{"id":20143,"date":"2026-01-23T10:02:28","date_gmt":"2026-01-23T09:02:28","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20143"},"modified":"2026-06-16T14:44:02","modified_gmt":"2026-06-16T12:44:02","slug":"wall-thickness","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness","title":{"rendered":"Wall thickness"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wall thickness is a key parameter in construction practice, in concrete demolition and in separation and splitting technology. It influences the selection of methods, the sizing of tools and the sequence of work steps. Whether concrete wall, masonry, pipe wall, retaining wall, steel tank or natural stone slab: The <em>component thickness<\/em> largely determines which forces, interventions and safety measures are required. For Darda GmbH, wall thicknesses are crucial for deploying <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a>, concrete pulverizers, hydraulic power packs or tank cutters in a technically meaningful way &#8211; always targeted and material-appropriate, without unnecessary vibrations. In practice, accurate knowledge of thickness supports structural integrity, minimizes collateral effects and enables efficient, low-nuisance workflows.<\/p>\n<h2>Definition: What is meant by wall thickness?<\/h2>\n<p><strong>Wall thickness<\/strong> means the perpendicular thickness of a wall component between its two relevant surfaces. It can refer to reinforced concrete, masonry, natural stone, steel sheet or composite assemblies. A distinction is made between nominal thickness (design dimension) and the effective on-site thickness, which can deviate due to tolerances, plaster and facing layers, voids or reinforcement layers. In reinforced concrete, the position of the reinforcement and the concrete cover are relevant, as they influence the effective cross-sectional thickness as well as the separation and splitting behavior. For tubular or tank components, the term refers to the radial plate thickness; in double-shell constructions, each shell and any cavity must be considered separately to determine the effective thickness during separation.<\/p>\n<ul>\n<li><strong>Nominal vs. effective thickness:<\/strong> Design value versus measured value including deviations from execution, surface layers and cavities.<\/li>\n<li><strong>Measurement principle:<\/strong> Shortest distance between opposite faces, taken perpendicular to the surface; edge effects require separate verification.<\/li>\n<li><strong>Composite structures:<\/strong> Claddings, insulating layers and lost formwork alter perceived and effective thickness and must be identified before work begins.<\/li>\n<\/ul>\n<h2>Importance of wall thickness in deconstruction and cutting technology<\/h2>\n<p>In concrete demolition and specialized deconstruction, wall thickness determines the choice of gripping, cutting and splitting techniques. Thin members can often be separated with lower forces and finer tools, while massive cross-sections require a multi-stage approach. For concrete pulverizers, thickness influences the suitable jaw opening, kinematics and staged removal. With rock and concrete splitters, it controls borehole diameter, grid pattern and splitting direction. In strip-out and cutting, member thickness dictates the cut path, number of passes and the need for auxiliary shoring. The goal is a controlled, low-vibration process with a predictable fracture line. In addition, thickness affects permissible handling weights, logistics on site and the achievable rate of progress under noise and dust constraints.<\/p>\n<h2>Wall thickness and tool selection<\/h2>\n<p>Tool selection follows member thickness, material and accessibility. It is about a well-tuned interaction of hydraulic performance, kinematics, edge guidance and tool life. A sound assessment of wall thickness reduces risks such as uncontrolled spalling, jamming or unnecessary loads. Supplementary selection criteria include:<\/p>\n<ul>\n<li><strong>Accessibility and free edges:<\/strong> Reach, jaw orientation and working angles must match thickness and boundary conditions.<\/li>\n<li><strong>Hydraulic capacity:<\/strong> Pressure and flow must sustain required forces over the expected cycle length for the given thickness.<\/li>\n<li><strong>By-product control:<\/strong> Dust, noise and vibration targets influence whether splitting, pulverizing or cutting takes precedence.<\/li>\n<li><strong>Service life and wear:<\/strong> Thickness and material strength define contact pressures and thus wear of edges, blades and wedges.<\/li>\n<\/ul>\n<h3>Concrete pulverizers<\/h3>\n<p>With concrete pulverizers, <em>wall thickness<\/em> is decisive for jaw opening, tool orientation and removal strategy. Slender walls are removed in a controlled bite sequence to avoid edge breakouts and cracks. For massive elements, a sequential removal with pre-relief and, if necessary, the introduction of relief openings is recommended. Reinforcement density and concrete strength influence cutting forces; wall thickness determines how many gripping and crushing cycles are required to reach the target contour. Integrated rebar cutting and the positioning of bites close to supports improve control when thickness and reinforcement interact.<\/p>\n<h3>Rock and concrete splitters<\/h3>\n<p>Splitters generate a defined splitting impulse along predrilled grids. Wall thickness governs borehole spacing, edge distances and the staging of the splitting process. Thin cross-sections can often be released with few splitting points; for thick walls, a multi-stage break from the edge towards the center is advisable to guide the intended fracture joint. This controls load redistribution and minimizes <strong>vibrations<\/strong>. Matching wedge set, stroke and activation sequence to thickness and rock or concrete fabric enhances crack guidance and efficiency.<\/p>\n<h3>Other tools and systems<\/h3>\n<ul>\n<li>Hydraulic power packs: The required working pressure and flow rate depend on wall thickness, material and tool size. Greater thicknesses often mean longer load cycles and adapted hydraulic supply.<\/li>\n<li>Combination shears and multi cutters: Sensible for composite assemblies and varying thicknesses, for example in combined concrete-steel deconstruction.<\/li>\n<li>Steel shears: Decisive is the steel wall thickness (e.g., on sections and tanks), which defines the necessary cutting force and staging.<\/li>\n<li>Tank cutters: Plate thickness and any double walls define feed, cutting strategy and safety distances during the cutting process.<\/li>\n<li>Wire saws and core drills: Where precise cut geometry and low vibration are required, thickness influences wire length, bead selection and core bit diameter.<\/li>\n<li>Dust suppression and extraction systems: Higher thicknesses and longer cycles require robust dust control strategies to maintain visibility and air quality.<\/li>\n<\/ul>\n<h2>Determining wall thickness on site<\/h2>\n<p>Before using concrete pulverizers or rock and concrete splitters, the actual member thickness must be established. The more precise the data, the safer the planning of splitting points, cut edges and the demolition sequence. Verification against available as-built documentation reduces uncertainty.<\/p>\n<ul>\n<li>Visual inspection and measurement: Expose edges; measure at openings and interfaces.<\/li>\n<li>Trial openings or core samples: Targeted exploration of thickness, concrete quality and reinforcement content.<\/li>\n<li>Endoscopy\/inspection: Insight into voids, layers and composite joints.<\/li>\n<li>Rebar locating: Detection of bar diameters, layers and concrete cover as an indication of effective cross-sectional thickness.<\/li>\n<li>Low-destructive testing methods: Acoustic or ultrasonic methods can indicate thickness variations and inhomogeneities.<\/li>\n<li>Electromagnetic and radar methods: Where suitable, GPR and related techniques help map reinforcement and detect cavities that alter effective thickness.<\/li>\n<\/ul>\n<h3>Documentation and tolerances<\/h3>\n<p>Recorded thicknesses, measurement points and particularities (e.g., layers, facing shells, voids) should be documented and integrated into work planning. Usual construction tolerances and local deviations must be considered, as well as possible material changes. Information on standards and codes must be verified in general; project-specific decisions are always made after expert evaluation.<\/p>\n<ul>\n<li>Record method, device and calibration status for each measurement series.<\/li>\n<li>Note environmental conditions that may affect readings (temperature, moisture).<\/li>\n<li>State measurement uncertainty and define conservative planning values where scatter is high.<\/li>\n<\/ul>\n<h2>Influencing factors: concrete strength, reinforcement and voids<\/h2>\n<p>Beyond thickness alone, material properties affect separation and splitting behavior. High concrete densities and compressive capacity often require higher forces or finer staging. Reinforcement deflects cracks and locally strengthens cross-sections; its position relative to the wall surface influences fracture propagation. Voids, lost formwork or facing shells alter the effective wall thickness and can favor irregular breaks. A combination of concrete pulverizer and splitting technology often enables controlled progress: pre-relieve first, then split or crush in a targeted manner.<\/p>\n<ul>\n<li><strong>Moisture and age:<\/strong> Dry, aged concrete may behave more brittle; fresh or moist concrete can exhibit tougher fracture behavior.<\/li>\n<li><strong>Aggregate type and grading:<\/strong> Hard, coarse aggregates increase required force and roughness of the fracture surface.<\/li>\n<li><strong>Temperature:<\/strong> Low temperatures may elevate required forces and affect hydraulic performance during longer cycles.<\/li>\n<li><strong>Composite action:<\/strong> Bonded layers or coatings can trigger delamination; staged pre-relief limits uncontrolled separation.<\/li>\n<\/ul>\n<h2>Selecting work methods by wall thickness<\/h2>\n<p>Member thickness defines the <strong>demolition strategy<\/strong>: number of work steps, load sequence, grid and safeguards. The aim is a predictable process with the lowest possible dust and noise. Transitions between categories are defined project-specifically, taking support conditions and connection details into account.<\/p>\n<h3>Slender members<\/h3>\n<p>For thin walls, a gentle intervention with lower forces, short lever arms and tight tool guidance is recommended. Concrete pulverizers work section by section with high precision; splitters are applied at selected points to define break edges and guide crack paths. Edge scoring and protection measures reduce local spalling, especially at openings and corners.<\/p>\n<h3>Medium member thicknesses<\/h3>\n<p>Here, a combination of pre-relief and sequential removal is proven. Splitting points are placed so that stresses are reduced step by step. Concrete pulverizers open the structure before further splitting cycles extend the fracture surface. Cutting or milling operations can protect edges. Coordinated handling of reinforcement (cropping and trimming) maintains control over crack propagation.<\/p>\n<h3>Massive members<\/h3>\n<p>For high wall thicknesses, a stepped splitting plan is usually indispensable. Grid, borehole diameter and edge distances must be matched to member thickness. Intermediate reliefs and the use of load-bearing frames or shoring must be assessed. Hydraulic power packs should be configured for longer pressure-hold phases. Remote operation and staged debris removal assist in maintaining stability and safe working distances.<\/p>\n<h2>Planning drilling patterns for rock and concrete splitters<\/h2>\n<p>The drilling pattern guides the fracture and determines efficiency. It depends on wall thickness, material and the desired demolition edge. Principles include edge and center distances, staged activation of splitting points and safeguarding adjacent components.<\/p>\n<ul>\n<li>Edge distance: Sufficient distance reduces uncontrolled spalling and edge breakouts.<\/li>\n<li>Hole spacing: With increasing thickness, the required spacings and\/or splitting phases grow.<\/li>\n<li>Sequence: Splitting sequences from outside to inside or vice versa &#8211; depending on support and free edge.<\/li>\n<li>Intermediate relief: Targeted pre-breaks lower overall forces and improve crack guidance.<\/li>\n<li>Orientation: Align grids with reinforcement layout, bedding planes or dominant joints to leverage existing weaknesses.<\/li>\n<li>Pilot verification: Trial holes and initial splits validate assumptions before full grid execution.<\/li>\n<\/ul>\n<h2>Wall thickness in special applications<\/h2>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>Massive columns, shear walls or shafts require a coordinated approach of splitting, crushing and occasional relief cuts. Concrete pulverizers refine edges and reduce projections, splitters create predictable fracture joints. Adjacent components remain as undisturbed as possible. Where continuity or pre-stressing is suspected, exploratory opening and conservative staging are essential.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In strip-out, wall thicknesses influence the selection of separation tools and the cutting sequence. Thinner facings are removed first, followed by load-bearing layers. Multi cutters and combination shears handle varying thicknesses in composite assemblies; concrete pulverizers create defined openings. Pre-planned waste separation by material stream benefits from early thickness mapping.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In rock, the effective thickness often corresponds to bed or slab thickness. Splitting cylinders transmit their force into existing joints or a drilled pattern. Greater thicknesses require adapted splitting sequences and hydraulic cycles to achieve the desired fracture surface. Pre-splitting along designed contours enhances stability in adjacent rock.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In natural stone, layer thickness, fabric and bedding control splittability. A finely tuned pattern facilitates clean separation faces. Wall thickness and grain structure determine how many splitting cycles are required for a dimensionally accurate slab. The alignment of drills with natural cleavages improves yield and surface quality.<\/p>\n<h3>Special applications<\/h3>\n<p>Special environments with large wall thicknesses &#8211; such as shielding, high-strength special concretes or composite constructions &#8211; require a conservative, stepwise approach. Remote-controlled hydraulic power packs support safe distances, while concrete pulverizers and splitters guide the fracture. Monitoring of induced vibrations and displacement ensures compliance with protection targets.<\/p>\n<h2>Calculation and estimation of required forces<\/h2>\n<p>With increasing wall thickness, the required splitting and cutting forces rise. Material properties (e.g., compressive strength), reinforcement ratio and construction details act as multipliers. A practical approach is an <em>iterative<\/em> approximation: trial splitting points, staged removal with the concrete pulverizer and fine-tuning of hydraulic parameters. For steel walls (e.g., tanks), plate thickness and geometry define the cutting sequence and the necessary shear or cutting capacity.<\/p>\n<ul>\n<li>Start with conservative parameter sets and escalate in controlled increments.<\/li>\n<li>Track pressure, stroke and response to refine estimates of required energy per stage.<\/li>\n<li>Apply safety factors appropriate to uncertainty in thickness and reinforcement detail.<\/li>\n<\/ul>\n<h2>Cut-edge quality and reworking<\/h2>\n<p>Wall thickness influences the surface quality of fracture or cut edges. Thick members often exhibit coarser roughness and local spalls, especially at edges. A combination of preliminary relief cuts and subsequent edge finishing leads to reproducible results. Concrete pulverizers can precisely trim edges and expose protruding reinforcement. Acceptance criteria should define allowable roughness, maximum breakout size and required rework steps.<\/p>\n<ul>\n<li>Finishing options: Mechanical trimming, grinding and targeted re-crushing at local irregularities.<\/li>\n<li>Edge protection: Temporary protection prevents secondary spalling during handling and transport.<\/li>\n<\/ul>\n<h2>Occupational safety in connection with wall thickness<\/h2>\n<p>Safe processes require stable support and controlled load paths. Larger wall thicknesses store higher stresses; accordingly, shoring, intermediate relief and secured demolition sequences must be provided. Notes on occupational and environmental protection must be checked on a project-specific basis; binding decisions are made by those responsible on site.<\/p>\n<ul>\n<li>Plan load transfer: Align the sequence with wall thickness, supports and connection details.<\/li>\n<li>Define exclusion zones: With increasing member thickness, enlarge fall-out zones.<\/li>\n<li>Control hydraulics: Operate pressure and flow within approved system values.<\/li>\n<li>Apply thermal cutting procedures (e.g., tank plates) with care: Consider ventilation, cleanliness and material thickness.<\/li>\n<li>Monitor in real time: Observe displacement, vibration and noise to adapt sequencing when thresholds are approached.<\/li>\n<li>Ensure safe release of stored energy: Use relief steps and verify de-tensioning before proceeding.<\/li>\n<\/ul>\n<h2>Typical sources of error and practical notes<\/h2>\n<ul>\n<li>Underestimated wall thickness leads to jamming, uncontrolled fracture patterns or unnecessarily high forces.<\/li>\n<li>Unknown reinforcement layouts deflect cracks; combining rebar locating with trial openings reduces surprises.<\/li>\n<li>Edge distances that are too small at splitting points favor spalling; carefully adapt the pattern to thickness.<\/li>\n<li>Inhomogeneous zones (voids, facing shells) distort behavior; stepwise progress with intermediate checks is advantageous.<\/li>\n<li>Neglected boundary effects (e.g., post-tensioning, bonded overlays) can invalidate assumed crack paths.<\/li>\n<li>Insufficient debris and segment handling planning elevates risk; match lift sizes and handling routes to thickness and mass.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wall thickness is a key parameter in construction practice, in concrete demolition and in separation and splitting technology. It influences the selection of methods, the sizing of tools and the sequence of work steps. Whether concrete wall, masonry, pipe wall, retaining wall, steel tank or natural stone slab: The component <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20143","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wall Thickness in Concrete Demolition &amp; Cutting<\/title>\n<meta name=\"description\" content=\"Guide to wall thickness in construction &amp; demolition \u27a4 definition, tools, safe methods for controlled splitting.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wall Thickness in Concrete Demolition &amp; Cutting\" \/>\n<meta property=\"og:description\" content=\"Guide to wall thickness in construction &amp; demolition \u27a4 definition, tools, safe methods for controlled splitting.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-16T12:44:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-thickness\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-thickness\",\"name\":\"Wall Thickness in Concrete Demolition & Cutting\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-23T09:02:28+00:00\",\"dateModified\":\"2026-06-16T12:44:02+00:00\",\"description\":\"Guide to wall thickness in construction & demolition \u27a4 definition, tools, safe methods for controlled splitting.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-thickness#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-thickness\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-thickness#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wall thickness\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wall Thickness in Concrete Demolition & Cutting","description":"Guide to wall thickness in construction & demolition \u27a4 definition, tools, safe methods for controlled splitting.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness","og_locale":"en_US","og_type":"article","og_title":"Wall Thickness in Concrete Demolition & Cutting","og_description":"Guide to wall thickness in construction & demolition \u27a4 definition, tools, safe methods for controlled splitting.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-16T12:44:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness","url":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness","name":"Wall Thickness in Concrete Demolition & Cutting","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-23T09:02:28+00:00","dateModified":"2026-06-16T12:44:02+00:00","description":"Guide to wall thickness in construction & demolition \u27a4 definition, tools, safe methods for controlled splitting.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wall-thickness"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-thickness#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wall thickness"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20143","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20143"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20143\/revisions"}],"predecessor-version":[{"id":28388,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20143\/revisions\/28388"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20143"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}