{"id":20176,"date":"2026-01-27T16:09:27","date_gmt":"2026-01-27T15:09:27","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20176"},"modified":"2026-06-18T08:55:04","modified_gmt":"2026-06-18T06:55:04","slug":"wide-angle-surveying","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying","title":{"rendered":"Wide-angle surveying"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wide-angle surveying describes the large-area, wide-perspective capture of structures, infrastructure, and terrain using cameras, scanners, or combined sensor systems. Especially in work environments such as concrete demolition, special demolition, rock excavation and tunnel construction, or natural stone extraction, the broad coverage from short stand-off distances enables a swift, safe as-built survey even in tight, dusty, or structurally complex areas. On this basis, measures with hydraulic tools &#8211; such as <strong>concrete demolition shears<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> &#8211; become plannable, documentable, and implementable with minimized risk. In many projects, this approach forms a robust reality-capture basis for method statements, risk assessments, and verifiable documentation.<\/p>\n<h2>Definition: What is meant by wide-angle surveying?<\/h2>\n<p><em>Wide-angle surveying<\/em> refers to the georeferenced capture of large objects or spaces using sensors with a large field of view (wide-angle to fisheye optics, 360\u00b0 cameras) and\/or mobile systems with simultaneous localization and mapping (SLAM). The resulting data &#8211; point clouds, textured 3D models, orthophotos, or panoramas &#8211; serve analysis, planning, clash detection, and documentation. In contrast to classical, narrow-angle survey shots, more structures can be covered with fewer support positions and critical lines of sight can be captured faster. In Darda GmbH application areas, this supports the selection of attack points, sequences, and safety zones for hydraulic cutting, splitting, and shearing processes. The term is often used alongside reality capture and panoramic surveying, emphasizing both spatial completeness and dimensional reliability.<\/p>\n<h2>Methods and technologies of wide-angle surveying<\/h2>\n<p>Technically, wide-angle surveying comprises optical and active approaches. Optical methods process image series into 3D models (photogrammetry, structure from motion), while active methods capture geometry directly (e.g., LiDAR). Sensors are often combined to unite a wide field of view, high coverage, and robust geometry, with multi-sensor fusion improving completeness, precision, and resilience in dusty or low-texture scenes.<\/p>\n<h3>Optical systems and sensors<\/h3>\n<ul>\n<li>Wide-angle and fisheye lenses: Very large field of view, suitable for confined environments such as shafts, mezzanine levels, tunnel bores. Requires precise distortion models (e.g., radial\/tangential correction).<\/li>\n<li>360\u00b0 cameras: Spherical panoramas from a single position, helpful during interior demolition and in complex plant rooms for rapid situational awareness.<\/li>\n<li>Mobile sensor platforms (SLAM): Cameras and\/or LiDAR plus IMU for continuous trajectories in corridors, galleries, or tunnel sections.<\/li>\n<li>Terrestrial laser scanners: Stationary point clouds with high density, often with panoramic optics for near-complete room coverage.<\/li>\n<li>Stereo and multi-camera rigs: Overlapping wide-angle views that stabilize reconstruction and improve depth accuracy in feature-poor areas.<\/li>\n<\/ul>\n<h3>Acquisition methods<\/h3>\n<ul>\n<li>Stationary: A few strategically placed tripods with a large field of view cover entire work zones, useful before deploying concrete demolition shears to determine bearing areas and safety clearances.<\/li>\n<li>Mobile\/handheld: Rapid walkthrough along demolition edges, facades, or tunnel walls; good for intermediate states and progress documentation.<\/li>\n<li>Airborne: Wide-angle perspectives from above to capture roofs, silos, basins, or rock slopes; complementary to near-ground data.<\/li>\n<li>Hybrid: Stationary panoramas for control and detail, combined with handheld or cart-based SLAM for continuous coverage and efficient registration.<\/li>\n<\/ul>\n<h3>Data processing and georeferencing<\/h3>\n<ul>\n<li>Photogrammetric reconstruction: Feature detection, bundle adjustment, dense reconstruction to point clouds and meshes.<\/li>\n<li>SLAM localization: Continuous position estimation facilitates coherent, large-area models without extensive targets.<\/li>\n<li>Georeferencing: Integration of control points, GNSS, or local benchmarks for dimensional reliability and comparability across project phases.<\/li>\n<li>Loop closures and drift control: Trajectory checks and targetless registration improve consistency across long corridors and repetitive geometries.<\/li>\n<\/ul>\n<h2>Accuracy, tolerances, and influencing factors<\/h2>\n<p>Accuracy depends on optics, acquisition geometry, texture, exposure, and calibration. Wide-angle optics reduce the number of required stations but induce more pronounced edge distortions. For construction-site-ready results, consistent overlaps, stable baselines, and a robust calibration are crucial. In practice, at close range, millimeter- to centimeter-accurate measurements are achieved depending on object size, capture distance, and sensor quality. Traceable uncertainty budgets, documented calibration certificates, and repeat measurements on control geometries strengthen reliability for planning and verification.<\/p>\n<h3>Quality metrics<\/h3>\n<ul>\n<li>Overlap and visibility: Relevant surfaces should be seen at least two to three times.<\/li>\n<li>Reprojection error and RMSE: Indicators of model quality and calibration consistency.<\/li>\n<li>Point density and GSD: Sufficient resolution to reliably identify cracks, edges, reinforcement layers, or borehole axes.<\/li>\n<li>Registration and loop metrics: Low residuals and stable loop closures indicate controlled drift and coherent alignment.<\/li>\n<\/ul>\n<h3>Error sources and corrections<\/h3>\n<ul>\n<li>Radial distortion: Correction via calibrated lens models.<\/li>\n<li>Motion blur\/dust: Short exposure times, low-dust time windows, additional lighting if required.<\/li>\n<li>Occlusions: Supplementary stations, elevated positions, wide-angle plus detail shots.<\/li>\n<li>Scaling: Scale bars\/targets and solid georeferencing for reliable length and volume statements.<\/li>\n<li>Thermal and mechanical drift: Warm-up routines, rigid mounts, and periodic rechecks against control points.<\/li>\n<\/ul>\n<h2>Practical relevance: Planning in concrete demolition and special demolition<\/h2>\n<p>Before intervening in load-bearing components, wide-angle surveying provides a more complete view of boundary conditions: member thicknesses, connection details, utility routing, bearings, and adjacent components. This allows planning sequences for cutting, crushing, and removal in such a way that load redistribution is controlled. For the targeted use of <strong>concrete demolition shears<\/strong>, a wide field of view enables the definition of cut-in points, gripping paths, and protection areas. <strong>Hydraulic wedge splitters<\/strong> benefit from precisely surveyed drill-hole grids and splitting directions to achieve the desired separation joint with minimal side effects. The same datasets support risk assessments, method statements, and coordination with site logistics.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>In interiors with complex building services, panorama models are helpful for locating utilities, shafts, and openings. In combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">mobile hydraulic power units<\/a>, combination shears, multi cutters, or steel shears, wide-angle documentation supports safe cutting paths, access routes, clearance envelopes, and temporary shoring. Spatial context reduces rework by highlighting interference risks and preferred load paths.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>On rock faces, wide-angle imagery provides a rapid overview of joint systems, bedding, and unstable zones. In tunnels, spherical capture facilitates alignment control, checking of over- and under-profile, and planning of drilling patterns for rock splitting cylinders. These practices support consistent planning for <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a> by aligning measures with natural weak zones. Change detection across rounds enables early identification of overbreak trends and localized convergence.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, wide-angle surveying accelerates volume and block estimation, the definition of separation planes, and the positioning of splitting points. Shadowed areas on benches are closed with a few additional stations without significantly interrupting operations. Bench geometry and haul-route clearances can be checked continuously to improve operational safety.<\/p>\n<h3>Special use<\/h3>\n<p>In confined or damaged structures &#8211; such as cavities, tanks, or vessels &#8211; wide fields of view are valuable for condition checks before tank cutters or concrete demolition shears are used. The safety distance remains high while still providing sufficient geometry for planning. Ruggedized, glare-reduced optics and controlled lighting improve results where reflective surfaces or suspended dust are present.<\/p>\n<h2>Data outputs and use in the workflow<\/h2>\n<p>Typical outputs are georeferenced point clouds, textured meshes, 2D orthophotos, and panoramas. They feed into as-built plans, clash detection, bills of materials, sequence plans, or BIM models. In Darda GmbH application areas, this enables the derivation of section planes, gripping zones, splitting directions, and protective areas. Preferably, open or widely supported exchange formats (e.g., E57, LAS\/LAZ, OBJ, IFC) are used to keep downstream processes flexible and auditable.<\/p>\n<h3>Clash detection and sequence planning<\/h3>\n<p>Based on the 3D geometry, machine paths, boom configurations, and tool opening angles are checked virtually. This limits unnecessary repositioning and aligns work sequences. Clearance checks, swept-volume analyses, and lift-path simulations reduce on-site improvisation and downtime.<\/p>\n<h3>Structural diagnosis and deformation measurement<\/h3>\n<p>Before-and-after comparisons reveal displacements, deformations, or crack growth. This helps plan deconstruction stages with minimal impact on the remaining structure. Surface comparisons and section-based measurements provide objective criteria for go\/no-go decisions and acceptance documentation.<\/p>\n<h2>Selection criteria for methods and equipment<\/h2>\n<p>The choice between purely optical wide-angle capture, LiDAR-based methods, or hybrid systems depends on accuracy, texture, dust, lighting conditions, and accessibility. Robust, documented calibration chains are important, as is data safeguarding that reflects the progress of site activities. Additional selection aspects include ruggedness and ingress protection, battery runtime, available mounting options, and compatibility with existing coordinate systems and deliverable formats.<\/p>\n<h3>Checklist for deployment preparation<\/h3>\n<ul>\n<li>Goal definition: Required accuracy, relevant components, safety zones.<\/li>\n<li>Acquisition planning: Locations, elevations, wide-angle coverage, overlaps.<\/li>\n<li>Control geometry: Control points, scale bars, references to axes and elevations.<\/li>\n<li>Exposure and visibility: Additional lighting, low-dust time windows, access control.<\/li>\n<li>Redundancy: Complementary detail shots at critical edges and connections.<\/li>\n<li>Validation: On-site quality check, spot measurement verification.<\/li>\n<li>Data management: Versioning, traceable file naming, handover formats.<\/li>\n<li>Coordination framework: Roles, communication paths, and timing with adjacent trades.<\/li>\n<li>Coordinate systems: Definition of project CRS, units, and elevation reference for consistent handover.<\/li>\n<\/ul>\n<h2>Legal and organizational aspects<\/h2>\n<p>Before capture, responsibilities, access rights, and protection areas must be clarified. Depending on the site, permits, safety briefings, and data protection requirements for image-based methods may be relevant. Documentation should be tailored to the project and contain only the information necessary for planning and verification. Retention periods, confidentiality levels, and disclosure rules should be defined in advance to ensure compliant handling of imagery and derived models.<\/p>\n<h2>Example workflow from capture to execution<\/h2>\n<ol>\n<li>Pre-assessment and goal definition: Required accuracies, construction phases, safety distances.<\/li>\n<li>Acquisition planning: Wide-angle stations, control geometry, sight lines.<\/li>\n<li>Capture: Stationary panoramas, mobile sequences, supplementary detail images.<\/li>\n<li>On-site quality control: Dimensional comparison, gap search, additional capture if required.<\/li>\n<li>Processing: Calibration, bundle adjustment\/registration, georeferencing.<\/li>\n<li>Derivation of deliverables: Point cloud, orthophoto, 3D model, sections, and measurement reports.<\/li>\n<li>Planning the measures: Define cut lines, gripping points, splitting grids; coordinate the sequence for concrete demolition shears and hydraulic wedge splitters.<\/li>\n<li>Monitoring and progress: Capture intermediate states, compare with targets, adjust sequences.<\/li>\n<li>Final documentation: Dimensional accuracy, remaining geometry, proof of execution.<\/li>\n<\/ol>\n<h2>Limits and best practices<\/h2>\n<p>Dust, vibrations, low texture, and severe occlusions limit data quality. Helpful measures include redundant sight lines, stable camera guidance, and combining wide-angle overviews with several detail-oriented close-ups. Where possible, measurements should be taken before heavy interventions and repeated after major state changes to obtain reliable intermediate states. Protective housings, lens shades, and controlled lighting reduce glare and contamination, while fixed repeat stations improve comparability over time.<\/p>\n<h3>Safety and ergonomics<\/h3>\n<p>Wide-angle perspectives enable capture from a safe distance and elevated positions. This avoids hazard zones without sacrificing necessary area coverage. It supports proactive planning of cutting and splitting operations under operational safety requirements. Remote operation and minimized repositioning further reduce manual exposure and improve ergonomics on constrained sites.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wide-angle surveying describes the large-area, wide-perspective capture of structures, infrastructure, and terrain using cameras, scanners, or combined sensor systems. Especially in work environments such as concrete demolition, special demolition, rock excavation and tunnel construction, or natural stone extraction, the broad coverage from short stand-off distances enables a swift, safe as-built <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20176","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wide-Angle Surveying | 3D Mapping &amp; LiDAR<\/title>\n<meta name=\"description\" content=\"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wide-Angle Surveying | 3D Mapping &amp; LiDAR\" \/>\n<meta property=\"og:description\" content=\"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-18T06:55:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wide-angle-surveying\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wide-angle-surveying\",\"name\":\"Wide-Angle Surveying | 3D Mapping & LiDAR\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-27T15:09:27+00:00\",\"dateModified\":\"2026-06-18T06:55:04+00:00\",\"description\":\"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wide-angle-surveying#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wide-angle-surveying\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wide-angle-surveying#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wide-angle surveying\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wide-Angle Surveying | 3D Mapping & LiDAR","description":"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying","og_locale":"en_US","og_type":"article","og_title":"Wide-Angle Surveying | 3D Mapping & LiDAR","og_description":"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-18T06:55:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying","url":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying","name":"Wide-Angle Surveying | 3D Mapping & LiDAR","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-27T15:09:27+00:00","dateModified":"2026-06-18T06:55:04+00:00","description":"Geospatial 3D capture for construction and demolition using wide-angle surveying \u2713 fast planning, clear documentation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wide-angle-surveying#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wide-angle surveying"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20176"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20176\/revisions"}],"predecessor-version":[{"id":28430,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20176\/revisions\/28430"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}