{"id":20194,"date":"2026-01-29T10:14:16","date_gmt":"2026-01-29T09:14:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20194"},"modified":"2026-06-19T15:46:03","modified_gmt":"2026-06-19T13:46:03","slug":"stump-grinder","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder","title":{"rendered":"Stump grinder"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A stump grinder &#8211; also called a stump cutter or stump milling machine &#8211; is used for the mechanical removal of tree stumps and larger root remnants in the ground. In the context of deconstruction, excavation of pit and utility line installation, it creates space, protects adjacent structures through low vibration levels, and improves accessibility for subsequent trades. In projects by Darda GmbH, such as in <em>concrete demolition<\/em> and <em>special demolition<\/em>, work with stump grinders frequently encounters <em>edge foundation<\/em>, pavement surface or root-penetrated concrete edges, which are subsequently further processed with <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong>. In professional practice, this enables selective, low-impact stump removal with minimal disturbance to surrounding soils and structures.<\/p>\n<h2>Definition: What is meant by a stump grinder?<\/h2>\n<p>A stump grinder is a machine with a rotating milling tool that removes the <strong>stump<\/strong> along with near-surface roots in a controlled manner. The cutting tool &#8211; usually a disc or drum system with carbide teeth &#8211; grinds the wooden stump step by step down to below finished grade. Stump grinders are available as hand-guided units, self-propelled units (e.g., on a <em>crawler undercarriage<\/em>), or as an <em>attachment<\/em> for a <em>carrier machine<\/em>. Drives are via combustion engines or hydraulically. The goal is a defined grinding depth and a level, load-bearing surface for subsequent construction or deconstruction works. The resulting void is backfilled with suitable material, typically screened soil or a compactable mineral mix, to ensure consistent bearing capacity.<\/p>\n<h2>Interfaces with concrete demolition and special demolition<\/h2>\n<p>Stump grinders are often used as a preparatory step before removing smaller foundations, curb stone or edge restraints. In urban areas or near existing structures, the <em>low vibration levels<\/em> milling is an advantage to minimize settlement and damage. Once roots have grown into concrete or run under pavement, the wood is <strong>not<\/strong> milled as part of the mineral composite. Instead, the structure is first separated selectively:<\/p>\n<ul>\n<li>Concrete edges, strip footings or root-penetrated upstands are opened in a controlled manner with a <strong>concrete demolition shear<\/strong> to expose embedded root zones.<\/li>\n<li>For dense or reinforced sections, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> enable crack-controlled separation without impact and with low vibration.<\/li>\n<li>Exposed <em>reinforcement<\/em> is then cut to size &#8211; depending on the cross-section &#8211; with <em>steel shear<\/em> or <em>Multi Cutters<\/em>.<\/li>\n<\/ul>\n<p>The combination of milling the organic material and controlled separation of mineral or steel composites supports precise demolition processes in the application areas of <em>concrete demolition<\/em> and <em>special demolition<\/em>, <em>building gutting<\/em> and <em>concrete cutting<\/em>, and &#8211; during site preparation &#8211; also <em>rock excavation<\/em> and <em>tunnel construction<\/em>, <em>natural stone extraction<\/em> and <em>special demolition<\/em>. This staged approach reduces rework, simplifies waste segregation, and maintains low-vibration, low-noise execution in sensitive surroundings.<\/p>\n<h2>Operating principle and types<\/h2>\n<p>The cutting tool sweeps laterally across the stump, removing layers of wood and chipping them into shavings. Chip thickness is controlled via feed rate, speed, and tooth geometry. Typical chip sizes range from fine shavings to coarse chips, depending on tooth condition and operator settings. Typical types:<\/p>\n<ul>\n<li>Hand-guided grinders for tight, hard-to-reach areas in existing environments.<\/li>\n<li>Self-propelled crawler grinders with a larger swing range for higher performance and throughput.<\/li>\n<li>Mounted grinders as an <em>attachment<\/em> for excavators or loaders when greater grinding depths, reach, and productive material handling are required.<\/li>\n<\/ul>\n<h3>Hydraulic drive and energy supply<\/h3>\n<p>Hydraulically driven mounted grinders require defined flow rates and pressures. The coordination of hose routing, case-drain line, and thermal management is similar to Darda GmbH\u2019s hydraulic demolition tools. A dedicated supply via <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> is planned when carrier machines or stationary supplies are unavailable, or when constant performance decoupled from engine speed is required. Clean hydraulic oil, adequate filtration, and correct quick-coupler selection reduce pressure losses and extend tool life; monitoring return-line temperature prevents overheating during continuous milling.<\/p>\n<h2>Work preparation and procedure<\/h2>\n<p>Careful preparation increases process reliability and reduces the risk of damage:<\/p>\n<ol>\n<li>Utility and service detection: review drawings, perform locating, define <em>safety distance<\/em>s.<\/li>\n<li>Access and ground protection: load-bearing access, protection mats in sensitive green areas, load distribution as needed.<\/li>\n<li>Stump preparation: shorten protruding wood, remove loose stones and metal parts.<\/li>\n<li>Define grinding depth: typically 20-40 cm below finished grade; deeper in excavation pits or traffic areas.<\/li>\n<li>Material management: stockpile chips at the side, screen or haul away; ensure construction waste separation if concrete or pavement remnants are mixed in.<\/li>\n<li>Exclusion and signaling: set up an exclusion zone with visual barriers, mark the throw zone, and coordinate traffic routing.<\/li>\n<li>Backfilling and verification: compact in layers and, where specified, verify density to avoid later settlement.<\/li>\n<\/ol>\n<h3>Coordination with deconstruction trades<\/h3>\n<p>When milling near concrete edges, there is close coordination with the teams for <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitter<\/strong>. This keeps the throw zone clear and ensures clean organization of material separation (wood\/soil\/concrete\/steel). In building gutting and when cutting embedded parts, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">precision multi cutters<\/a><\/em> support the removal of exposed lines or metal parts. Clearly labeled collection points and color-coded containers streamline handoffs and reduce double handling.<\/p>\n<h3>Soil, surfaces, and environmental conditions<\/h3>\n<p>Wet soils, frost, or slopes affect machine stability and cut quality. Splash guards limit the chip throw. In sensitive areas, covering adjacent facades, glass surfaces, or machines is advisable. Where dust or debris could spread, local shielding and water mist &#8211; used sparingly to avoid slurry &#8211; improve cleanliness without degrading visibility.<\/p>\n<h2>Technical parameters and selection criteria<\/h2>\n<p>Key parameters for selecting a stump grinder are:<\/p>\n<ul>\n<li><strong>Grinding depth<\/strong>: often 20-60 cm, project-specific more.<\/li>\n<li><strong>Power<\/strong>: about 10-60 kW; mounted units are sized to the available <em>drive power<\/em> window.<\/li>\n<li><strong>Swing range<\/strong>: determines productivity on larger stumps.<\/li>\n<li><strong>Tooth geometry<\/strong>: carbide-tipped for abrasive soils and occasional stone contact.<\/li>\n<li><strong>Transport width<\/strong> and <strong>weight<\/strong>: relevant for tight access in existing surroundings.<\/li>\n<li><strong>Emissions and noise<\/strong>: plan quiet windows, add shielding in sensitive environments.<\/li>\n<li><strong>Control and visibility<\/strong>: remote control, camera support, and lighting for confined or low-visibility work areas.<\/li>\n<li><strong>Serviceability<\/strong>: quick tooth change, spare parts availability, and tool wear indicators for consistent output.<\/li>\n<\/ul>\n<h2>Safety, environment, and permits<\/h2>\n<p>Occupational safety and environmental protection come first. <em>safety equipment<\/em>, defined exclusion zones, and protection against flying chips are mandatory. In residential areas, quiet hours and noise limits apply. Environmental and nature protection aspects such as breeding seasons, tree protection bylaws, or the protection of root zones of adjacent trees to be preserved must be considered early. Permits and conditions are project-specific and should be clarified in advance with the responsible authorities.<\/p>\n<ul>\n<li><strong>PPE<\/strong>: protective helmet with face shield or safety glasses, hearing protection, gloves, and sturdy safety footwear.<\/li>\n<li><strong>Minimum distances<\/strong>: no bystanders in the throw and swing range; use spotters in complex site logistics.<\/li>\n<li><strong>Emergency readiness<\/strong>: stop devices tested, fire extinguisher on site, clear communication protocols.<\/li>\n<\/ul>\n<h2>Specifics on concrete, pavement, and rock<\/h2>\n<p>Roots often run under pavement surfaces or along concrete edges. The grinder primarily mills the wood here; mineral layers are handled separately. Practical approach:<\/p>\n<ul>\n<li>Open pavement locally, expose layer structure, mill the wood; then restore the superstructure according to standards.<\/li>\n<li>For intergrown concrete edges: targeted opening with a <strong>concrete demolition shear<\/strong>; crack-controlled separation with a <strong>hydraulic splitter<\/strong> for vibration-sensitive structures.<\/li>\n<li>Rock or highly compacted ground: no stump grinder, but rock processing, such as controlled splitting in <em>rock excavation<\/em> and <em>tunnel construction<\/em> or in <em>natural stone extraction<\/em>.<\/li>\n<\/ul>\n<p>Clean separation of organic and mineral fractions prevents recontamination; edge cuts with suitable tools produce precise interfaces for subsequent reconstruction or compaction control.<\/p>\n<h2>Logistics, material separation, and disposal<\/h2>\n<p>Grinding debris consists of wood chips and soil fractions. For clean follow-on surfaces, the material is screened or hauled away. If concrete, pavement, or metal parts are mixed in, construction waste separation is required. Container sizes, access times, and traffic routing are planned so that milling and deconstruction crews work without downtime. In excavation pits, backfilling and <em>compaction<\/em> follow in layers to avoid later settlement. Where permitted, clean wood chips can be reused on site as temporary mulch or cover; contaminated fractions are routed to appropriate disposal streams.<\/p>\n<h2>Quality criteria and documentation<\/h2>\n<p>Acceptance is based on visible and measurable criteria: defined grinding depth, flatness, and freedom from foreign objects. Photo documentation and survey points help demonstrate quality to subsequent trades. In sensitive areas, the position and depth of removed stumps are optionally georeferenced so that follow-up works &#8211; such as demolition with a <em>concrete demolition shear<\/em> or cutting &#8211; can be reliably planned. Clear acceptance records with target values, test points, and corrective actions support traceability and reduce interface risks.<\/p>\n<h2>Typical mistakes and countermeasures<\/h2>\n<ol>\n<li>Too little grinding depth leads to settlement or later breakouts. Countermeasure: define, mark, and verify depth.<\/li>\n<li>Unknown installations in the root zone. Countermeasure: utility locating, safe exposure, stepwise approach.<\/li>\n<li>Damage to adjacent surfaces. Countermeasure: protective coverings, sufficient distance, controlled feed.<\/li>\n<li>Mixing wood chips with concrete or steel parts. Countermeasure: first separate mineral components with <strong>concrete demolition shear<\/strong>, <em>steel shear<\/em>, or <em>Multi Cutters<\/em>, then mill.<\/li>\n<li>Insufficient dust and noise mitigation. Countermeasure: shielding, <em>dust suppression<\/em>, suitable time windows.<\/li>\n<li>Unstable machine setup on slopes. Countermeasure: increase bearing area, use mats, adjust approach and swing limits.<\/li>\n<li>Dull or damaged teeth reduce control and increase throw. Countermeasure: scheduled inspections, timely tooth changes, and correct torqueing.<\/li>\n<\/ol>\n<h2>Practical application scenarios<\/h2>\n<p>When deconstructing a small courtyard pavement with a root-penetrated <em>edge beam<\/em>, the concrete edges are first opened with a <strong>concrete demolition shear<\/strong>, reinforcement is cut with <em>steel shear<\/em>, and then the stumps are milled down to below the planned foundation level. In utility trench excavation along a row of trees, only the stumps of felled trees are milled, while the root zones of trees to be preserved remain intact. In <em>special demolition<\/em> &#8211; for example, near sensitive installations &#8211; the combination of stump grinder and <strong>hydraulic splitter<\/strong> provides a low-vibration approach. On sloped terrain with retaining structures, staged milling with reduced swing and additional ground protection ensures stability and clean interfaces.<\/p>\n<h2>Terminology and alternatives<\/h2>\n<p>Stump grinder, stump cutter, and root grinder denote similar methods in practice. Alternatives include excavating with an <em>excavator grapple<\/em> or <em>excavator bucket<\/em>, using root lifting accessories, or exposing and separating with cutting and splitting technology. The <em>chemical demolition method<\/em> is rarely used in construction practice. Criteria for selection include accessibility, required grinding depth, the need for low vibration levels, and proximity to concrete and rock structures, which may be handled separately with Darda GmbH tools &#8211; from <strong>concrete demolition shear<\/strong> and <strong>hydraulic splitter<\/strong> to <em>Multi Cutters<\/em>. From a project perspective, the method with the lowest overall impact and cleanest material separation typically achieves the most reliable downstream performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A stump grinder &#8211; also called a stump cutter or stump milling machine &#8211; is used for the mechanical removal of tree stumps and larger root remnants in the ground. In the context of deconstruction, excavation of pit and utility line installation, it creates space, protects adjacent structures through low <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20194","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stump Grinder - Tree Stump Removal Machine<\/title>\n<meta name=\"description\" content=\"Learn how a stump grinder machine \u2713 removes tree stumps &amp; roots with low vibration, precise depth &amp; clean separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stump Grinder - Tree Stump Removal Machine\" \/>\n<meta property=\"og:description\" content=\"Learn how a stump grinder machine \u2713 removes tree stumps &amp; roots with low vibration, precise depth &amp; clean separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T13:46:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stump-grinder\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stump-grinder\",\"name\":\"Stump Grinder - Tree Stump Removal Machine\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-29T09:14:16+00:00\",\"dateModified\":\"2026-06-19T13:46:03+00:00\",\"description\":\"Learn how a stump grinder machine \u2713 removes tree stumps & roots with low vibration, precise depth & clean separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stump-grinder#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stump-grinder\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/stump-grinder#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Stump grinder\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stump Grinder - Tree Stump Removal Machine","description":"Learn how a stump grinder machine \u2713 removes tree stumps & roots with low vibration, precise depth & clean separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder","og_locale":"en_US","og_type":"article","og_title":"Stump Grinder - Tree Stump Removal Machine","og_description":"Learn how a stump grinder machine \u2713 removes tree stumps & roots with low vibration, precise depth & clean separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-19T13:46:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder","url":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder","name":"Stump Grinder - Tree Stump Removal Machine","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-29T09:14:16+00:00","dateModified":"2026-06-19T13:46:03+00:00","description":"Learn how a stump grinder machine \u2713 removes tree stumps & roots with low vibration, precise depth & clean separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/stump-grinder"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/stump-grinder#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Stump grinder"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20194","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20194"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20194\/revisions"}],"predecessor-version":[{"id":28487,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20194\/revisions\/28487"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}