{"id":20171,"date":"2026-01-27T09:13:37","date_gmt":"2026-01-27T08:13:37","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20171"},"modified":"2026-09-12T19:53:38","modified_gmt":"2026-09-12T17:53:38","slug":"soft-rock-stabilization","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization","title":{"rendered":"Soft rock stabilization"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Soft rock stabilization encompasses all technical, organizational, and geotechnical measures used to improve the stability of loose rock, clayey-marly formations, heavily weathered or bedded rocks and to protect them against rockfall, subsequent failures, and deformations. It is a central topic in rock excavation and tunnel construction, but is equally relevant in excavation pits, on slopes, in natural stone extraction, and in concrete demolition within the context of soft rock. In practical construction workflows, support systems such as shotcrete, lattice girder beams, rock bolts, anchors, injections, and drainage are combined with carefully coordinated advance cycles and precise contouring. For low-vibration, controlled interventions in the rock mass or in already installed support elements, hydraulic tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, concrete pulverizers, rock splitting cylinders, combination shears, multi cutters, steel shears, tank cutters as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">suitable hydraulic power units<\/a> from Darda GmbH are frequently used &#8211; always embedded in a geotechnically sound support concept. When integrated into a staged excavation concept, these methods help achieve precise geometry, protect adjacent structures, and support verifiable quality and schedule adherence.<\/p>\n<h2>Definition: What is meant by soft rock stabilization?<\/h2>\n<p>Soft rock stabilization refers to the entirety of methods for temporary or permanent stabilization of soft and loose rock during earthworks and rock works. The aim is the <strong>establishment of operational safety<\/strong> and the limitation of deformations in the vicinity of cavities, slopes, and excavation pits. These include, among others: systematic application of shotcrete (reinforced or fiber-reinforced), installation of lattice girder beams, rock bolts and anchors, pipe canopy and spile support, nailing, net and mat coverings, injections for consolidation or sealing, as well as drainage and pressure relief measures. Soft rocks often exhibit low compressive and tensile strengths, anisotropic bedding, creep and swelling tendencies, and strong sensitivity to water. The support is therefore designed to redistribute loads, increase rock mass cohesion, and favorably influence time-dependent behavior. In professional practice, this is also referred to as <em>weak rock support<\/em>; performance targets are typically formulated via allowable deformation, water ingress limits, and safety factors against failure that are verified by monitoring.<\/p>\n<h2>Methods and measures of soft rock stabilization<\/h2>\n<p>The selection of measures is based on structure, strength, water regime, and construction method. In practice, several methods are combined to achieve short-term stability and long-term durability. In soft rock, <em>controlled, minimal disturbance of the rock mass<\/em> is crucial; mechanical, low-vibration steps and coordinated support intervals are particularly suitable for this.<\/p>\n<ul>\n<li><strong>Immediate face and contour support:<\/strong> short excavation rounds, rapid shotcrete application, lattice girder beams, and spiles to limit relaxation.<\/li>\n<li><strong>Water management and sealing:<\/strong> drainage, filter-stable relief boreholes, and, where appropriate, consolidation or sealing injections.<\/li>\n<li><strong>Load transfer into competent zones:<\/strong> systematic nailing and anchors to couple layers across bedding and discontinuities.<\/li>\n<\/ul>\n<h2>Geotechnical fundamentals and particularities of soft rock<\/h2>\n<p>Soft rock (for example clays, marls, tuffs, gypsum, heavily weathered schists or carbonates) shows pronounced time- and water-sensitivity. Low uniaxial compressive strengths, low splitting tensile strengths, and frequent discontinuities lead to a <strong>rapid loss of strength upon loosening<\/strong>. Water ingress can trigger swelling, softening, and increases in pore water pressure. The support therefore addresses three core mechanisms: rapid bridging and networking of the surface, removal and discharge of water, and measured load transfer via nails, anchors, and shotcrete so that the rock can share load without failing. Transitions between weathering grades and bedding zones often require adaptive support classes and staged advance lengths; in swelling or sulfate-bearing strata, the mix design and drainage strategy must be resilient to chemical and volumetric changes.<\/p>\n<h3>Effects of water and temperature<\/h3>\n<p>Drainage and dewatering are fundamental pillars of soft rock stabilization. They reduce pore water pressure and prevent erosion at the support surface. Freeze-thaw cycles can cause scaling and edge delamination; surface sealing, controlled water routing, and appropriate frost protection stabilize the boundary zone. In chemically aggressive environments, suitable materials and protective coatings help maintain durability of temporary and permanent linings while drainage elements remain serviceable.<\/p>\n<h2>Overview of support systems<\/h2>\n<ul>\n<li>Shotcrete with or without fibers: rapid surface cover, load redistribution, erosion protection.<\/li>\n<li>Lattice girder beams and spiles: shape stability and early load-carrying capacity along the contour and tunnel face.<\/li>\n<li>Rock bolts and anchors: bonding of loose layers, increase of shear strength along bedding and discontinuities.<\/li>\n<li>Injection and consolidation measures: reduction of permeability and increase of cohesion.<\/li>\n<li>Drainage, relief boreholes, and filter elements: control of the water regime.<\/li>\n<li>Nets, mats, and particle protection: safeguarding against small detachments and spalling.<\/li>\n<\/ul>\n<p>The configuration and sequencing of these systems are project-specific and are validated by observation and measurement to keep deformations within target corridors.<\/p>\n<h3>Mechanical preparations with hydraulic tools<\/h3>\n<p>For precise formation of the excavation contour, gentle removal of overbreak, and elimination of disruptive blocks, <strong>low-vibration<\/strong> methods are advantageous. In this role, tools from Darda GmbH are regularly used in projects:<\/p>\n<ul>\n<li>Stone and concrete splitters as well as rock splitting cylinders for controlled, low-crack separation of rock packages and concrete structures along targeted drilling patterns.<\/li>\n<li>Concrete pulverizers for selective removal of shotcrete overbreak, opening of test sections, or adjustment work on temporary lining elements.<\/li>\n<li>Combination shears, multi cutters, and steel shears for cutting reinforcement, lattice girder beams, and steel inserts within the support system.<\/li>\n<li>Hydraulic power packs for reliable, mobile energy supply to the hydraulic tools, matched to performance and duty cycle.<\/li>\n<li>Tank cutters &#8211; such as the <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a> &#8211; are specialized tools for operations where thick-walled steel components in the support environment must be separated safely and with minimal sparking.<\/li>\n<li>Dust suppression and water-spray attachments to limit fines release at the face and to improve visibility and occupational hygiene.<\/li>\n<\/ul>\n<h2>Application in tunnel construction and rock excavation<\/h2>\n<p>Under soft rock conditions in tunnel construction, excavation and support are closely interlinked. The construction process is based on short support intervals, a cleanly guided contour, and early closure of the load-bearing arch. In rock excavation and benching in soft, bedded formations, targeted stress relief and controlled block division take center stage.<\/p>\n<ol>\n<li>Investigation and classification of the rock mass, assessment of bedding, joints, water inflow, and time-dependent behavior.<\/li>\n<li>Advance in partial cross-sections, immediately followed by shotcrete, lattice girder beams, and nailing.<\/li>\n<li>Drainage and dewatering to lower pore water pressure, injections if required.<\/li>\n<li>Contouring and fine finishing with low-vibration tools, e.g., stone and concrete splitters as well as concrete pulverizers.<\/li>\n<li>Monitoring of convergence and deformation, adapting the support to measured actual values.<\/li>\n<\/ol>\n<p>Sequential excavation principles with short rounds, early ring closure, and precise contouring minimize relaxation times and reduce the risk of delayed failures in weak rock.<\/p>\n<h3>Tunnel face stabilization and contour control<\/h3>\n<p>In soft rock, the tunnel face is particularly sensitive. Pipe canopies and spiles stabilize the near-face zone, while precise contour control limits later detachments. Where blasting alternatives are required, stone and concrete splitters from Darda GmbH enable targeted opening of intended fracture planes. Concrete pulverizers assist in trimming local shotcrete overthickness without excessively shaking the fresh support. Systematic face mapping and feedback into drilling patterns and support classes ensure that the excavation remains within the design envelope.<\/p>\n<h2>Slope stabilization and excavation pits in soft rock<\/h2>\n<p>On open slopes and in excavation pits, stability verifications are fulfilled by stepped slope angles, temporary nailing, shotcrete facing shells, and drainage concepts. In sensitive environments, low-emission, quiet, and low-vibration working methods are required. Hydraulic splitting technology minimizes vibrations, concrete pulverizers enable selective removal at breakout edges or concrete beams. Combination shears and steel shears assist in adapting bracing elements and temporary steel structures. Bench widths and the sequence of cuts are aligned with the geotechnical model and the equipment envelope to maintain stability during every construction stage.<\/p>\n<h2>Natural stone extraction and special operations<\/h2>\n<p>In soft dimensional stones such as limestone, tuff, or marlstone, gentle block extraction is crucial for quality and dimensional accuracy. Hydraulic wedge splitters and stone and concrete splitters from Darda GmbH apply splitting force along predefined boreholes; separation-joint quality and material loss depend on the drilling pattern, material and operating sequence. In special operations &#8211; e.g., in urban areas, under infrastructure, or near sensitive existing structures &#8211; low-vibration methods and precise cutting and shear technology provide a <em>controlled<\/em> alternative to vibration-intensive methods. Orientation of extraction cuts to bedding, natural partings, and desired block sizes helps minimize waste and microcracking.<\/p>\n<h2>Selection of suitable equipment and drives<\/h2>\n<p>Equipment selection follows the construction objective, rock class, and state of support. Criteria include, among others, splitting tensile strength, bed thickness, access, required cut depth, existing reinforcement, and permissible emissions. Hydraulic power packs are selected according to required flow rate and pressure; a <strong>constant, finely metered performance<\/strong> is often more important than peak force in soft rock.<\/p>\n<ul>\n<li>Concrete pulverizers: for precise trimming of shotcrete, opening of test openings, and removal of minor overthickness without edge breakouts.<\/li>\n<li>Stone and concrete splitters \/ rock splitting cylinders: for controlled separation of rock packages, stress relief along the contour, and exposing anchor heads.<\/li>\n<li>Combination shears and multi cutters: when concrete and embedded steel need to be processed alternately or in a single step.<\/li>\n<li>Steel shears: for lattice girder beams, structural steel sections, and reinforcement in temporary or permanent supports.<\/li>\n<li>Tank cutters: for thick-walled steel vessels or pipelines that need to be dismantled in special operations within the support area.<\/li>\n<\/ul>\n<h3>Selection criteria and sizing<\/h3>\n<ul>\n<li>Hydraulic supply: available flow, pressure, and duty cycle versus tool requirements.<\/li>\n<li>Access constraints: face clearance, bench width, lifting capacity, and positioning accuracy.<\/li>\n<li>Rock behavior: bedding orientation, block size, and expected rebound to tailor drilling patterns and splitting forces.<\/li>\n<li>Environmental limits: vibration, noise, dust, and permissible emissions for neighborhood-sensitive work.<\/li>\n<\/ul>\n<h2>Planning, monitoring, and quality assurance<\/h2>\n<p>Soft rock stabilization is a control loop of prognosis, installation, and verification. Planning includes geotechnical classification, design of the support, a construction sequence with short support intervals, and the definition of trigger values. During execution, measurement data are continuously evaluated to adjust support thicknesses and lengths. Digital site logs and consistent data structures enable traceability and facilitate timely design updates.<\/p>\n<ul>\n<li>Convergence and settlement measurements to capture deformation of the excavation cross-section.<\/li>\n<li>Inclinometers and extensometers for shear and displacement analyses.<\/li>\n<li>Pore water pressure and flow measurements to assess the effectiveness of dewatering.<\/li>\n<li>Documentation of shotcrete thicknesses, nail lengths, injection quantities, and drilling pattern parameters.<\/li>\n<\/ul>\n<h3>Trigger values and response plan<\/h3>\n<ul>\n<li>Define limit and alert thresholds for deformation, water inflow, and face stability.<\/li>\n<li>Pre-plan corrective actions: shorten advance, increase support density, adjust drainage, or revise mix designs.<\/li>\n<li>Establish acceptance criteria and sign-off procedures for stage transitions and handover milestones.<\/li>\n<\/ul>\n<h2>Occupational safety, environmental protection, and neighborhood<\/h2>\n<p>Working in soft rock entails increased requirements for safety distances, protective nets, dust and water management. Mechanical, hydraulic processing reduces vibrations and airborne sound and is advantageous in neighborhood-sensitive areas. Dust suppression by wetting, orderly material logistics, and defined exclusion zones are part of a safe construction site concept. Legal requirements and standards must be observed; project-specific measures must always be adapted to the individual case, without establishing binding obligations here.<\/p>\n<ul>\n<li>Protective systems: netting, barriers, tool guards, and clear traffic routes.<\/li>\n<li>Emission control: wet cutting, water curtains, negative-pressure enclosures where feasible.<\/li>\n<li>Real-time checks: vibration and noise monitoring against project thresholds with documented responses.<\/li>\n<\/ul>\n<h2>Typical failure patterns and how to avoid them<\/h2>\n<ul>\n<li>Inadequate drainage: leads to softening and hydraulic loosening. Remedy: early drainage, filter stability, maintenance of drains.<\/li>\n<li>Support intervals that are too long: foster edge breakouts. Remedy: short cycles, early shotcrete and nailing.<\/li>\n<li>Overly stiff or undersized support: both can be harmful. Remedy: design to a target deformation corridor and use monitoring.<\/li>\n<li>Unsuitable processing methods: high vibrations in soft rock promote cracking. Remedy: hydraulic splitting and shear technology, adapted cutting sequences.<\/li>\n<li>Insufficient documentation: hampers verification and optimization. Remedy: complete, standardized recording of all support steps.<\/li>\n<li>Overcut and irregular contours: foster stress concentrations. Remedy: tighter drilling patterns, controlled splitting, and careful fine trimming.<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Gentle excavation methods, precise contour control, and controlled splitting improve material yield, reduce shotcrete overuse, and lower energy demand. Reuse of removed material and clean separation of steel components &#8211; e.g., with steel shears or multi cutters &#8211; can reduce the use of new materials where the recovered material meets the applicable technical requirements.<\/p>\n<ul>\n<li>Material efficiency: minimize overbreak, optimize support thicknesses, and segregate materials for recycling.<\/li>\n<li>Energy and emissions: select right-sized power packs and tools to avoid idling and peak-load inefficiencies.<\/li>\n<li>Water stewardship: closed-loop water treatment for drilling and dust suppression where practicable.<\/li>\n<\/ul>\n<h2>Documentation and handover of the support<\/h2>\n<p>Complete as-built documentation is essential for later operation: survey of support thicknesses, verified anchor records, drainage plans, test certificates, and measurement data. In addition, documented equipment and method choices &#8211; for example, the use of stone and concrete splitters or concrete pulverizers from Darda GmbH in sensitive areas &#8211; are helpful for planning maintenance, inspection, and any potential subsequent support.<\/p>\n<ul>\n<li>Handover dossier: drawings, logs, inspection records, and calibration certificates for monitoring devices.<\/li>\n<li>Operating guidance: maintenance intervals for drains and nets, access rules, and defined trigger values for future observations.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Soft rock stabilization encompasses all technical, organizational, and geotechnical measures used to improve the stability of loose rock, clayey-marly formations, heavily weathered or bedded rocks and to protect them against rockfall, subsequent failures, and deformations. It is a central topic in rock excavation and tunnel construction, but is equally relevant <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20171","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Soft Rock Stabilization | Geotechnical Methods<\/title>\n<meta name=\"description\" content=\"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes &amp; pits with shotcrete, bolts &amp; drainage.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Soft Rock Stabilization | Geotechnical Methods\" \/>\n<meta property=\"og:description\" content=\"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes &amp; pits with shotcrete, bolts &amp; drainage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:38+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soft-rock-stabilization\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soft-rock-stabilization\",\"name\":\"Soft Rock Stabilization | Geotechnical Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-27T08:13:37+00:00\",\"dateModified\":\"2026-09-12T17:53:38+00:00\",\"description\":\"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes & pits with shotcrete, bolts & drainage.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soft-rock-stabilization#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soft-rock-stabilization\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/soft-rock-stabilization#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Soft rock stabilization\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Soft Rock Stabilization | Geotechnical Methods","description":"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes & pits with shotcrete, bolts & drainage.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization","og_locale":"en_US","og_type":"article","og_title":"Soft Rock Stabilization | Geotechnical Methods","og_description":"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes & pits with shotcrete, bolts & drainage.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:38+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization","url":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization","name":"Soft Rock Stabilization | Geotechnical Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-27T08:13:37+00:00","dateModified":"2026-09-12T17:53:38+00:00","description":"Geotechnical guide to soft rock stabilization \u2713 methods for tunnels, slopes & pits with shotcrete, bolts & drainage.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/soft-rock-stabilization#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Soft rock stabilization"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20171","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20171"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20171\/revisions"}],"predecessor-version":[{"id":29168,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20171\/revisions\/29168"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20171"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}