{"id":20196,"date":"2026-01-29T12:03:56","date_gmt":"2026-01-29T11:03:56","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20196"},"modified":"2026-06-19T11:47:02","modified_gmt":"2026-06-19T09:47:02","slug":"x-reinforcement","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement","title":{"rendered":"X-reinforcement"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>X-reinforcement denotes a specific arrangement of reinforcing bars in reinforced concrete members where diagonal bars intersect, enabling an X-shaped load transfer. This cross reinforcement occurs particularly where high shear and tensile forces must be safely introduced into the concrete-for example in shear walls, coupling joints, coupling beams, areas around openings, column heads, or zones subjected to seismic demand. In existing structures, X-reinforcement significantly affects the planning of concrete demolition and special demolition: it increases resistance to fracture, requires adapted separation and splitting strategies, and imposes particular demands on tool selection, for instance when using concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH. Anticipating diagonal force paths enables precise sequencing, reduces collateral damage, and supports compliance with strict vibration and noise limits.<\/p>\n<h2>Definition: What is meant by X-reinforcement?<\/h2>\n<p>X-reinforcement refers to a diagonally oriented, intersecting reinforcement arrangement in reinforced concrete that improves structural behavior under shear, transverse tension, and cyclic loading. In contrast to purely orthogonal reinforcement grids (longitudinal\/transverse), X-reinforcement forms inclined tension paths that follow the direction of the concrete\u2019s compression struts. This constructively supports the strut-and-tie model, limits crack widths, and increases ductility. In practice, X-reinforcement appears as <em>cross reinforcement<\/em>, <em>diagonal reinforcement<\/em>, or <em>inclined reinforcement<\/em>-commonly in walls, slabs with large openings, at wall openings, in couplings of shear walls, or as a retrofitted strengthening in seismic upgrades. Typical bar inclinations of approximately 30 to 45 degrees align with principal tension trajectories, with generous anchorage and confinement in nodes to prevent slip. Compared to conventional stirrups or headed shear reinforcement, the cross arrangement provides continuous diagonal tension ties that stabilize disturbed regions.<\/p>\n<h2>Constructive features and use cases<\/h2>\n<p>X-reinforcement follows the governing load paths in position and inclination. Typically, pairs of diagonal bars are laid with sufficient anchorage length in the node regions. Bar diameters depend on design, cover, and member thickness. In coupling beams, opening framings, or overlapping zones of shear walls, the crossing nodes concentrate, which can lead to increased bar density and tight bend radii. This <strong>reinforcement concentration<\/strong> improves reserve capacity but complicates later interventions such as separation cuts, selective deconstruction, or openings. The constructability and later accessibility of nodes should be considered early during design and refurbishment planning.<\/p>\n<ul>\n<li><strong>Anchorage and laps<\/strong>: Avoid lap splices within nodes where possible; place laps or mechanical connections outside highly stressed crossing regions.<\/li>\n<li><strong>Spacing and cover<\/strong>: Ensure bar spacing and concrete cover permit reliable compaction and reduce honeycombing near dense crossings.<\/li>\n<li><strong>Bend geometry<\/strong>: Respect minimum bend diameters and stagger bar planes to mitigate congestion and tight radii.<\/li>\n<li><strong>Interface coordination<\/strong>: Coordinate diagonal bars with orthogonal layers and embedded items to prevent four-layer congestion at openings and supports.<\/li>\n<\/ul>\n<h3>Shear and tension transfer<\/h3>\n<p>The inclined tension bars carry the tensile forces arising from shear stresses, while the concrete forms compression struts. As a result, crack angles and widths are favorably influenced. Under cyclic loading (e.g., wind, earthquakes, machine excitation), the diagonal reinforcement increases energy dissipation capacity and limits damage in node regions. In compression field and strut-and-tie terms, the diagonals act as continuous ties, reducing slip and improving low-cycle fatigue performance of joints and disturbed regions.<\/p>\n<h3>Locations in the structure<\/h3>\n<ul>\n<li>Walls and shear walls with large openings where transverse tension is introduced into the jambs<\/li>\n<li>Coupling beams between shear walls with high shear and bending moment demand<\/li>\n<li>Slab panels with openings where load redistributions occur diagonally<\/li>\n<li>Column heads, beams, pier zones with node compression and transverse tension<\/li>\n<li>Retrofitted strengthening in existing structures where diagonal bars have been added<\/li>\n<\/ul>\n<h3>Implications for deconstruction<\/h3>\n<p>The crossing of the bars creates a mechanical \u201clocking\u201d between concrete and steel. This increases the force required for separation, promotes uncontrolled crack propagation, and can cause spalling when unsuitable methods are used. The strategy therefore shifts to controlled opening and successive exposure of the nodes-preferably with low-vibration methods such as rock and concrete splitters and targeted crushing and nibbling with concrete pulverizers from Darda GmbH. Pre-exposure of crossings reduces the risk of tool jamming and enables a predictable release of restrained stresses.<\/p>\n<h2>Existing-condition investigation and documentation<\/h2>\n<p>Before intervening in members suspected of containing X-reinforcement, careful investigation and evaluation of existing documents are essential. Drawings, bar schedules, and structural calculations provide clues about the inclination, diameter, and position of the diagonals. Locating methods (e.g., radar scans, magnetic detection) and small-scale exposures or core drills clarify the actual reinforcement layout, cover, and nodes. The findings govern the separation concept, the selection of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic Power Units<\/a> and attachments from Darda GmbH, and the sequence of work steps. For diagonally oriented bars, cross-polarized GPR passes and calibration with cover meters improve interpretability; targeted trial openings validate bar angles and nodal densities and should be documented in plan and section.<\/p>\n<h2>Technical characteristics in connection with deconstruction<\/h2>\n<p>X-reinforcement modifies the fracture behavior of members. Crack flanks often follow the diagonals; node areas act as force collectors. For separation, this means:<\/p>\n<ul>\n<li><strong>Segmentation<\/strong>: Members are divided into smaller panels so that nodes are exposed and relieved one after another.<\/li>\n<li><strong>Split before cutting<\/strong>: Concrete is first weakened in a controlled manner (splitting technique), then exposed bars are severed.<\/li>\n<li><strong>Node management<\/strong>: Crossing points are purposefully opened to cut bars sequentially and release locked-in stresses.<\/li>\n<li><strong>Local stabilization<\/strong>: Temporary shoring or clamping maintains geometry while nodes are relieved and bars are cut.<\/li>\n<\/ul>\n<h2>Tool selection and procedures<\/h2>\n<p>The choice of equipment depends on member thickness, reinforcement density, accessibility, and environmental constraints (vibration, noise, dust). Hydraulic power packs from Darda GmbH supply the attachments with the required power. Matching hydraulic flow and pressure to attachment requirements, remote operation options, and efficient oil cooling increase productivity and safety in confined or sensitive areas. Proven combinations are:<\/p>\n<ul>\n<li><strong>Rock and concrete splitters<\/strong> as well as <strong>rock splitting cylinders<\/strong>: For low-vibration, low-noise pre-weakening along the presumed diagonals and for opening the nodes.<\/li>\n<li><strong>Concrete pulverizers<\/strong>: For crushing, exposing, and selective nibbling of the concrete around the reinforcement, especially in node fields.<\/li>\n<li><strong>Steel shear<\/strong>, <strong>multi cutters<\/strong>, or <strong>combination shears<\/strong>: For safely cutting exposed diagonal bars and node overlaps.<\/li>\n<\/ul>\n<h3>Working with concrete pulverizers<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">Concrete pulverizers<\/a> attack the concrete in a targeted manner to make reinforcing bars visible. In areas with X-reinforcement, it is advisable to nibble progressively from the panel edges toward the node. This keeps bars under controlled tension until they are cut one after another. A focused <em>heading<\/em> on the nodes prevents uncontrolled tearing of the diagonal bars. Orienting the jaws to work parallel to the expected crack plane and using short, controlled bites limits spalling; dust suppression and shielding reduce secondary impacts.<\/p>\n<h3>Splitting instead of impact<\/h3>\n<p>Where vibrations must be minimized, rock and concrete splitters offer a clear advantage. Prepared boreholes along the desired crack path direct the splitting energy to where the X-reinforcement locks the concrete matrix. The result is predictable crack patterns, fewer secondary damages, and a good setup for subsequently severing the reinforcement. Hole diameter, spacing, and edge distances should be matched to member thickness and bar angle; inclined drilling can further guide the split toward the node.<\/p>\n<h3>Cutting the reinforcement<\/h3>\n<p>After exposure, diagonal bars, stirrup overlaps, and nodes are cut with steel shear, multi cutters, or combination shears. Stable supports, retraction safety, and a cutting sequence that releases stored stresses in a controlled manner are important. With high-strength steels, pre-bending can reduce cutting forces; short cut lengths and a perpendicular approach improve result quality. Where sparks must be avoided, preference is given to purely mechanical cutting; progressive cuts from peripheral bars toward the crossing reduce rebound and tool loading.<\/p>\n<h2>Member-specific strategies<\/h2>\n<h3>Walls and shear walls<\/h3>\n<p>With diagonal crack patterns, wall panels are segmented in a grid. Splitters open the panels, concrete pulverizers expose the crossings, then bars are cut. Jambs of openings receive special attention, as diagonal reinforcement is often bundled there. Temporary bracing and, where necessary, back-propping maintain stability while node regions are relieved.<\/p>\n<h3>Coupling beams and beams<\/h3>\n<p>High shear forces and short spans lead to dense X-reinforcement. Sequential opening from the less reinforced panel toward the node reduces forces in the remaining cross-sections. Temporary shoring may be required. Anchorage zones at supports are treated as critical nodes; relieving these regions early prevents sudden releases.<\/p>\n<h3>Slabs with openings<\/h3>\n<p>Diagonally running tension paths around openings require edge-field preparation with splitters before cuts create the opening. This protects the slab and limits spalling. Symmetrical cutting sequences and local propping reduce torsional effects and preserve adjacent finishes.<\/p>\n<h2>Relevance across application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: X-reinforcement requires controlled dismantling steps. A combination of splitting, crushing with concrete pulverizers, and precise steel cutting enables selective separation while respecting vibration and dust constraints.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: In existing walls with openings, diagonal bars are common. Targeted exposure and cutting avoid damage to adjacent members and finishes.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: In portal zones and support structures with diagonal reinforcement, splitters increase control with minimal vibration and limited overbreak.<\/li>\n<li><strong>Natural stone extraction<\/strong>: Not primarily relevant; however, knowledge of controlled splitting transfers to crack management in brittle materials.<\/li>\n<li><strong>Special deployment<\/strong>: In sensitive environments (laboratories, hospitals, heritage structures), low-vibration splitting methods and precise cutting facilitate work on member-critical X-reinforcement.<\/li>\n<\/ul>\n<h2>Safety and environmental protection<\/h2>\n<p>Work on X-reinforcement carries the risk of sudden releases in node regions. Therefore, rebound protection, shoring, and controlled cutting sequences must be planned. Dust and noise reduction, spark control during steel cutting, and consistent separation of concrete demolition debris and reinforcing steel support environmental and occupational safety. Guidance on standards and regulatory requirements must be observed; concrete implementation depends on the project, location, and applicable law. Vibration and crack monitoring, water management for wet processes, and clear exclusion zones further enhance safety and reduce environmental impact.<\/p>\n<h2>Quality assurance and recycling<\/h2>\n<p>Documented exposures, photos of the nodes, marking of cutting points, and checks for concealed bars increase execution safety. After deconstruction, reinforcing steel and concrete debris are cleanly separated to enable recycling pathways. A consistent record facilitates later tracing of the separation strategy. Digital logs with geo-referenced photos and annotated sketches improve traceability; material segregation by fraction supports efficient downstream processing.<\/p>\n<h2>Typical challenges and solutions<\/h2>\n<ul>\n<li><strong>Concealed nodes<\/strong>: Gradual exposure with concrete pulverizers; add additional splitting holes if required.<\/li>\n<li><strong>High steel density<\/strong>: Smaller segmentation, more powerful hydraulic power packs, short cuts with steel shear or multi cutters.<\/li>\n<li><strong>Inaccessible areas<\/strong>: Use compact attachments, adapt the work sequence, secure load transfer temporarily.<\/li>\n<li><strong>Brittle concrete matrix<\/strong>: Prefer splitters to control crack paths; limit spalling with controlled bites.<\/li>\n<li><strong>Unknown bar angles<\/strong>: Perform diagonal GPR passes and targeted trial openings to verify inclination before finalizing the cut plan.<\/li>\n<li><strong>Corroded or work-hardened bars<\/strong>: Reduce bite length, reorient to a perpendicular cut, and consider pre-bending to lower cutting forces.<\/li>\n<\/ul>\n<h2>Planning and tendering<\/h2>\n<p>Bills of quantities should include investigation, locating of reinforcement, drilling and splitting works, crushing with concrete pulverizers, cutting of diagonal bars, and the provision of suitable hydraulic power packs. Time allowances for node exposure, cutting sequences, and material logistics must be assessed realistically. The choice of the Darda GmbH equipment combination depends on member thicknesses, bar diameters, and access conditions. Tender documents benefit from method statements, measurable acceptance criteria (e.g., vibration and dust limits), and, where appropriate, small test areas to validate segmentation and cutting sequences in advance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>X-reinforcement denotes a specific arrangement of reinforcing bars in reinforced concrete members where diagonal bars intersect, enabling an X-shaped load transfer. This cross reinforcement occurs particularly where high shear and tensile forces must be safely introduced into the concrete-for example in shear walls, coupling joints, coupling beams, areas around openings, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20196","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>X-Reinforcement in Reinforced Concrete Explained<\/title>\n<meta name=\"description\" content=\"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear &amp; seismic loads \u27a4 plus safe demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"X-Reinforcement in Reinforced Concrete Explained\" \/>\n<meta property=\"og:description\" content=\"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear &amp; seismic loads \u27a4 plus safe demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T09:47:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/x-reinforcement\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/x-reinforcement\",\"name\":\"X-Reinforcement in Reinforced Concrete Explained\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-29T11:03:56+00:00\",\"dateModified\":\"2026-06-19T09:47:02+00:00\",\"description\":\"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear & seismic loads \u27a4 plus safe demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/x-reinforcement#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/x-reinforcement\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/x-reinforcement#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"X-reinforcement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"X-Reinforcement in Reinforced Concrete Explained","description":"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear & seismic loads \u27a4 plus safe demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement","og_locale":"en_US","og_type":"article","og_title":"X-Reinforcement in Reinforced Concrete Explained","og_description":"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear & seismic loads \u27a4 plus safe demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-19T09:47:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement","url":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement","name":"X-Reinforcement in Reinforced Concrete Explained","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-29T11:03:56+00:00","dateModified":"2026-06-19T09:47:02+00:00","description":"Learn how X-reinforcement strengthens reinforced concrete via diagonals for shear & seismic loads \u27a4 plus safe demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/x-reinforcement#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"X-reinforcement"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20196","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20196"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20196\/revisions"}],"predecessor-version":[{"id":28475,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20196\/revisions\/28475"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20196"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}