{"id":20192,"date":"2026-01-29T15:46:19","date_gmt":"2026-01-29T14:46:19","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20192"},"modified":"2026-06-19T13:17:03","modified_gmt":"2026-06-19T11:17:03","slug":"residential-building-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition","title":{"rendered":"Residential building demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Residential building demolition refers to the controlled deconstruction of single- and multi-family houses as well as residential buildings in dense neighborhoods. The aim is safe, low-vibration and materially clean separation of structural elements to minimize construction debris, increase recycling rates and protect the surroundings. The focus is on selective deconstruction, precise cutting and separation, and the use of hydraulic tools such as concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> in combination with suitable hydraulic power packs from Darda GmbH. In practice, this enables low-noise, low-dust work in space-limited, community-sensitive environments with a strong emphasis on resource efficiency and circularity.<\/p>\n<h2>Definition: What is meant by residential building demolition?<\/h2>\n<p>Residential building demolition is the planned and orderly deconstruction of a residential building up to the complete removal of the structures and &#8211; depending on the objective &#8211; the foundations. It includes building gutting, selective dismantling of load-bearing components, separation of construction materials (concrete, masonry, wood, metal), low-emission crushing, and hauling away or recycling of materials. Key criteria are occupational safety, structural analysis, neighbor protection, noise reduction measures and dust suppression, as well as transparent documentation. In residential environments, a <em>controlled, stepwise deconstruction<\/em> has proven effective, in which low-vibration methods &#8211; such as hydraulic splitting and shear-based demolition &#8211; often replace blasting or percussive techniques.<\/p>\n<p>In many projects, a distinction is made between <em>demolition<\/em> and <em>deconstruction<\/em>: demolition targets efficient removal, while deconstruction prioritizes material recovery via selective dismantling. A pre-demolition survey and material inventory typically precede both approaches to identify reusable elements, hazardous substances and structurally critical zones.<\/p>\n<h2>Process and planning for residential building demolition<\/h2>\n<p>The success of a residential building demolition is determined during preparation. A structured approach reduces risks, costs and construction time and facilitates clean, single-grade material separation.<\/p>\n<h3>Step-by-step approach<\/h3>\n<ol>\n<li><strong>As-built assessment<\/strong>: capture drawings, structural analysis, materials, extensions, utility connections, year of construction (suspicious periods for hazardous substances), access routes and adjacent buildings.<\/li>\n<li><strong>Demolition plan<\/strong>: deconstruction sequence, partial demolition versus complete demolition, protection of neighboring buildings, temporary shoring, emissions and construction logistics concept.<\/li>\n<li><strong>Permits and notices<\/strong>: demolition notice(s), traffic management orders, protective measures &#8211; always in line with locally applicable requirements and technical standards, without case-specific advice.<\/li>\n<li><strong>Service disconnection and isolation<\/strong>: verification of gas, electricity, district heating, water and data lines including lockout-tagout, pressure relief and final clearance.<\/li>\n<li><strong>Building gutting<\/strong>: removal of non-load-bearing components, installations, wood elements, doors\/windows, floor coverings; systematic material separation.<\/li>\n<li><strong>Component separation<\/strong>: controlled cutting, shear-based demolition or splitting of concrete\/masonry; planned load transfer.<\/li>\n<li><strong>Foundations and subsoil<\/strong>: choose between demolition, splitting or partial remaining; if necessary, rock excavation\/loosening for new excavation pits.<\/li>\n<li><strong>Recycling and disposal<\/strong>: single-grade fractions, documentation, value chains for mineral construction debris and metals.<\/li>\n<\/ol>\n<p>Clear hold points for inspections, vibration and dust monitoring plans, and defined communication channels with stakeholders lead to predictable progress and measurable quality.<\/p>\n<h2>Selective deconstruction and building gutting in residential settings<\/h2>\n<p>Building gutting prepares the actual demolition: the aim is low-contaminant, single-grade and manageable dismantling. Indoors, compact, precise tools play a major role.<\/p>\n<h3>Tools and work steps<\/h3>\n<ul>\n<li><strong>Multi Cutters<\/strong> and <strong>combination shears<\/strong> for installations, profiles, window\/door frames, light steel elements and composite components.<\/li>\n<li><strong>Steel shears<\/strong> for reinforcing steel, beams and railings, especially where movement space is limited.<\/li>\n<li><strong>Concrete demolition shears<\/strong> for clean removal of reinforced concrete elements, e.g., for openings in walls and ceilings.<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a><\/strong> from Darda GmbH reliably and energy-efficiently supply mobile tools in confined, poorly ventilated areas.<\/li>\n<\/ul>\n<p>The combination of saw-free separation cuts, shear-based demolition and targeted splitting reduces sparks, dust exposure and vibrations &#8211; an advantage in inhabited neighborhoods. Additional efficiency is achieved through pre-sorting at source, short internal transport routes and the use of low-noise working windows.<\/p>\n<h2>Methods of component separation: concrete demolition shears and splitting technique<\/h2>\n<p>The choice of method depends on structural analysis, material, member thickness and environmental sensitivity. The goal is controlled, reproducible separation with minimal secondary damage.<\/p>\n<h3>Concrete demolition shears in load-bearing areas<\/h3>\n<p><strong>Concrete demolition shears<\/strong> enable powerful engagement in reinforced concrete with high precision. Typical applications:<\/p>\n<ul>\n<li>Ceiling openings for utility routing or stair flights<\/li>\n<li>Deconstruction of balcony slabs and lintels<\/li>\n<li>Removal of upstands and ring beams<\/li>\n<li>Core and shaft openings where cutting depth is limited<\/li>\n<\/ul>\n<p>Advantages include a good ratio of crushing force, control and lower vibration compared with percussive methods. For reinforcement control, rebar mapping and staged cuts help avoid uncontrolled crack propagation and preserve adjacent finishes.<\/p>\n<h3>Rock and concrete splitters for low-vibration deconstruction<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> &#8211; including <strong>rock wedge splitter cylinders<\/strong> &#8211; generate high spreading forces in predrilled holes. This allows massive foundations, shear walls or masonry assemblies to be separated <em>quietly and with low vibration<\/em>. The method is ideal for:<\/p>\n<ul>\n<li>Foundation demolition adjacent to sensitive buildings<\/li>\n<li>Partial deconstruction of load-bearing elements without uncontrolled crack propagation<\/li>\n<li>Special operations in interiors, basements and narrow shafts<\/li>\n<li>Work under noise restrictions or time-window constraints<\/li>\n<\/ul>\n<p>In combination with <strong>hydraulic power packs<\/strong> from Darda GmbH, long work cycles can be achieved reliably. Uniform hole patterns and appropriate spacing improve splitting efficiency and keep edges stable.<\/p>\n<h2>Application areas in residential building demolition<\/h2>\n<p>The tasks in residential building demolition cover multiple application areas that often overlap in practice.<\/p>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: targeted removal of reinforced concrete members with concrete demolition shears or splitting technique; controlled load redistribution.<\/li>\n<li><strong>Building gutting and cutting<\/strong>: dismantling of fit-out and installation components, separation cuts in composite materials, preparation for shear or splitting operations.<\/li>\n<li><strong>Special operations<\/strong>: work in confined spaces, overhead, near sensitive components or with ongoing neighborhood use.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: relevant with rocky subsoil under existing foundations; low-vibration splitting protects adjacent structures.<\/li>\n<li><strong>Natural stone extraction<\/strong>: methodological parallels in splitting natural stone show precise, crack-controlled approaches &#8211; transferable to massive foundation bodies.<\/li>\n<li><strong>Facade retention and heritage protection<\/strong>: selective deconstruction behind retained facades with strict vibration and dust limits.<\/li>\n<\/ul>\n<h2>Dismantling of steel and tanks in existing buildings<\/h2>\n<p>In residential buildings, steel beams, reinforcement and old heating oil tanks are not uncommon. The following tools have proven effective for safe dismantling:<\/p>\n<ul>\n<li><strong>Steel shears<\/strong> for reinforcement, beams and railing segments<\/li>\n<li><strong>Combination shears<\/strong> for mixed tasks with changing materials<\/li>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter TC120<\/a><\/strong> for steel and heating oil tanks in basement areas, including segmentation for removal<\/li>\n<\/ul>\n<p>Work is carried out after prior emptying, cleaning and ventilation of the vessels and in compliance with generally accepted safety standards. Information is fundamentally general and not case-specific. Where hot-work cannot be avoided, fire watch, spark containment and gas monitoring are part of the control strategy.<\/p>\n<h2>Emission reduction: noise, dust and vibrations<\/h2>\n<p>In residential settings, the reduction of emissions is central. Hydraulic methods score through controlled force transmission.<\/p>\n<ul>\n<li><strong>Dust<\/strong>: localized water misting at shears and splitting points; short work intervals; material-appropriate separation sequence.<\/li>\n<li><strong>Noise<\/strong>: use of lower-noise hydraulic tools, moderate cycling, shielding at sensitive areas.<\/li>\n<li><strong>Vibrations<\/strong>: shear-based demolition and splitting techniques instead of percussive methods; monitoring when adjacent buildings are present.<\/li>\n<\/ul>\n<p>Baseline measurements and continuous monitoring support compliance with project-specific limits. Enclosures, negative-pressure zones for critical interiors and clean site access routes reduce spread to neighboring areas.<\/p>\n<h2>Material separation, recycling and resource efficiency<\/h2>\n<p>Clean separation increases recycling rates and reduces disposal costs.<\/p>\n<ul>\n<li>Concrete and masonry: crushing or splitting, separation of reinforcement with steel shears; use as recycled concrete aggregate depending on regional provisions.<\/li>\n<li>Metals: collect sorted by type (steel, copper, aluminum) &#8211; economically valuable and readily recyclable.<\/li>\n<li>Wood, glass, plastics: separate already during building gutting to avoid mixing.<\/li>\n<li>Plasterboard and gypsum: keep strictly separate to prevent sulfates contaminating mineral fractions.<\/li>\n<\/ul>\n<p>Documentation of material flows supports evidence and quality assurance. Reuse options for doors, fixtures or timber can be evaluated early to raise circular value and reduce transport volumes.<\/p>\n<h2>Safety and hazardous substances<\/h2>\n<p>Occupational safety and health take top priority. This includes hazard analysis, instruction, personal protective equipment, cordoning off and clear communication channels. In the case of potential hazardous substances &#8211; for example asbestos in older plasters and panels, tar-containing waterproofing or man-made mineral fibers &#8211; special technical rules, qualifications and separate procedures typically apply. These notes are general in nature and do not replace a case-by-case assessment.<\/p>\n<ul>\n<li><strong>Typical controls<\/strong>: access control, edge protection, fall arrest, secure lifting points and exclusion zones.<\/li>\n<li><strong>Utilities safety<\/strong>: verified isolation, residual energy discharge and protection against inadvertent re-energization.<\/li>\n<li><strong>Process safety<\/strong>: staged dismantling with load paths verified before each cut, combined with real-time communication.<\/li>\n<\/ul>\n<h2>Construction logistics and documentation<\/h2>\n<p>Smooth processes reduce downtime and emissions. Short transport routes, coordinated container logistics, defined intermediate storage areas and graduated deconstruction zones have proven effective. Complete documentation covers the demolition plan, approvals, inspection and maintenance records of the hydraulic power packs from Darda GmbH used, as well as weigh tickets and disposal certificates.<\/p>\n<p>Digital logs with photo evidence, container identification and time-stamped weighbridge data improve traceability. Clear site signage and just-in-time deliveries reduce congestion and neighborhood disturbance.<\/p>\n<h2>Practical equipment selection in residential building demolition<\/h2>\n<p>Tool selection follows the principle: as precise as necessary, as low-emission as possible.<\/p>\n<ul>\n<li><strong>Concrete demolition shears<\/strong> for load-bearing reinforced concrete components, openings and edge removal<\/li>\n<li><strong>Rock and concrete splitters<\/strong> for massive foundations, confined situations and sensitive neighborhoods<\/li>\n<li><strong>Hydraulic power packs<\/strong> as compact, reliable energy sources for mobile applications<\/li>\n<li><strong>Multi Cutters<\/strong> and <strong>combination shears<\/strong> for variable cutting tasks in building gutting<\/li>\n<li><strong>Steel shears<\/strong> for reinforcing steel and beams<\/li>\n<li><strong>Tank cutters<\/strong> for segmented dismantling of basement tanks<\/li>\n<\/ul>\n<p>Selection criteria include member geometry, reinforcement density, permissible vibrations, disposal pathways and available power supply. Matching jaw opening to element thickness and planning reaction forces for splitting improves control and reduces rework.<\/p>\n<h2>Special situations: partial demolition and work in existing structures<\/h2>\n<p>In partial demolition, selected parts of the building remain. Important are structural safeguards, protection against moisture and dirt ingress and finely tuned sequencing of separation steps. Concrete demolition shears and splitting cylinders help release components in a controlled manner without overloading the remaining structure. In mixed construction (brick masonry load-bearing structure with reinforced concrete slabs), the combination of shear-based demolition, cutting and targeted splitting has proven effective.<\/p>\n<p>Temporary shoring, weatherproofing and monitoring of deflections at residual structures are essential until the new load path is established. Interfaces with refurbishment trades should be scheduled to minimize idle time and protect cleaned surfaces.<\/p>\n<h2>Quality criteria for a successful residential building demolition<\/h2>\n<ul>\n<li>Coherent demolition and disposal concept with a clear sequence<\/li>\n<li>Single-grade separation and high recycling rate<\/li>\n<li>Low emissions through hydraulic, low-vibration methods<\/li>\n<li>Traceable documentation and records<\/li>\n<li>Safe, ergonomic workflows with suitable tools from Darda GmbH<\/li>\n<li>Verified monitoring results within planned limits for noise, dust and vibrations<\/li>\n<li>Transparent stakeholder communication and well-managed interfaces to follow-on trades<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Residential building demolition refers to the controlled deconstruction of single- and multi-family houses as well as residential buildings in dense neighborhoods. The aim is safe, low-vibration and materially clean separation of structural elements to minimize construction debris, increase recycling rates and protect the surroundings. The focus is on selective deconstruction, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20192","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Residential Building Demolition Process &amp; Methods<\/title>\n<meta name=\"description\" content=\"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Residential Building Demolition Process &amp; Methods\" \/>\n<meta property=\"og:description\" content=\"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T11:17:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/residential-building-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/residential-building-demolition\",\"name\":\"Residential Building Demolition Process & Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-29T14:46:19+00:00\",\"dateModified\":\"2026-06-19T11:17:03+00:00\",\"description\":\"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/residential-building-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/residential-building-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/residential-building-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Residential building demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Residential Building Demolition Process & Methods","description":"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition","og_locale":"en_US","og_type":"article","og_title":"Residential Building Demolition Process & Methods","og_description":"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-19T11:17:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition","name":"Residential Building Demolition Process & Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-29T14:46:19+00:00","dateModified":"2026-06-19T11:17:03+00:00","description":"Explore residential building demolition for safe low vibration deconstruction \u2713 selective material recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/residential-building-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Residential building demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20192"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20192\/revisions"}],"predecessor-version":[{"id":28483,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20192\/revisions\/28483"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}