{"id":20161,"date":"2026-01-26T12:24:31","date_gmt":"2026-01-26T11:24:31","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20161"},"modified":"2026-06-17T13:50:03","modified_gmt":"2026-06-17T11:50:03","slug":"water-jet-cutting","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting","title":{"rendered":"Water jet cutting"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Water jet cutting is a precise, cold cutting method that uses a focused high-pressure water jet to cut or remove materials. In construction-adjacent applications, it is frequently used where vibrations, sparks, thermal influence, or dust generation must be avoided &#8211; such as for sensitive deconstruction tasks, creating openings in concrete slabs, exposing reinforcement, or the separating deconstruction of tanks and pipelines. In practice, water jet cutting is often combined with hydraulic tools to dovetail work steps efficiently: for example, concrete pulverizers such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for precise demolition<\/a> can be used for targeted breaking after the jet cut, and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> take over low-vibration separation of larger components. Remote operation and rail or robotic guidance can further improve safety and repeatability in confined spaces.<\/p>\n<h2>Definition: What is meant by water jet cutting?<\/h2>\n<p>Water jet cutting refers to the cutting or removal of materials using a focused water jet that is delivered through a precision nozzle at very high pressure (typically 2,500-6,000 bar). Depending on the task, the process operates as a pure water jet (PWJ, without abrasive) or as an abrasive water jet (AWJ, with a hard abrasive, often garnet sand). The method is <em>cold cutting<\/em> without any significant heat-affected zone, thereby preserving material structures, matrices, and coatings. Because no mechanical blows are imparted into the component, only very low vibrations occur &#8211; a key advantage in areas such as concrete demolition and special demolition, strip-out and cutting, rock excavation and tunnel construction, as well as in natural stone extraction. Typical kerf widths range from approximately 0.8 to 2.0 mm depending on nozzle and focusing tube; with AWJ, thick and hard materials can be cut with high dimensional accuracy while maintaining surface integrity.<\/p>\n<h2>Technical fundamentals and methods<\/h2>\n<p>In water jet cutting, water is pressurized by a high-pressure pump, routed through a line to the cutting nozzle, and accelerated to very high velocity there. In the abrasive method, a fine-grained abrasive is fed into the water jet, which significantly increases the cutting effect on hard and thick materials. Decisive for quality and productivity are pressure level, volume flow, nozzle and focusing tube diameter, wear-part service lives, as well as precisely tuned abrasive dosing. Clean, filtered process water and consistent abrasive grain size (for example 80 to 120 mesh for typical construction tasks) stabilize performance and reduce wear. Orifices made of sapphire or diamond and correctly aligned mixing chambers sustain cut quality over longer duty cycles.<\/p>\n<ul>\n<li><strong>Key system components:<\/strong> high-pressure pump, pressure accumulator, flexible high-pressure lines, cutting head with orifice and focusing tube, and &#8211; for AWJ &#8211; an abrasive feeder with dosing control.<\/li>\n<li><strong>Guidance and control:<\/strong> manual, rail-guided, or automated traverse systems ensure constant feed rates and accurate geometries across variable site conditions.<\/li>\n<li><strong>Media management:<\/strong> collection trays, splash protection, and filtration units limit spread of water and fines and enable compliant disposal.<\/li>\n<\/ul>\n<h2>How it works in detail<\/h2>\n<p>Before linear cutting, initial piercing is executed with adapted parameters to avoid blowback and delamination in layered materials. Depending on the substrate, techniques such as low-pressure pre-pierce, dynamic piercing, or start holes created by drilling can be used to control entry effects and protect the surface.<\/p>\n<h3>Pure water jet<\/h3>\n<p>The pure water jet cuts soft to medium-tough materials and is suitable for thin layers, sealants, coatings, and for the gentle opening of component surfaces. It is preferred when no mineral content or reinforcement is present and when a particularly clean cut edge with minimal material loss (<em>small kerf<\/em>) is required.<\/p>\n<h3>Abrasive water jet<\/h3>\n<p>The abrasive water jet supplements the water with an abrasive. This reliably separates hard materials such as concrete, natural stone, steel, or composite materials. Typical applications include cutting openings in reinforced concrete, exposing reinforcement, removing damaged concrete areas, and precisely cutting steel components, such as in tanks and beams.<\/p>\n<h3>Process parameters and their effects<\/h3>\n<ul>\n<li><strong>Pressure and volume flow:<\/strong> determine jet energy and thus cutting speed and depth.<\/li>\n<li><strong>Nozzle\/focusing tube diameter:<\/strong> influence kerf width, surface finish, and achievable contour accuracy.<\/li>\n<li><strong>Abrasive quality and quantity:<\/strong> govern cutting performance in concrete, stone, and steel; too much abrasive increases wear, too little reduces cut quality.<\/li>\n<li><strong>Feed rate and standoff distance:<\/strong> regulate the balance of productivity, edge accuracy, and burr formation.<\/li>\n<li><strong>Water quality and filtration:<\/strong> poor water quality accelerates wear and destabilizes the jet; use appropriate filtration and conditioning.<\/li>\n<li><strong>Piercing strategy:<\/strong> adapted start procedures minimize spall and protect sensitive surfaces.<\/li>\n<\/ul>\n<h2>Advantages and limitations of water jet cutting<\/h2>\n<ul>\n<li><strong>Low vibration and cold:<\/strong> no heat-affected zone, hardly any microcracks, ideal for sensitive existing structures and stress-prone components.<\/li>\n<li><strong>Low dust and spark-free:<\/strong> reduces fire and explosion risk; important for strip-out, tanks, sensitive building services, and in tunnels.<\/li>\n<li><strong>Broad material range:<\/strong> concrete, reinforced concrete, natural stone, steel, aluminum, composites, coatings &#8211; even in hybrid constructions.<\/li>\n<li><strong>Precise kerfs:<\/strong> dimensionally accurate openings, minimal edge-zone influence, reduced rework.<\/li>\n<li><strong>Sustainability aspects:<\/strong> selective removal preserves adjacent materials and coatings, supports reuse, and limits secondary damage.<\/li>\n<li><strong>Limitations:<\/strong> water and slurry management required; removal of very thick cross-sections is time-intensive; noise emissions at the nozzle must be considered; access and sealing must be planned; permits and working time windows may constrain deployment.<\/li>\n<\/ul>\n<h2>Water jet cutting in concrete demolition and special demolition<\/h2>\n<p>In selective deconstruction of reinforced concrete components, the abrasive water jet enables precise cuts with minimal edge influence. Openings for doors, shafts, or utility runs can be created with high dimensional accuracy. The cut is often used to weaken components in a controlled manner and then break them with concrete pulverizers. This creates a planned crack path that avoids unwanted load redistribution in the existing structure. Where space is tight or vibrations must be strictly avoided, hydraulic wedge splitters can separate components with low vibration after a pre-cut. Reinforcement can be exposed in a targeted way so that subsequent cutting or shearing takes place under safe, accessible conditions.<\/p>\n<h3>Typical process chain<\/h3>\n<ol>\n<li>Mark the cutting contour and set up sealing of the work zone.<\/li>\n<li>Abrasive water-jet cut along the planned separation line.<\/li>\n<li>Targeted break-out with concrete pulverizers along the weakened zone.<\/li>\n<li>Segmented separation of large blocks with hydraulic wedge splitters.<\/li>\n<li>Finishing: clean edges, cut reinforcement, finish surfaces.<\/li>\n<li>Verification and documentation: dimensional checks, photographs, and recording of media handling.<\/li>\n<\/ol>\n<h2>Strip-out and cutting in existing buildings<\/h2>\n<p>In strip-out, low dust and low vibration levels are central. Water jet cutting is suitable for creating openings in slabs and walls, exposing reinforcement, or separating inserts such as steel beams, trapezoidal sheets, and profiles. For subsequent dismantling &#8211; depending on the material &#8211; steel shears, multi cutters, or combination shears are suitable. Concrete pulverizers then break off remaining webs. Thanks to the cold cutting technique, lines, coatings, or adjacent components are better protected. Prior survey with non-destructive testing and as-built scans reduces risks from embedded services and unknown inclusions.<\/p>\n<h3>Detail aspects in existing structures<\/h3>\n<ul>\n<li><strong>Media handling:<\/strong> safe feeding and retention of water and abrasive, prevention of moisture ingress.<\/li>\n<li><strong>Load transfer:<\/strong> temporary shoring before cutting to avoid settlements and uncontrolled breaks.<\/li>\n<li><strong>Reinforcement:<\/strong> targeted exposure and subsequent cutting with suitable shears.<\/li>\n<li><strong>Substrate protection:<\/strong> splash guards, drainage mats, and edge tapes protect finishes and prevent staining.<\/li>\n<\/ul>\n<h2>Rock excavation and tunnel construction<\/h2>\n<p>In mining or tunnel-adjacent applications, water jet cutting can be used for selective removal, working up to sensitive areas, and removing damaged concrete layers. The method is spark-free and reduces dust in enclosed spaces. After the jet cut, blocks can be loosened and recovered in a controlled manner with hydraulic wedge splitters. In concrete linings, concrete pulverizers can remove the cut segments in a targeted way without overloading the surroundings. Attention to rock mass properties and jointing patterns ensures that kerfs and subsequent splitting follow the planned release lines.<\/p>\n<h3>Specific constraints underground<\/h3>\n<ul>\n<li><strong>Water and slurry handling:<\/strong> collection, separation of abrasive, proper disposal.<\/li>\n<li><strong>Ventilation and visibility:<\/strong> account for mist formation, ensure airflow management.<\/li>\n<li><strong>Noise:<\/strong> factor in sound levels at the nozzle, plan protective measures.<\/li>\n<li><strong>Access and evacuation:<\/strong> plan routes, lighting, and communications for confined environments.<\/li>\n<\/ul>\n<h2>Natural stone extraction and stone processing<\/h2>\n<p>In working natural stone, water jet cutting enables precise, low-crack separations and clean exposed edges. In extraction, the method can be used for contour cuts along planned fracture lines. Hydraulic wedge splitters then take over the controlled release of blocks along the kerfs. This reduces material losses and yields blocks with high dimensional accuracy. For fine adjustments and openings in already installed natural stone structures, cold cutting offers an advantage over thermal methods. Surface textures remain largely unchanged, which benefits restoration and visible surfaces.<\/p>\n<h2>Special application: tanks, installations, and hazardous atmospheres<\/h2>\n<p>When dismantling tanks, pipelines, and vessels &#8211; especially in potentially explosive areas &#8211; the spark-free cutting technique enhances safety. Water jet cutting minimizes heat input and ignition sources. For subsequent downsizing of the segments, the <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">Tank Cutter<\/a>, steel shears, or multi cutters can be used &#8211; depending on plate thicknesses, geometry, and accessibility. However, deployment requires a careful hazard analysis, cordoning and extraction concepts, as well as coordinated media and waste management. Inerting, gas monitoring, and remote-operated cutting reduce exposure where atmospheres are uncertain.<\/p>\n<h2>Combination with concrete pulverizers and hydraulic wedge splitters<\/h2>\n<p>The combination of precise, cold cutting and mechanical demolition unites dimensional accuracy with productivity. Water jet cutting produces sharp separation contours and deliberately weakens components. Concrete pulverizers then engage along these lines, reducing the required tool force and limiting edge spalling. After pre-cutting, hydraulic wedge splitters can build internal stresses in a controlled way so that large components separate into planned segments. This process coupling is particularly effective in sensitive existing areas, for demanding openings, or near vibration-sensitive installations. Coordinated tooling reduces cycle times and limits secondary damage to finishes and adjacent systems.<\/p>\n<h3>Practical notes<\/h3>\n<ul>\n<li><strong>Sequence planning:<\/strong> first cut, then shore and break\/split in a controlled manner; size lifting equipment appropriately.<\/li>\n<li><strong>Cut geometry:<\/strong> choose radii and corners to reduce stresses and optimize access for concrete pulverizers.<\/li>\n<li><strong>Residual bridges:<\/strong> deliberately leave them to maintain stability until lifting; only cut immediately before release.<\/li>\n<li><strong>Monitoring:<\/strong> measure deflections and vibrations in critical areas during cutting and breakout.<\/li>\n<\/ul>\n<h2>Quality, tolerances, and documentation<\/h2>\n<p>The achievable cut quality depends on nozzle, pressure, abrasive, and feed rate. For structural interventions, dimensional accuracy, squareness, and surface condition must be documented. As a rule: higher pressure, optimized nozzle diameter, and correctly dosed abrasive increase cutting speed while maintaining a clean edge. For exposed concrete or natural stone, a sample cut is recommended. Measurement records for kerf, flatness, and burr formation support quality assurance. Calibration of feed rates on representative off-cuts or mock-ups improves predictability and reduces rework.<\/p>\n<h3>Typical tolerance factors<\/h3>\n<ul>\n<li><strong>Cutting-edge taper:<\/strong> influenced by focus length and feed on thick cross-sections.<\/li>\n<li><strong>Kerf width:<\/strong> dependent on nozzle diameter; affects material loss and fit accuracy.<\/li>\n<li><strong>Edge-zone strength:<\/strong> generally high due to cold cutting; nevertheless check for microcracks in heterogeneous composites.<\/li>\n<li><strong>Surface texture:<\/strong> roughness and striation height correlate with feed rate and standoff; adapt parameters to visibility requirements.<\/li>\n<\/ul>\n<h2>Environment, occupational safety, and disposal<\/h2>\n<p>Water jet cutting avoids sparks and reduces dust but introduces water and abrasive into the process. The resulting suspension must be collected, separated, and properly disposed of. Noise control, splash protection, slip-resistant working surfaces, safe hose routing, and clearly defined exclusion zones are key components of occupational safety. Legal requirements on emissions, waste classification, and water protection must always be observed in general; specific interpretation is project-specific, and responsibilities should be clearly defined before execution. High-pressure systems demand strict PPE, barrier concepts, pressure testing, and lockout-tagout for media lines.<\/p>\n<h2>Planning and selection criteria<\/h2>\n<p>Whether water jet cutting is the appropriate method depends on material, component thickness, accessibility, requirements for dimensional accuracy, environmental stipulations, and project logistics. In many cases, a mixed strategy is sensible: water jet cutting for precise cutting lines and critical areas, followed by mechanical processing with concrete pulverizers, hydraulic wedge splitters, steel shears, multi cutters, or combination shears. Hydraulic power packs reliably supply the hydraulic tools with energy; in parallel, water and abrasive supply as well as retention and treatment of the media must be planned. Early coordination of shift models, noise windows, and transport routes minimizes idle time and interfaces between trades.<\/p>\n<h3>Decision guide<\/h3>\n<ul>\n<li><strong>Thickness and reinforcement:<\/strong> plan the abrasive method for massive reinforced concrete; cut reinforcement in a targeted manner after the cut.<\/li>\n<li><strong>Surrounding conditions:<\/strong> prioritize dust- and spark-free operation in sensitive areas; design water protection.<\/li>\n<li><strong>Component function:<\/strong> shore load-bearing parts beforehand; align the cutting sequence with the structural model.<\/li>\n<li><strong>Dismantling concept:<\/strong> define segment weights, lifting points, lifting paths, and removal\/transport.<\/li>\n<li><strong>Utilities and access:<\/strong> verify water, power, and abrasive availability; ensure unimpeded hose runs and collection capacity.<\/li>\n<\/ul>\n<h2>Typical application examples from practice<\/h2>\n<p>When opening a reinforced concrete slab in an existing building, the contour is first cut abrasively. Concrete pulverizers then engage along the sharp edges to release the panel without edge spalling. Large segments are separated with hydraulic wedge splitters and recovered in a controlled manner. In a facility with sensitive building services, a tank is divided into segments by water jet cutting before steel shears and tank cutters reduce the pieces to transportable sizes. In tunnel construction, the water jet enables selective removal of damaged concrete tips; subsequent mechanical processing proceeds with low vibration and is predictable. On bridge decks, expansion joint zones can be cut with AWJ to defined depths so that replacement proceeds without collateral damage.<\/p>\n<h2>Avoiding sources of error<\/h2>\n<ul>\n<li><strong>Insufficient sealing:<\/strong> leads to water escape into sensitive zones; test sealing and collection systems in advance.<\/li>\n<li><strong>Incorrect abrasive dosing:<\/strong> reduces cut quality or increases wear; match dosing to material and thickness.<\/li>\n<li><strong>Unclear load paths:<\/strong> provide temporary shoring before cutting and align the cutting sequence with the structure.<\/li>\n<li><strong>Lack of media logistics:<\/strong> plan slurry and abrasive disposal in good time, keep transport routes short.<\/li>\n<li><strong>Piercing mismanagement:<\/strong> avoid uncontrolled piercing in layered or coated elements; use adapted start procedures.<\/li>\n<\/ul>\n<h2>Materials and typical cutting parameters (indicative)<\/h2>\n<p>For concrete and natural stone, abrasive jets with medium to high pressures are usually selected. Thin-walled metals can be cut quickly; for thick cross-sections, pressure and cutting time increase. In composite materials, multiple passes with reduced feed speed improve edge quality. In principle: the higher the precision requirement, the more carefully nozzle, focusing tube, abrasive grain, and feed must be matched. Typical orifice sizes around 0.25 to 0.35 mm with focusing tubes of 0.8 to 1.2 mm, combined with 80 to 120 mesh abrasive, cover most structural tasks efficiently.<\/p>\n<h2>Interaction with construction logistics<\/h2>\n<p>Effective construction logistics connect water jet cutting with subsequent trades. During jet cutting, lifting equipment is prepared, lifting points are checked, and access routes for removal are kept clear. Hydraulic power packs for concrete pulverizers, hydraulic wedge splitters, steel shears, multi cutters, or combination shears are positioned so that hose runs are short and sure-footed. At the same time, collection trays, filter units, and big bags provide rapid separation of water, fines, and abrasive residues. Buffer zones for interim storage and clear transport corridors ensure that cut segments can be removed without rehandling.<\/p>\n<h2>Maintenance and service life<\/h2>\n<p>The service life of the nozzle, focusing tube, and mixing chamber is a significant cost and quality factor. Regular inspections, clean process water, consistent abrasive quality, and correct pressure settings increase repeatability and reduce downtime. A consistent maintenance regime likewise applies to the hydraulic tools used &#8211; concrete pulverizers and hydraulic wedge splitters work more efficiently and gently on materials when blades, jaws, wedges, and seals are in perfect condition. Documented change intervals and calibrated pressure gauges help maintain stable parameters across shifts and project phases.<\/p>\n<ul>\n<li><strong>Wear tracking:<\/strong> record hours on orifices and focusing tubes; replace at defined thresholds to prevent quality drift.<\/li>\n<li><strong>Hydraulic care:<\/strong> check hoses, couplings, and filters; maintain oil cleanliness to protect pumps and actuators.<\/li>\n<li><strong>Spare parts logistics:<\/strong> keep critical consumables and seals on site to avoid downtime during continuous operations.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Water jet cutting is a precise, cold cutting method that uses a focused high-pressure water jet to cut or remove materials. In construction-adjacent applications, it is frequently used where vibrations, sparks, thermal influence, or dust generation must be avoided &#8211; such as for sensitive deconstruction tasks, creating openings in concrete <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20161","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water Jet Cutting - Concrete, Steel &amp; Demolition<\/title>\n<meta name=\"description\" content=\"Cold, precise cuts in concrete &amp; steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water Jet Cutting - Concrete, Steel &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"Cold, precise cuts in concrete &amp; steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T11:50:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-jet-cutting\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-jet-cutting\",\"name\":\"Water Jet Cutting - Concrete, Steel & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-26T11:24:31+00:00\",\"dateModified\":\"2026-06-17T11:50:03+00:00\",\"description\":\"Cold, precise cuts in concrete & steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-jet-cutting#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-jet-cutting\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-jet-cutting#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Water jet cutting\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water Jet Cutting - Concrete, Steel & Demolition","description":"Cold, precise cuts in concrete & steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting","og_locale":"en_US","og_type":"article","og_title":"Water Jet Cutting - Concrete, Steel & Demolition","og_description":"Cold, precise cuts in concrete & steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-17T11:50:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting","url":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting","name":"Water Jet Cutting - Concrete, Steel & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-26T11:24:31+00:00","dateModified":"2026-06-17T11:50:03+00:00","description":"Cold, precise cuts in concrete & steel with water jet cutting \u2713 low vibration, spark-free, dimensional accuracy.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-jet-cutting#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Water jet cutting"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20161","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20161"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20161\/revisions"}],"predecessor-version":[{"id":28406,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20161\/revisions\/28406"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20161"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}