{"id":20193,"date":"2026-01-29T09:54:58","date_gmt":"2026-01-29T08:54:58","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20193"},"modified":"2026-06-19T12:40:03","modified_gmt":"2026-06-19T10:40:03","slug":"apartment-deconstruction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction","title":{"rendered":"Apartment deconstruction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Apartment deconstruction describes the planned, selective removal of individual components within existing buildings. The aim is to restructure rooms, expose utilities, remove hazardous substances, or prepare structures for conversions <em>without<\/em> jeopardizing the overall stability of the building. In practice, strip-out, concrete demolition in existing structures, and precise cutting must meet high requirements for safety, cleanliness, and emissions control. Tools such as concrete demolition shears or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> make a key contribution because they work with low vibration, in a controlled and material-appropriate manner. In occupied properties and sensitive environments, <strong>low-vibration, low-dust, and spark-reduced methods<\/strong> enable precise interventions while protecting finishes and limiting noise transmission.<\/p>\n<h2>Definition: What is meant by apartment deconstruction?<\/h2>\n<p>Apartment deconstruction means the selective, usually partial demolition of components in the interior of a building. This includes removing non-load-bearing and partially load-bearing walls, opening slabs, replacing components, gutting bathrooms or kitchens, and preparing for new utility runs. In contrast to complete demolition, the focus is on the <strong>preservation of the remaining building fabric<\/strong>. Typical activities are drilling, cutting, breaking, and controlled splitting of concrete or masonry. In specialist usage, the process is also described as <em>interior demolition, selective dismantling, or strip-out in existing structures<\/em> where structural integrity must remain intact.<\/p>\n<p>Apartment deconstruction is closely linked to the application areas of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> as well as strip-out and cutting. Depending on the task, handheld hydraulic tools are used that generate little vibration and sparking. Concrete demolition shears enable controlled nibbling of reinforced concrete while simultaneously exposing the reinforcement, whereas stone and concrete splitters separate components by force-locking action without sawing into the structure. This creates openings or segments components that can subsequently be safely transported out of the building. <strong>Component protection<\/strong> through precise force application and minimal collateral damage is a central quality criterion.<\/p>\n<h2>Process and methods in apartment deconstruction<\/h2>\n<p>Efficient deconstruction follows a structured approach: from the existing-condition survey through planning and selection of suitable methods to source-separated sorting. The more precise the preparation, the safer and more economical the intervention &#8211; especially in occupied or sensitive environments.<\/p>\n<h3>Existing-condition survey and investigation<\/h3>\n<p>Before starting, plans, structural analysis, and layer build-ups are reviewed. Component thicknesses, degree of reinforcement, utility routing, and anchorage points are decisive for tool selection. An investigation of potential hazardous substances is generally carried out according to recognized rules &#8211; results influence the sequence of work and protective measures. Where available, scans and trial openings improve certainty regarding hidden elements, post-tensioning, or embedded components. Clear marking of cutting lines, no-go areas, and transport routes reduces interface risks.<\/p>\n<h3>Deconstruction concept and structural analysis<\/h3>\n<p>The deconstruction concept defines load-sequencing, load redistribution, and temporary supports. For wall or slab openings, a staged approach is recommended: pre-cutting, section-by-section nibbling with concrete demolition shears, segmenting by means of split cylinders, and controlled setting down of the segments. For confined conditions, weight limits per piece and handling aids are defined to avoid overloads and to keep cycles predictable.<\/p>\n<h3>Site setup and emissions protection<\/h3>\n<p>Indoors, dust suppression, noise reduction, and vibration control take priority. Water-mist systems, local enclosures, and short transport routes reduce impacts. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> are positioned with safe access and sufficient ventilation. Slurry capture, targeted drainage, and regular cleaning of work areas support hygiene and shorten subsequent fit-out times.<\/p>\n<h3>Selective deconstruction and material separation<\/h3>\n<p>Lightweight layers are removed first, followed by the processing of mineral components. Source-separated sorting of concrete, masonry, metal, and wood increases the recycling rate. Exposed reinforcement is cut with steel shears, which simplifies disposal. Sequencing aligns with protection goals: shielding of sensitive areas, immediate removal of loose debris, and short intermediate storage to maintain safe walkways.<\/p>\n<h2>Tools and methods: precise, low-vibration, controlled<\/h2>\n<p>In apartment deconstruction, robust yet compact systems prove their worth. They work close to the component, are highly maneuverable, and limit secondary damage. Particularly relevant are <strong>concrete demolition shears<\/strong> as well as <strong>stone and concrete splitters<\/strong>, supported by hydraulic power units. Key selection aspects include <em>power-to-weight ratio, jaw geometry or splitter cylinder size, hose management, and ergonomics<\/em> to maintain precision over longer cycles.<\/p>\n<h3>Concrete demolition shears for controlled interior demolition<\/h3>\n<p>Concrete demolition shears separate concrete locally, crush residual pieces, and expose reinforcement. Advantages include low vibration, no sparking, and little dust generation with suitable dust suppression. Typical applications: door and window openings, demolition of lintels, edge areas, and cantilevering components. In confined spaces, compact jaw geometries and rotatable couplings improve handling and precision. For dense reinforcement, controlled nibbling along marked lines minimizes microcracking in adjacent zones and facilitates clean edges for subsequent detailing.<\/p>\n<h3>Stone and concrete splitters for splitting-based component openings<\/h3>\n<p>Splitters generate directed splitting forces that open components along defined lines. The method is quiet, low-vibration, and suitable for massive components in which sawing or core drilling is only possible to a limited extent. The technique is also used in special demolition when vibrations must be minimized. Pre-drilled holes define the splitting axis, enable reproducible crack propagation, and reduce the need for secondary finishing.<\/p>\n<h3>Hydraulic power units as the energy source<\/h3>\n<p>Hydraulic power units feed concrete demolition shears, split cylinders, and other tools. Adequate flow rate, hose management, and secure couplings are important. With changing work locations, compact units with short setup times support efficient cycles. Noise shielding, remote start or emergency stop provisions, and regular pressure checks increase operational safety and availability.<\/p>\n<h3>Supplementary tools<\/h3>\n<p>Combination shears, multi cutters, steel shears, and tank cutters cover special tasks &#8211; from cutting structural steel sections to cutting reinforcement through to opening vessels. In apartment deconstruction, they are especially useful when steel parts are exposed, tailored cuts are required, or installations must be released with minimal damage. Coordinated tool changes limit downtime and maintain consistent cut quality.<\/p>\n<h2>Application areas and their relevance to apartment deconstruction<\/h2>\n<p>The requirements of apartment deconstruction overlap with several proven application areas:<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> precise component opening, segmental removal, low-vibration interventions in load-bearing areas.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> removal of fit-out trades, openings in walls and slabs, cutting of metal components.<\/li>\n<li><strong>Special operations:<\/strong> work under confined space conditions, sensitive environments, limited load capacities, and strict emissions requirements.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> the splitting principles proven there have advantages in massive areas of existing structures when hard-to-access zones must be opened gently.<\/li>\n<\/ul>\n<h2>Planning, safety, and protective measures<\/h2>\n<p>Safety has priority. The following points form a proven framework that is adapted to the specific project:<\/p>\n<ol>\n<li><strong>Clarify load transfer:<\/strong> distinguish load-bearing and non-load-bearing components, provide temporary shoring.<\/li>\n<li><strong>Define work sequence:<\/strong> strip-out, separate, remove partial segments, keep transport routes clear.<\/li>\n<li><strong>Emissions protection:<\/strong> dust suppression with water mist, local enclosure, extraction, and noise reduction.<\/li>\n<li><strong>Plan equipment deployment:<\/strong> hydraulic capacity, hose routing, working areas, escape routes.<\/li>\n<li><strong>Personal protective equipment:<\/strong> matched to the task and environment.<\/li>\n<\/ol>\n<p>Legal and regulatory frameworks must generally be observed and examined on a project-specific basis, particularly when intervening in load-bearing components and when hazardous substances may be present. Utility isolation, stability checks during interim states, and defined communication paths are integral to the method statement.<\/p>\n<h3>Risk assessment and permits<\/h3>\n<p>A structured risk assessment clarifies interfaces and obligations. Depending on scope, permits or notifications may be required for interventions in load-bearing components, traffic management for removal logistics, or hazardous substance handling. Typical checks include:<\/p>\n<ul>\n<li><strong>Service isolation and verification:<\/strong> electrical, gas, water, and data lines marked and made safe.<\/li>\n<li><strong>Neighboring impact management:<\/strong> working hours, noise or vibration limits, and monitoring concept.<\/li>\n<li><strong>Temporary works design:<\/strong> shoring, propping, and release procedures for each stage.<\/li>\n<li><strong>Emergency preparedness:<\/strong> access, first-aid provisions, and clear stop rules.<\/li>\n<\/ul>\n<h2>Material separation, recycling, and disposal<\/h2>\n<p>A central goal is <em>source-separated sorting<\/em>. It increases reuse and recovery rates and reduces disposal costs. In practice, a component-based separation logic has proven effective: mineral fractions (concrete, masonry) separated from metals, wood, and composites. Reinforcement can be efficiently separated with steel shears; concrete demolition shears produce manageable piece sizes for removal. Clear labeling of the fractions facilitates logistics and documentation. Where feasible, <strong>reuse<\/strong> of intact components and closed material loops further reduce embodied impacts.<\/p>\n<h2>Typical use cases in apartment deconstruction<\/h2>\n<ul>\n<li>Creating wall openings for doors and passages in reinforced concrete or masonry.<\/li>\n<li>Enlarging window openings while stabilizing edge zones.<\/li>\n<li>Selective removal of slab edges for new stair or service shafts.<\/li>\n<li>Removing pedestals, downstand beams, lintels, or upstands.<\/li>\n<li>Exposing and cutting reinforcement, brackets, embedded components, and sections.<\/li>\n<li>Dismantling heavy installations in bathrooms and kitchens followed by new utility routing.<\/li>\n<li>Cutting recesses and chases for mechanical, electrical, and plumbing runs with controlled tolerances.<\/li>\n<\/ul>\n<h2>Low vibration, low dust, noise-aware: working on existing structures<\/h2>\n<p>In occupied buildings, secondary impacts often matter more than pure removal performance. Hydraulic methods with concrete demolition shears or splitters minimize vibrations, reduce sparking, and combine well with dust suppression measures. Short work windows, forward-looking staged planning, and a clean site process strengthen acceptance and quality. <strong>Monitoring<\/strong> with vibration and noise measurements, along with consistent housekeeping and signage, underpins compliance and reduces rework.<\/p>\n<h2>Specifics in solid and mixed construction<\/h2>\n<p>Existing structures often feature changing material zones: from reinforced concrete to solid and perforated brick through to composite constructions. A <strong>component-specific tool selection<\/strong> is crucial: splitters for massive, crack-poor areas; concrete demolition shears for precise removal and exposing; steel shears for reinforcement and sections. In older buildings, previous refurbishments, additional loads, or hidden embedded parts are to be expected &#8211; trial openings and measurements help avoid surprises. Particular caution applies to prestressed or post-tensioned elements where release procedures and specialist input are mandatory.<\/p>\n<h2>Project organization and documentation<\/h2>\n<p>Transparent workflows facilitate coordination and evidence. Component and section logs, photo documentation before\/after each step, and continuous recording of material flows are advisable. The documentation supports billing, disposal records, and handover to follow-on trades. Digital checklists and brief daily reports make progress traceable, enable quick adjustments, and provide a defensible record of emissions controls and protection measures.<\/p>\n<h3>Monitoring and quality assurance<\/h3>\n<p>Quality assurance links method, protection goals, and acceptance criteria. Typical elements include:<\/p>\n<ul>\n<li><strong>Pre-start checks:<\/strong> tool condition, hydraulic pressures, and enclosure integrity.<\/li>\n<li><strong>In-process controls:<\/strong> cut-line adherence, segment weights, and protection of adjacent finishes.<\/li>\n<li><strong>Completion criteria:<\/strong> edge quality, dimensional tolerances, and cleanliness for follow-on trades.<\/li>\n<\/ul>\n<h2>Economic factors and influencing variables<\/h2>\n<ul>\n<li>Component thickness, degree of reinforcement, and accessibility determine pacing and tool selection.<\/li>\n<li>Transport routes, crane or stair use, and intermediate storage areas influence logistics times.<\/li>\n<li>Emissions protection, work windows, and neighborhood constraints affect staging.<\/li>\n<li>Sorting quality reduces disposal costs and increases recycling revenues.<\/li>\n<li>Setup times of hydraulic power units and tool changes determine productivity.<\/li>\n<li>Coordination effort with stakeholders and the required documentation depth influence overheads.<\/li>\n<\/ul>\n<h2>Sustainability and circular construction<\/h2>\n<p>Selective deconstruction lays the foundation for reuse and high-quality recycling. Precise work &#8211; such as segment-by-segment nibbling with concrete demolition shears or line-accurate splitting &#8211; preserves component qualities, facilitates separation, and reduces resource consumption. In this way, apartment deconstruction evolves from a necessary intervention into an active building block of a <em>circular<\/em> construction practice. Balancing structural goals with <strong>embodied carbon<\/strong> considerations and maximizing material recovery strengthens overall project sustainability.<\/p>\n<h2>Selection criteria for tools and methods<\/h2>\n<p>Tool selection is based on the component, environment, and objective:<\/p>\n<ul>\n<li><strong>Component parameters:<\/strong> thickness, reinforcement, material matrix, moisture.<\/li>\n<li><strong>Environment:<\/strong> space constraints, support scaffolds, protective walls, escape routes.<\/li>\n<li><strong>Emissions targets:<\/strong> vibration, dust, and noise limits.<\/li>\n<li><strong>Energy supply:<\/strong> hydraulic power units, hose runs, coupling systems.<\/li>\n<li><strong>Downstream process:<\/strong> piece sizes for removal, sorting logic, recycling paths.<\/li>\n<\/ul>\n<p>Preference is given to the least invasive method that meets the objective and complies with emissions and quality targets. The result is a project-specific combination: concrete demolition shears for precise concrete removal, stone and concrete splitters for controlled openings, supplemented by steel shears and other cutting tools &#8211; powered by reliable hydraulic power units. In this way, apartment deconstruction combines quality, safety, and efficiency in existing structures.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Apartment deconstruction describes the planned, selective removal of individual components within existing buildings. The aim is to restructure rooms, expose utilities, remove hazardous substances, or prepare structures for conversions without jeopardizing the overall stability of the building. In practice, strip-out, concrete demolition in existing structures, and precise cutting must meet <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20193","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Apartment Deconstruction | Interior Demolition<\/title>\n<meta name=\"description\" content=\"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration &amp; precise dust control indoors.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Apartment Deconstruction | Interior Demolition\" \/>\n<meta property=\"og:description\" content=\"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration &amp; precise dust control indoors.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T10:40:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/apartment-deconstruction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/apartment-deconstruction\",\"name\":\"Apartment Deconstruction | Interior Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-29T08:54:58+00:00\",\"dateModified\":\"2026-06-19T10:40:03+00:00\",\"description\":\"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration & precise dust control indoors.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/apartment-deconstruction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/apartment-deconstruction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/apartment-deconstruction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Apartment deconstruction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Apartment Deconstruction | Interior Demolition","description":"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration & precise dust control indoors.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction","og_locale":"en_US","og_type":"article","og_title":"Apartment Deconstruction | Interior Demolition","og_description":"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration & precise dust control indoors.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-19T10:40:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction","url":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction","name":"Apartment Deconstruction | Interior Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-29T08:54:58+00:00","dateModified":"2026-06-19T10:40:03+00:00","description":"Selective interior demolition in apartment deconstruction, safe planning \u2713 low vibration & precise dust control indoors.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/apartment-deconstruction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Apartment deconstruction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20193"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20193\/revisions"}],"predecessor-version":[{"id":28479,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20193\/revisions\/28479"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}