{"id":20178,"date":"2026-01-28T16:08:47","date_gmt":"2026-01-28T15:08:47","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20178"},"modified":"2026-06-18T09:14:02","modified_gmt":"2026-06-18T07:14:02","slug":"section-modulus","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus","title":{"rendered":"Section modulus"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The <strong>section modulus<\/strong> is a central parameter in structural mechanics. It describes a cross-section\u2019s ability to resist a bending moment or a torsional moment. It is especially important for planning deconstruction steps, separation cuts, and splitting operations because it directly influences the expected stresses and thus crack and fracture behavior. In <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, during building gutting, in rock excavation and tunnel construction, or in natural stone extraction, understanding the section modulus helps plan measures in a controlled way &#8211; for example when applying concrete pulverizers or when using <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH. Well-chosen geometrical weakening combined with appropriate tool forces supports predictable crack initiation, efficient sequencing, and risk mitigation.<\/p>\n<h2>Definition: What is meant by section modulus?<\/h2>\n<p>The section modulus is a geometric property of a cross-section. It links the external action (moment) with the resulting stress at the extreme fiber. For bending: <em>\u03c3 = M \/ W<\/em>, where \u03c3 is the bending stress, M the bending moment, and <strong>W<\/strong> the (linear) section modulus. It is determined from the second moment of area <strong>I<\/strong> and the distance to the extreme fiber <strong>c<\/strong>: <em>W = I \/ c<\/em>. Unit: m\u00b3. For torsion of circular cross-sections, the <strong>polar section modulus<\/strong> <em>Wp<\/em> is used; there, <em>\u03c4 = Mt \/ Wp<\/em>, with \u03c4 as shear stress and <em>Mt<\/em> as torsional moment. The section modulus is thus a measure of a cross-section\u2019s <em>bending or torsional robustness<\/em> &#8211; the larger <em>W<\/em> or <em>Wp<\/em>, the lower the stresses for the same moment.<\/p>\n<p><strong>Clarifications:<\/strong> In elastic design, <em>W<\/em> refers to the elastic section modulus. In ductile steel design, a plastic section modulus <em>Z<\/em> may be used for plastic capacity checks, but for demolition planning the elastic <em>W<\/em> provides a conservative first estimate. For non-circular torsion, the torsion constant <em>J<\/em> and warping effects become relevant, so <em>Wp<\/em> from circular theory is not directly applicable. Consistent units are essential &#8211; using mm and mm\u00b3 is common in detailing, while m and m\u00b3 are typical in conceptual estimates.<\/p>\n<h2>Physical principles and variables<\/h2>\n<p>Bending stress increases proportionally with the bending moment and inversely with the section modulus. The second moment of area <em>I<\/em> (unit m\u2074) describes the area distribution about the neutral axis; dividing by the extreme fiber distance <em>c<\/em> yields the section modulus <em>W<\/em>. For plates, beams, pipes, or sections, not only the material but above all the <em>geometry<\/em> is decisive: greater section depth and a suitable shape significantly increase <em>I<\/em> and thus <em>W<\/em>. Notches, openings, slot cuts, and holes reduce <em>W<\/em> &#8211; often more than the removed area would suggest. In deconstruction practice, this geometry effect is deliberately used to induce controlled breaking of components and to reduce the required tool forces.<\/p>\n<p>After cracking in reinforced concrete, the neutral axis shifts and the concrete in tension becomes less effective; the steel then governs tensile force transfer while the geometric <em>W<\/em> around the compressed zone still indicates where extreme stresses occur. For composite or partially cut members, the effective stiffness and <em>W<\/em> change with the construction stage, which should be reflected in the cut sequence.<\/p>\n<h2>Cross-section shapes and typical section moduli<\/h2>\n<p>For simple cross-section shapes, closed-form approximations exist. Key examples:<\/p>\n<ul>\n<li>Rectangle (width b, depth h) about the strong axis: <em>W \u2248 b \u00b7 h\u00b2 \/ 6<\/em>. Doubling the depth quadruples <em>W<\/em>.<\/li>\n<li>Solid circle (radius r) in bending: <em>W \u2248 \u03c0 \u00b7 r\u00b3 \/ 4<\/em>; in torsion: <em>Wp \u2248 \u03c0 \u00b7 r\u00b3 \/ 2<\/em>.<\/li>\n<li>Hollow circle (outer radius R, inner radius r): <em>W \u2248 \u03c0 \u00b7 (R\u2074 \u2212 r\u2074) \/ (4 \u00b7 R)<\/em> in bending; <em>Wp \u2248 \u03c0 \u00b7 (R\u2074 \u2212 r\u2074) \/ (2 \u00b7 R)<\/em> in torsion.<\/li>\n<li>I\/H-sections: Large web depth and slender webs provide a high <em>W<\/em> with relatively little material; cuts at the flange drastically reduce <em>W<\/em>.<\/li>\n<li>Thin-walled rectangular tubes: efficient in bending relative to mass, but local wall removals near extreme fibers penalize <em>W<\/em> disproportionately.<\/li>\n<\/ul>\n<p><strong>Note:<\/strong> The stated <em>W<\/em> values refer to the axis about which bending occurs. Misidentifying the strong vs. weak axis can lead to large errors in stress estimates.<\/p>\n<h2>Impact on concrete demolition and specialist deconstruction<\/h2>\n<p>When deconstructing slabs, beams, walls, or columns, separation and slot cuts as well as the application of crushers and split cylinders deliberately generate moments. The goal is controlled failure along planned planes. The section modulus provides the geometric control parameter: by reducing <em>W<\/em>, extreme fiber stresses increase for the same moment &#8211; members fail earlier, required tool forces decrease, and the fracture path becomes more predictable. Restraints, partial continuity, or prestress can temporarily increase internal moments; staged weakening of <em>W<\/em> helps keep these effects within controllable bounds.<\/p>\n<h3>Practical benefits<\/h3>\n<ul>\n<li>Separation cuts across the section depth significantly reduce <em>W<\/em>; this allows targeted opening of components with concrete pulverizers.<\/li>\n<li>Drilling patterns for stone and concrete splitters reduce the effective <em>W<\/em> of the remaining cross-section and favor the desired splitting direction.<\/li>\n<li>Pre-cuts at slab edges reduce the extreme fiber distance <em>c<\/em> and thus <em>W<\/em> &#8211; helpful for edge-near gripping.<\/li>\n<li>Areas near supports have small bending moments; controlled breaking can still be achieved there despite high <em>W<\/em> if shear governs.<\/li>\n<li>Stepwise notching localizes crack initiation and limits uncontrolled redistribution of forces when the component yields.<\/li>\n<li>Temporary props or suspensions can be combined with <em>W<\/em>-reduction to control rotation and deflection during opening.<\/li>\n<\/ul>\n<h2>Application with concrete pulverizers: cuts, notches, and extreme fibers<\/h2>\n<p>Concrete pulverizers predominantly induce compression and bending. For planned opening of girders or wall webs, the position of the neutral axis and the extreme fiber distance are decisive. If the cross-section is reduced by slots or core drills, both <em>I<\/em> and <em>W<\/em> decrease. A smaller pulverizer torque then suffices to reach the required bending stress <em>\u03c3<\/em>. Continuous slot cuts across the member depth are particularly effective because <em>h<\/em> enters <em>W \u2248 b \u00b7 h\u00b2 \/ 6<\/em> quadratically. Targeted <em>biting<\/em> at the extreme fiber &#8211; where stresses are maximal &#8211; steers the crack path. In reinforced sections, the position and diameter of longitudinal reinforcement influence the crack pattern; geometrical <em>W<\/em> remains the first basis for selecting the cut sequence and gripping points. Coordinating sequence, grip width, and temporary support conditions prevents unintended snap-through when <em>W<\/em> drops suddenly.<\/p>\n<h2>Application with stone and concrete splitters: drilling pattern and splitting direction<\/h2>\n<p>Stone and concrete splitters act via wedge forces that generate tensile splitting along a weakened plane. A suitable drilling pattern reduces the effective section modulus of the splitting plane by removing material from the cross-section and shortening the extreme fiber distance. In massive members, natural stone blocks, or rock structures, row drilling can reduce <em>W<\/em> so that splitting reliably initiates at moderate hydraulic pressures. In anisotropic rocks, aligning the drilling pattern along bedding or joint planes supports the desired crack path. Practical rule of thumb: hole spacing consistent with wedge spacing improves force introduction and minimizes off-axis cracking.<\/p>\n<h2>Steel sections, pipes, and tanks: relation to steel shears and tank cutters<\/h2>\n<p>When cutting steel beams, hollow sections, and vessels, the section modulus is equally decisive. Cuts near the flange on I\/H-sections strongly reduce <em>W<\/em> and facilitate severing with steel shears. For pipes and tank shells, besides bending resistance the polar section modulus matters: notches, openings, or partial cuts reduce <em>Wp<\/em> &#8211; the cross-section yields earlier in torsion, which aids flaring or controlled bending. For cutting tank openings or dropping larger shell fields, cut sequences that reduce <em>W<\/em> and-or <em>Wp<\/em> stepwise are advisable to avoid uncontrolled deformations. In ductile steels, local yielding may shift the neutral axis; nevertheless, pre-weakening at the extreme fibers remains the most effective way to lower cutting forces.<\/p>\n<h2>Worked example: rough estimate for a reinforced concrete beam<\/h2>\n<p>Assume a rectangular beam with <em>b = 0.30 m<\/em> and <em>h = 0.50 m<\/em>. Approximation for bending about the strong axis: <em>W \u2248 b \u00b7 h\u00b2 \/ 6 = 0.30 \u00b7 0.50\u00b2 \/ 6 = 0.0125 m\u00b3<\/em>. If the beam is loaded at the free end like a cantilever by self-weight and installation forces with <em>M = 50 kNm<\/em>, the extreme fiber bending stress is <em>\u03c3 \u2248 M \/ W = 50,000 Nm \/ 0.0125 m\u00b3 = 4.0 MPa<\/em>. If a continuous slot of 10 cm depth is cut across the width, the effective depth becomes <em>h = 0.40 m<\/em>; then <em>W \u2248 0.30 \u00b7 0.40\u00b2 \/ 6 = 0.0080 m\u00b3<\/em> and <em>\u03c3<\/em> rises to about <em>6.3 MPa<\/em> for the same <em>M<\/em>. The member thus fails at smaller moments and requires lower tool forces. This rough calculation does not replace structural verification &#8211; but it shows how sensitively <em>\u03c3<\/em> responds to changes in <em>W<\/em>. For documentation and comparison, expressing <em>W<\/em> in mm\u00b3 may be convenient if dimensions are given in mm.<\/p>\n<h2>Influencing factors in concrete and rock<\/h2>\n<p>Beyond pure geometry, material parameters govern real behavior:<\/p>\n<ul>\n<li>Concrete strength, crack state, and reinforcement alter stress distribution; after cracking, load transfer shifts to the steel.<\/li>\n<li>Notch effects and microcracks raise local stresses; small notches can strongly affect the effective extreme fiber distance.<\/li>\n<li>In rock and natural stone, bedding, joint spacing, and moisture influence splitting direction; the calculated <em>W<\/em> should be checked against geological observations.<\/li>\n<li>Loading rate and temperature affect toughness and brittleness, which can accelerate or delay crack propagation at a given <em>W<\/em>.<\/li>\n<\/ul>\n<h2>Practical guidance for planning separation and splitting cuts<\/h2>\n<ul>\n<li>Stepwise reduction: decrease <em>W<\/em> and, if applicable, <em>Wp<\/em> in several stages (pre-cuts, drilling pattern, final separation cut) to promote controlled fractures.<\/li>\n<li>Select gripping points: apply concrete pulverizers near edges where <em>\u03c3<\/em> is maximal; use support-near regions when low moments are desired.<\/li>\n<li>Align drilling patterns: for split cylinders, place holes so the remaining cross-section has a small <em>W<\/em> in the desired splitting direction.<\/li>\n<li>Prepare steel sections: position flange or web cutouts to lower local <em>W<\/em> and reduce the cutting force demand of steel shears.<\/li>\n<li>Secure load paths: before intervention, plan load release and transfer (suspensions, shoring) so unintended bending moments remain limited.<\/li>\n<li>Monitor in stages: after each reduction of <em>W<\/em>, reassess deformations and restraints before proceeding to the next step.<\/li>\n<\/ul>\n<h2>Hydraulic tools and section modulus: relationships<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> provide pressure and flow that translate into crushing or splitting forces. These forces generate moments via lever arms (grip width, member dimensions). The smaller the effective section modulus, the lower the force and pressure required to achieve the same stress state. Therefore, for selecting and sequencing work steps with concrete pulverizers, stone and concrete splitters, combination shears, or multi cutters, it is sensible to assess the member geometry (and thus <em>W<\/em>) in advance. Matching tool geometry and opening width to the anticipated <em>W<\/em> shortens cycle times and reduces energy demand.<\/p>\n<h2>Limits of simplification and safety-relevant aspects<\/h2>\n<p>The section modulus is a powerful planning tool &#8211; but it does not replace a full capacity or stability verification. Boundary conditions such as restraint, neighboring members, prestress, crack state, shear failure, or dynamics can govern. Appropriate safeguarding and monitoring measures must be taken before interventions. Structural checks, protection concepts, and assessment of construction stages belong in the hands of qualified professionals. The principles outlined here serve for technical orientation and must be verified on a project-specific basis, including compliance with applicable codes and site-specific safety plans.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The section modulus is a central parameter in structural mechanics. It describes a cross-section\u2019s ability to resist a bending moment or a torsional moment. It is especially important for planning deconstruction steps, separation cuts, and splitting operations because it directly influences the expected stresses and thus crack and fracture behavior. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/section-modulus\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20178","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Section Modulus for Bending &amp; Torsion - Definition<\/title>\n<meta name=\"description\" content=\"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending &amp; torsion for safer cuts.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/section-modulus\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Section Modulus for Bending &amp; Torsion - Definition\" \/>\n<meta property=\"og:description\" content=\"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending &amp; torsion for safer cuts.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/section-modulus\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-18T07:14:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/section-modulus\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/section-modulus\",\"name\":\"Section Modulus for Bending & Torsion - Definition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-28T15:08:47+00:00\",\"dateModified\":\"2026-06-18T07:14:02+00:00\",\"description\":\"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending & torsion for safer cuts.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/section-modulus#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/section-modulus\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/section-modulus#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Section modulus\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Section Modulus for Bending & Torsion - Definition","description":"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending & torsion for safer cuts.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus","og_locale":"en_US","og_type":"article","og_title":"Section Modulus for Bending & Torsion - Definition","og_description":"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending & torsion for safer cuts.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-18T07:14:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus","url":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus","name":"Section Modulus for Bending & Torsion - Definition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-28T15:08:47+00:00","dateModified":"2026-06-18T07:14:02+00:00","description":"Explore section modulus in structural mechanics \u2713 learn how geometry shapes bending & torsion for safer cuts.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/section-modulus"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/section-modulus#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Section modulus"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20178","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20178"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20178\/revisions"}],"predecessor-version":[{"id":28434,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20178\/revisions\/28434"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20178"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}