{"id":20153,"date":"2026-01-24T12:54:33","date_gmt":"2026-01-24T11:54:33","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20153"},"modified":"2026-09-12T19:53:38","modified_gmt":"2026-09-12T17:53:38","slug":"hydropower-plant-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition","title":{"rendered":"Hydropower plant demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Hydropower plant demolition is a complex engineering process at the interface of hydraulic engineering, concrete demolition, and environmental technology. It involves dam walls, weir structures, powerhouse buildings, penstocks, intake and outlet structures, as well as rock interfaces. Objectives may include full river renaturation, the renewal of individual structural components, or adaptation to current safety and environmental standards. In practical deconstruction, <strong>concrete pulverizers<\/strong>, <strong>hydraulic wedge splitters<\/strong>, and associated <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> can be used for sectional processing; vibration and process performance must be assessed for the specific structure and task.<\/p>\n<p>Strategic drivers for removal or partial deconstruction include aging infrastructure, flood risk management, ecological restoration targets, and cost-benefit considerations for operation versus decommissioning. Success factors are precise staging under live-water constraints, predictable breaking behavior of concrete and rock, and demonstrable minimization of turbidity, noise, and vibrations.<\/p>\n<h2>Definition: What is meant by hydropower plant demolition?<\/h2>\n<p>Hydropower plant demolition refers to the planned and approved deconstruction of structures and plant components of a hydropower facility. This includes the dam or weir, powerhouse, turbine foundations, inspection and gate systems, fish passage facilities, bed ramps, pressure tunnels and pipes, as well as associated piping and operating equipment. Demolition may be complete (including soil remediation) or partial, for example when only weirs are opened, bed structures are adapted, or structural barriers to river continuity are removed. Hallmarks include high requirements for water control, sediment management, occupational safety, water protection, and controlled construction waste separation.<\/p>\n<p>Depending on the project objective, demolition can be framed as decommissioning, barrier removal, or structural conversion. Interfaces to ongoing power operations, public safety zones, and downstream users require clear definition in the works description and in the sequencing logic.<\/p>\n<h2>Process, methods, and phases in hydropower plant demolition<\/h2>\n<p>The deconstruction typically follows a structured sequence: investigation and planning, permits, site setup and water control, selective interior strip-out, large-volume concrete and rock removal, metal separation, transport logistics, restoration, and documentation. The selection of methods and tools depends on material thickness, degree of reinforcement, location in or adjacent to water, accessibility, and ecological and structural constraints. Blasting-free techniques such as hydraulic splitting and concrete pulverizers are preferred when vibrations, noise, and removal safety must be minimized.<\/p>\n<p>State-of-the-art practice integrates survey-grade 3D capture, structural modeling, and construction-phase monitoring. Drone photogrammetry and laser scanning support volume estimation and progress tracking. Method statements and risk assessments are iteratively refined based on trial cuts and test splits to calibrate tool settings, borehole patterns, and cycle times.<\/p>\n<h2>Structural systems and materials in focus<\/h2>\n<p>Hydropower facilities consist of massive components and heterogeneous materials. Mass concrete in dams and weirs, heavily reinforced concrete in turbine houses and foundations, natural rock at abutments, and large steel components such as penstocks, trash racks, gates, or hydraulic steel structures characterize the demolition scope. This material diversity requires the combined use of <strong>concrete pulverizers<\/strong> for reinforced concrete, <strong>hydraulic wedge splitters<\/strong> for mass concrete and rock, and shear and cutting technology (e.g., combination shears, multi cutters, steel shear, cutting torch) for ferromagnetic components and pipelines.<\/p>\n<p>Special attention is warranted for prestressed or post-tensioned elements, grout anchors, and coatings. Alkali-silica reaction zones, embedded metals, and historical construction joints can alter fracture propagation, requiring adapted splitting sequences, pre-cutting of reinforcement, and staged load relief.<\/p>\n<h2>Selective deconstruction: from the inside out<\/h2>\n<p>Before intervening in load-bearing structures, installations are stripped out and hazardous materials removed. The <em>strip-out and cutting<\/em> includes inspection platforms, building services, cable trays, machine components, and operating supplies. This is followed by the removal of load-bearing elements in a defined sequence, coordinated with water control, structural stability, and the flow regime.<\/p>\n<h3>Strip-out, separation, preparation<\/h3>\n<ul>\n<li>Dismantling of units and steelwork using combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">multi cutters<\/a>, and steel shear<\/li>\n<li>Clean separation of concrete, reinforcement, and steel components to optimize the recycling rate<\/li>\n<li>Preparatory scoring of concrete edges and controlled breaking with concrete pulverizers<\/li>\n<\/ul>\n<h3>Large-volume concrete and rock removal<\/h3>\n<ul>\n<li>Non-explosive processing with <strong>hydraulic wedge splitters<\/strong>; verify vibration limits and effects on adjacent structures for the project<\/li>\n<li>Pulverizer-based biting-off of reinforced concrete components (wall and slab panels, foundations) with <strong>concrete pulverizers<\/strong><\/li>\n<li>Removal of abutments and rock ribs using rock splitting cylinders, suitable for <em>rock excavation and tunnel construction<\/em><\/li>\n<\/ul>\n<h3>Steel and pipeline work<\/h3>\n<ul>\n<li>Cutting of penstocks, pipe bridges, and fittings with steel shear or cutting torch<\/li>\n<li>Pre-assembly into transportable segments for safe transport logistics<\/li>\n<\/ul>\n<h2>Water control, sediments, and aquatic ecology<\/h2>\n<p>The control of water levels and discharges is central. Temporary dams, cut-off walls, or bed coverings minimize erosion and turbidity. Sediments are sampled and &#8211; depending on contamination &#8211; removed, temporarily stored, or treated. Deconstruction can improve river continuity and facilitate fish migration. Methods with <em>low vibration levels<\/em> and controlled material removal help protect banks and habitats.<\/p>\n<h3>Monitoring and verification<\/h3>\n<ul>\n<li>Turbidity, suspended solids, pH, and temperature monitoring against project-specific thresholds<\/li>\n<li>Fish protection measures synchronized with ecological windows and flow regimes<\/li>\n<li>Bank stability checks and visual inspections tied to hold points in the method statement<\/li>\n<\/ul>\n<h3>Sediment management and material streams<\/h3>\n<ul>\n<li>Quantification of sediment volumes and qualities<\/li>\n<li>Targeted dredging, dewatering, and reapplication as construction or restoration material<\/li>\n<li>Separate collection of concrete, reinforcing steel, non-ferrous metals, wood, and operating supplies<\/li>\n<\/ul>\n<h2>Method selection: non-explosive, controlled, adaptable<\/h2>\n<p>In densely populated areas, near sensitive structures, or under ongoing flow conditions, non-explosive methods offer advantages. Hydraulic <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> generate high splitting forces through borehole patterns to break up mass concrete and rock in a controlled manner. <strong>Concrete pulverizers<\/strong> reduce reinforced concrete components appropriately and facilitate separating the reinforcement. <em>Hydraulic power packs<\/em> supply the tools efficiently; their compact design supports work in confined caverns and galleries.<\/p>\n<p>Sequencing typically alternates between selective pre-splitting to relieve internal stresses and subsequent downsizing with pulverizers or lifting equipment. This staged approach limits crack runout, contains fragments, and supports predictable handling and transport.<\/p>\n<h3>Areas of application and typical tasks<\/h3>\n<ul>\n<li><strong>Concrete demolition and special deconstruction:<\/strong> selective removal of walls, slabs, foundations with concrete pulverizers<\/li>\n<li><strong>Strip-out and cutting:<\/strong> separating processes on steel structures, pipes, and tanks<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> opening up abutments and rock ribs with splitting cylinders<\/li>\n<li><strong>Natural stone extraction:<\/strong> transferred splitting technology for massive rock bodies at weir connections<\/li>\n<li><strong>Special operations:<\/strong> work in sensitive zones, with restricted accessibility, or under strict noise control requirements<\/li>\n<\/ul>\n<h2>Underwater and shoreline works<\/h2>\n<p>Work in contact with water requires special precautions. Options include drying out using sheet pile walls and pumps, working in shallow water with adapted equipment, or targeted pre-cutting and lifting of components. Cutting tools and pulverizers with hydraulic drive have proven their worth thanks to precise, controllable force transmission.<\/p>\n<h3>Special protective measures<\/h3>\n<ul>\n<li>Double sealing and drip oil management on the hydraulic system<\/li>\n<li>Catch mats and barriers to prevent the entry of fragments and fine sediments<\/li>\n<li>Acoustic and visual monitoring to protect aquatic fauna<\/li>\n<\/ul>\n<p>Diving operations, if required, demand certified procedures, adequate visibility, current assessment, and emergency planning. Lifting activities over water are paired with redundant slinging concepts and exclusion zones.<\/p>\n<h2>Equipment and tool selection in the project context<\/h2>\n<p>The selection depends on geometry, degree of reinforcement, concrete compressive strength class, rock quality, material thickness, and accessibility. A practice-oriented combination is crucial: <strong>concrete pulverizers<\/strong> for load-bearing RC components, <strong>hydraulic wedge splitters<\/strong> for massive, thick-walled zones and at rock contacts; steel shear, multi cutters, and cutting torch for penstocks and hydraulic steelwork; <em>hydraulic power packs<\/em> as the energy and control center.<\/p>\n<h3>Selection parameters and sizing<\/h3>\n<ul>\n<li>Pulverizers: jaw opening and crushing force matched to component thickness and rebar density, cycle time optimized for throughput<\/li>\n<li>Splitters: wedge set, borehole diameter, depth, and spacing adapted to concrete strength and desired fracture plane<\/li>\n<li>Power packs: operating pressure and flow rate aligned with tool family, with sufficient cooling and filtration capacity<\/li>\n<li>Ancillary gear: dust suppression, edge protection, and lifting accessories sized for confined access and wet environments<\/li>\n<\/ul>\n<h3>Examples of components and methods<\/h3>\n<ul>\n<li>Crest of the dam: sectional biting, pre-splitting to reduce internal stresses<\/li>\n<li>Weir bays: pulverizer demolition at support beams, cutting of steel components<\/li>\n<li>Powerhouse: strip-out, then pulverizer demolition of wall and slab elements<\/li>\n<li>Penstock: segmented cutting and controlled lifting<\/li>\n<li>Rock abutment: borehole splitting with rock splitting cylinders and guided fracture propagation<\/li>\n<\/ul>\n<h2>Occupational safety and health protection<\/h2>\n<p>Safety planning covers load transfer, fall protection, water and bank protection, machine and hydraulic safety, noise control and dust suppression, as well as emergency concepts. Methods with low vibration levels and reduced dust generation are advantageous. Hydraulic equipment should be ergonomic, compact, and stably positioned, with clear communication and shutdown paths.<\/p>\n<h3>Risk factors and technical countermeasures<\/h3>\n<ul>\n<li>Vibrations: non-explosive methods and splitting technology<\/li>\n<li>Kickback and edge break-offs: defined cuts and a sectional approach with concrete pulverizers<\/li>\n<li>Water-hazardous substances: tight containment and separation systems, proper disposal<\/li>\n<\/ul>\n<p>Additional provisions include lockout-tagout for hydraulic and electrical systems, personal flotation devices in water-adjacent zones, gas monitoring in galleries, and rescue drills coordinated with emergency services.<\/p>\n<h2>Material cycles and recycling<\/h2>\n<p>To achieve a high recycling rate, material streams are separated by type. Concrete can be crushed on site and reused as recycled construction material, reinforcing steel and steel components go to metal recycling. Large tanks, pipelines, and vessels are converted into manageable segments with suitable cutting tools. Complete documentation supports evidence and quality assurance.<\/p>\n<p>Pre-demolition audits establish material inventories and potential reuse pathways. End-of-waste criteria, quality classes for recycled aggregates, and traceable weighbridge records underpin compliance and environmental accounting.<\/p>\n<h2>Planning, permits, and documentation<\/h2>\n<p>Legal frameworks typically involve water law, nature conservation, emissions control, waste and soil protection law, and occupational safety. The requirements are project- and site-specific and should be coordinated early with the competent authorities. Basic data collection, surveying, subsoil investigation and material testing, as well as a robust deconstruction and water control concept, are integral components. All information is of a general nature and does not replace individual legal or technical advice.<\/p>\n<h3>Typical deliverables and documentation<\/h3>\n<ul>\n<li>Method statements and risk assessments for each work package<\/li>\n<li>Water control, erosion, and sediment control plans with monitoring protocols<\/li>\n<li>Waste and material management plans including recycling pathways<\/li>\n<li>Ecological protection concepts for fish passage, habitats, and timing windows<\/li>\n<li>Stakeholder communication records and traffic management arrangements<\/li>\n<\/ul>\n<h2>Practical guide: sequence of steps for hydropower plant demolition<\/h2>\n<ol>\n<li>Inventory, hazard analysis, and deconstruction concept<\/li>\n<li>Permits, environmental and traffic management, communication plan<\/li>\n<li>Site setup, water control, sediment precautions<\/li>\n<li>Strip-out and separation of utilities, removal of operating supplies<\/li>\n<li>Structural removal: splitting of mass concrete\/rock, pulverizer demolition of reinforced concrete<\/li>\n<li>Cutting and dismantling of pipelines and hydraulic steelwork<\/li>\n<li>Source-separated handling, transport logistics, recycling<\/li>\n<li>Backfilling, bank stabilization, renaturation<\/li>\n<li>Final measurements, documentation, and monitoring<\/li>\n<\/ol>\n<p>Post-project monitoring verifies hydromorphological targets, bank stability, and habitat development, and informs any adaptive maintenance needs.<\/p>\n<h2>Technical notes on the use of concrete pulverizers and splitting technology<\/h2>\n<p><strong>Concrete pulverizers<\/strong> are efficient for medium component thicknesses and a high degree of reinforcement, especially on walls, slabs, downstand beams, and foundation edges. For thick-walled, high-strength components and rock interfaces, <strong>hydraulic wedge splitters<\/strong> offer advantages: they selectively relieve internal stresses and create predetermined fracture planes, so that subsequent pulverizer or lifting operations become safer and more predictable. <em>Hydraulic power packs<\/em> should be matched to the respective tool family in terms of operating pressure, flow rate, and power supply.<\/p>\n<ul>\n<li>Pre-cut reinforcement where accessible to prevent rebar bridging and uncontrolled spalling<\/li>\n<li>Stage splitting from free edges towards restraints to guide crack paths<\/li>\n<li>Use trial holes to validate borehole spacing and wedge selection before full production<\/li>\n<li>Coordinate tool changeovers and waste handling to minimize double handling and idle time<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hydropower plant demolition is a complex engineering process at the interface of hydraulic engineering, concrete demolition, and environmental technology. It involves dam walls, weir structures, powerhouse buildings, penstocks, intake and outlet structures, as well as rock interfaces. Objectives may include full river renaturation, the renewal of individual structural components, or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20153","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hydropower Plant Demolition - Engineering Process<\/title>\n<meta name=\"description\" content=\"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hydropower Plant Demolition - Engineering Process\" \/>\n<meta property=\"og:description\" content=\"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:38+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydropower-plant-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydropower-plant-demolition\",\"name\":\"Hydropower Plant Demolition - Engineering Process\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-24T11:54:33+00:00\",\"dateModified\":\"2026-09-12T17:53:38+00:00\",\"description\":\"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydropower-plant-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydropower-plant-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/hydropower-plant-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Hydropower plant demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hydropower Plant Demolition - Engineering Process","description":"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition","og_locale":"en_US","og_type":"article","og_title":"Hydropower Plant Demolition - Engineering Process","og_description":"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:38+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition","name":"Hydropower Plant Demolition - Engineering Process","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-24T11:54:33+00:00","dateModified":"2026-09-12T17:53:38+00:00","description":"Guide to hydropower plant demolition \u2713 non-explosive methods for dams and turbines, water protection and habitat safeguards.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/hydropower-plant-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Hydropower plant demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20153"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20153\/revisions"}],"predecessor-version":[{"id":29165,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20153\/revisions\/29165"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}