{"id":20157,"date":"2026-01-26T11:46:38","date_gmt":"2026-01-26T10:46:38","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20157"},"modified":"2026-06-17T09:23:04","modified_gmt":"2026-06-17T07:23:04","slug":"water-protection","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/water-protection","title":{"rendered":"Water protection"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Water protection in the context of demolition, deconstruction and rock excavation means safeguarding surface waters and groundwater from pollutants, fine sediments and alkaline concrete water. Across all areas of application &#8211; from concrete demolition through building gutting to rock excavation, tunnel construction and natural stone extraction &#8211; the choice of work methods, equipment and construction site organization determines how reliably waters are protected. Mechanical separation and splitting techniques such as concrete pulverizers as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock wedge splitters and concrete splitters<\/a> enable clean, labor-efficient and water-friendly workflows in many situations. In addition, a risk-based approach aligned with permits and local hydrology strengthens robust, compliant execution from planning through completion.<\/p>\n<h2>Definition: What is meant by water protection?<\/h2>\n<p>Water protection encompasses all preventive and accompanying measures that prevent impairment of groundwater, springs, rivers, lakes and artificial water bodies. This includes avoiding pollutant inputs (oils, fuels, hydraulic fluid), reducing suspended matter and fine sediments, the controlled management of concrete water and sawing water with high pH levels, as well as rainwater and surface runoff management on the construction site. In the context of concrete demolition and rock work, water protection covers both process technology (e.g., dry, mechanical separation\/cutting) and site setup, construction logistics and emergency preparedness.<\/p>\n<p>Effective concepts follow the hierarchy of avoid, reduce and control. Avoid harmful inputs by selecting dry, mechanical processes; reduce unavoidable loads through capture at the source and process optimization; and control residual risks with treatment, retention and documented monitoring.<\/p>\n<h2>Water protection on construction sites: risks and typical pathways<\/h2>\n<p>Water hazards on demolition and construction areas often arise from a combination of substance inputs and uncontrolled runoff. Key sources include:<\/p>\n<ul>\n<li><strong>Hydraulic fluid, fuels and lubricants<\/strong> from power units and attachments (leaks, transfer operations, damaged lines).<\/li>\n<li><strong>Concrete water and cement slurry<\/strong> with elevated pH and dissolved solids during wet cutting, drilling and flushing.<\/li>\n<li><strong>Fine sediments<\/strong> from demolition, crushing and rock work that are washed away by rain or spray water.<\/li>\n<li><strong>Contaminated sites and contaminated construction materials<\/strong> that can be mobilized during deconstruction and special works.<\/li>\n<li><strong>Stormwater runoff<\/strong> that rapidly transports contaminated areas into receiving waters via channels, shafts and pipelines.<\/li>\n<\/ul>\n<p>The selection of suitable methods, working on impermeable, paved areas, the collection and treatment of contaminated water, and consistent leakage prevention are the central levers for effective water protection. Transport mechanisms include sheet flow across sealed and unsealed surfaces, infiltration in permeable soils and sudden discharges during intense rain. Particular attention is required near drains, karst features and water inlets where short-circuit pathways to groundwater or surface waters exist.<\/p>\n<h2>Mechanical separation and splitting methods as a contribution to water protection<\/h2>\n<p>Mechanical methods minimize water-relevant side effects because they typically operate without cooling and flushing water and generate little to no slurry. <em>Concrete pulverizers<\/em> as well as <em>rock wedge splitters and concrete splitters<\/em> are particularly relevant for this:<\/p>\n<h3>Concrete pulverizers in concrete demolition and special deconstruction<\/h3>\n<ul>\n<li><strong>Dry cutting<\/strong> without cooling slurry reduces the amount of alkaline wastewater and simplifies construction site drainage.<\/li>\n<li><strong>Controlled gripping and crushing<\/strong> lowers the proportion of fines that could enter runoff.<\/li>\n<li><strong>Low vibrations<\/strong> reduce risks to existing seals, lines and water-bearing parts of structures.<\/li>\n<li><strong>Selective dismantling<\/strong> supports clean material streams, minimizing contamination of stockpiles and reducing downstream washing needs.<\/li>\n<\/ul>\n<h3>Rock wedge splitters and concrete splitters in rock excavation and tunnel construction<\/h3>\n<ul>\n<li><strong>Non-explosive splitting<\/strong> avoids explosive-typical inputs and reduces the amount of loose fines.<\/li>\n<li><strong>Precise crack guidance<\/strong> enables runoff-oriented workflows and protects sensitive areas (e.g., spring horizons, drains).<\/li>\n<li><strong>Reduced water demand<\/strong> for dust and slurry management because no water-intensive cooling is required.<\/li>\n<li><strong>Low overbreak<\/strong> preserves natural drainage patterns and reduces the need for water-intensive clean-up of debris.<\/li>\n<\/ul>\n<p>These characteristics make it easier to integrate surface water and groundwater protection into workflows without compromising occupational safety or construction progress. They also facilitate predictable scheduling in weather-sensitive settings by decoupling critical steps from process water availability.<\/p>\n<h2>Site setup and prevention: from concept to field execution<\/h2>\n<p>A water-friendly construction site starts with planning and continues through execution:<\/p>\n<ol>\n<li><strong>Site analysis<\/strong>: Record flow directions, inlets, shafts, ditches, proximity to water bodies and groundwater levels.<\/li>\n<li><strong>Impermeable working areas<\/strong>: Operate equipment and hydraulic power packs on paved, liquid-tight surfaces with upstands.<\/li>\n<li><strong>Retention and sealing systems<\/strong>: Plan for trays, catch mats, curbs and temporary berms.<\/li>\n<li><strong>Compliant storage<\/strong> of operating supplies and waste; provide decanting areas with retention.<\/li>\n<li><strong>Weather management<\/strong>: Avoid high-risk activities during heavy rain; use covers and temporary protective enclosure.<\/li>\n<li><strong>Water routing<\/strong>: Separate clean from contaminated water; direct contaminated areas to treatment.<\/li>\n<li><strong>Emergency preparedness<\/strong>: Keep absorbents, sealing wedges, spare hoses, a construction emergency plan and notification chain ready.<\/li>\n<li><strong>Documentation and control<\/strong>: Visual inspections, measuring points and simple logs for incidents and corrective actions.<\/li>\n<\/ol>\n<h3>Essential planning deliverables<\/h3>\n<ul>\n<li><strong>Drainage and retention plan<\/strong> with marked clean and contaminated routes, containment volumes and overflow safeguards.<\/li>\n<li><strong>Spill response plan<\/strong> with roles, alert thresholds and disposal pathways for recovered liquids and solids.<\/li>\n<li><strong>Inventory register<\/strong> for operating supplies and wastes including storage locations and maximum on-site quantities.<\/li>\n<li><strong>Induction and training<\/strong> on water protection measures, with signposted working and refilling zones.<\/li>\n<\/ul>\n<h2>Handling concrete water, sawing slurry and pH levels<\/h2>\n<p>Where wet cutting or drilling is unavoidable, a structured water and slurry management applies:<\/p>\n<ul>\n<li><strong>Capture at the source<\/strong>: Edge seals, suction devices and impermeable underlays prevent uncontrolled runoff.<\/li>\n<li><strong>Separation and calming<\/strong>: Settling tanks or sedimentation stages reduce suspended solids.<\/li>\n<li><strong>pH reduction<\/strong>: Alkaline concrete water is professionally neutralized before discharge; avoid direct discharges.<\/li>\n<li><strong>Recirculation instead of discharge<\/strong>: Closed loops with filtration reduce freshwater demand.<\/li>\n<li><strong>Review method choice<\/strong>: Where possible, switch to dry, mechanical techniques such as concrete pulverizers or splitters.<\/li>\n<\/ul>\n<h3>Treatment options and quality control<\/h3>\n<ul>\n<li><strong>pH neutralization<\/strong> in controlled systems using suitable agents or CO2 injection, with continuous mixing and verification.<\/li>\n<li><strong>Solid-liquid separation<\/strong> by staged sedimentation, bag filters or mobile units; consider flocculants where approved.<\/li>\n<li><strong>Acceptance criteria<\/strong> defined for turbidity, pH and conductivity before any off-site discharge or transfer.<\/li>\n<li><strong>Sludge handling<\/strong> via dewatering and compliant disposal to prevent re-mobilization during rain events.<\/li>\n<\/ul>\n<h2>Operating hydraulic power packs and lines safely<\/h2>\n<p>Hydraulic systems are powerful but require special care in water protection:<\/p>\n<ul>\n<li><strong>Tight couplings and hoses<\/strong> should be used, lines protected against mechanical damage and inspected regularly.<\/li>\n<li><strong>Retention systems<\/strong> should be in place beneath <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a> and coupling points; absorb drips immediately and dispose of them properly.<\/li>\n<li><strong>Select operating supplies carefully<\/strong> and keep only the necessary quantity on the area.<\/li>\n<li><strong>Clean refilling<\/strong> on retention surfaces; have funnels, cans and wipes ready.<\/li>\n<li><strong>Observe service intervals<\/strong> to renew seals, filters and couplings in time.<\/li>\n<li><strong>Prefer rapidly biodegradable oils<\/strong> where technically and contractually permitted, combined with spill kits sized to equipment volumes.<\/li>\n<\/ul>\n<h2>Areas of application: plan and execute with minimal water impact<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In structural deconstruction, selective removal with concrete pulverizers can protect water-bearing areas. Component separations without cooling slurry reduce the need for sedimentation and neutralization stages. Bulk materials must be protected from precipitation, fine fractions stored separately and transport routes kept clean. Sequencing works to isolate wet processes within contained zones further limits pathways to drains and soil.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>During building gutting, working on impermeable floors with edge sealing prevents contaminated water from entering shafts. If sawing cuts are required, a closed water circuit with filtration is recommended. Where structurally feasible, <em>concrete pulverizers<\/em> offer a dry alternative for separation and opening works. Regular housekeeping and vacuum-assisted cleaning prevent fines from being tracked to outdoor areas during logistics.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In water-bearing zones, fine sediments are the main issue. Splash protection, silt barriers and calm flow routing reduce inputs. <em>Rock wedge splitters and concrete splitters<\/em> reduce loose fines and enable runoff-oriented sequencing of work steps. In tunnel areas, collection channels, sedimentation and regular clearing of settling volumes must be planned. A simple water balance that tracks inflow, process water, treatment and discharge supports compliance and capacity planning.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In stone quarries, precipitation and floor geometry determine runoff paths. Mechanical splitting reduces the use of water-intensive cutting methods and lowers slurry loads. Settling basins must be sized to the amount of fines; overflows are protected against erosion. Perimeter drains and check dams help control peak flows during storm events and protect receiving waters.<\/p>\n<h3>Special operations<\/h3>\n<p>In sensitive zones, for example in drinking water catchments, stricter requirements apply. Equipment with reliable sealing systems, redundant retention options and close-meshed inspections are standard there. Work is scheduled to avoid heavy rainfall events operationally. Independent audits and pre-start tests of retention and alarms can be required by permits and should be reflected in the schedule.<\/p>\n<h2>Thinking material flow, recycling and water protection together<\/h2>\n<p>Sorting by type reduces fines generation and facilitates clean storage. Size reduction with concrete pulverizers decreases the need for water-intensive downstream processes. Feeding, screening and interim storage take place on sealed areas; loading zones are kept clean to prevent carryover. Covered stockpiles, wheel-wash or track-out controls and routine sweeping prevent migration of sediments to drainage infrastructure.<\/p>\n<h2>Monitoring, documentation and continuous improvement<\/h2>\n<p>Simple, practice-oriented monitoring supports the protection of waters:<\/p>\n<ul>\n<li><strong>Visual and functional checks<\/strong> of retention and settling systems at defined intervals.<\/li>\n<li><strong>Measuring points<\/strong> for discharges (e.g., turbidity, conductivity, pH) where contaminated water occurs.<\/li>\n<li><strong>Incident logs<\/strong> for leaks, heavy rain and deviations, including documented remedies.<\/li>\n<li><strong>Lessons learned<\/strong> are carried over into the next planning after project completion.<\/li>\n<\/ul>\n<h3>Simple field measurements<\/h3>\n<ul>\n<li><strong>Handheld pH meters<\/strong> calibrated daily, with readings recorded alongside location, time and operator.<\/li>\n<li><strong>Turbidity checks<\/strong> using turbidity tubes or portable meters to verify sediment control performance.<\/li>\n<li><strong>Rainfall records<\/strong> linked to site actions, enabling threshold-based responses and post-event reviews.<\/li>\n<li><strong>Photo documentation<\/strong> of retention levels, discharge clarity and containment set-ups for traceability.<\/li>\n<\/ul>\n<h2>Roles, responsibilities and legal framework<\/h2>\n<p>Water protection is a team effort: site management, environmental coordination, equipment operators and disposal professionals work together. Responsibilities for inspections, emergency measures and releases must be clearly defined. Legal requirements arise from the applicable water regulations and permits; they must be checked on a project-specific basis and applied as a precaution. Binding legal advice is not provided here. Permit conditions, notification obligations and approved treatment or discharge points should be available on site and referenced in daily briefings.<\/p>\n<h2>Practical guide: key measures for the daily routine<\/h2>\n<ol>\n<li>Check working areas: impermeable, clean, retention functional.<\/li>\n<li>Equipment check: inspect couplings, hoses, seals and capture means.<\/li>\n<li>Agree on method selection: where possible, work dry with <em>concrete pulverizers<\/em> or <em>rock wedge splitters and concrete splitters<\/em>.<\/li>\n<li>Set runoff routing: separate clean and contaminated water, mark collection points.<\/li>\n<li>Monitor weather: during heavy rain, postpone critical activities or add safeguards.<\/li>\n<li>Follow-up and cleaning: collect fine sediments, clear settling volumes, update documentation.<\/li>\n<li>Verify discharge quality: confirm pH and turbidity meet acceptance criteria before any release.<\/li>\n<li>Restock spill response<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Water protection in the context of demolition, deconstruction and rock excavation means safeguarding surface waters and groundwater from pollutants, fine sediments and alkaline concrete water. Across all areas of application &#8211; from concrete demolition through building gutting to rock excavation, tunnel construction and natural stone extraction &#8211; the choice of <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20157","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water Protection in Demolition &amp; Rock Excavation<\/title>\n<meta name=\"description\" content=\"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction &amp; rock work that cut runoff risks.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water Protection in Demolition &amp; Rock Excavation\" \/>\n<meta property=\"og:description\" content=\"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction &amp; rock work that cut runoff risks.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/water-protection\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-17T07:23:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection\",\"name\":\"Water Protection in Demolition & Rock Excavation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-26T10:46:38+00:00\",\"dateModified\":\"2026-06-17T07:23:04+00:00\",\"description\":\"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction & rock work that cut runoff risks.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/water-protection#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Water protection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water Protection in Demolition & Rock Excavation","description":"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction & rock work that cut runoff risks.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/water-protection","og_locale":"en_US","og_type":"article","og_title":"Water Protection in Demolition & Rock Excavation","og_description":"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction & rock work that cut runoff risks.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-17T07:23:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection","url":"https:\/\/www.darda.de\/en\/knowledge\/water-protection","name":"Water Protection in Demolition & Rock Excavation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-26T10:46:38+00:00","dateModified":"2026-06-17T07:23:04+00:00","description":"Protect surface waters on construction sites \u2713 Methods for demolition, deconstruction & rock work that cut runoff risks.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/water-protection"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/water-protection#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Water protection"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20157","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20157"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20157\/revisions"}],"predecessor-version":[{"id":28400,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20157\/revisions\/28400"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20157"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}