{"id":20214,"date":"2026-01-31T12:52:19","date_gmt":"2026-01-31T11:52:19","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20214"},"modified":"2026-06-20T13:12:03","modified_gmt":"2026-06-20T11:12:03","slug":"brick-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition","title":{"rendered":"Brick demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Brick demolition describes the orderly deconstruction of masonry made of fired bricks &#8211; from the careful dismantling of individual wall areas to the complete removal of large wall surfaces. In existing buildings, in special demolition and during strip-out, low-dust and low-vibration methods are required to protect adjacent components and maintain ongoing use. For this purpose, handheld and hydraulic tools are used in practice that enable precise cutting, breaking, and controlled releasing of masonry. At interfaces to concrete, such as ring beams, lintels, or reinforced concrete additions, <strong>concrete demolition shears<\/strong> are often used; for low-vibration measures, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\"><strong>hydraulic rock and concrete splitters<\/strong><\/a> driven by hydraulic power packs are also suitable. Brick demolition is typical in refurbishment, conversion, and partial deconstruction where selective, single-grade removal and protection of neighboring structures are paramount.<\/p>\n<h2>Definition: What is meant by brick demolition?<\/h2>\n<p>Brick demolition is understood as the structured releasing, cutting, and removal of brick masonry, including mortar joints, connections, and embedded parts. The spectrum ranges from selective removal of individual brick courses to the systematic bringing down of entire walls. Brick demolition differs from concrete demolition in that the matrix consists of individual bricks and joints; this opens up different points of attack and tools. The goal is usually material-separated recovery of construction materials, low-hazard execution, and the preservation of the structural stability of adjacent components. Depending on the objective &#8211; such as partial deconstruction, creating openings, or structural strengthening &#8211; different methods and tool concepts from the areas of <em>strip-out and cutting<\/em>, <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\"><em>concrete demolition and deconstruction<\/em><\/a>, and <em>special applications<\/em> are used. In practice, the brittle brick units and comparatively weaker mortar joints govern the choice of method, bite sequence, and the level of pre-cutting.<\/p>\n<h2>Methods and tools in brick demolition<\/h2>\n<p>Due to its layered structure, brick masonry can be released both mechanically and hydraulically. A typical approach combines separation cuts, targeted detachment of brick rows, sectional downsizing, and material-pure removal. Several tool groups have proven themselves for combining low emissions with high control:<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong>: for nibbling masonry, separating lintels, exposing ring beams, and downsizing composite concrete-and-masonry sections. Particularly suitable for mixed construction and precise interventions in existing structures.<\/li>\n<li><strong>Stone and concrete splitters<\/strong> as well as <em>stone splitting cylinders<\/em>: for low-vibration splitting along prepared drilling lines; useful for thick walls, sensitive neighboring structures, or heritage contexts.<\/li>\n<li><em>Hydraulic power packs<\/em>: as the energy source for shears, splitters, combination shears, and other hydraulic tools; enable compact, quiet, and low-emission applications inside buildings.<\/li>\n<li><em>Combi shears<\/em> and <em>multi cutters<\/em>: versatile for cutting masonry remnants, metal profiles, door frames, anchors, and installations during strip-out.<\/li>\n<li><em>Steel shears<\/em>: for cleanly cutting wall anchors, tie rods, bracing, or reinforcement integrated into masonry.<\/li>\n<li><em>Cutting torch<\/em>: rare in brick demolition, but relevant in industrial deconstruction with tanks or pipelines integrated into masonry spaces (special applications).<\/li>\n<\/ul>\n<p>The choice of method depends on wall thickness, brick type (solid brick, vertically perforated brick, clinker), mortar type (lime, cement, or mixed mortar), embedded parts, accessibility, and requirements for dust, noise, and vibration control. Additional selection criteria include required tolerances at edges, target recycling grade, and constraints from heritage protection and fire safety.<\/p>\n<h2>Planning and survey before deconstruction<\/h2>\n<p>Sound planning minimizes risks and increases execution quality. A structured site\/building survey and assessment of possible interactions are essential. Early coordination of access routes, load-bearing temporary works, and disposal logistics supports uninterrupted progress.<\/p>\n<h3>Material analysis and building structure<\/h3>\n<ul>\n<li>Identification of brick types, mortar qualities, and any concrete elements (lintels, ring beams, bracing).<\/li>\n<li>Localization of concealed embedded parts: lines, anchors, reinforcement, steel sections, timber inserts.<\/li>\n<li>Assessment of the structural stability of adjacent components; definition of shoring and safety measures.<\/li>\n<li>Moisture mapping and salt content assessment where relevant to tool performance and emissions.<\/li>\n<li>Verification of wall thicknesses, composite zones, and existing damages or prior interventions.<\/li>\n<\/ul>\n<h3>Occupational and environmental protection<\/h3>\n<ul>\n<li>Dust reduction through wet cutting, localized misting, or extraction; protection against quartz-containing fine dust.<\/li>\n<li>Noise reduction through tool selection, damping, and timing.<\/li>\n<li>Vibration control, especially for sensitive neighboring buildings or delicate installations.<\/li>\n<li>Handling of potentially hazardous coatings or plasters; selection of suitable removal and packaging procedures.<\/li>\n<li>Management of cutting slurry and wash water to avoid uncontrolled discharge.<\/li>\n<\/ul>\n<h3>Permits and boundary conditions<\/h3>\n<p>Depending on location, scope, and building condition, notifications, coordination, and protective measures may be required. The applicable local regulations, standards, and authority requirements are decisive; assessment is fundamentally project-specific and non-binding. Heritage approvals, noise restrictions, and traffic management plans may dictate sequence and working hours.<\/p>\n<h2>Sequence and order in brick demolition<\/h2>\n<ol>\n<li>Strip-out: removal of non-load-bearing installations, finishes, and utilities (e.g., with multi cutters and combi shears).<\/li>\n<li>Separation cuts: creation of defined separation joints and openings; exposing connection points and embedded parts.<\/li>\n<li>Taking down: controlled releasing of brick courses; where necessary, apply <strong>concrete demolition shears<\/strong> locally or split with <strong>stone and concrete splitters<\/strong>.<\/li>\n<li>Downsizing and material-separated removal: separate masonry, cut embedded parts with steel shears, and prepare for transport.<\/li>\n<li>Follow-up work: smooth edges, clean bed joints, and prepare substrates for subsequent trades.<\/li>\n<\/ol>\n<p>Protective sheeting, chutes, and interim supports are set before separation cuts to avoid uncontrolled detachment. Acceptance checkpoints after each phase improve quality and safety.<\/p>\n<h2>Separation and splitting techniques on masonry<\/h2>\n<h3>Mechanical releasing via joints<\/h3>\n<p>The natural weakness of masonry lies in the bed and head joints. By working at the joints, brick courses can be efficiently released. Slightly vibrating methods reduce damage to neighboring components. Pre-scoring along intended lines with shallow cuts increases accuracy and reduces breakout.<\/p>\n<h3>Hydraulic splitting<\/h3>\n<p>For thick walls, vaults, or sensitive environments, hydraulic splitting is advantageous. Procedure:<\/p>\n<ul>\n<li>Define the drilling pattern (spacing, depth, axis).<\/li>\n<li>Insert stone splitting cylinders and build up pressure in a controlled manner.<\/li>\n<li>Track crack initiation and release the section.<\/li>\n<\/ul>\n<p>This method is low-vibration and produces little dust; it is particularly suitable in <em>special demolition<\/em> and for <em>special applications<\/em> in confined spaces. Sequenced pressurization and visual control limit overbreak and protect adjacent finishes.<\/p>\n<h3>Downsizing and nibbling<\/h3>\n<p><strong>Concrete demolition shears<\/strong> enable precise nibbling of masonry, exposing concrete lintels, and separating ring beams. In mixed constructions with masonry and concrete, this is a key method because the shear can both crush masonry and expose reinforcement. Optimized bite size and controlled rotation improve accuracy at edges and corners.<\/p>\n<h2>Tool systems and power supply<\/h2>\n<p>Hydraulic tools unfold their potential in combination with suitable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\"><em>compact hydraulic power units<\/em><\/a>. For interior demolition and strip-out, compact units with low noise levels are advantageous. The routing of hoses\/lines must be planned to avoid tripping hazards and maintain operator reach.<\/p>\n<p>Key parameters are available pressure and flow rate, tool compatibility, and cooling in continuous operation. Quick-connect couplings, protective hose sleeves, and drip trays enhance safety and cleanliness, especially in finished interiors.<\/p>\n<h3>Combinations in practice<\/h3>\n<ul>\n<li><strong>Concrete demolition shears<\/strong> at wall openings: notching reveals, adjusting opening sizes, removing breakouts without removing large areas.<\/li>\n<li><strong>Stone and concrete splitters<\/strong> on vaults: splitting along defined axes to protect heritage-worthy areas.<\/li>\n<li><em>Combi shears<\/em> and <em>steel shears<\/em> when exposing steel anchors and tie rods in masonry.<\/li>\n<li>Hydraulic shears with pre-drilled relief holes at stress concentrations to prevent uncontrolled cracking.<\/li>\n<\/ul>\n<h2>Particularities in mixed constructions<\/h2>\n<p>Many existing buildings combine brick masonry with concrete components, steel sections, or timber. Typical nodes are masonry-reinforced concrete connections at slab bearings, ring beams, and lintels. Here, <strong>concrete demolition shears<\/strong> are effective for selectively removing masonry zones and for exposing and downsizing concrete edges. Metallic inserts are then cut with <em>steel shears<\/em>. Differences in stiffness and bonding require staged detachment to avoid spalling and to preserve load paths.<\/p>\n<h3>Ring beams and lintels<\/h3>\n<p>Concrete ring beams often require a methodical separation: first remove masonry, then downsize the concrete with the shear and cut reinforcement. This sequence limits uncontrolled cracking and facilitates load transfer via temporary shoring. Where necessary, local pre-cutting and incremental load release reduce edge damage at supports and bearings.<\/p>\n<h2>Emissions control: dust, noise, vibrations<\/h2>\n<ul>\n<li>Dust: wet cutting, localized wetting, shielded work areas, and suitable extraction are key measures. Fine brick dust is relevant to health.<\/li>\n<li>Noise: hydraulic tools and orderly removal sequences reduce peak levels; working hours and shielding must be considered.<\/li>\n<li>Vibrations: hydraulic splitting and shear work generate lower vibrations than impact-intensive methods and are therefore suitable near sensitive neighboring structures.<\/li>\n<li>Water and slurry: collect, filter, and dispose of according to local requirements; avoid infiltration into building fabric.<\/li>\n<\/ul>\n<h2>Recycling and material flow management<\/h2>\n<p>The aim of brick demolition is clean separation by material. Whole bricks can be reused depending on condition; broken portions serve as recycled aggregate in base layers or as aggregate in suitable applications. Mortar adhesion, plaster, and attachments should be minimized. Metallic inserts are handled separately. Early clarification of recycling routes and acceptance criteria improves recovery rates and reduces disposal costs.<\/p>\n<h3>Logistics and processing<\/h3>\n<ul>\n<li>Separate containers for brick, concrete, metal, and mixed fractions.<\/li>\n<li>On-site crushing to a transport- and recycling-suitable particle size.<\/li>\n<li>Documentation of material flows and records according to local requirements.<\/li>\n<li>Short transport routes and staged container swaps to prevent mixing and downtime.<\/li>\n<\/ul>\n<h2>Applications overview<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: brick demolition in combination with concrete elements; precise downsizing with <strong>concrete demolition shears<\/strong> and controlled splitting with <strong>stone and concrete splitters<\/strong>.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: selective removal of interior walls, creation of openings, separation of installations with <em>combi shears<\/em> and <em>multi cutters<\/em>.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: hydraulic splitting methods from rock engineering can be transferred to massive masonry, especially where low-vibration performance is required.<\/li>\n<li><strong>Natural stone extraction<\/strong>: know-how from stone splitting informs linear separation of masonry using <em>stone splitting cylinders<\/em>.<\/li>\n<li><strong>Special applications<\/strong>: confined, poorly ventilated areas, highly sensitive environments, industrial plants with masonry integrations; in exceptional cases, cutting tanks using a <em>cutting torch<\/em> after clearance measurements and with suitable protection.<\/li>\n<\/ul>\n<h2>Quality criteria and documentation<\/h2>\n<p>The quality of brick demolition is measured by dimensional accuracy, protection of adjacent components, low emissions, and recycling rate. Defined inspection and acceptance points &#8211; e.g., for separation cuts, shoring, and clean material separation &#8211; support target achievement. Accompanying photo documentation, measurement logs (e.g., dust or vibration monitoring), and quantity records ensure transparency.<\/p>\n<ul>\n<li><strong>Accuracy<\/strong>: compliance with opening dimensions and tolerances at edges and reveals.<\/li>\n<li><strong>Edge quality<\/strong>: limited spalling, clean joint surfaces, and readiness for subsequent trades.<\/li>\n<li><strong>Emission control<\/strong>: verification of dust suppression and vibration limits according to the project specification.<\/li>\n<li><strong>Recovery<\/strong>: documented separation rates and routing to certified recycling or reuse.<\/li>\n<\/ul>\n<h2>Typical challenges and solution approaches<\/h2>\n<h3>Old voids and cavities<\/h3>\n<p>Concealed cavities, chases, and niches in brick walls can alter load distribution. A step-by-step removal sequence and temporary shoring prevent uncontrolled failure. Pre-drilling and endoscopic inspection provide indications of cavities. Where needed, infill or bridging before separation stabilizes the work area.<\/p>\n<h3>Hard mortars, softer bricks<\/h3>\n<p>Combinations of hard cement mortars and softer bricks make manual releasing more difficult. Here, <strong>concrete demolition shears<\/strong> and hydraulic splitting are advantageous for targeted separation along the mortar line or through the brick. Local pre-wetting and shallow pre-cuts help control breakout and reduce dust.<\/p>\n<h3>Damp masonry<\/h3>\n<p>Moisture affects stability and tool performance. An adapted cutting sequence and emission protection (slurry) must be planned. Additional drying time or protective sealing of adjacent finishes can be required in sensitive interiors.<\/p>\n<h2>Interfaces to subsequent trades<\/h2>\n<p>Brick demolition often prepares openings, connections, and bearings for new components. Dimensional accuracy and edge quality influence subsequent trades such as masonry and concrete works, steel construction, and fit-out. Smooth cut edges and cleanly cleaned joint surfaces facilitate load-bearing connections. Tolerance management and documented handover conditions reduce rework and interface risks.<\/p>\n<h2>Occupational safety and general caution<\/h2>\n<ul>\n<li>Risk assessment and instruction; appropriate PPE including eye, respiratory, and hearing protection.<\/li>\n<li>Shore and secure before starting separation cuts; controlled load redistribution.<\/li>\n<li>Utility isolation and clearance measurements, especially in industrial deconstruction.<\/li>\n<li>Tool-specific operation: hydraulic pressure, cutting and splitting forces within permissible range, stable positioning.<\/li>\n<li>Exposure management: hand-arm vibration, silica dust compliance, and hot works permits where applicable.<\/li>\n<\/ul>\n<p>Compliance with local regulations and codes is fundamental; project-specific requirements must be coordinated with the stakeholders. The information provided is general in nature and does not replace individual planning.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Brick demolition describes the orderly deconstruction of masonry made of fired bricks &#8211; from the careful dismantling of individual wall areas to the complete removal of large wall surfaces. In existing buildings, in special demolition and during strip-out, low-dust and low-vibration methods are required to protect adjacent components and maintain <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20214","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Brick Demolition - Masonry Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Guide to brick demolition in masonry \u2713 methods, low dust &amp; vibration, controlled openings, precise hydraulic tools.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Brick Demolition - Masonry Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Guide to brick demolition in masonry \u2713 methods, low dust &amp; vibration, controlled openings, precise hydraulic tools.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-20T11:12:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/brick-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/brick-demolition\",\"name\":\"Brick Demolition - Masonry Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-31T11:52:19+00:00\",\"dateModified\":\"2026-06-20T11:12:03+00:00\",\"description\":\"Guide to brick demolition in masonry \u2713 methods, low dust & vibration, controlled openings, precise hydraulic tools.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/brick-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/brick-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/brick-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Brick demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Brick Demolition - Masonry Methods & Tools","description":"Guide to brick demolition in masonry \u2713 methods, low dust & vibration, controlled openings, precise hydraulic tools.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition","og_locale":"en_US","og_type":"article","og_title":"Brick Demolition - Masonry Methods & Tools","og_description":"Guide to brick demolition in masonry \u2713 methods, low dust & vibration, controlled openings, precise hydraulic tools.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-20T11:12:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition","name":"Brick Demolition - Masonry Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-31T11:52:19+00:00","dateModified":"2026-06-20T11:12:03+00:00","description":"Guide to brick demolition in masonry \u2713 methods, low dust & vibration, controlled openings, precise hydraulic tools.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/brick-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/brick-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Brick demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20214","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20214"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20214\/revisions"}],"predecessor-version":[{"id":28513,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20214\/revisions\/28513"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20214"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}