p>\n<h3>Risk management and emergency preparedness<\/h3>\n<ul>\n<li><strong>Scenario analysis:<\/strong> identify potential oil release points and define containment measures.<\/li>\n<li><strong>Response equipment:<\/strong> keep absorbents, drain covers, and spill kits ready near work zones.<\/li>\n<li><strong>Alarm and escalation:<\/strong> establish contact paths to site management and authorities; document incidents promptly.<\/li>\n<li><strong>Post-incident review:<\/strong> analyze root causes and adapt maintenance and cleaning routines accordingly.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Oil separators are a central element of water protection wherever work is carried out on a construction site, in yard depots, or during deconstruction with hydraulic equipment. When using concrete demolition shear, Hydraulic Rock and Concrete Splitters, Steel Shears, Multi Cutters, Tank Cutters, as well as associated Hydraulic Power Units, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/oil-separators\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20222","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Oil Separators for Construction &amp; Water Treatment<\/title>\n<meta name=\"description\" content=\"Protect water on site with oil separators for construction &amp; demolition \u2713 Coalescing tech to stop oils and sludge.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/oil-separators\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Oil Separators for Construction &amp; Water Treatment\" \/>\n<meta property=\"og:description\" content=\"Protect water on site with oil separators for construction &amp; demolition \u2713 Coalescing tech to stop oils and sludge.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/oil-separators\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-22T11:21:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/oil-separators\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/oil-separators\",\"name\":\"Oil Separators for Construction & Water Treatment\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-02-02T11:53:33+00:00\",\"dateModified\":\"2026-06-22T11:21:02+00:00\",\"description\":\"Protect water on site with oil separators for construction & demolition \u2713 Coalescing tech to stop oils and sludge.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/oil-separators#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/oil-separators\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/oil-separators#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Oil separators\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Oil Separators for Construction & Water Treatment","description":"Protect water on site with oil separators for construction & demolition \u2713 Coalescing tech to stop oils and sludge.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators","og_locale":"en_US","og_type":"article","og_title":"Oil Separators for Construction & Water Treatment","og_description":"Protect water on site with oil separators for construction & demolition \u2713 Coalescing tech to stop oils and sludge.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-22T11:21:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators","url":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators","name":"Oil Separators for Construction & Water Treatment","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-02-02T11:53:33+00:00","dateModified":"2026-06-22T11:21:02+00:00","description":"Protect water on site with oil separators for construction & demolition \u2713 Coalescing tech to stop oils and sludge.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/oil-separators"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/oil-separators#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Oil separators"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20222","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20222"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20222\/revisions"}],"predecessor-version":[{"id":28545,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20222\/revisions\/28545"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20222"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}