{"id":20159,"date":"2026-01-26T09:03:11","date_gmt":"2026-01-26T08:03:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20159"},"modified":"2026-06-17T16:40:03","modified_gmt":"2026-06-17T14:40:03","slug":"water-protection-wall","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall","title":{"rendered":"Water protection wall"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A water protection wall is an essential element on construction sites and in deconstruction to safely route surface and dirty water, provide <strong>retention volume<\/strong>, and protect bodies of water, soil, and the sewer system from inputs. It is used wherever work with concrete, natural stone, or metal generates water, where water may escape, or where it must be intentionally retained &#8211; such as during deconstruction works, in tunnel construction, during strip-out operations, or in sensitive areas with special water protection requirements. In combination with tools from Darda GmbH &#8211; for example, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for deconstruction<\/a> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> &#8211; a suitable water protection wall helps capture dirty water in a controlled manner, separate sediments, and minimize the risk of spread. In best practice, <em>containment and controlled discharge<\/em> form a closed system that supports environmental protection and compliance with site requirements.<\/p>\n<h2>Definition: What is a water protection wall?<\/h2>\n<p>A water protection wall is a temporary or permanent barrier that confines, directs, or impounds water flows. It serves to retain rainwater, cooling water, and cleaning water, to protect against splashing and flushing water, and to provide preventive flood protection on construction sites. Typical tasks include sealing against laterally penetrating water, enclosing work areas as retention basins, and preventing the discharge of water containing sediments or pollutants into the ground, sewer, or surface waters. Depending on requirements, the water protection wall can be designed as an elevated structure, an applied upstand, a plug-in or bulkhead system, or a solid concrete body. In some contexts, the system is also referred to as a <em>containment berm<\/em> or <em>secondary containment<\/em> when used to enclose potential leakage areas.<\/p>\n<h2>Structure and operating principle of a water protection wall<\/h2>\n<p>The basic setup combines a load-bearing wall body with a tight connection to the subgrade and adjacent components. Sealing is achieved using sealing membranes, sealing tapes, compression seals, or mineral fillers. The operating principle is based on safely accommodating hydrostatic pressures, preventing underflow or bypass seepage, and directing water in a controlled manner via overflows, hose connections, or pump sumps with filtration. For practical operation, emergency overflows are provided to prevent overtopping, and the retained water is settled or filtered before pumping out.<\/p>\n<ul>\n<li><strong>Load transfer and stability:<\/strong> the wall body must resist fill levels, impact, and vibration without displacement.<\/li>\n<li><strong>Continuous sealing:<\/strong> uninterrupted, compressed contacts at wall-to-floor and joint transitions limit seepage paths.<\/li>\n<li><strong>Controlled discharge:<\/strong> defined outlets with filtration and shut-off options enable safe emptying and documentation.<\/li>\n<\/ul>\n<h2>Requirements in concrete demolition, deconstruction, and strip-out<\/h2>\n<p>In the application fields of concrete demolition and specialized deconstruction, strip-out and cutting, as well as rock excavation and tunnel construction, the water protection wall must balance structural stability, tightness, accessibility, and robustness. The wall must withstand varying loads (fill levels, impact loads from equipment transport, vibrations) without hindering site operations. Where concrete crushers or rock and concrete splitters are used, the demand for process water is significantly lower compared to traditional wet-cutting methods, which often reduces the requirements for retention volume and filtration. At the same time, protection against rainwater, splash water, and contaminated seepage and cleaning water remains essential.<\/p>\n<h3>Typical tasks of the water protection wall in practice<\/h3>\n<ul>\n<li>Retention of water-bearing work areas as a temporary basin with controlled emptying<\/li>\n<li>Splash protection when crushing concrete components with concrete crushers<\/li>\n<li>Separation of clean surface water from potentially sediment-laden work water<\/li>\n<li>Protection of adjacent areas, traffic routes, and shafts from wash-ins<\/li>\n<li>Preventive flood protection for exposed excavation pits and during tunnel heading<\/li>\n<li>Interim storage and potential pH adjustment of alkaline water from cement-bound materials<\/li>\n<\/ul>\n<ul>\n<li><strong>Design checkpoints:<\/strong> ensure passability for equipment, provide edge protection at transitions, and avoid tripping hazards at door thresholds or crossings.<\/li>\n<\/ul>\n<h2>Types and materials<\/h2>\n<p>The choice of type depends on load case, duration, logistical framework, and reusability. Important factors are sufficient stiffness, stable base points, and a seal suited to the subgrade.<\/p>\n<ul>\n<li>Modular plug-in or bulkhead systems made of metal or plastic for temporary areas<\/li>\n<li>Upstands made of wood or metal profiles with membrane sealing for flexible layouts<\/li>\n<li>Massive concrete walls or elements for high hydrostatic pressures or long service life<\/li>\n<li>Inflatable barriers for quick, short-term protection during rain events<\/li>\n<li>Combined systems with sedimentation zones, filter shafts, and a pump sump<\/li>\n<li>Geotextile-lined earth berms where site soils and space allow a cost-efficient, temporary solution<\/li>\n<\/ul>\n<h2>Planning and dimensioning<\/h2>\n<p>Dimensioning is based on expected water generation, inflows from precipitation, process water, the subgrade (permeability), and safety allowances for heavy rainfall. Logistical aspects such as delivery routes, escape and rescue routes, and the operability of the tools used from Darda GmbH must also be considered. As a rule of thumb, include a <strong>freeboard<\/strong> to account for peak inflows and wave run-up, and design outlets to match the permissible discharge rate.<\/p>\n<ol>\n<li>Load case analysis: rainfall intensity, inflow and outflow, hydrostatic pressure, impact loads<\/li>\n<li>Determine retention volume and provide emergency overflows<\/li>\n<li>Sealing concept: subgrade preparation, joint connections, wall-to-floor connection<\/li>\n<li>Stability verification for wall body and anchors<\/li>\n<li>Operational concept: emptying, filtration, monitoring, documentation<\/li>\n<li>Interfaces: clarify discharge permits, acceptance criteria, and sampling points<\/li>\n<\/ol>\n<h3>Practical sizing notes<\/h3>\n<p>Retention volume should cover peak inflow during the critical duration of a rain cell plus operational water, with reserve capacity for sediment accumulation. In permeable subgrades, sealing layers limit infiltration; in impermeable subgrades, pump capacity must match both process water and precipitation scenarios. Where feasible, <em>segmented basins<\/em> shorten settling paths and improve filtration efficiency.<\/p>\n<h2>Water management with concrete crushers and rock and concrete splitters<\/h2>\n<p>The choice of working method has a significant impact on water management. Wet cutting typically generates large volumes of water with fine solids; splitting methods and crushers reduce this effect. Tools from Darda GmbH such as concrete crushers and rock and concrete splitting devices often operate without process water, creating coarse fracture edges and lower sludge loads. As a result, water protection walls can be planned with smaller retention volumes, and filtration stages become simpler. Nevertheless, effective splash and seepage protection is required to keep fines and corrosion protection oils from hydraulic lines out of the discharge. Monitoring <em>turbidity and total suspended solids<\/em> helps verify treatment performance before release.<\/p>\n<h3>Concrete crushers: Crushing with a controllable water balance<\/h3>\n<p>Crushing components with concrete crushers produces only small amounts of water, for example from cleaning or precipitation. A low, continuous water protection wall with a tight bearing surface and a local sedimentation zone is often sufficient. A key factor is <em>splash protection<\/em> at starter notches to keep the finest particles and moisture within the retention zone. Where floor gradients exist, direct flow paths toward the pump sump and shield vulnerable interfaces such as door thresholds with reinforced upstands.<\/p>\n<h3>Rock and concrete splitters: A low-water separation method<\/h3>\n<p>Controlled splitting involves drilling holes and separating the body along defined lines. Without continuous wet cooling, hardly any process water is generated. Here, water protection walls primarily serve to separate clean and contaminated water, protect against rainfall events, and route cleaning water after the splitting process. If localized wet drilling is applied, collect drill slurry at the source and filter before it enters the common retention area.<\/p>\n<h3>Other Darda GmbH tools in the context of water protection<\/h3>\n<ul>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a>: place on sealed surfaces, enclose potential leakage areas with walls, and provide containment volume<\/li>\n<li>Combination shears, multi cutters, steel shears: combine splash protection and chip retention when cutting rebar and sections<\/li>\n<li>Concrete crushers: keep fracture surfaces damp to bind dust within the retention zone<\/li>\n<li>Tank cutters: pay special attention to potentially contaminated flushing water; set up separate retention and treatment areas<\/li>\n<li>Dust suppression systems: align nozzle placement and flow rates with retention capacity and filtration stages<\/li>\n<\/ul>\n<h2>Fields of application: From strip-out to tunnel construction<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>During partial deconstruction in existing buildings, water protection walls protect adjacent areas, shafts, and drainage points. They allow orderly collection and filtration of the water generated, while concrete crushers crush load-bearing components in a controlled manner. In confined areas, modular systems with corner-tight joints and integrated thresholds increase safety and efficiency.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Strip-out work generates cleaning and flushing water. Flat, flexible wall systems with membrane sealing secure corridors and rooms. Where splitters can be used, the volume of flushing water drops significantly, and the water protection wall primarily provides separation and routing. Clearly marked crossings and hose ramps prevent damage to seals in high-traffic zones.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In underground applications, inflows vary. Water protection walls define safe work areas, keep sediments out of the discharge, and protect equipment such as hydraulic power units. Robust, mechanically resilient wall bodies with redundant seals are advantageous here. Materials and connections should withstand abrasion from aggregates and cyclic wetting without loss of tightness.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When freeing blocks with rock splitting cylinders, process water can be minimized. Water protection walls capture rain and cleaning water and route it to treatment via sedimentation. Where site topography permits, gravity-fed discharge to staged filters reduces pumping effort.<\/p>\n<h3>Special applications<\/h3>\n<p>In sensitive areas with stricter requirements, the combination of a multi-stage water protection wall, filtration module, and documented monitoring is common. The choice of low-water methods &#8211; such as with concrete crushers or splitters &#8211; supports compliance with stringent limits. Additional protective layers or drip trays can be integrated to shield permeable subgrades.<\/p>\n<h2>Execution: installation, operation, and inspection<\/h2>\n<p>Reliable performance depends on clean bearing surfaces, tight connections, and a clear operating plan. The wall is positioned so that traffic routes, escape lines, and workspaces remain unobstructed.<\/p>\n<ol>\n<li>Prepare the subgrade, level irregularities, lay a sealing membrane<\/li>\n<li>Assemble the wall body, seal joints, and form corners to be pressure-tight<\/li>\n<li>Arrange pump sump and filtration stage, define an emergency overflow<\/li>\n<li>Conduct regular visual inspections, record fill levels, remove sediments properly<\/li>\n<li>Dismantle without residue, clean and inspect surfaces<\/li>\n<\/ol>\n<p><strong>Commissioning tip:<\/strong> prior to operation, perform a brief leak test with clean water, verify freeboard at design level, and document initial conditions with photos.<\/p>\n<h2>Filtration and treatment of the retained water<\/h2>\n<p>Before discharge, the water is treated to reduce solids and potential contaminants. Common measures include sedimentation, screens, filter socks\/hoses, or multi-stage filters. The choice depends on the particles generated (concrete fines, rust, metal shavings) and local requirements.<\/p>\n<p>Depending on the substrate and process, additional steps may be required: <em>pH adjustment<\/em> for alkaline waters from cement-bound materials, <em>adsorber media<\/em> or oil-absorbent mats for hydraulic oils, and <em>flocculants<\/em> where fine particles reduce settling efficiency. Measuring turbidity and pH at the outlet supports verifiable compliance.<\/p>\n<h2>Safety and legal framework<\/h2>\n<p>Handling water-hazardous substances and discharging water is subject to requirements in many regions. Planning should therefore be coordinated early with the competent authorities. The information in this text is general and does not replace a case-by-case assessment. Execution must always comply with applicable regulations, official requirements, and the specific conditions of the construction site.<\/p>\n<ul>\n<li>Define discharge limits and sampling routines in the method statement.<\/li>\n<li>Provide spill response materials and train personnel on containment procedures.<\/li>\n<li>Maintain logs for inspections, cleaning, and filter exchanges.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient sealing at the wall-to-floor connection: underflow due to localized unevenness<\/li>\n<li>Missing emergency overflow: overtopping during heavy rain<\/li>\n<li>Retention volume too small: no reserve for peak inflows<\/li>\n<li>Unclear separation of clean and contaminated water: mixing complicates treatment<\/li>\n<li>Involving the method too late: excess water due to unsuitable procedures<\/li>\n<li>No leak test before start of work: unnoticed seepage paths remain active<\/li>\n<li>Unsecured hose and pipe penetrations: bypassing of filtration stages<\/li>\n<\/ul>\n<h2>Relation to equipment selection and construction sequence<\/h2>\n<p>The water protection wall delivers optimal benefit when aligned with equipment selection and the sequence of work steps. If, for example, a component is deconstructed in sections using Darda GmbH concrete crushers, small, robust retention areas can be created that are emptied and cleaned in parallel. When splitting with rock and concrete splitters, a continuous, low barrier with clear water routing is often sufficient. Forward-looking logistics are important so that access routes remain clear and the retention areas are not compromised by material handling. Reusable modular elements shorten setup times and enable rapid adaptation as the workfront advances.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A water protection wall is an essential element on construction sites and in deconstruction to safely route surface and dirty water, provide retention volume, and protect bodies of water, soil, and the sewer system from inputs. It is used wherever work with concrete, natural stone, or metal generates water, where <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20159","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water Protection Wall for Construction Sites<\/title>\n<meta name=\"description\" content=\"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water Protection Wall for Construction Sites\" \/>\n<meta property=\"og:description\" content=\"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T14:40:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-wall\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-wall\",\"name\":\"Water Protection Wall for Construction Sites\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-26T08:03:11+00:00\",\"dateModified\":\"2026-06-17T14:40:03+00:00\",\"description\":\"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-wall#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-wall\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-wall#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Water protection wall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water Protection Wall for Construction Sites","description":"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall","og_locale":"en_US","og_type":"article","og_title":"Water Protection Wall for Construction Sites","og_description":"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-17T14:40:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall","url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall","name":"Water Protection Wall for Construction Sites","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-26T08:03:11+00:00","dateModified":"2026-06-17T14:40:03+00:00","description":"Learn how to plan a water protection wall for construction sites \u2713 retain runoff, trap sediment, prevent pollution.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-wall#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Water protection wall"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20159","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20159"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20159\/revisions"}],"predecessor-version":[{"id":28416,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20159\/revisions\/28416"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20159"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}