{"id":20197,"date":"2026-01-29T13:07:48","date_gmt":"2026-01-29T12:07:48","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20197"},"modified":"2026-06-19T12:16:03","modified_gmt":"2026-06-19T10:16:03","slug":"xps-insulation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation","title":{"rendered":"Xps insulation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>XPS insulation is indispensable in modern building and civil engineering. The extruded polystyrene rigid foam is used wherever high compressive strength, low water absorption, and long-lasting thermal insulation are required &#8211; such as on basement exterior walls, floor slabs, inverted roofs, and trafficked surfaces. Over a structure\u2019s life cycle, XPS insulation plays a role not only in planning and execution, but also in <em>selective deconstruction<\/em>. Especially during strip-out, in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, controlled, low-vibration methods are needed to separate insulated components by material type. This is where the tool capabilities of Darda GmbH come into play, such as using concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> to precisely separate mineral layers from XPS insulation layers. Clean interfaces and design-for-disassembly principles improve material purity and downstream recycling performance.<\/p>\n<h2>Definition: What is meant by XPS insulation?<\/h2>\n<p>XPS insulation refers to thermal insulation boards made of <strong>extruded polystyrene rigid foam<\/strong>. The material is produced in a continuous extrusion process, resulting in a <em>closed-cell<\/em> structure. This structure leads to very low water absorption, high compressive strength, and stable thermal conductivity. XPS insulation is preferred where components are permanently exposed to moisture, frost, or mechanical loads &#8211; typically as <strong>perimeter insulation<\/strong> on earth-contacting components, in <strong>inverted roofs<\/strong>, and beneath load-transferring layers, such as on parking decks or other trafficked areas. Typical declared thermal conductivity values lie in the range of approximately 0.027 to 0.040 W\/mK, with compressive stress classes commonly between 200 and 700 kPa depending on product type and application.<\/p>\n<h2>Composition, properties, and typical applications of XPS insulation<\/h2>\n<p>XPS insulation boards are dimensionally stable, easy to work, and resistant to earth pressures, fluctuating moisture, and freeze-thaw cycles. Depending on the type, bulk density, compressive stress, and thermal conductivity vary; what they share is robustness against moisture and mechanical loading. When selecting products, the edge profile (lap, tongue-and-groove), surface embossing, and integration into the waterproofing system play a key role. Compatibility with adhesives, primers, and waterproofing chemistries should be verified to avoid softening or bond failures.<\/p>\n<h3>Essential properties<\/h3>\n<ul>\n<li>Low thermal conductivity, stable over the service life with correct installation<\/li>\n<li>Very low water absorption thanks to the closed-cell structure<\/li>\n<li>High compressive strength and creep resistance for durable load transfer<\/li>\n<li>Dimensionally stable, easy to cut, yet sensitive to certain solvents<\/li>\n<li>Low capillary conductivity, suitable for earth-contact applications<\/li>\n<li>Resistant to freeze-thaw and wet-dry cycling in exposed assemblies<\/li>\n<li>Generally combustible &#8211; requires appropriate fire protection and separation from heat sources<\/li>\n<\/ul>\n<h3>Typical fields of application<\/h3>\n<ul>\n<li><strong>Perimeter insulation<\/strong> on basement exterior walls and foundations<\/li>\n<li><strong>Inverted roofs<\/strong> and insulated flat roofs under ballast (gravel, slab paving)<\/li>\n<li>Insulation beneath floor slabs, industrial floors, and trafficked surfaces<\/li>\n<li>Frost aprons, plinth areas, parapets, and edge terminations<\/li>\n<li>Edge zones of bridge and parking structures with thermal separation<\/li>\n<li>Cold storage floors and areas with sustained low temperatures<\/li>\n<\/ul>\n<h2>Planning and installation of XPS insulation in new construction<\/h2>\n<p>To ensure XPS insulation performs its function over the long term, detailed planning and careful installation are crucial. The interface between insulation, waterproofing, and ballast must be conceived as a system. This is especially true in earth-contact areas and on flat roofs, where moisture ingress and thermal interactions impose high demands. Coordinated sequencing, verified tolerances, and mock-ups for critical details reduce rework and help maintain target performance.<\/p>\n<h3>Perimeter areas and floor slab<\/h3>\n<ul>\n<li>Substrate even and load-bearing; waterproofing compatible with the XPS surface<\/li>\n<li>Mechanical fixing or spot bonding only with compatible adhesives<\/li>\n<li>Stagger joints and design edge details to minimize thermal bridges<\/li>\n<li>Execute protective and drainage layers so the insulation is not point-loaded<\/li>\n<li>Verify buoyancy and groundwater exposure; dimension ballast and anchorage accordingly<\/li>\n<\/ul>\n<h3>Inverted roof and parapet details<\/h3>\n<ul>\n<li>Loose-laid XPS insulation boards with sufficient <em>ballast<\/em> (e.g., gravel or slab paving)<\/li>\n<li>Form penetrations and upstands with minimal thermal bridging<\/li>\n<li>Ensure UV protection until ballast and surfacing are installed<\/li>\n<li>Provide a continuous falls and drainage concept to avoid water accumulation<\/li>\n<li>Consider a water flow reducing layer where specified to optimize thermal performance<\/li>\n<\/ul>\n<h2>Selective deconstruction of building components with XPS insulation<\/h2>\n<p>In existing buildings, XPS insulation layers frequently meet mineral build-ups, waterproofing, surfacing, and reinforcement. During deconstruction, <strong>single-grade separation<\/strong> is essential: it facilitates recycling and reduces disposal costs. Mechanical separation should be low-vibration, low-dust, and controlled &#8211; especially in sensitive environments such as hospitals, laboratories, or occupied buildings. Clear documentation of assemblies and materials supports compliance with recycling targets and disposal rules.<\/p>\n<h3>Suitable methods and tools in the context of Darda GmbH<\/h3>\n<ul>\n<li><strong>Concrete demolition shears<\/strong> enable nibbling off upstands, edge beams, and parapets in small, controlled segments. In this way, concrete and mortar layers can be progressively released from XPS insulation boards without unduly loading adjacent components.<\/li>\n<li><strong>Rock and concrete splitters<\/strong> create defined crack lines in massive components, for example at foundation webs next to perimeter insulation. Pinpoint splitting supports selective removal when XPS and waterproofing layers are to be preserved or recovered separately.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a><\/strong> supply the tools quietly and efficiently &#8211; an advantage during strip-out and cutting in existing buildings when noise and vibration limits must be observed.<\/li>\n<li><strong>Multi Cutters<\/strong> and <strong>steel shears<\/strong> cut reinforcing steel, embedded parts, and rails that penetrate XPS insulation, without large-area destruction of components.<\/li>\n<li><strong>Combination shears<\/strong> assist in deconstructing mixed assemblies of concrete, steel, and attachments, as found in flat roof build-ups and equipment staging areas.<\/li>\n<\/ul>\n<h3>Recommended deconstruction sequence<\/h3>\n<ol>\n<li>Component analysis: Review layer sequence, waterproofing, and potential contaminants in legacy insulation (e.g., flame retardants in historical applications), in general and without case-specific assessment.<\/li>\n<li>Expose joints and connections; detach surfacing, railings, and embedded items.<\/li>\n<li>Mechanical separation: Release edge beams and upstands section by section with concrete demolition shears; open up more massive areas in a controlled manner with rock and concrete splitters.<\/li>\n<li>Separate reinforcement: Cut steel with Multi Cutters or steel shears to separate mineral and polymer-based materials.<\/li>\n<li>Create single-grade material streams: Provide XPS insulation, concrete, metals, and waterproofing separately to improve recycling options.<\/li>\n<li>Document quantities and separation purity to support recycling or disposal pathways.<\/li>\n<\/ol>\n<h2>Quality assurance, durability, and repair<\/h2>\n<p>The energy performance of XPS insulation depends not only on the material but also on execution. Typical sources of error include open joints, insufficient ballast on inverted roofs, inadequate drainage, or a non-coordinated combination of waterproofing, adhesives, and insulation. In the event of damage, local repairs can often be carried out without full demolition if assemblies are selectively opened. Trial areas and on-site tests for adhesion, drainage behavior, and load transfer help validate the planned build-up before full-area execution.<\/p>\n<h3>Inspection and control points<\/h3>\n<ul>\n<li>Joint pattern and board bearing under traffic loads<\/li>\n<li>Function of drainage elements and slope formation<\/li>\n<li>Compatibility of waterproofing with XPS insulation, particularly in refurbishments<\/li>\n<li>Mechanical damage from fasteners, embedded items, and penetrations<\/li>\n<li>Ballast mass and wind uplift verification on inverted roofs; optional thermography and moisture surveys in operation<\/li>\n<\/ul>\n<h2>Environmental aspects, recycling, and disposal<\/h2>\n<p>The circular use of XPS insulation is a dynamic field. Single-grade, clean boards can &#8211; depending on regional possibilities &#8211; be materially recycled or used for energy recovery. For older installations, check whether historical flame retardants are present. In general: clean separation of concrete, metals, waterproofing, and XPS insulation facilitates orderly recovery. Dust and noise mitigation through <em>hydraulic, low-impact<\/em> methods &#8211; such as with concrete demolition shears or rock and concrete splitters &#8211; supports environmentally conscious deconstruction. Where regulations permit and boards are intact, dimensional checks and visual inspection may enable reuse in suitable applications.<\/p>\n<h3>Special use and sensitive environments<\/h3>\n<p>In areas with ongoing operations, cooling or cleanroom use, as well as in earth-contact sections with protected assets, a low-vibration, controlled approach is particularly important. Tools from Darda GmbH are selected so that components with XPS insulation can be opened in a targeted manner and layers separated without causing unnecessary secondary damage. Vibration, dust, and noise monitoring concepts contribute to maintaining operational continuity and protection targets.<\/p>\n<h2>Details, interfaces, and structural particularities<\/h2>\n<p>In practice, XPS insulation meets numerous connection details: plinths, parapets, expansion joints, penetrations, and edge terminations. The constructive solution determines whether building physics targets are achieved and whether later interventions are possible without impairing the overall system. Continuity of the thermal envelope and moisture management at transitions is decisive for durability and performance.<\/p>\n<h3>Penetrations and upstands<\/h3>\n<ul>\n<li>Reduce thermal bridges: guide insulation at columns, railings, and roof drains<\/li>\n<li>Plan mechanical protection layers against point loads<\/li>\n<li>Design for deconstruction: detachable connections, clear layer sequencing<\/li>\n<li>Select collars, sealants, and sleeves compatible with the waterproofing system and XPS<\/li>\n<\/ul>\n<h3>Refurbishment-friendly planning<\/h3>\n<ul>\n<li>Segmented build-ups and documented layers make later selective deconstruction easier<\/li>\n<li>Clarify material compatibility early, especially waterproofing\/insulation\/adhesives<\/li>\n<li>Documented embedded items (railing bases, supports) facilitate targeted work with concrete demolition shears and splitters<\/li>\n<li>As-built documentation with photos and coordinates simplifies future interventions<\/li>\n<\/ul>\n<h2>Occupational safety and organizational notes<\/h2>\n<p>When working on components insulated with XPS insulation, personal protective equipment, dust and noise protection, and fire safety must be considered. Hot work near polymeric insulation should be planned carefully. For deconstruction, clear site logistics are recommended: separate collection points, short transport routes, and a sequence that enables opening connection details and controlled removal of mineral layers. Depending on the scope, temporary structural support and stability checks may be required prior to cutting or splitting.<\/p>\n<h3>Coordination in deconstruction<\/h3>\n<ul>\n<li>Preliminary investigation and documentation of the layer sequence<\/li>\n<li>Coordination among trades (waterproofing, deconstruction, disposal)<\/li>\n<li>Continuous monitoring of separation quality and material streams<\/li>\n<li>Labeled, weather-protected collection containers and documented transfer to transport<\/li>\n<\/ul>\n<h2>Distinction from other insulation materials<\/h2>\n<p>XPS insulation differs from EPS and PUR\/PIR through its closed-cell structure, very low water absorption, and high compressive strength. In earth-contact areas and under trafficked surfaces, XPS insulation is therefore often the first choice. EPS scores with very good insulation performance at low weight in less moisture-exposed areas, while PUR\/PIR is used for high thermal performance with minimal build-up height. For planning, execution, strip-out, and deconstruction, knowing the installed insulation material is crucial &#8211; it influences the choice of installation, waterproofing products, and suitable deconstruction tools such as concrete demolition shears or rock and concrete splitters. Additionally, temperature limits, fire behavior, and long-term creep under load differ by material and must be considered in design and during selective deconstruction.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>XPS insulation is indispensable in modern building and civil engineering. The extruded polystyrene rigid foam is used wherever high compressive strength, low water absorption, and long-lasting thermal insulation are required &#8211; such as on basement exterior walls, floor slabs, inverted roofs, and trafficked surfaces. Over a structure\u2019s life cycle, XPS <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20197","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>XPS Insulation - Extruded Polystyrene Rigid Foam<\/title>\n<meta name=\"description\" content=\"Discover extruded polystyrene XPS insulation for wet &amp; load-bearing areas \u2713 properties, installation &amp; deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"XPS Insulation - Extruded Polystyrene Rigid Foam\" \/>\n<meta property=\"og:description\" content=\"Discover extruded polystyrene XPS insulation for wet &amp; load-bearing areas \u2713 properties, installation &amp; deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T10:16:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/xps-insulation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/xps-insulation\",\"name\":\"XPS Insulation - Extruded Polystyrene Rigid Foam\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-29T12:07:48+00:00\",\"dateModified\":\"2026-06-19T10:16:03+00:00\",\"description\":\"Discover extruded polystyrene XPS insulation for wet & load-bearing areas \u2713 properties, installation & deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/xps-insulation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/xps-insulation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/xps-insulation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Xps insulation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"XPS Insulation - Extruded Polystyrene Rigid Foam","description":"Discover extruded polystyrene XPS insulation for wet & load-bearing areas \u2713 properties, installation & deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation","og_locale":"en_US","og_type":"article","og_title":"XPS Insulation - Extruded Polystyrene Rigid Foam","og_description":"Discover extruded polystyrene XPS insulation for wet & load-bearing areas \u2713 properties, installation & deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-19T10:16:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation","url":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation","name":"XPS Insulation - Extruded Polystyrene Rigid Foam","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-29T12:07:48+00:00","dateModified":"2026-06-19T10:16:03+00:00","description":"Discover extruded polystyrene XPS insulation for wet & load-bearing areas \u2713 properties, installation & deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/xps-insulation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/xps-insulation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Xps insulation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20197","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20197"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20197\/revisions"}],"predecessor-version":[{"id":28477,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20197\/revisions\/28477"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}