{"id":20146,"date":"2026-01-24T13:57:17","date_gmt":"2026-01-24T12:57:17","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20146"},"modified":"2026-09-12T19:53:36","modified_gmt":"2026-09-12T17:53:36","slug":"wall-strengthening","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening","title":{"rendered":"Wall strengthening"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wall strengthening refers to the professional upgrading of masonry and reinforced concrete walls to safely transfer loads, to limit deformations, and to restore or increase serviceability. It is used when uses change, openings are created, damage is present, or increased code requirements demand verification. In practice, wall strengthening frequently interfaces with processes from <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> as well as from strip-out and cutting &#8211; such as when areas are selectively removed, reinforcement is exposed, or bearing surfaces are created. Precise and low-vibration tools such as concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">precise rock and concrete splitters<\/a> make an important contribution to the clean preparation of strengthening works. In addition to static verifications, construction sequencing, temporary works, and interface management with deconstruction are decisive for a robust outcome.<\/p>\n<h2>Definition: What is meant by wall strengthening?<\/h2>\n<p>Wall strengthening comprises measures that increase or restore a wall\u2019s load-bearing capacity, stiffness, and ductility. This includes local interventions (e.g., crack repairs, stitching, bearing upgrades) as well as area-wide systems (e.g., overlays, shotcrete, steel or CFRP laminates). The goal is the safe uptake of bending, compressive, and shear actions and the control of cracks and deformations. Wall strengthening differs from pure repair in that it not only preserves the original properties but often results in an <em>increase<\/em> in load reserves. Typical triggers are new loads due to adding stories, larger wall openings, material damage (e.g., corrosion, freeze-thaw with deicing salts, alkali-silica reaction), or requirements from seismic design and fire protection.<\/p>\n<p><strong>Typical verification aspects<\/strong> include ultimate limit states (axial, shear, and bending capacity with interaction), serviceability (crack width, deflection), robustness against accidental actions, and construction stage effects during partial removals.<\/p>\n<h2>Objectives and application cases of wall strengthening<\/h2>\n<p>Wall strengthening pursues several, often combined objectives. In existing buildings, it is deliberately synchronized with deconstruction and cutting works to prepare interventions in a controlled, low-dust, and low-vibration manner.<\/p>\n<ul>\n<li><strong>Increase load-bearing capacity<\/strong>: Take up additional vertical loads or lateral forces; stabilize against buckling and bulging; improve anchorage and load transfer into foundations.<\/li>\n<li><strong>Ensure serviceability<\/strong>: Limit crack widths and deflections, improve vibration and acoustic performance; safeguard long-term durability of interfaces and finishes.<\/li>\n<li><strong>Remediate damage<\/strong>: Repair chloride- or carbonation-induced damage, crack and edge spalling, voids and delaminations; restore passivation and protect against further ingress.<\/li>\n<li><strong>Create openings<\/strong>: Strengthening with lintels, steel frames, or bearing upgrades for door, window, and breakthrough openings.<\/li>\n<li><strong>Seismic and impact upgrading<\/strong>: Improve ductility and shear capacity, develop ductile load paths; confine compression zones and provide reliable anchorage detailing.<\/li>\n<li><strong>Fire protection and durability<\/strong>: Additional concrete cover, mineral coatings, corrosion-resistant detailing; ensure adequate fire resistance of added systems.<\/li>\n<\/ul>\n<p>In every application, compatibility of materials and reversibility where required are key selection criteria alongside constructability under restricted site conditions.<\/p>\n<h2>Material- and structure-specific considerations<\/h2>\n<p>The choice of method depends on construction type, condition, and use. Masonry, reinforced concrete, and natural stone respond differently to interventions; this is reflected in site practice and in equipment selection. Prior testing (e.g., pull-off, trial removals) helps to calibrate preparation methods and confirms substrate integrity before strengthening is applied.<\/p>\n<h3>Reinforced concrete walls<\/h3>\n<p>For reinforced concrete, the focus is on flexural and shear checks, concrete cover, reinforcement layout, and crack pattern. Before area-wide systems (e.g., shotcrete, overlays, CFRP), damaged zones are removed and edges are cleanly formed. Concrete pulverizers enable sectional, low-vibration removal that exposes reinforcement without excessively loading adjacent components. Stone and concrete splitters can be used for defined separation and relief cuts, for example to release component areas in a controlled way and to profile them for strengthening. Additional attention is given to bond conditions, anchorage and lap splice lengths, interface shear transfer, and moisture management during curing to reduce shrinkage cracking.<\/p>\n<h3>Masonry walls<\/h3>\n<p>Masonry is strong in compression but sensitive to tension and shear. Sensitive surfaces and irregular joints call for measured interventions: crack injection, stitching, bed joint reinforcement, and two-sided render or shotcrete carriers with embedded reinforcement. To create openings or bed joints, stones are removed piece by piece; concrete pulverizers and multi cutters support work at adjacent concrete elements, while stone and concrete splitters can produce defined separation surfaces at transitions to concrete members. Unit strength, mortar class, and condition of joints determine the feasible level of intervention; compatible, mineral systems and restrained vibration are preferred to protect the bond and avoid notch effects.<\/p>\n<h3>Natural stone masonry and historic constructions<\/h3>\n<p>For natural stone and historic masonry bonds, reversibility, minimal vibration, and preservation of substance take priority. Stitching and anchors, mineral mortars, as well as localized bearing upgrades are common. Where massive concrete additions are involved, precise, force-introducing tools help with selective exposure without vibrations to protect the fabric. Lime-based injection grouts, low-pressure techniques, and removable or stainless anchorage are typical solutions where fabric conservation and approval by heritage authorities are required.<\/p>\n<h2>Methods of wall strengthening at a glance<\/h2>\n<p>The procedures can be broadly divided into area-wide, linear, and point-type measures. They are often combined, for example an area thickening together with local bearing improvements. Selection is guided by the load path to be established, access restrictions, fire rating, durability class, and inspectability for future maintenance.<\/p>\n<h3>Overlays, PCC reprofiling, and shotcrete (concrete jacketing)<\/h3>\n<p>Mineral systems increase cross-section, concrete cover, and shear capacity. A prerequisite is a load-bearing, roughened substrate with adequate pull-off strength. Damaged zones are neatly cut back with concrete pulverizers; stone and concrete splitters can be deployed in a targeted way for predetermined break lines or to release at construction joints. Reinforcement is added, anchors are installed, and the surface is closed with shotcrete or an overlay. Careful curing, control of shrinkage, bonding bridge selection, and interface shear detailing (e.g., dowels or shear keys) are essential for durable composite action.<\/p>\n<h3>CFRP strips and fabrics<\/h3>\n<p>Carbon fiber reinforcements increase flexural and shear capacity with minimal build-up. Substrate preparation, adhesive systems, and edge distances are decisive. They are particularly suitable where space is limited or added mass must be avoided. Substrates must be free of voids and loose areas &#8211; the preparatory removals are performed with low vibration to avoid weakening the bond zone. Anchorage and end detailing against peeling, temperature and fire performance, as well as compatibility with subsequent finishes require explicit consideration.<\/p>\n<h3>Steel plates, brackets, and anchoring systems<\/h3>\n<p>Bolted or bonded steel components introduce tension and shear forces in a targeted manner. Anchors, dowels, and stud bolts establish composite action. When fitting steel sections in existing structures, installation recesses are created; concrete pulverizers support controlled breakout, while steel shears and multi cutters handle adapting and cutting reinforcement or built-in parts. Corrosion protection, fire protection, tolerances, and galvanic isolation to avoid bimetallic corrosion in contact zones must be planned.<\/p>\n<h3>Stitching, crack injection, and bed joint reinforcement<\/h3>\n<p>Drilled and bonded bars across cracks, injected cracks (cementitious or resin-based), and reinforced bed joints improve the integrity of masonry. The measures are often part of an overall concept with bearing upgrades and small-format additions. Injection pressures are kept low, verification of crack connectivity is performed, and sequence planning avoids unintended restraint or stress concentrations.<\/p>\n<h3>External prestressing, steel frames, and lintels<\/h3>\n<p>For wall openings, steel frames or supported lintels ensure load transfer. External prestressing can limit crack formation. Creating the opening is performed in stages, with temporary shoring and controlled removal. Concrete pulverizers enable precise \u201cbiting out\u201d without vibrations, thereby protecting adjacent areas. Stone and concrete splitters define cut lines where a saw-rough, low-vibration separation is required. Anchor blocks, deviators, and preloading sequences are designed for inspectability and maintenance, including protection against corrosion and fire.<\/p>\n<h2>Wall openings with subsequent strengthening &#8211; process and key points<\/h2>\n<p>Opening load-bearing walls requires a coordinated approach between planning, shoring, separation technique, and strengthening. A typical sequence includes:<\/p>\n<ol>\n<li>Structural assessment, definition of the opening geometry, selection of the strengthening system (lintel, steel frame, thickening).<\/li>\n<li>Temporary shoring and load redistribution; marking of separation lines.<\/li>\n<li>Preparatory strip-out and exposure of embedded parts; staged removal with concrete pulverizers.<\/li>\n<li>Defined separation using splitting techniques where low vibration is required; removal of the wall panels.<\/li>\n<li>Installation of the strengthening (e.g., bearing enhancement, frame installation, dowels\/anchors); corrosion and fire protection.<\/li>\n<li>Finishing works: reprofiling, surfaces, documentation, visual inspection.<\/li>\n<li>Optional proof tests and monitoring: vibration limits, settlement checks, and verification of designed clear opening dimensions.<\/li>\n<\/ol>\n<h2>Workflow: From diagnosis to execution<\/h2>\n<p>A robust plan is based on reliable knowledge of the existing structure and controlled execution steps.<\/p>\n<ul>\n<li><strong>Investigation<\/strong>: Visual inspection, crack mapping, reinforcement locating, material tests (e.g., rebound hammer, pull-off), core samples where necessary.<\/li>\n<li><strong>Concept<\/strong>: Design to applicable standards, selection of compatible systems, consideration of building physics and fire protection.<\/li>\n<li><strong>Site logistics<\/strong>: Access, dust and noise protection, protection of adjacent components, shoring, emergency routes.<\/li>\n<li><strong>Selective removal<\/strong>: Use concrete pulverizers for precise removals; stone and concrete splitters for defined separations at construction joints or massive areas.<\/li>\n<li><strong>Installation<\/strong>: Set anchors, install reinforcement, apply strengthening; observe curing times and aftercare.<\/li>\n<li><strong>Testing<\/strong>: In-house and third-party monitoring, pull-off and anchor tests, documentation.<\/li>\n<li><strong>Handover<\/strong>: As-built review, protection of exposed edges and interfaces, maintenance recommendations.<\/li>\n<\/ul>\n<h2>Site practice: equipment use and interfaces<\/h2>\n<p>Hydraulic tools are often integrated with strengthening activities. Concrete pulverizers allow controlled interventions in existing structures &#8211; such as removing damaged zones or exposing reinforcement and bearing areas. Stone and concrete splitters separate massive concrete sections with low vibration along defined drilling patterns. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">low-emission hydraulic power units<\/a> reliably supply these tools. In sections with embedded steel, depending on the situation, combination shears, multi cutters, or steel shears are used to adapt and cut reinforcement, sections, and built-in parts. For special tasks (special operations), tailored cutting techniques for thick-walled steel components are relevant when these have to be removed or modified in the course of wall upgrading. Coordinated sequences reduce rework and protect prepared bonding surfaces for overlays, laminates, or frames.<\/p>\n<h3>Low-vibration and low-emission working methods<\/h3>\n<p>In sensitive environments &#8211; such as hospitals, laboratories, or listed buildings &#8211; a <em>low-vibration<\/em> and dust-reduced working method is crucial. Sectional grabbing with concrete pulverizers and targeted splitting techniques reduce vibrations and help avoid cracks in adjacent components. This improves the quality of bonding surfaces for subsequent strengthening systems. Environmental controls can include water suppression, local extraction, and vibration monitoring with trigger values defined in the method statement.<\/p>\n<h2>Fields of application related to wall strengthening<\/h2>\n<ul>\n<li><strong>Concrete demolition and special deconstruction<\/strong>: Selective removal to prepare thickening, bearing upgrades, and frame installation.<\/li>\n<li><strong>Strip-out and cutting<\/strong>: Creating openings, exposing reinforcement, removing embedded items as a prerequisite for strengthening.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: Upgrading portal and retaining walls, installing anchors; splitting techniques for controlled interventions in massive areas.<\/li>\n<li><strong>Natural stone extraction<\/strong>: Experience in controlled splitting and separation supports gentle work on adjacent natural stone masonry.<\/li>\n<li><strong>Special operations<\/strong>: Specific cutting and separation tasks on steel components when these must be adapted in the course of upgrading.<\/li>\n<li><strong>Basements and retaining structures<\/strong>: Strengthening against groundwater and earth pressure, detailing for durable interfaces in damp environments.<\/li>\n<li><strong>Industrial and infrastructure assets<\/strong>: Adapting load paths during refurbishments, maintaining operations with low-vibration methods.<\/li>\n<\/ul>\n<h2>Safety, standards, and coordination<\/h2>\n<p>Wall strengthening requires planning and verification. The relevant standards for reinforced concrete and masonry as well as provisions for maintenance and construction products are decisive. Coordination with structural engineering, site management, and, where applicable, authorities should start early. Protective measures against dust, noise, and vibration must be planned; the load-bearing capacity of temporary shoring requires separate verification. The notes are general in nature and do not replace individual structural design or official decisions. Risk assessments, permits (including hot works where applicable), and surveys for hazardous materials are to be completed before intervention; fire stopping and penetrations must be reinstated in compliance with approvals.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>A quality-assured process includes preliminary tests (e.g., pull-off), records of torque values and embedment depths, checks of injections, visual inspections of adhesive joints, and spot load tests. As-built documentation records the position, dimensions, and characteristic values of the strengthening, including photo documentation of substrate preparation and the installed elements. Inspection and test plans define hold points, acceptance criteria, and traceability of materials (e.g., batch numbers of anchors and adhesives), supporting transparent handover and future maintenance.<\/p>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Wall strengthening extends service life and saves resources compared to complete replacement. Selective, low-vibration deconstruction with suitable hydraulic tools reduces damage to adjacent building fabric, minimizes waste, and enables clean substrate preparation for durable strengthening systems. Additional levers include reuse of removed components where feasible, low-carbon binders in mineral systems, and planning for inspectability and repair to extend service life.<\/p>\n<h2>Terms and distinctions in context<\/h2>\n<p>In everyday practice, upgrading, repair, and strengthening are often equated. Repair aims to restore the original condition; strengthening increases load reserves; upgrading encompasses both &#8211; often combined with detailing measures such as bearing improvements, crack remediation, and surface protection. Clear terminology facilitates planning, tendering, and execution. The term retrofitting is frequently used as an umbrella for targeted strengthening and associated adaptations to meet new functional or regulatory demands.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wall strengthening refers to the professional upgrading of masonry and reinforced concrete walls to safely transfer loads, to limit deformations, and to restore or increase serviceability. It is used when uses change, openings are created, damage is present, or increased code requirements demand verification. In practice, wall strengthening frequently interfaces <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20146","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wall Strengthening | Masonry &amp; Reinforced Concrete<\/title>\n<meta name=\"description\" content=\"Upgrade masonry &amp; concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic &amp; fire safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wall Strengthening | Masonry &amp; Reinforced Concrete\" \/>\n<meta property=\"og:description\" content=\"Upgrade masonry &amp; concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic &amp; fire safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:36+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-strengthening\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-strengthening\",\"name\":\"Wall Strengthening | Masonry & Reinforced Concrete\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-24T12:57:17+00:00\",\"dateModified\":\"2026-09-12T17:53:36+00:00\",\"description\":\"Upgrade masonry & concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic & fire safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-strengthening#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-strengthening\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-strengthening#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wall strengthening\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wall Strengthening | Masonry & Reinforced Concrete","description":"Upgrade masonry & concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic & fire safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening","og_locale":"en_US","og_type":"article","og_title":"Wall Strengthening | Masonry & Reinforced Concrete","og_description":"Upgrade masonry & concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic & fire safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:36+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening","url":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening","name":"Wall Strengthening | Masonry & Reinforced Concrete","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-24T12:57:17+00:00","dateModified":"2026-09-12T17:53:36+00:00","description":"Upgrade masonry & concrete walls with expert wall strengthening \u2713 Methods for load, openings, seismic & fire safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-strengthening#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wall strengthening"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20146","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20146"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20146\/revisions"}],"predecessor-version":[{"id":29330,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20146\/revisions\/29330"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20146"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}