{"id":20181,"date":"2026-01-28T15:36:51","date_gmt":"2026-01-28T14:36:51","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20181"},"modified":"2026-09-12T19:53:39","modified_gmt":"2026-09-12T17:53:39","slug":"remanufacturing","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing","title":{"rendered":"Remanufacturing"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Remanufacturing in construction describes the deliberate recovery and renewed use of construction materials and components from deconstruction, demolition, and interior demolition. At its core are <strong>single-grade separation<\/strong> (mono-material), <strong>material-conserving size reduction<\/strong>, and an efficient process chain from the component to the secondary raw material. In practice, technical processes merge with pragmatic on-site decisions: <em>mechanical severing, targeted splitting, controlled cutting<\/em>, and downstream processing. For activities in concrete demolition and special demolition, interior demolition and cutting, as well as rock excavation and tunnel construction, tools such as concrete pulverizers, rock and concrete splitters, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a>, combination shears, steel shears, multi cutters, tank cutters, and rock wedge splitters are central building blocks for producing high-quality recycling fractions. Well-coordinated <em>pre-crushing<\/em>, <em>clean separation<\/em>, and <em>low-emission handling<\/em> determine the value of the resulting secondary aggregates and reusable components.<\/p>\n<h2>Definition: What is meant by remanufacturing?<\/h2>\n<p>Remanufacturing encompasses all measures that, after their first use, through <strong>cleaning, separation, mechanical processing, or repair<\/strong>, prepare substances, components, or materials for renewed use or as secondary raw materials. In the context of building, this includes in particular the <em>selective dismantling<\/em> of components, the <em>single-grade separation<\/em> of construction materials (e.g., concrete, steel, masonry, natural stone), as well as <em>material-conserving size reduction<\/em> to obtain defined gradings with low fines content. The goal is high-quality valorization, for example as aggregate in recycled concrete, as base-course material in road construction, or as a reusable component. Remanufacturing differs from disposal through its processing and reuse steps. Effects on transport, landfill loads, and the carbon footprint must be calculated against a defined disposal scenario with stated life-cycle boundaries and documented data. Where quality allows, <strong>direct component reuse<\/strong> can be evaluated as an alternative to material recycling; any ecological comparison requires defined indicators, system boundaries, and documented data.<\/p>\n<h2>Methods and tools for remanufacturing in deconstruction<\/h2>\n<p>The choice of method influences the quality, safety, and cost-effectiveness of processing. Mechanical separation and size-reduction techniques are combined so that <em>reinforcement steel<\/em> is cleanly separated, <em>concrete<\/em> is broken down into suitable gradings, and <em>contaminants<\/em> are minimized. Concrete pulverizers reduce components in a controlled manner, rock and concrete splitters create cracks along natural planes of weakness, and hydraulic power packs deliver the necessary drive power. Combination shears, steel shears, and multi cutters take care of cutting profiles, reinforcement, and composite assemblies; tank cutters are used for special operations. Rock wedge splitters can be considered as an alternative to blasting; vibration and block reusability must be assessed for the same task under comparable conditions.<\/p>\n<ul>\n<li><strong>Selection criteria:<\/strong> target grading and fines limit, reinforcement density, material strength, access constraints, emission limits, and required throughput.<\/li>\n<li><strong>Interface quality:<\/strong> clean separation cuts and defined fracture lines reduce downstream crusher wear and improve particle shape.<\/li>\n<li><strong>Contaminant control:<\/strong> early removal of coatings, embedded parts, and attachments increases single-grade purity and marketability.<\/li>\n<\/ul>\n<h2>Importance in concrete demolition and special demolition<\/h2>\n<p>In concrete demolition, the type of pre-crushing determines the subsequent value of recycling fractions. <strong>Concrete pulverizers<\/strong> enable nibbling of component edges, opening of slabs, and releasing of columns with comparatively low fines content. <strong>Rock and concrete splitters<\/strong> produce directed crack patterns, yielding large, geometrically favorable pieces. Combination shears and steel shears cut reinforcement so that steel can be collected separately. Hydraulic power packs supply attached and handheld tools with constant working pressure and flow rate, which is essential for reproducible fragment quality. Overall, <em>single-grade material streams<\/em> are created that are suitable for high-quality remanufacturing applications. Additional effects include reduced microcracking, improved <em>particle shape<\/em> and flakiness indices, and stable feed behavior in subsequent crushing and screening.<\/p>\n<h2>Process chain: From condition assessment to secondary raw materials<\/h2>\n<p>A functioning remanufacturing effort follows a clear sequence. The rule is: The earlier separability and material paths are planned, the higher the degree of processing.<\/p>\n<h3>1. Investigation and planning<\/h3>\n<p>A materials register, material samples, and the deconstruction concept define target gradings, separation points, and work sequences. Potential contaminants (adhesions, coatings, embedded parts) are identified so they can be removed at an early stage. Where available, digital as-built data and material documentation shorten investigation times and improve forecasts for purity and yield.<\/p>\n<h3>2. Interior demolition and selective separation<\/h3>\n<p>Interior finishes, installations, and embedded elements are dismantled. Multi cutters and combination shears accelerate the separation of heterogeneous materials. Tank cutters are used when closed vessels or thick-walled hollow bodies need to be opened safely. Removing mixed layers early keeps subsequent material streams clean and reduces post-sorting.<\/p>\n<h3>3. Pre-crushing at the component<\/h3>\n<p>Concrete pulverizers reduce cross-sections, create gripping edges, and free reinforcement. Rock and concrete splitters as well as rock wedge splitters induce defined cracks to release large chunks without impact energy. Noise, dust and fines generation must be measured for the selected method and compared with a defined alternative. Pre-crushing aligned with reinforcement and casting joints yields cubical pieces with favorable fracture surfaces.<\/p>\n<h3>4. Sorting and intermediate storage<\/h3>\n<p>Magnetic separators and manual sorting remove steel. Concrete, masonry, and natural stone are stockpiled separately in heaps with homogeneous grading. Short travel paths and clean storage pads prevent mixing. Clearly marked zones and covered storage for sensitive fractions support consistent quality.<\/p>\n<h3>5. Mobile or stationary processing<\/h3>\n<p>Crushers, screens, and air classifiers produce the target grading. The quality of the pre-demolition determines efficiency: The more single-grade and cubical the feed, the less rework is required. Hydraulic power packs must operate stably to ensure consistent size-reduction performance of the connected tools. Process parameters such as jaw gap, feed rate, and screen media should match the defined end use.<\/p>\n<h3>6. Quality control and handover<\/h3>\n<p>Spot checks of grading curves, fines content, and impurity share verify results. Documentation and labeling accompany the material to transfer points or end users and create transparency for subsequent use.<\/p>\n<h2>Material flows, quality, and applications<\/h2>\n<p>Remanufactured construction materials are assigned to different applications depending on purity and size range. Concrete recycling material with low fines content is suitable as aggregate for recycled concrete or as an unbound base course. Natural stone from rock excavation can be reused as masonry stone, riprap, or high-grade chippings. Reinforcement steel is recycled as scrap. Decisive factors are <strong>single-grade purity<\/strong>, <em>particle shape<\/em>, <em>grading<\/em>, and compliance with recognized rules of engineering. Regional requirements and technical codes must be observed; legal requirements should generally be reviewed without anticipating the individual case.<\/p>\n<ul>\n<li><strong>High-purity, cubical concrete fractions:<\/strong> potential for bound applications with elevated performance requirements.<\/li>\n<li><strong>Mixed mineral fractions with higher fines:<\/strong> suitable for sub-base and backfilling where specifications permit.<\/li>\n<li><strong>Blocky natural stone:<\/strong> reuse as dimension stone or shaped masonry after minor formatting.<\/li>\n<li><strong>Clean steel cuttings:<\/strong> direct transfer to metal recycling with favorable yield.<\/li>\n<\/ul>\n<h2>Remanufacturing of concrete: minimize fines, maximize quality<\/h2>\n<p>For concrete, pre-crushing determines later use: <em>low fines content<\/em>, <em>cubical particle shape<\/em>, and <em>freed reinforcement<\/em> are the ideal targets. Concrete pulverizers create defined fracture edges without grinding the concrete. Rock and concrete splitters utilize controlled crack formation and reduce impact energy &#8211; an advantage in sensitive environments. Steel shears cut reinforcement so the crushing process is not overloaded by tough steels. The result is high-quality gradings suitable for more demanding remanufacturing applications. Where pre-stressing or high-strength concretes are present, cutting and splitting strategies must be adapted to maintain safety and fragment geometry.<\/p>\n<h2>Remanufacturing of natural stone and rock<\/h2>\n<p>In natural stone extraction and tunnel construction, low-vibration methods are in demand. Rock wedge splitters and rock and concrete splitters open discontinuities in the rock, allowing large blocks to be released with minimal crack damage. This increases reusability as block or masonry stone. Where reworking is necessary, multi cutters and combination shears adapt formats or cut anchor and embedded parts. In special operations &#8211; such as in confined spaces or sensitive structures &#8211; these methods excel through low emissions. Aligning splitting with bedding planes and joints improves block integrity and reduces waste.<\/p>\n<h2>Safety, emissions, and framework conditions<\/h2>\n<p>Dust, noise, and vibrations are central aspects in deconstruction. Emissions and effects on the surroundings from controlled splitting and targeted jaw opening must be assessed for the project and compared with a defined alternative. The relevant safety rules apply to all work. Hazards must be assessed in advance; protective measures (e.g., extraction, wetting, shielding, personal protective equipment) must be defined on a project-specific basis. Permit and notification procedures may be relevant depending on region and activity; legal requirements should always be checked in general terms without replacing case-specific advice.<\/p>\n<ul>\n<li><strong>Emission control:<\/strong> water suppression and local extraction reduce dust; acoustic shielding limits noise.<\/li>\n<li><strong>Vibration management:<\/strong> splitting and nibbling minimize structure-borne sound and protect adjacent buildings.<\/li>\n<li><strong>Energy safety:<\/strong> constant hydraulic pressures and monitored hose integrity prevent failures and leaks.<\/li>\n<\/ul>\n<h2>Economics and ecology of remanufacturing<\/h2>\n<p>Effects of remanufacturing on landfill volumes, transport distances, and primary raw material demand must be quantified against a defined alternative. The economic assessment covers labor time, the energy demand of hydraulic power packs, tool wear, logistics, and the quality premium of the produced fractions. Efficiency, downstream processing, emissions, transport and material recovery for concrete pulverizers and rock and concrete splitters must be assessed against a defined alternative. Any climate claim requires stated system boundaries and a documented calculation. Transparent tracking of fuel use, energy intensity per ton processed, and avoided ton-kilometers supports optimization and reporting.<\/p>\n<ul>\n<li><strong>Cost levers:<\/strong> pre-separation quality, changeover times, wear parts management, haul road design, and on-site stockpile logistics.<\/li>\n<li><strong>Value levers:<\/strong> higher sales potential for clean, defined gradings and reduced gate fees for disposal.<\/li>\n<\/ul>\n<h2>Practical guide: Tool selection by component and objective<\/h2>\n<p>Tool selection follows the component, the environment, and the desired material output.<\/p>\n<ul>\n<li>Massive slabs and walls: Pre-open with concrete pulverizers, then split with rock and concrete splitters to obtain large, easily crushable pieces.<\/li>\n<li>Heavily reinforced nodes: Expose with a concrete pulverizer, cut reinforcement with steel shears, then follow up with targeted breaking.<\/li>\n<li>Composites and embedded parts: Multi cutters and combination shears for flexible separation cuts on profiles, sheets, and composite materials.<\/li>\n<li>Rock and natural stone: Rock wedge splitters for low-vibration block release, formatting with hand tools if required.<\/li>\n<li>Special operations (e.g., tanks, hollow bodies): Tank cutters for controlled opening in compliance with safety rules.<\/li>\n<li>Confined urban sites: Prefer low-vibration splitting and precise cutting to meet emission and neighborhood requirements.<\/li>\n<\/ul>\n<h2>Avoiding common mistakes<\/h2>\n<ol>\n<li>Excessive impact energy: Leads to high fines and poor particle shape. Prefer material-conserving, jaw- and split-based methods.<\/li>\n<li>Insufficient strip-out: Residual materials degrade the quality of the recycling fraction and increase the effort for post-sorting.<\/li>\n<li>Missing reinforcement separation: Not cutting steel burdens crushers and reduces the yield of usable gradings.<\/li>\n<li>Unsteady hydraulic supply: Fluctuating working pressure of hydraulic power packs diminishes tool performance and fragment quality.<\/li>\n<li>Mixed stockpiling: Different materials and gradings must not be stored together to avoid quality losses.<\/li>\n<li>Incomplete documentation: Missing labels and absent process records hinder traceability and market acceptance.<\/li>\n<\/ol>\n<h2>Quality assurance and documentation<\/h2>\n<p>Regular visual inspections, spot checks of particle size distribution, and recording of process parameters (e.g., tool type, pressure, cutting sequence) improve reproducibility. Clear labeling of stockpiles, clean handling areas, and documented haulage logistics create traceability and trust along the entire value chain of remanufacturing. Consistent sampling points and retention samples underpin quality statements and facilitate acceptance by end users.<\/p>\n<ul>\n<li><strong>KPIs:<\/strong> fines share, impurity content, particle shape metrics, and yield per operating hour.<\/li>\n<li><strong>Records:<\/strong> equipment settings, energy consumption, environmental measures, and test results with date and location.<\/li>\n<\/ul>\n<h2>Application areas of remanufacturing: fields of practice<\/h2>\n<p>In <strong>concrete demolition and special demolition<\/strong>, concrete pulverizers, rock and concrete splitters, and steel shears determine the quality of concrete and steel fractions. In <strong>interior demolition and cutting<\/strong>, multi cutters, combination shears, and tank cutters are used for the structured separation of embedded elements and hollow bodies. In <strong>rock excavation and tunnel construction<\/strong>, rock wedge splitters ensure low-vibration block extraction. In <strong>natural stone extraction<\/strong>, controlled splitting preserves material value. <strong>Special operations<\/strong> require low-emission, precise methods that protect the surroundings and enable high-quality remanufacturing streams. The decisive factor across all fields is a coordinated interface between dismantling, pre-crushing, sorting, and processing.<\/p>\n<h2>Planning for circular construction<\/h2>\n<p>Forward-looking planning facilitates remanufacturing. Demolition and deconstruction concepts define separation points, material targets, and tool sequences. Digital as-built data, systematic material capture, and clear logistics paths increase the quality of secondary raw materials. Those who consider separability already in the planning phase create the foundation for high-quality cycles &#8211; from component exposure with concrete pulverizers, through splitting of massive cross-sections, to single-grade stockpiling and further processing. Design-for-disassembly principles and material passports strengthen transparency and long-term circularity in the built environment.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Remanufacturing in construction describes the deliberate recovery and renewed use of construction materials and components from deconstruction, demolition, and interior demolition. At its core are single-grade separation (mono-material), material-conserving size reduction, and an efficient process chain from the component to the secondary raw material. In practice, technical processes merge with <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20181","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Remanufacturing in Construction - Methods &amp; Tools<\/title>\n<meta name=\"description\" content=\"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation &amp; low fines for high-quality reuse.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Remanufacturing in Construction - Methods &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation &amp; low fines for high-quality reuse.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:39+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remanufacturing\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remanufacturing\",\"name\":\"Remanufacturing in Construction - Methods & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-28T14:36:51+00:00\",\"dateModified\":\"2026-09-12T17:53:39+00:00\",\"description\":\"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation & low fines for high-quality reuse.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remanufacturing#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remanufacturing\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/remanufacturing#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Remanufacturing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Remanufacturing in Construction - Methods & Tools","description":"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation & low fines for high-quality reuse.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing","og_locale":"en_US","og_type":"article","og_title":"Remanufacturing in Construction - Methods & Tools","og_description":"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation & low fines for high-quality reuse.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:39+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing","url":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing","name":"Remanufacturing in Construction - Methods & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-28T14:36:51+00:00","dateModified":"2026-09-12T17:53:39+00:00","description":"Smarter remanufacturing in construction \u27a4 selective dismantling, clean separation & low fines for high-quality reuse.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/remanufacturing"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/remanufacturing#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Remanufacturing"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20181"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20181\/revisions"}],"predecessor-version":[{"id":29169,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20181\/revisions\/29169"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}