{"id":20148,"date":"2026-01-24T16:48:16","date_gmt":"2026-01-24T15:48:16","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20148"},"modified":"2026-06-16T09:42:02","modified_gmt":"2026-06-16T07:42:02","slug":"construction-site-water-connection","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection","title":{"rendered":"Construction site water connection"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The construction site water connection is a basic prerequisite for numerous activities in building construction and civil engineering, in deconstruction as well as in natural stone extraction. It supplies workplaces, equipment and processes with construction water for dust suppression, wet cutting, core drilling, cleaning and material processing. In the context of concrete demolition and special demolition, a properly planned connection provides the basis for safe, clean and efficient workflows &#8211; for example when using concrete pulverizers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, or during wet sawing and drilling. This article explains terms, components, planning steps, safety and environmental topics, and the practical link to typical applications of Darda GmbH. In professional practice, the construction site water connection is also referred to as a temporary site water supply or site water service line and is subject to utility approvals.<\/p>\n<h2>Definition: What is meant by a construction site water connection?<\/h2>\n<p>The term \u201cconstruction site water connection\u201d refers to the temporary provision of water at a construction or deconstruction site. The supply is usually via a standpipe at the hydrant or via a provisional connection to the domestic installation of a building under refurbishment. The connection includes measuring and safety devices (e.g., water meter, backflow preventer), lines and distributors through to points of use. The objective is to provide water as needed for processes such as wet cutting, core drilling, dust suppression, cleaning, as well as for post-treatment of concrete &#8211; in compliance with recognized rules of the trade, the specifications of the water utility, and with regard to occupational and environmental protection. In contrast to permanent building services, the setup is <em>time-limited<\/em>, must be removable without damage, and requires clear responsibilities regarding operation and hygiene.<\/p>\n<h2>Structure and components of a construction site water connection<\/h2>\n<p>A functional construction site water connection consists of the inlet (e.g., hydrant with standpipe), measuring and safety technology (water meter, backflow preventer\/backflow breaker), pressure and flow management (pressure reducer, manifold), robust hose lines, and points of use with shut-off valves and quick couplings. In addition, filters, frost protection measures, and temporary collection or settling tanks for arising dirty water or slurry are used. Where conditions demand, buffer tanks ensure decoupling from fluctuating mains pressure and provide operational reliability during peak extraction.<\/p>\n<h3>Inlet and safeguarding<\/h3>\n<ul>\n<li>Standpipe at the hydrant or provisional connection to existing lines with approved fittings.<\/li>\n<li><strong>Backflow preventer\/backflow breaker<\/strong> to protect the drinking water network from back-siphonage or backpressure of contaminated water.<\/li>\n<li>Water meter (construction water meter) for consumption recording in accordance with the utility\u2019s specifications.<\/li>\n<li>Optional: <em>pressure reducer<\/em> to adapt to permissible hose and equipment operating pressures.<\/li>\n<li>Lockable, tamper-resistant fittings to prevent unauthorized operation and water losses.<\/li>\n<li>Strainers at the standpipe inlet to intercept coarse particles and protect downstream components.<\/li>\n<\/ul>\n<h3>Lines and distribution<\/h3>\n<ul>\n<li>Hose lines in suitable nominal sizes (typically 3\/4\u2033 to 1 1\/2\u2033) with kink-resistant, pressure-stable quality.<\/li>\n<li>Manifolds (e.g., multi couplings) with shut-off cocks per outlet for separate control.<\/li>\n<li>Color marking, mechanical protection (drive-over protection, bridges) and trip-free routing.<\/li>\n<li>Observe pressure ratings of hoses and couplings; use anti-kink protectors and strain relief at manifolds.<\/li>\n<\/ul>\n<h3>Points of use and accessories<\/h3>\n<ul>\n<li>Quick couplings for fast changeovers between dust suppression nozzles, wet cutting, core drilling equipment and cleaning applications.<\/li>\n<li>Filter inserts upstream of fine nozzles\/fittings to prevent clogging by particles.<\/li>\n<li>Frost protection (insulated fittings, trace heating or draining) for winter operation.<\/li>\n<li>Splash guards, slurry rings and collection adapters for core drills and saws to guide water to collection points.<\/li>\n<\/ul>\n<h2>Demand assessment and sizing<\/h2>\n<p>Sizing is based on the peak loads of the intended work steps, the parallel use of multiple points of use, and the pressure\/flow requirements of connected devices. A conservative design prevents bottlenecks, water hammer effects, and unnecessary downtime. <strong>Rule of thumb:<\/strong> dimension the manifold and main hose at least one size above the largest individual consumer and verify pressure losses for the longest line run.<\/p>\n<h3>Typical guide values for construction water flows<\/h3>\n<ul>\n<li>Wet cutting (floor\/wall saws, diamond-bonded): approx. 10-30 l\/min per machine, depending on blade size and material.<\/li>\n<li>Core drilling (wet): approx. 3-10 l\/min per drilling location, depending on diameter.<\/li>\n<li>Dust suppression during demolition\/splitting\/grappling: approx. 5-15 l\/min per spray point with fine mist.<\/li>\n<li>Cleaning of tools, components and work areas: highly variable, often 5-20 l\/min intermittently.<\/li>\n<\/ul>\n<h3>Pressure requirements<\/h3>\n<ul>\n<li>For most applications, approx. 2-5 bar at the point of use is sufficient; fine mist nozzles require stable pressure and clean water.<\/li>\n<li><strong>Pressure management<\/strong> via pressure reducers and adequately sized hoses reduces pressure losses and protects fittings.<\/li>\n<li>Consider static vs. dynamic pressure: validate under simultaneous load to avoid drops during peak demand.<\/li>\n<\/ul>\n<h2>Applications in concrete demolition and special demolition<\/h2>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, water is central to dust suppression, wet cutting and binding fine particles. This improves visibility, reduces burdens on personnel and the surroundings, and supports precise workflows. Integrating dust suppression with cutting and drilling schedules minimizes rework and keeps adjacent areas cleaner.<\/p>\n<h3>Concrete pulverizers: dust suppression and surface cleaning<\/h3>\n<ul>\n<li>When crushing concrete with concrete pulverizers, fracture zones with fine dust are generated. <em>Finely atomized water<\/em> near the engagement point significantly reduces emissions.<\/li>\n<li>Pre-wetting the surface improves the binding of particles on the component surface.<\/li>\n<li>After separation, water supports cleaning of exposed reinforcement, e.g., for safe further cutting.<\/li>\n<li>Align nozzles with the prevailing wind and set droplet size to mist rather than spray to limit water consumption.<\/li>\n<\/ul>\n<h3>Rock and concrete splitters: water in surrounding area management<\/h3>\n<ul>\n<li>Hydraulic splitting itself typically requires no water. However, spray mist along the crack line reduces dust and improves visibility.<\/li>\n<li>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, targeted wetting helps bind drill cuttings and chips.<\/li>\n<li>Avoid water accumulation in cracks during frost periods to prevent freeze damage to adjacent structures.<\/li>\n<\/ul>\n<h3>Interior demolition and cutting<\/h3>\n<ul>\n<li>Wet cutting with wall saws and core drilling reduces friction and carries away the grinding slurry.<\/li>\n<li>With combination shears, multi cutters, steel shears and tank cutters, water is primarily used for cleaning and dust control in the surrounding area, not for the cutting process.<\/li>\n<li>Use local collection devices and vacuum-assisted slurry rings to contain emissions in sensitive interiors.<\/li>\n<\/ul>\n<h2>Water quality, hygiene and backflow protection<\/h2>\n<p>Depending on use, drinking water quality is required (e.g., wet cutting indoors) or service water is sufficient (e.g., dust suppression outdoors). Regardless, protecting the public network is essential. Stagnant water in hoses can pose hygiene risks; regular flushing and documented inspections reduce microbial growth.<\/p>\n<h3>Separation of systems<\/h3>\n<ul>\n<li>Use <strong>backflow preventer\/backflow breaker<\/strong> to avoid cross-connections.<\/li>\n<li>No suction from basins\/pits without suitable separation; contaminated water must not enter the supply network.<\/li>\n<li>Prefer physical separation by air gap where practicable in temporary setups.<\/li>\n<\/ul>\n<h3>Filtration<\/h3>\n<ul>\n<li>Installing coarse\/fine filters upstream reduces nozzle failures and extends maintenance intervals.<\/li>\n<li>Regular filter replacement prevents pressure drop and germ growth.<\/li>\n<li>Monitor differential pressure across filters to schedule service before performance degrades.<\/li>\n<\/ul>\n<h2>Handling wastewater, slurries and emissions<\/h2>\n<p>Wet cutting and core drilling generate grinding slurry consisting of water, cement paste and rock particles. Proper capture and treatment are necessary to ensure discharge to soil, water bodies or sewer without harm. Local acceptance criteria for suspended solids and pH apply and may require pre-approval.<\/p>\n<h3>Capture and pretreat<\/h3>\n<ul>\n<li>Guide the wet cutting slurry in channels to collection points; use settling tanks\/sedimentation for particle separation.<\/li>\n<li>Filter fleeces, big bags with filter function or mobile clarification boxes to retain fine particles.<\/li>\n<li>Monitor the pH value; highly alkaline waters from concrete processing should only be treated in a controlled manner and according to specifications.<\/li>\n<li>Provide sufficient buffer volume for peak loads and plan for safe removal of retained solids.<\/li>\n<\/ul>\n<h3>Dust suppression<\/h3>\n<ul>\n<li>Fine-mist systems minimize water consumption and prevent puddle formation.<\/li>\n<li>Avoid over-wetting to prevent slip and skid hazards and unnecessary wastewater volumes.<\/li>\n<li>Position nozzles to envelop the emission source; adjust flow with needle valves rather than throttling at hose ends.<\/li>\n<\/ul>\n<h2>Occupational safety, operation and maintenance<\/h2>\n<p>Water lines are portable work equipment. Their safe routing, protection against damage and orderly operation are mandatory. A brief risk assessment and on-site briefing clarify responsibilities, emergency shut-off procedures and inspection intervals.<\/p>\n<h3>Safe routing<\/h3>\n<ul>\n<li>Secure hoses crossing walkways (hose bridges), avoid trip hazards.<\/li>\n<li>Pressure-test and check for tightness, especially after coupling changes.<\/li>\n<li>Avoid sudden valve openings to prevent <em>water hammer<\/em>.<\/li>\n<li>Keep hoses clear of sharp edges, hot surfaces and vehicle paths or provide suitable protection.<\/li>\n<\/ul>\n<h3>Frost and heat protection<\/h3>\n<ul>\n<li>In frost: drain or heat; insulate standpipes; remove standing water.<\/li>\n<li>In heat: choose UV-stable hoses, avoid pressure rise in closed sections.<\/li>\n<li>Do not leave dead-end branches pressurized in direct sun; vent or shade to limit thermal expansion.<\/li>\n<\/ul>\n<h3>Equipment care<\/h3>\n<ul>\n<li>Regular visual inspection of couplings, seals, valves and spray nozzles.<\/li>\n<li>Replace worn hoses early; mark inspection dates.<\/li>\n<li>Keep service kits with spare seals and screens available at the manifold for quick replacement.<\/li>\n<\/ul>\n<h2>Practical relevance to devices and areas of application of Darda GmbH<\/h2>\n<p>Hydraulic tools from Darda GmbH such as concrete pulverizers, rock and concrete splitters or stone splitting cylinders operate without water supply. Nevertheless, water on the construction site is an important companion to these processes: for dust suppression in the engagement area, for improved visibility, for cleaning component surfaces and for post-treatment of adjacent cut edges. Coordinated planning of water availability enables parallel workflows without interference.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<ul>\n<li>Local spray mist at pulverizer engagement points reduces fine dust and increases precision.<\/li>\n<li>With combined approaches (e.g., pulverizer plus wet cutting), a stable water connection is required to work in parallel.<\/li>\n<li>Use adjustable manifolds to prioritize supply to cutting devices during critical phases.<\/li>\n<\/ul>\n<h3>Interior demolition and cutting<\/h3>\n<ul>\n<li>Wet cutting for openings, core drilling for anchor points; water ensures removal of grinding slurry.<\/li>\n<li>Follow-up with hydraulic tools benefits from clean, exposed reinforcement.<\/li>\n<li>Noise and dust are reduced when water flow and suction are balanced with tool speed.<\/li>\n<\/ul>\n<h3>Rock excavation and tunnel construction<\/h3>\n<ul>\n<li>Wetting reduces dust in enclosed spaces and tunnels, supporting occupational safety.<\/li>\n<li>A mobile water supply with sufficient buffer volume is crucial where infrastructure is limited.<\/li>\n<li>Robust couplings and impact-resistant manifolds withstand rough handling in confined spaces.<\/li>\n<\/ul>\n<h3>Natural stone extraction and special operations<\/h3>\n<ul>\n<li>Fine mist along splitting joints binds drilling dust, improves visibility and protects sensitive surroundings.<\/li>\n<li>For special operations, consider flow paths, sedimentation and retention early in planning.<\/li>\n<li>On slopes, use staged collection points to prevent uncontrolled runoff.<\/li>\n<\/ul>\n<h2>Planning steps and checklist<\/h2>\n<p>Structured planning prevents downtime, reduces emissions and increases safety.<\/p>\n<ol>\n<li>Determine demand: peak volumetric flow, parallel points of use, pressure requirements.<\/li>\n<li>Clarify supply: hydrant\/standpipe or building installation; observe permits and handover records with the utility.<\/li>\n<li>Define safeguarding: backflow preventer\/backflow breaker, water meter, if applicable pressure reducer and filters.<\/li>\n<li>Plan the distribution network: hose dimensions, lengths, couplings, manifolds, shut-offs, protective measures.<\/li>\n<li>Wastewater routing: channels, collection points, sedimentation\/filters, pH management and disposal routes.<\/li>\n<li>Safety: marking, hose bridges, emergency shut-off, staff briefing.<\/li>\n<li>Winter\/summer operation: draining, insulation, UV and pressure protection.<\/li>\n<li>Documentation: plans, inspection intervals, maintenance and responsibilities.<\/li>\n<li>Contingencies: spare hoses and seals, backup pump or buffer tank for critical activities.<\/li>\n<\/ol>\n<h2>Typical pitfalls and practical solutions<\/h2>\n<p>Many problems can be avoided with simple means.<\/p>\n<ul>\n<li>Insufficient pressure: choose larger hose cross-sections and short line runs; set the pressure reducer correctly.<\/li>\n<li>Clogged nozzles: pre-filter, regular flushing, clean coupling changes.<\/li>\n<li>Slip hazard due to water: mist instead of jet, targeted wetting, quick drainage.<\/li>\n<li>Backflow risks: consistent separation, tested fittings, clear hose labeling.<\/li>\n<li>Flooding during wet cutting: continuous removal, suitably sized collection tanks, throttling at the valve instead of at the hose end.<\/li>\n<li>Unplanned outages: lock fittings against tampering and mark critical valves for fast access.<\/li>\n<\/ul>\n<h2>Legal and organizational notes<\/h2>\n<p>Establishing a construction site water connection is subject to the requirements of the responsible water utility and recognized rules of the trade. Standpipes, water meters and safety devices are often specified or provided. Discharges of slurries and contaminated water should only take place after upstream treatment and in accordance with local regulations. Information is general and does not replace a case-by-case review. Keep utility handover protocols, flushing and inspection records, and disposal receipts readily available for audits and project documentation.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The construction site water connection is a basic prerequisite for numerous activities in building construction and civil engineering, in deconstruction as well as in natural stone extraction. It supplies workplaces, equipment and processes with construction water for dust suppression, wet cutting, core drilling, cleaning and material processing. In the context <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20148","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Site Water Connection Setup &amp; Safety<\/title>\n<meta name=\"description\" content=\"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control &amp; wastewater.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Site Water Connection Setup &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control &amp; wastewater.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-16T07:42:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-water-connection\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-water-connection\",\"name\":\"Construction Site Water Connection Setup & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-24T15:48:16+00:00\",\"dateModified\":\"2026-06-16T07:42:02+00:00\",\"description\":\"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control & wastewater.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-water-connection#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-water-connection\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/construction-site-water-connection#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction site water connection\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Site Water Connection Setup & Safety","description":"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control & wastewater.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection","og_locale":"en_US","og_type":"article","og_title":"Construction Site Water Connection Setup & Safety","og_description":"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control & wastewater.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-16T07:42:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection","url":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection","name":"Construction Site Water Connection Setup & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-24T15:48:16+00:00","dateModified":"2026-06-16T07:42:02+00:00","description":"Learn how to plan a construction site water connection \u2713 temporary hydrant supply, safety, dust control & wastewater.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/construction-site-water-connection#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Construction site water connection"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20148","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20148"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20148\/revisions"}],"predecessor-version":[{"id":28366,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20148\/revisions\/28366"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}