{"id":20158,"date":"2026-01-26T14:29:58","date_gmt":"2026-01-26T13:29:58","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20158"},"modified":"2026-06-17T08:33:04","modified_gmt":"2026-06-17T06:33:04","slug":"water-protection-layer","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer","title":{"rendered":"Water protection layer"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A water protection layer safeguards structures, excavations and geotechnical systems against ingress of water while simultaneously protecting soil and groundwater from contamination. It is used in new construction, refurbishment, concrete demolition, special deconstruction, rock excavation and tunnel construction and comprises both artificial waterproofing and natural, low-permeability strata in the subsoil. In selective deconstruction measures &#8211; such as removing concrete above existing waterproofing &#8211; the right choice of tool determines the preservation of this sensitive layer. Hydraulic cutting and splitting methods from Darda GmbH, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, enable low-vibration working practices that significantly reduce the risk of mechanical damage to the water protection layer. Complementary to mechanical preservation, clean site logistics, controlled drainage and contamination control minimize the risk of pollutant migration and support regulatory compliance throughout execution.<\/p>\n<h2>Definition: What is meant by a water protection layer?<\/h2>\n<p>A water protection layer is understood to be a <strong>waterproof or strongly water-retarding layer<\/strong> that controls the permeability of water. It can be artificial (e.g., membranes, coatings, mineral seals) or natural (e.g., clay, marl as a geological barrier). In building construction it secures waterproofing against pressurized and non-pressurized water; in civil and tunnel works it protects linings and backfill; and in deconstruction it preserves the subgrade, utility corridors and groundwater from pollutant ingress. Decisive factors are low permeability, durable seams and details, as well as a sufficiently robust protective layer against mechanical actions. In mineral systems, target permeability coefficients <em>k<\/em> are typically in the order of magnitude of \u2264 10<sup>-9<\/sup> m\/s, while synthetic membranes achieve practical impermeability when properly welded and tested. Robustness against <strong>installation damage<\/strong>, <strong>aging<\/strong> and <strong>chemical exposure<\/strong> is equally essential for long-term functionality.<\/p>\n<h2>Functions and operating principles of a water protection layer<\/h2>\n<p>A water protection layer performs several functions: it <em>blocks<\/em> water flow, <em>distributes<\/em> hydrostatic loads, <em>separates<\/em> moisture-sensitive planes and <em>protects<\/em> waterproofing against mechanical stress. In cross-section it acts as a barrier against capillary rise and as a seal against seepage and groundwater. In deconstruction it is also a protected asset that must not be damaged. Tools such as concrete demolition shears or stone and concrete splitters from Darda GmbH help dismantle components in a controlled manner so that the water protection layer remains functional. In practice, performance is governed by transport mechanisms (<strong>advection<\/strong>, <strong>diffusion<\/strong>, <strong>capillary action<\/strong>), the effective hydrostatic head and the integrity of seams, details and transitions. Redundancy through combined systems (e.g., membrane plus protective and slip layers) increases resilience against local defects and differential movements.<\/p>\n<h2>Structure and materials of water protection layers<\/h2>\n<p>Material selection is governed by water exposure, substrate, temperature, chemical and UV loads, as well as mechanical actions. Common systems include:<\/p>\n<ul>\n<li><strong>Polymer and elastomer membranes<\/strong> (e.g., PE\/HDPE, FPO\/TPO, PVC-P): high tightness, weldable seams, suitable for tunnel waterproofing and earth-contact elements.<\/li>\n<li><strong>Bituminous membranes<\/strong> and polymer-modified bitumen: proven waterproofing in building and civil engineering, good crack-bridging capability.<\/li>\n<li><strong>Mineral sealing layers<\/strong> (clay, marl, bentonite mats): low permeability, suitable as area-wide barrier layers and in geosynthetic composite systems.<\/li>\n<li><strong>Reactive coatings<\/strong> (cementitious, crystalline): close pore space, supplement or upgrade existing waterproofing.<\/li>\n<li><strong>Protective, separation and slip layers<\/strong> (geotextiles, protective screeds): prevent mechanical damage to the waterproofing and reduce shear stresses.<\/li>\n<\/ul>\n<p>Decisions should consider <em>compatibility<\/em> at interfaces (e.g., plasticizer migration, alkaline milieu), <em>installation temperature windows<\/em>, <em>expected movements<\/em> and <em>service life<\/em>. Where feasible, systems with documented aging resistance and repairability simplify maintenance and end-of-life considerations.<\/p>\n<h3>Layer sequence in practice<\/h3>\n<p>A typical build-up comprises a prepared substrate, primer\/bonding bridge, waterproofing layer, seam and detail formation, protective layer and, if applicable, drainage with filter fleece. In tunnel structures a flexible membrane often lies between shotcrete and the inner lining; on flat roofs, separation and protective layers complement the waterproofing; in the ground, protective screeds or dimpled sheets safeguard against point loads. Quality assurance includes verifying thickness and overlap, continuous seam formation and the immediate installation of protective layers before trafficking. Where specified, holiday testing or vacuum testing verifies defect-free execution for coatings and membrane details.<\/p>\n<h2>Design, dimensioning and detailing<\/h2>\n<p>Decisive for durability are:<\/p>\n<ul>\n<li>Correct classification of water exposure (pressurized\/non-pressurized water, hydrostatics, capillarity)<\/li>\n<li>A flat, load-bearing, clean and sufficiently dry substrate<\/li>\n<li>Seam-safe connections, homogeneously welded overlaps, carefully executed corner and penetration details<\/li>\n<li>Compatible material combinations (chemical resistance, temperature window)<\/li>\n<li>Adequate protective layers against impact, cutting and point loads<\/li>\n<li>Regular internal and external monitoring with documented tests<\/li>\n<li>Allowance for movement joints and differential settlement (detailing of transitions, waterstops, sliding interfaces)<\/li>\n<li>Drainage and pressure relief where needed to limit hydrostatic head on the waterproofing<\/li>\n<\/ul>\n<h2>Water protection layers in concrete demolition and special deconstruction<\/h2>\n<p>In selective deconstruction works, the water protection layer is often located directly beneath concrete layers to be removed. The goal is to detach components in a controlled way without perforating the seal. Low-vibration methods help avoid crack formation and seam detachment. Concrete demolition shears from Darda GmbH allow precise nibbling of component edges; stone and concrete splitters separate components along defined lines without impact shock. This allows the load to be removed piece by piece while the underlying waterproofing is protected. Prior to works, surveys to locate seams, terminations and penetrations, as well as clearly marked no-go and buffer zones, reduce the risk of inadvertent damage.<\/p>\n<h3>Strip-out and cutting on waterproofing levels<\/h3>\n<p>During strip-out and cutting, load distribution and protective underlays are crucial. Equipment placed on the surface should be set on load-distributing plates. Cutting debris and rebar ends must be neutralized immediately. Sparks and heat input must be avoided at waterproofing layers; hydraulic shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">precision concrete crushers<\/a> offer advantages here. Slurry and fines from cutting or crushing must be collected and removed in a controlled manner to prevent infiltration at laps and terminations; wet vacuum systems and edge sealing measures are proven aids.<\/p>\n<h3>Joints, penetrations and details<\/h3>\n<p>Risk zones include joints, terminations, pipe penetrations and waterstops. Handling\/gripping points for deconstruction must be chosen so that no tensile action is introduced into the waterproofing. Cutting guides and anchorage points must be underlaid with protective layers. Following dismantling steps near details, immediate visual inspection and, where specified, local integrity testing (e.g., vacuum bell on laps) ensure continued functionality.<\/p>\n<h2>Rock excavation, tunnel construction and protection of the waterproofing<\/h2>\n<p>In tunnel construction, waterproofing membranes lie behind shotcrete or between shotcrete and the inner concrete. Vibrations, sharp-edged fracture surfaces and offsets can cause perforations. During excavation and subsequent fit-out, methods with low explosive energy and controlled splitting action are advantageous. Rock splitting cylinders from Darda GmbH create defined split cracks in the rock, thereby reducing actions on waterproofing membranes and backfill. Smooth blasting or pre-splitting at the membrane interface and subsequent surface conditioning (rounding arrises, removing offsets) further reduce point loads and cutting hazards.<\/p>\n<h3>Working with low vibration<\/h3>\n<p>Limiting vibration reduces the risk of microcracks and seam detachment. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> with finely metered output facilitate uniform processing and an appropriate feed rate. Project-specific vibration limits should be established for critical zones and verified with suitable monitoring so that process parameters can be adjusted before membrane integrity is compromised.<\/p>\n<h3>Protecting the membrane<\/h3>\n<p>Before casting the inner lining, the membrane must be provided with suitable protective layers. Component edges are blunted, anchor remnants are cut flush and covered with protective mats before shear or cutter work begins. Where traffic over membranes is unavoidable, temporary protective roadways and slip layers prevent shear transfer into the waterproofing and minimize abrasion.<\/p>\n<h2>Natural stone extraction and groundwater protection<\/h2>\n<p>In deposits with near-surface, water-retarding clay or marl layers, preserving these is important to avoid adversely altering the groundwater regime. Splitting methods and precise shear work open rock bodies along natural joints without causing large-scale disturbance in protective layers. This reduces turbidity plumes and inputs into drainage channels. Supplementary measures such as staged dewatering, silt traps and clean separation of spoil types support groundwater protection during extraction and backfilling.<\/p>\n<h2>Execution: practical guidance<\/h2>\n<ol>\n<li>Carefully prepare the substrate: remove loose particles, break edges, deburr ridges.<\/li>\n<li>Install waterproofing with minimal restraint: avoid folds and restraint points, close overlaps homogeneously.<\/li>\n<li>Apply protective layers immediately after the waterproofing so the construction and deconstruction phases are survived without damage.<\/li>\n<li>Plan load paths: place equipment on load-distributing plates, keep crane installations away from the sealed area.<\/li>\n<li>Adapt tool selection: concrete demolition shears for controlled nibbling, splitters for low-vibration separation, shears for rebar without sparks.<\/li>\n<li>Work in sections, schedule visual inspections and rectify critical details immediately.<\/li>\n<li>Control water and fines: capture slurry, prevent ponding on laps, and maintain clean drainage lines at all times.<\/li>\n<li>Document works: record seam tests, protective measures and inspections to enable traceability and acceptance.<\/li>\n<\/ol>\n<h2>Testing, monitoring and maintenance<\/h2>\n<p>Quality assurance includes leak tests, seam inspections and visual checks for cuts, indentations and perforations. On deconstruction sites, temporary protective layers are regularly supplemented and shifted covers corrected. After completion, acceptance of the waterproofed areas takes place and &#8211; if specified &#8211; a controlled water test with documented observation. Depending on the system, suitable integrity tests (e.g., vacuum box on laps, spark testing for coatings, dye tracing in contained areas) provide evidence of tightness and facilitate targeted repair if needed.<\/p>\n<h2>Environmental and legal aspects at a glance<\/h2>\n<p>Water protection layers serve precautionary groundwater protection. Depending on the project, water law requirements, standards for building waterproofing and rules for handling water-hazardous substances may apply. Any such information is always of a general nature and does not replace case-by-case verification. In sensitive areas, protective, containment and emergency measures must be in place; cutting and splitting work must be planned to prevent any material entering soil or water bodies. Waste, slurry and residues are to be collected and disposed of in accordance with applicable regulations, with spill prevention and response equipment kept readily available.<\/p>\n<h2>Typical sources of error and how to avoid them<\/h2>\n<ul>\n<li>Mechanical damage due to edge loads: avoid through protective mats and load distribution<\/li>\n<li>Insufficient seam formation: systematically check overlaps and weld seams<\/li>\n<li>Incorrect material selection: realistically assess exposure (water, temperature, chemistry)<\/li>\n<li>Missing protective layer: never drive over or load waterproofing without protection<\/li>\n<li>Excessive vibrations: prefer low-vibration shearing and splitting methods<\/li>\n<li>Heat and sparks: avoid thermal cutting near waterproofing; cut and shear hydraulically<\/li>\n<li>Uncontrolled water management: prevent ponding and backpressure by providing adequate drainage and filtration<\/li>\n<li>Poorly planned temporary works: design handling points and supports so that no tensile or shear forces act on the waterproofing<\/li>\n<\/ul>\n<h2>Distinction: waterproofing, protective layer and water protection layer<\/h2>\n<p>In practice, terms are often mixed. The <strong>waterproofing<\/strong> is the water-retarding or waterproof layer. The <strong>protective layer<\/strong> lies above it and protects the waterproofing from mechanical stresses. Depending on context, the <strong>water protection layer<\/strong> is understood as the waterproofing itself or the combination of waterproofing and protective layer. In deconstruction, both are to be treated as a functional unit and protected accordingly. Clear terminology in planning and site instructions prevents misinterpretation when allocating responsibilities and selecting tools and temporary measures.<\/p>\n<h2>Interfaces to tools and application areas of Darda GmbH<\/h2>\n<p>In the application areas of concrete demolition and special deconstruction, strip-out and cutting, as well as rock excavation and tunnel construction, Darda GmbH\u2019s hydraulic solutions have proven themselves: concrete demolition shears for controlled removal of components, stone and concrete splitters for defined separation cracks, combination shears and multi cutters for mixed tasks, steel shears for reinforcement, tank cutters for special assignments with increased requirements for spark and leakage protection. Hydraulic power units deliver precise, finely metered output. Together, these tools enable work that respects and maintains the integrity of water protection layers. Selecting the appropriate tool geometry, force level and feed control, combined with trained operators and documented process parameters, further reduces risk to seams, laps and membranes.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A water protection layer safeguards structures, excavations and geotechnical systems against ingress of water while simultaneously protecting soil and groundwater from contamination. It is used in new construction, refurbishment, concrete demolition, special deconstruction, rock excavation and tunnel construction and comprises both artificial waterproofing and natural, low-permeability strata in the subsoil. <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20158","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water Protection Layer | Waterproofing &amp; Tunnels<\/title>\n<meta name=\"description\" content=\"Expert guide to a robust water protection layer in construction &amp; tunneling \u2713 functions, materials, safe deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water Protection Layer | Waterproofing &amp; Tunnels\" \/>\n<meta property=\"og:description\" content=\"Expert guide to a robust water protection layer in construction &amp; tunneling \u2713 functions, materials, safe deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T06:33:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-layer\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-layer\",\"name\":\"Water Protection Layer | Waterproofing & Tunnels\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-26T13:29:58+00:00\",\"dateModified\":\"2026-06-17T06:33:04+00:00\",\"description\":\"Expert guide to a robust water protection layer in construction & tunneling \u2713 functions, materials, safe deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-layer#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-layer\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection-layer#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Water protection layer\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water Protection Layer | Waterproofing & Tunnels","description":"Expert guide to a robust water protection layer in construction & tunneling \u2713 functions, materials, safe deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer","og_locale":"en_US","og_type":"article","og_title":"Water Protection Layer | Waterproofing & Tunnels","og_description":"Expert guide to a robust water protection layer in construction & tunneling \u2713 functions, materials, safe deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-17T06:33:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer","url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer","name":"Water Protection Layer | Waterproofing & Tunnels","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-26T13:29:58+00:00","dateModified":"2026-06-17T06:33:04+00:00","description":"Expert guide to a robust water protection layer in construction & tunneling \u2713 functions, materials, safe deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection-layer#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Water protection layer"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20158","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20158"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20158\/revisions"}],"predecessor-version":[{"id":28396,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20158\/revisions\/28396"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20158"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}