{"id":20203,"date":"2026-01-30T16:12:02","date_gmt":"2026-01-30T15:12:02","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20203"},"modified":"2026-06-20T11:48:03","modified_gmt":"2026-06-20T09:48:03","slug":"tenon-joint","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint","title":{"rendered":"Tenon joint"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The tenon joint is among the oldest interlocking connection types in construction. It appears in traditional timber construction as well as in historic natural-stone masonry and in structural connections in which a <em>tenon<\/em> engages a corresponding <em>mortise<\/em> or slot. For deconstruction, building gutting and the exposure of such joints, controlled, low-vibration working methods are essential. In practice, concrete pulverizers as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> are frequently used which &#8211; combined with additional hydraulic tools from Darda GmbH &#8211; enable gentle work on and around tenon joints. This approach reduces shock loads, limits microcracking in adjacent materials, and supports conservation aims where historic fabric must be preserved.<\/p>\n<h2>Definition: What is meant by a tenon joint?<\/h2>\n<p>A tenon joint is a <strong>form-fit (interlocking) connection<\/strong> between two components in which a projecting member end (the tenon) is inserted into a corresponding negative shape (slot or mortise) of a second component. Force transfer occurs via bearing pressure, shear, and &#8211; depending on the configuration &#8211; additionally by friction. The joint shoulders provide positional restraint, limit rotation, and spread contact stresses into the counterpart. In practice, three material worlds are especially relevant:<\/p>\n<ul>\n<li>Timber construction: mortise-and-tenon, double tenon, round tenon, and modified forms for frames, rails, posts, and wall plates.<\/li>\n<li>Natural stone: mortises with metal tenons or mineral grouts, e.g., on cornices, balusters, portals, and fa\u00e7ade elements.<\/li>\n<li>Hybrid constructions: timber or natural-stone elements in combination with masonry or concrete, often with embedded metal tenons or dowels.<\/li>\n<\/ul>\n<p><strong>Terminology<\/strong>: mortise-and-tenon joints are sometimes referred to as interlocking or tongue-and-slot connections. In engineering documentation, the tenon is the positive part, the mortise the negative counterpart.<\/p>\n<h2>Structure, types, and functional principle of the tenon joint<\/h2>\n<p>Tenon joints consist of the tenon itself, the associated slot or mortise, and the <em>shoulders<\/em> that define the bearing faces and introduce loads into the counterpart. Depending on the geometry, forces are transferred primarily as shear in the tenon cross-section or as bearing pressure at the mantle surface. Fit and moisture behavior govern serviceability and durability, especially where seasonal movement or temperature gradients occur.<\/p>\n<h3>Geometry and tolerances<\/h3>\n<p>Key parameters include tenon length, tenon width and thickness, and the shoulder configuration. In timber, fiber orientation and moisture content influence load-bearing behavior. In natural stone, compressive strength, anisotropy, and the execution of the mortise (straight, tapered, with grout) determine durability. <strong>Fits<\/strong> range from light clearance for assembly to interference fits; in historic natural-stone tenons, lead or mortar grouts are common. Allowances should support safe assembly while limiting racking, and bearing faces should be flat, clean, and well aligned to avoid stress peaks.<\/p>\n<h3>Variants in timber construction<\/h3>\n<ul>\n<li>Mortise-and-tenon with single or double shoulder for frame and corner joints.<\/li>\n<li>Double tenons to increase shear area for higher loads.<\/li>\n<li>Round tenons (dowel tenons) for faster production and concealed connections.<\/li>\n<li>Oblique or wedged tenons where forces are introduced at an angle.<\/li>\n<\/ul>\n<p><strong>Execution hints<\/strong>: through-tenons allow visual inspection and mechanical wedging, while blind tenons conceal the joint. Pegging or wedges can provide additional locking and compensate for shrinkage.<\/p>\n<h3>Variants in natural-stone construction<\/h3>\n<ul>\n<li>Straight mortises with metal tenons and mineral grout to fix cornice stones.<\/li>\n<li>Tapered tenons with lift-off protection, often on balusters and pier heads.<\/li>\n<li>Combinations of tenons and clamps to prevent overturning and sliding.<\/li>\n<\/ul>\n<p>In exposed environments, corrosion protection and the isolation of dissimilar materials reduce the risk of rust jacking and cracking around mortises.<\/p>\n<h2>Load-bearing behavior, forces, and design notes<\/h2>\n<p>Tenon joints transfer loads through interlock; decisive are shear in the tenon, bearing pressure in the contact surfaces and &#8211; in timber &#8211; interaction with the fiber direction. Typical actions:<\/p>\n<ul>\n<li>Tension parallel to the tenon (withdrawal, shoulder tear-off).<\/li>\n<li>Shear transverse to the tenon (shear-off, cracking in mortise walls).<\/li>\n<li>Bending and overturning in cantilevering members.<\/li>\n<li>Settlement and relaxation in grout solutions in natural stone.<\/li>\n<\/ul>\n<p>For interventions and deconstruction, understanding the load path is crucial: temporary shoring reduces shear and bending actions before tenon joints are exposed or released. Normative details and verifications vary by country and code; for historic structures, assessments are usually object-specific and cautious.<\/p>\n<ul>\n<li><strong>Design notes<\/strong>: maintain sufficient edge distances and shoulder widths, ensure moisture management to limit swelling or shrinkage, and separate reactive metals from mineral substrates to avoid corrosion products expanding in the mortise.<\/li>\n<li><strong>Serviceability<\/strong>: consider creep and cyclic actions that can loosen fits over time; where relevant, plan for inspection access or reversible fixes.<\/li>\n<\/ul>\n<h2>Tenon joints in deconstruction, gutting, and special demolition<\/h2>\n<p>In selective deconstruction, tenon joints must either be preserved or released in a controlled manner. Low-vibration procedures protect adjacent materials and minimize the risk of damage to concealed mortises. Impact-intensive tools are typically avoided to prevent hidden cracking and loss of substance in sensitive components.<\/p>\n<h3>Selective deconstruction in hybrid constructions<\/h3>\n<p>In buildings with timber frames on masonry or concrete, tenons and mortises are often hidden. <strong>Concrete pulverizers<\/strong> are suitable for locally removing concrete cover and exposing tenon areas. <strong>Stone and concrete splitters<\/strong> create defined crack paths in concrete or natural stone without introducing impact blows. In this way, joints can be made visible and unloaded before metal tenons are cut or timber tenons are withdrawn. Protective measures such as dust extraction, local shielding, and temporary weather protection help maintain surrounding finishes.<\/p>\n<h3>Exposing and releasing natural-stone tenons<\/h3>\n<p>On fa\u00e7ades, parapets, and cornices, metal tenons secure individual stones. For releasing them:<\/p>\n<ul>\n<li>Expose the grout zone with concrete pulverizers or gentle chiseling at low energy density.<\/li>\n<li>Drill short splitting holes and use splitting cylinders to steer cracks away from the mortise.<\/li>\n<li>After exposure, release the tenons in a controlled manner; corroded metal parts can be cut with combination shears, multi cutters, or steel shears.<\/li>\n<li>Provide support and fall protection for elements being released to avoid unintended displacement or edge spalling.<\/li>\n<\/ul>\n<h3>Decoupling metallic tenons and bolts<\/h3>\n<p>In some constructions, tenons are functionally close to bolt or dowel connections. After exposure, metal tenons &#8211; depending on cross-section &#8211; can be cut with <em>steel shears<\/em> or <em>multi cutters<\/em>. In special applications, additional separation methods can be considered; selection depends on material, accessibility, and safety requirements. Permits for hot work and measures against flying sparks or chips may be required depending on the environment.<\/p>\n<h2>Tools and methods in the context of the tenon joint<\/h2>\n<p>Hydraulic tools from Darda GmbH support precise work on and around tenon joints. Selection depends on the component, material, and objective (preservation or separation):<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: Local removal of concrete to reveal concealed mortises and to reduce edge stresses.<\/li>\n<li><strong>Stone and concrete splitters<\/strong>: Creation of controlled split joints in concrete, masonry, and natural stone to relieve tenon areas.<\/li>\n<li><strong>Stone splitting cylinders<\/strong>: Point-specific splitting of natural-stone blocks, e.g., when removing elements secured by tenons.<\/li>\n<li><strong>Combination shears<\/strong> and <strong>multi cutters<\/strong>: Cutting metal tenons, clamps, and stirrups after exposure.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a><\/strong>: Cutting high-strength metal tenons or reinforcement connections along a defined cut line.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a><\/strong>: Provision of pressure and flow; fine performance control supports low-vibration work, especially in heritage-relevant areas.<\/li>\n<li><strong>Tank cutters<\/strong>: Special tool for special missions where tenon or bolt connections on vessels or thick plates must be released.<\/li>\n<\/ul>\n<p><strong>Selection criteria<\/strong>: required cutting or splitting force, jaw opening or cylinder stroke, tool weight and reach, available power supply, and the permissible vibration level in the structure. Access geometry and disposal logistics for separated parts complete the planning picture.<\/p>\n<h2>Practical guide: from investigation to execution<\/h2>\n<ol>\n<li><strong>Survey<\/strong>: Locate the position of tenons and mortises (trial openings, endoscopy, low-damage methods). Document material condition (corrosion, cracks, moisture). Where possible, corroborate findings with historical plans or prior interventions.<\/li>\n<li><strong>Temporary stabilization<\/strong>: Install shoring and load rerouting to remove shear and bending actions from the joint areas. Define load cases for interim states and verify bearing of temporary supports.<\/li>\n<li><strong>Exposure<\/strong>: Carefully remove concrete or grout &#8211; preferably with concrete pulverizers; in natural stone, steer splitting cracks purposefully. Protect edges, label components, and maintain clean contact faces for later inspection.<\/li>\n<li><strong>Separation\/release<\/strong>: Cut metal tenons with suitable shears or withdraw timber tenons; for preservation: clean, dry, and protect the joint. Coordinate sequencing so that each release is secured and documented before proceeding.<\/li>\n<li><strong>Follow-up<\/strong>: Inspect contact faces and conserve if necessary; establish removal and sorting logistics for reuse and recycling. Record tool settings, pressures, and measured vibrations for traceability.<\/li>\n<\/ol>\n<h3>Quality assurance and monitoring<\/h3>\n<p>During the works, crack monitoring, acoustic monitoring, and regular visual inspections are proven measures. A clear cutting sequence and documented pressure\/splitting parameters increase reproducibility and reduce the risk of damage. Define acceptance criteria for surface condition, allowable crack widths, and residual deformations, and keep a photographic log of all steps.<\/p>\n<h2>Typical damage patterns and repair approaches<\/h2>\n<p>Damage arises from moisture, corrosion, excessive bearing pressures, or improper interventions. In timber, fiber splits, loosened fits, or crushing can occur; in natural stone, crack zones at the mortise, rust jacking from corroding metal tenons, or edge spalls are typical. Environmental effects such as freeze-thaw cycles or salt crystallization can accelerate deterioration around mortises and shoulders.<\/p>\n<h3>Repair in timber construction<\/h3>\n<p>Repairs range from cleaning and conservation to partial replacement solutions such as prosthetic tenons or scarf joints. Adhesives and timber species are selected on a case-by-case basis; climatic boundary conditions and fiber direction must be considered. Where non-visible reinforcement is acceptable, discreet mechanical fasteners or bonded inserts can restore capacity while keeping the joint geometry legible.<\/p>\n<h3>Interventions on natural-stone tenons<\/h3>\n<p>Corroded metal tenons are removed after exposure and, if necessary, replaced with more corrosion-resistant variants. Cracked mortises can be reprofiled with mineral mortars. Interventions should be minimally invasive; for objects of cultural significance, coordination with the authorities is customary and advisable. Electrical isolation and protective coatings reduce future corrosion risks at metal-to-stone interfaces.<\/p>\n<h2>Safety, environment, and legal framework<\/h2>\n<p>Work on tenon joints requires dust and noise reduction measures as well as appropriate personal protective equipment. When exposing historic grouts, hazardous substances may be encountered; corresponding protective measures must be provided. Regulations on occupational safety, construction waste separation, and monument preservation must be observed. Legal requirements are location-dependent; specific inspection and permit obligations must be clarified project-specifically. Control of respirable crystalline silica, water runoff from wet processes, and hot-work permits are commonly part of the execution planning.<\/p>\n<h2>Relation to application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: Exposing concealed tenons in connection zones, selective removal with concrete pulverizers, controlled splitting of adjacent components.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: Releasing metal tenons and dowels with combination shears, multi cutters, or steel shears without impairing load-bearing areas.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: Splitting cylinders for controlled crack steering in rock; relevant where natural-stone elements are tenon-supported or tenon-secured.<\/li>\n<li><strong>Natural-stone extraction<\/strong>: Splitting along desired beds to obtain blanks for tenon-secured components or to gently release existing tenon joints.<\/li>\n<li><strong>Special operations<\/strong>: Special cases with hard-to-reach tenon and bolt connections where low-vibration, compact tools are required.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The tenon joint is among the oldest interlocking connection types in construction. It appears in traditional timber construction as well as in historic natural-stone masonry and in structural connections in which a tenon engages a corresponding mortise or slot. For deconstruction, building gutting and the exposure of such joints, controlled, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20203","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tenon Joint in Woodworking &amp; Masonry<\/title>\n<meta name=\"description\" content=\"Guide to the tenon joint in timber &amp; natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tenon Joint in Woodworking &amp; Masonry\" \/>\n<meta property=\"og:description\" content=\"Guide to the tenon joint in timber &amp; natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-20T09:48:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tenon-joint\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tenon-joint\",\"name\":\"Tenon Joint in Woodworking & Masonry\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-30T15:12:02+00:00\",\"dateModified\":\"2026-06-20T09:48:03+00:00\",\"description\":\"Guide to the tenon joint in timber & natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tenon-joint#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tenon-joint\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tenon-joint#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tenon joint\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tenon Joint in Woodworking & Masonry","description":"Guide to the tenon joint in timber & natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint","og_locale":"en_US","og_type":"article","og_title":"Tenon Joint in Woodworking & Masonry","og_description":"Guide to the tenon joint in timber & natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-20T09:48:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint","url":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint","name":"Tenon Joint in Woodworking & Masonry","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-30T15:12:02+00:00","dateModified":"2026-06-20T09:48:03+00:00","description":"Guide to the tenon joint in timber & natural stone \u2713 mortise and tenon, design, repair, and low vibration deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tenon-joint"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tenon-joint#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tenon joint"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20203","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20203"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20203\/revisions"}],"predecessor-version":[{"id":28505,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20203\/revisions\/28505"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20203"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}