{"id":20166,"date":"2026-01-27T11:38:51","date_gmt":"2026-01-27T10:38:51","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20166"},"modified":"2026-09-12T19:53:38","modified_gmt":"2026-09-12T17:53:38","slug":"waterworks-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition","title":{"rendered":"Waterworks demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The demolition of waterworks &#8211; i.e., drinking water treatment plants, clear-water reservoirs, pumping stations, filter halls, and associated structures &#8211; requires precise execution, low emissions, and a high degree of material separation. Because of groundwater protection and soil protection, partly massive reinforced-concrete cross-sections, and constrained space, controlled hydraulic methods play a central role. These tools can be used for selective deconstruction at sensitive sites and live infrastructure. Vibration, noise, dust, material separation and compliance with water-protection requirements must be verified for the selected method and project conditions.<\/p>\n<h2>Definition: What is meant by waterworks demolition?<\/h2>\n<p>Waterworks demolition is the planned deconstruction of structures and plant components for the abstraction, treatment, storage, and distribution of drinking water. This includes raw water intakes, filtration and treatment stages, ozone and activated carbon areas, clear-water or elevated tanks, booster stations, shafts, <strong>pipeline<\/strong> systems, as well as steel and mechanical components. The goal is the safe, low-emission, and resource-conserving removal of concrete, masonry, steel, and composite structures, including gutting, separation, size reduction, and clean construction waste sorting with efficient <strong>transport logistics<\/strong>. Typical procedures include selective deconstruction, hydraulic splitting, shear-based concrete demolition, cutting, and shearing &#8211; often in combination, controlled via hydraulic power packs to adapt the demolition to structure geometry, material, and surroundings. Depending on the condition of the facility, decontamination of operational residues and the careful management of cleaning waters are integrated into the sequence to support high recycling rates and regulatory compliance.<\/p>\n<h2>Particularities and structural makeup in waterworks demolition<\/h2>\n<p>Waterworks buildings combine robust reinforced-concrete construction with water-bearing systems and installations. Filter tanks, clarification and mixing chambers, raw-water shafts, plant rooms, and pump rooms are often permanently damp, chemically stressed, and heavily reinforced. Clear-water and elevated reservoirs have thick walls and slabs, often with repair layers and coatings. Added to this are valve houses, pipe bridges, steel or cast-iron lines, stair flights, and shafts. This mix calls for methods with low vibration, a high degree of control, and good suitability for wet and partial-sludge conditions. <em>Hydraulic demolition shear<\/em> for beams, walls, and slabs as well as <em>hydraulic splitter<\/em> for massive, vibration-sensitive components are proven in practice here. In addition, steel shear for reinforcement and pipelines, tank cutters for pressure vessels, and hydraulic shear or multi cutters for changing material composites are used. Confined-space access routes, splash water, and potentially aggressive atmospheres further reinforce the choice of compact, precisely controllable hydraulic tools.<\/p>\n<h2>Suitable demolition methods and procedures<\/h2>\n<p>The choice of method depends on member thickness, degree of reinforcement, accessibility, environmental requirements, and water conditions. Combined strategies have proven effective: sequences are selected to minimize vibration, protect adjacent operations, and maintain water control measures required in protection zones.<\/p>\n<h3>Selective deconstruction and building gutting<\/h3>\n<p>Before structural demolition, disentanglement takes place: removal of plant and building services, valves, installations, railings, coatings, and emptying\/cleaning of tanks. <strong>Hydraulic shear<\/strong> and <strong>multi cutters<\/strong> support cutting of light steel sections, cable trays, and thin-walled components before load-bearing structures are addressed. Early material separation improves recycling quality and shortens later sorting times.<\/p>\n<h3>Low-vibration concrete removal<\/h3>\n<p><strong>Hydraulic splitter<\/strong> can create separation joints in pre-drilled walls, floors and slabs. Vibration, block size and effects on adjacent structures or equipment must be measured for the selected sequence and compared with a defined alternative.<\/p>\n<h3>Shear demolition on reinforced concrete<\/h3>\n<p>In filter halls, pumping stations, and on reservoir slabs, <strong>concrete demolition shear<\/strong> engages precisely, breaks edges and openings, and minimizes spalling. Removal can proceed section by section away from column and beam zones to keep load redistribution under control. Defined bite depths and progressive working lines support predictable removal performance and clean edges for subsequent works.<\/p>\n<h3>Cutting and separating<\/h3>\n<p>For tank openings, chamber breakthroughs, or pipelines, cutting methods are suitable. <strong>Steel shear<\/strong> processes reinforcing steel and thick-walled lines; <strong>tank cutter<\/strong> facilitates the dismantling of cylindrical vessels, pressure tanks, or dosing tanks. In concrete, <strong>core drilling<\/strong> and defined <strong>saw cut<\/strong>s are set for splitting cylinders or for defined dismantling edges. Cooling and slurry collection must be planned to prevent uncontrolled discharge into drainage systems.<\/p>\n<h3>Work in wet and partial underwater areas<\/h3>\n<p>In water-bearing sections and shafts, compact, hydraulic tools have an advantage. <strong>Hydraulic power pack<\/strong> reliably supplies demolition shear and splitters, while the removal is carried out in small lots. Processes must be arranged so that the <strong>dewatering system<\/strong>, sludge capture, and material flow do not conflict. Additional attention is given to slip resistance, hose management, and the avoidance of floating debris.<\/p>\n<h2>Equipment overview<\/h2>\n<ul>\n<li><strong>Concrete demolition shear<\/strong>: Opening slabs, walls, and beams; downsizing reinforced concrete while exposing reinforcement; ideal for selective <em>concrete demolition and special demolition<\/em>; enables controlled removal with low vibration.<\/li>\n<li><strong>Hydraulic splitter<\/strong> with <em>splitting cylinders<\/em>: Creating separation joints in thick cross-sections; low vibration on tanks, foundations, and shafts; suitable for massive sections and sensitive environments.<\/li>\n<li><strong>Hydraulic power pack<\/strong>: Energy supply for the tools; matched to power demand, hose lengths, and operating environment; robust operation in damp areas.<\/li>\n<li><strong>Hydraulic shear<\/strong> and <strong>multi cutters<\/strong>: Flexible separation of mixed materials from gutting and strip-out; helpful with changing material thicknesses; supports clean material streams.<\/li>\n<li><strong>Steel shear<\/strong>: Cutting reinforcement, rolled steel, railings, and pipelines; preparation for source-separated removal; reduces manual flame cutting in confined spaces.<\/li>\n<li><strong>Tank cutter<\/strong>: Dismantling steel vessels, pressure and storage tanks that can occur in dosing and treatment stages; supports defined sectioning of cylindrical geometries.<\/li>\n<li><strong>Core drilling and saw cuts<\/strong>: Precise openings and defined cut lines for splitting, lifting, and edge finishing; facilitates tolerance-compliant dismantling.<\/li>\n<\/ul>\n<h2>Planning, permits, and protected resources<\/h2>\n<p>Waterworks sites are often located in water protection or spring protection areas. Demolition concepts therefore consider regulatory requirements, sealing, water control, handling of cleaning residues, and the protection of groundwater and soil layers. The legal framework is project-specific and regionally different; it should be coordinated early with the competent authorities. Low-emission procedures &#8211; such as splitting rather than impact or targeted shear demolition &#8211; facilitate compliance with strict requirements. In addition, noise and vibration forecasts, waste and material flow plans, and concepts for dewatering and sludge handling are defined in advance to secure permits and streamline execution.<\/p>\n<h2>Member thicknesses, reinforcement, and material properties<\/h2>\n<p>Walls and slabs of clear-water reservoirs and filter tanks often have increased thicknesses, additional sealing layers, and high reinforcement ratios. This leads to specific requirements for tools and sequence:<\/p>\n<ul>\n<li><strong>Massive cross-sections<\/strong>: Pre-separation by splitting; then downsizing with concrete demolition shear.<\/li>\n<li><strong>High reinforcement<\/strong>: Shear exposure and material separation with steel shear in a coordinated cycle.<\/li>\n<li><strong>Coated internal surfaces<\/strong>: Separate removal of coatings and sealing systems, if required, before the main demolition.<\/li>\n<li><strong>Embedded waterstops and liners<\/strong>: Identify and remove in a controlled manner to avoid uncontrolled water ingress and contamination.<\/li>\n<\/ul>\n<h3>Respecting structural logic<\/h3>\n<p>The demolition follows support grids, load paths, and joints. Openings, slots, and splitting boreholes are placed so that residual load-bearing capacity is maintained until <strong>shoring<\/strong> is in place and lifts are executed. Temporary stability, drainage paths, and access routes are continuously reassessed as the structure is reduced.<\/p>\n<h2>Deconstruction sequence: from shutdown to material logistics<\/h2>\n<ol>\n<li><strong>Shutdown and emptying<\/strong>: Take plant areas out of service, depressurize <strong>pipelines<\/strong>, empty tanks.<\/li>\n<li><strong>Building gutting<\/strong>: Removal of services, railings, stair flights, doors, light partitions; use of hydraulic shear and multi cutters.<\/li>\n<li><strong>Prefabrication of separation points<\/strong>: <strong>Core drilling<\/strong> and <strong>saw cut<\/strong>s for splitting cylinders and defined lifts.<\/li>\n<li><strong>Structural demolition<\/strong>: Splitting massive elements; shear demolition for walls\/slabs; separation of reinforcement with steel shear.<\/li>\n<li><strong>Downsizing and sorting<\/strong>: Production of transportable fractions; separating concrete, steel, and fit-out materials.<\/li>\n<li><strong>Haulage and recycling<\/strong>: <strong>Transport logistics<\/strong> over short routes; intermediate storage and documentation in line with the specifications.<\/li>\n<li><strong>Final cleaning and verification<\/strong>: Removal of residues, water control checks, and documentation of exposed interfaces for follow-on works.<\/li>\n<\/ol>\n<h2>Occupational safety, emissions, and water protection<\/h2>\n<p>Safe access, <strong>fall protection<\/strong>, suitable <strong>lifting device<\/strong>s, and clear communication channels are key elements. Emissions are minimized by water misting via a <strong>water spray system<\/strong>, <strong>dust extraction<\/strong>, and orderly water control. When using hydraulic tools, ensure leak-tight operation, proper hose routing, and stable bearing surfaces. Handling potentially contaminated residues from water treatment is carried out in accordance with applicable regulations and with appropriate protective measures for <strong>groundwater protection<\/strong>. Confined-space procedures, lockout-tagout of drives and media, gas monitoring where required, and spill preparedness for hydraulic media complement the safety concept.<\/p>\n<h2>Relation to application areas<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: Core field of waterworks demolition; concrete demolition shear and hydraulic splitter are central tools.<\/li>\n<li><strong>Gutting and cutting<\/strong>: Preparatory steps with hydraulic shear, multi cutters, and steel shear for material separation.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: For raw-water adits, spring intakes, or shafts, rock may occur; hydraulic splitter with <em>splitting cylinders<\/em> supports these tasks.<\/li>\n<li><strong>Special deployment<\/strong>: Narrow shafts, restricted headroom, sensitive neighborhoods &#8211; targeted hydraulic methods reduce noise and vibration.<\/li>\n<li><strong>Conversion during ongoing operations<\/strong>: Interface cuts and selective dismantling with hydraulic tools limit outages and protect adjacent processes.<\/li>\n<\/ul>\n<h2>Typical application examples in waterworks demolition<\/h2>\n<ul>\n<li>Deconstruction of a clear-water reservoir with thick walls: pre-separation by splitting, followed by downsizing with a concrete demolition shear, separation of reinforcement with a steel shear.<\/li>\n<li>Selective demolition in a filter hall: building gutting, opening slab panels with a concrete demolition shear, controlled dismantling of beams in short lots.<\/li>\n<li>Dismantling of steel pipelines and tanks of a dosing station: use of steel shear and tank cutters, source-separated removal for <strong>recycling<\/strong>.<\/li>\n<li>Shaft and chamber deconstruction in wet conditions: hydraulically driven splitting cylinders, small block sizes, safe handling despite confined access.<\/li>\n<li>Partial replacement under protection constraints: precise cuts and low-vibration removal adjacent to live water lines and instrumentation.<\/li>\n<\/ul>\n<h2>Quality and documentation aspects<\/h2>\n<p>Transparent proof of <strong>material flow<\/strong>, separation quality, emission control measures, and the condition of adjacent structures is part of professional waterworks demolition. Inspection and acceptance points &#8211; e.g., after gutting, before structural demolition, and before backfilling or new construction &#8211; structure the process. Hydraulic procedures make it easier to adhere to defined work steps because they are reproducible and finely controllable. Complementary evidence such as waste transfer records, water handling logs, and photographic or digital progress documentation underpins verifiability and supports subsequent construction stages.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The demolition of waterworks &#8211; i.e., drinking water treatment plants, clear-water reservoirs, pumping stations, filter halls, and associated structures &#8211; requires precise execution, low emissions, and a high degree of material separation. Because of groundwater protection and soil protection, partly massive reinforced-concrete cross-sections, and constrained space, controlled hydraulic methods play <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20166","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Waterworks Demolition | Drinking Water Facilities<\/title>\n<meta name=\"description\" content=\"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Waterworks Demolition | Drinking Water Facilities\" \/>\n<meta property=\"og:description\" content=\"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:38+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/waterworks-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/waterworks-demolition\",\"name\":\"Waterworks Demolition | Drinking Water Facilities\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-27T10:38:51+00:00\",\"dateModified\":\"2026-09-12T17:53:38+00:00\",\"description\":\"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/waterworks-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/waterworks-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/waterworks-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Waterworks demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Waterworks Demolition | Drinking Water Facilities","description":"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition","og_locale":"en_US","og_type":"article","og_title":"Waterworks Demolition | Drinking Water Facilities","og_description":"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:38+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition","name":"Waterworks Demolition | Drinking Water Facilities","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-27T10:38:51+00:00","dateModified":"2026-09-12T17:53:38+00:00","description":"Guidance on waterworks demolition in drinking water facilities \u27a4 low vibration methods and safe material separation.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/waterworks-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Waterworks demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20166","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20166"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20166\/revisions"}],"predecessor-version":[{"id":29167,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20166\/revisions\/29167"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20166"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}