{"id":20162,"date":"2026-01-26T16:53:07","date_gmt":"2026-01-26T15:53:07","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20162"},"modified":"2026-06-17T08:49:04","modified_gmt":"2026-06-17T06:49:04","slug":"concrete-water-impermeability","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability","title":{"rendered":"Concrete water impermeability"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Concrete water impermeability is a central topic in building and structural engineering, especially for structures in contact with groundwater, pressurized water, or process water. Whether basements as <em>white tank<\/em> systems, basins, shafts, tanks, or tunnel liners: the quality of impermeability influences service life, operational safety, and maintenance. At the same time, it shapes the selection of processing and deconstruction methods. In practice, methods with low vibration and controlled crack guidance &#8211; for example the use of <strong>concrete pulverizer<\/strong> tools or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> in combination with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> &#8211; often offer advantages when working on water-carrying areas, dense members, or adjacent sensitive structures. For the application fields of <em>concrete demolition<\/em> and <em>special demolition<\/em>, <em>building gutting<\/em> and <em>concrete cutting<\/em>, as well as <em>rock excavation<\/em> and <em>tunnel construction<\/em>, a sound understanding of concrete water impermeability is the basis for predictable, safe operations. Impermeability also affects lifecycle assessments, sustainability criteria, and the selectability of refurbishment or deconstruction strategies.<\/p>\n<h2>Definition: What is meant by concrete water impermeability?<\/h2>\n<p>Concrete water impermeability describes the ability of a concrete element to resist the ingress of water &#8211; especially under hydrostatic pressure. It results from the interaction of material properties (e.g., low water-cement ratio, dense cement paste, fine aggregate grading, admixtures), the structural design (e.g., <em>crack width limitation<\/em>, joint planning, member thicknesses), as well as proper execution and curing. In common usage, the terms <strong>WU concrete<\/strong> and <em>white tank<\/em> are often used, although strictly speaking the <em>overall system<\/em> of mix design, reinforcement, joint sealing, and construction practice must always be considered. Test and assessment procedures follow recognized rules of practice; specific requirements must be defined for each project and do not replace individual design. Clear performance criteria, tolerances, and acceptance thresholds should be specified in the project documentation and verified by quality assurance.<\/p>\n<h2>Physical fundamentals of concrete water impermeability<\/h2>\n<p>The tightness of concrete is essentially governed by its pore and crack structure. Water transport occurs via capillary pores, gel pores, and microcracks; decisive is the permeability of the cement paste, influenced by the water-cement ratio, degree of hydration, and compaction. Under pressurized water, penetration depth and leak rates are determined by interconnected capillaries, interfacial transition zones at the aggregate, and crack networks. Low porosity, limitation of crack widths, and controlled joint sealing act together to minimize water ingress. The interfacial transition zone can become the dominant path for leakage if microcracking and restraint are not addressed through design and curing.<\/p>\n<h3>Transport mechanisms<\/h3>\n<ul>\n<li>Permeation under hydrostatic pressure (dominant in pressurized water applications)<\/li>\n<li>Capillary suction due to moisture gradients<\/li>\n<li>Diffusion of dissolved substances at concentration differences<\/li>\n<li>Convection along cracks and joints<\/li>\n<li>Capillary pumping effects under cyclic wetting and drying<\/li>\n<\/ul>\n<h3>Influencing factors<\/h3>\n<ul>\n<li>Low w\/c ratio and homogeneous cement paste<\/li>\n<li>Finely graded aggregate, low void content<\/li>\n<li>Additions and admixtures (e.g., <em>concrete admixture (plasticizer)<\/em>, sealing admixtures) in a coordinated system<\/li>\n<li>Supplementary cementitious materials where suitable (e.g., slag, fly ash, silica fume) with curing adapted to reactivity<\/li>\n<li>Compaction, curing, temperature control, and shrinkage minimization<\/li>\n<li><strong>Crack width limitation<\/strong> through reinforcement concept and member thickness<\/li>\n<li>Joint planning (construction, movement, and crack control joints) and <strong>joint sealing<\/strong><\/li>\n<li>Protection against early evaporation (curing membranes, coverings) and avoidance of unintended entrained air<\/li>\n<\/ul>\n<h2>Concrete technology and sealing concept<\/h2>\n<p>Impermeability starts with the mix design. A durable, dense matrix arises from a limited water-cement ratio, suitable binder combinations, and effective curing. Equally important is the sealing concept: WU concrete alone does not replace joint sealing where movements, separation cracks, or member interfaces are expected. An effective concept combines material, structural design, and detailing. Compatibility and redundancy of sealing components, as well as prequalification on mock-ups, increase reliability in execution.<\/p>\n<h3>Mix design and production<\/h3>\n<ul>\n<li>Appropriate cement content and low w\/c ratio to reduce capillarity<\/li>\n<li>Use of <em>concrete admixture (plasticizer)<\/em> to achieve tightness without excess mixing water<\/li>\n<li>Microstructure densification through proper compaction and curing<\/li>\n<li>Temperature management to minimize self-stresses and early-age shrinkage<\/li>\n<li>Workability retention tailored to placing length and geometry to avoid cold joints<\/li>\n<li>Targeted use of SCMs for pore refinement where exposure and curing permit<\/li>\n<\/ul>\n<h3>Structural design and reinforcement<\/h3>\n<ul>\n<li>Limitation of panel lengths, provision of planned crack inducers, crack width concept<\/li>\n<li>Adequate cover and uniform reinforcement distribution<\/li>\n<li>Capillary-breaking details at connections and penetrations<\/li>\n<li>Detail restraint and movement joints at re-entrant corners and changes in stiffness<\/li>\n<li>Staged casting concepts to reduce peak temperatures and restraint cracking<\/li>\n<\/ul>\n<h3>Joints and penetrations<\/h3>\n<ul>\n<li>Internal or external waterstops, swelling tapes, injection hoses<\/li>\n<li>Coordinated details for service lines, anchor points, and embedded components<\/li>\n<li>Documented installation and pressure tests where project-specific provisions exist<\/li>\n<li>Quality-controlled welding or splicing of waterstops at intersections and terminations<\/li>\n<li>Redundant sealing arrangements in high-risk interfaces and transitions<\/li>\n<\/ul>\n<h2>Execution, quality assurance, and test methods<\/h2>\n<p>Even a good concept is only as tight as its execution. Compaction, placement intervals, surface care, and joint interfaces are decisive. Depending on the project, penetration depth, permeability indicators, or tightness tests are used for assessment. Results must be interpreted in the context of boundary conditions (age, temperature, curing). Defined hold points, mock-ups, and traceable inspection records strengthen process reliability and acceptance.<\/p>\n<h3>Typical tests and indicators<\/h3>\n<ul>\n<li>Water penetration tests on core samples or specimens<\/li>\n<li>Permeability indicators under defined pressure<\/li>\n<li>Crack width measurement and documentation of joint conditions<\/li>\n<li>Moisture mapping and leak detection (e.g., dyes, tracers, electrical methods)<\/li>\n<li>Compartment-based on-site water pressure tests and vacuum leak tests<\/li>\n<li>Non-destructive mapping of voids and interfaces where appropriate (e.g., thermography, radar)<\/li>\n<\/ul>\n<h2>Typical damage patterns and diagnostics<\/h2>\n<p>Losses in impermeability manifest as damp spots, efflorescence, dripping points, or pressurized-water leaks. Common causes are uncontrolled cracking, leaking joints, inadequate curing, or local microstructural defects. Structured diagnostics combine inspection, moisture measurement, localization, and &#8211; if required &#8211; openings to precisely identify the defect location. Secondary effects such as calcite sinter, corrosion staining, or softening of adjacent finishes can accompany active leakage.<\/p>\n<h3>Cause patterns<\/h3>\n<ul>\n<li>Shrinkage- and temperature-induced self-stresses without effective crack width limitation<\/li>\n<li>Incomplete or damaged joint sealing<\/li>\n<li>Penetrations with insufficient connection detailing<\/li>\n<li>Local voids due to compaction deficits<\/li>\n<li>Temperature gradients from massive pours without controlled cooling or insulation<\/li>\n<\/ul>\n<h2>Deconstruction and processing of water-impermeable concrete structures<\/h2>\n<p>For demolition, openings, or modifications to WU members, special requirements apply: <strong>controlled interventions<\/strong> with minimal vibration and limited crack propagation are required to avoid impairing adjacent dense zones. In sensitive environments &#8211; such as in <em>concrete demolition<\/em> and <em>special demolition<\/em>, <em>building gutting<\/em> and <em>concrete cutting<\/em>, or in <em>rock excavation<\/em> and <em>tunnel construction<\/em> &#8211; hydraulic, low-noise, and low-vibration methods are often appropriate. Careful sequencing, load management, and monitoring minimize the risk of compromising residual tightness.<\/p>\n<h3>Tools and methods in the context of water-impermeable members<\/h3>\n<ul>\n<li><strong>Concrete pulverizer<\/strong>: precise gripping, crushing, and breaking of heavily reinforced, dense members with limited crack propagation; suitable for openings and deconstruction sections close to remaining impermeable zones.<\/li>\n<li><strong>Hydraulic splitter (wedge)<\/strong> and <em>rock wedge splitter<\/em>: induce controlled cracks along predrilled holes; low vibration, targeted crack guidance &#8211; advantageous for structures under pressurized water with residual tightness requirements.<\/li>\n<li><em>Hydraulic power pack<\/em>: provides the required pressures for precise, continuous work under changing loads; relevant for massive WU sections and high reinforcement ratios.<\/li>\n<li><em>Hydraulic demolition shear<\/em> and <em>cutting tool<\/em>: flexible for concrete and embedded parts; selective separation facilitates decoupling of sealing layers and inserts.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a>: for separate cutting of reinforcement to minimize tensioning and companion cracks in adjacent concrete zones.<\/li>\n<li><em>Cutting torch<\/em>: for tanks and shafts containing media; enables defined openings during refurbishment or decommissioning.<\/li>\n<li>Diamond wire saw for precise separations with low vibration in thick or congested members<\/li>\n<\/ul>\n<h3>Procedural notes<\/h3>\n<ul>\n<li>Advance planning of crack and cut paths to preserve residual tightness of adjacent members<\/li>\n<li>Prefer low-frequency, hydraulic methods instead of percussive tools in sensitive WU zones<\/li>\n<li>Segmented working (slab\/block formation) to avoid load redistributions and spontaneous crack propagation<\/li>\n<li>Separate cutting and extraction of reinforcement to limit transfer into dense edge zones<\/li>\n<li>Install splash guards, collection trays, and local containment to capture water and fines<\/li>\n<li>Use vibration and crack monitoring where residual tightness is critical<\/li>\n<\/ul>\n<h2>Fields of application: practical relevance and boundary conditions<\/h2>\n<p>In Darda GmbH\u00e2\u0080\u0099s core fields &#8211; from <em>concrete demolition<\/em> and <em>special demolition<\/em> through <em>building gutting<\/em> and <em>concrete cutting<\/em> to <em>rock excavation<\/em> and <em>tunnel construction<\/em> as well as <em>special operations<\/em> &#8211; requirements for impermeability often coincide with operational constraints. Procedures must therefore be chosen that respect tightness while still enabling productive work. Comparable boundary conditions arise in civil and industrial facilities with stringent leakage criteria and limited access.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<ul>\n<li>Deconstruction sections near water-carrying zones require low vibration and separation cuts with defined depth<\/li>\n<li>Concrete pulverizers facilitate removal in controlled layers; splitters limit crack propagation<\/li>\n<li>Temporary sealing or decompression (pressure relief) must be planned on a project-specific basis<\/li>\n<li>Integrate water management and emergency measures when intervening below the water table<\/li>\n<\/ul>\n<h3>Building gutting and concrete cutting<\/h3>\n<ul>\n<li>Creation of <em>core drilling<\/em> and openings with subsequent sealing of penetrations<\/li>\n<li>Hydraulic demolition shear and multi-purpose cutting enable selective removal of inserts without unnecessary damage to WU concrete<\/li>\n<li>Edges of openings should be produced with few cracks and prepared for subsequent joint sealing<\/li>\n<li>Prior scanning of reinforcement and inserts helps avoid incidental breaches and unforeseen leak paths<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>Work on segment rings, inner linings, or sealing layers requires minimal transmission of vibration<\/li>\n<li>Hydraulic splitter (wedge) devices enable controlled separations in confined spaces<\/li>\n<li>Particular attention to sealing systems and transitions between rock and concrete<\/li>\n<li>Coordinate water control, grouting interfaces, and sequence of ring openings<\/li>\n<\/ul>\n<h3>Natural stone extraction and special operations<\/h3>\n<ul>\n<li>Splitting techniques transfer seamlessly from natural stone to dense concrete matrices<\/li>\n<li>In special operations (e.g., during live operations, in water-bearing environments) hydraulic methods offer advantages due to pinpoint energy input<\/li>\n<li>Noise and vibration constraints may dictate tool selection and shift planning<\/li>\n<\/ul>\n<h2>Repair and strengthening of water-exposed members<\/h2>\n<p>If leaks are detected, various methods are available. Their applicability depends on cause, accessibility, and operating conditions. Decisions must be made case by case and should take into account the interaction between material, structure, and use. Where relevant, compatibility with potable or process water and long-term durability under the specific exposure must be verified.<\/p>\n<h3>Typical measures<\/h3>\n<ul>\n<li>Crack repair by injection (e.g., elastic or rigid, depending on movement and load case)<\/li>\n<li>Joint upgrading with swelling tapes, waterstops, or injection hoses<\/li>\n<li>Local surface protection systems and <em>hydrophobization<\/em>, where suitable<\/li>\n<li>Subsequent sealing of penetrations and anchor points<\/li>\n<li>Curtain injections for widespread seepage behind the member<\/li>\n<li>External localized sealing where internal access is constrained<\/li>\n<\/ul>\n<h2>Occupational safety, environmental aspects, and water control<\/h2>\n<p>Interventions in WU members may involve water ingress, contaminated water, or pressure conditions. Occupational and environmental protection, water control\/dewatering, and disposal are integral parts of planning. The goal is a safe, low-emission approach with controlled removal of water and fines. Additional constraints can arise from confined spaces, hazardous atmospheres, or media-specific handling requirements.<\/p>\n<h3>Recommendations from practice<\/h3>\n<ul>\n<li>Provide water control and contingency plans for unplanned inflows<\/li>\n<li>Plan sealing of cut edges and temporary joints section by section<\/li>\n<li>Separate suspensions and slurries and dispose of them properly<\/li>\n<li>Regularly check hydraulic systems; use low-leak connections<\/li>\n<li>Implement permit-to-work and confined-space procedures where applicable<\/li>\n<li>Prevent backflow and uncontrolled discharge with appropriate barriers and valves<\/li>\n<\/ul>\n<h2>Planning principles and best practices<\/h2>\n<p>Durable concrete water impermeability results from the chain of planning, concrete technology, execution, quality assurance, and use. The same principles apply to interventions in existing structures: careful diagnosis, adapted methods, and documented implementation. Interfaces between design, site management, and testing laboratories should be coordinated early with clear responsibilities.<\/p>\n<h3>Best practices for WU concrete and interventions<\/h3>\n<ol>\n<li>Determine load cases and boundary conditions (pressurized water, fluctuating water, media) on a project-specific basis<\/li>\n<li>Align mix design, crack width concept, and joint planning<\/li>\n<li>Execute with a focus on compaction, curing, and cold\/heat protection<\/li>\n<li>Prefer hydraulic, controlled methods for deconstruction and openings (concrete pulverizers, hydraulic splitter (wedge))<\/li>\n<li>Consistently seal penetrations, anchors, and cuts as part of the jointing concept<\/li>\n<li>Document all steps for traceability and future maintenance<\/li>\n<li>Prequalify materials and details with mock-ups and agreed test criteria<\/li>\n<li>Establish monitoring and maintenance plans for operation and after interventions<\/li>\n<\/ol>\n<h2>Key indicators, design, and execution notes in context<\/h2>\n<p>Project requirements for impermeability usually follow recognized technical rules. These include specifications for crack width limitation, joint detailing and sealing, and concrete technology. Exact provisions are defined for each project. Tests such as penetration depth and permeability support quality assurance but do not replace careful planning and execution. Meaningful key performance indicators help ensure continuity from design through acceptance.<\/p>\n<ul>\n<li>Verified crack width limits and documented joint continuity<\/li>\n<li>Recorded curing regime, temperature history, and compaction evidence<\/li>\n<li>Closed non-conformities and traceable remedial actions before handover<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Concrete water impermeability is a central topic in building and structural engineering, especially for structures in contact with groundwater, pressurized water, or process water. Whether basements as white tank systems, basins, shafts, tanks, or tunnel liners: the quality of impermeability influences service life, operational safety, and maintenance. At the same <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20162","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Water Impermeability in Civil Engineering<\/title>\n<meta name=\"description\" content=\"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Water Impermeability in Civil Engineering\" \/>\n<meta property=\"og:description\" content=\"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T06:49:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-water-impermeability\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-water-impermeability\",\"name\":\"Concrete Water Impermeability in Civil Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-26T15:53:07+00:00\",\"dateModified\":\"2026-06-17T06:49:04+00:00\",\"description\":\"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-water-impermeability#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-water-impermeability\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-water-impermeability#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete water impermeability\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Water Impermeability in Civil Engineering","description":"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability","og_locale":"en_US","og_type":"article","og_title":"Concrete Water Impermeability in Civil Engineering","og_description":"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-17T06:49:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability","name":"Concrete Water Impermeability in Civil Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-26T15:53:07+00:00","dateModified":"2026-06-17T06:49:04+00:00","description":"Learn how concrete water impermeability ensures durability under water pressure \u2713 mix design, joints, testing.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-water-impermeability#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete water impermeability"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20162"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20162\/revisions"}],"predecessor-version":[{"id":28398,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20162\/revisions\/28398"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}