{"id":20137,"date":"2026-01-23T12:17:34","date_gmt":"2026-01-23T11:17:34","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20137"},"modified":"2026-06-15T15:35:03","modified_gmt":"2026-06-15T13:35:03","slug":"wall-anchor","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor","title":{"rendered":"Wall anchor"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wall anchors securely connect components to a wall made of concrete, masonry, or natural stone. They transfer tension, shear, and combined loads and are used in new construction, refurbishment, strip-out, and deconstruction. In demolition and cutting projects, wall anchors directly influence the work process: they serve as attachment points for equipment or must be identified, exposed, and professionally released before cutting, crushing, or splitting. In this context, tools from Darda GmbH such as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers<\/a><\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> play a role because they enable targeted exposing, separating, and removal of areas near the anchor &#8211; controlled and with low vibration. When planned correctly, this supports clean sequencing, limits dust and noise, and protects adjacent finishes and installations.<\/p>\n<h2>Definition: What is a wall anchor?<\/h2>\n<p>A wall anchor is a fastening element that introduces loads into a wall. It can act mechanically (e.g., by expansion, undercutting, or thread forming) or chemically (bonded anchors with injection or capsule mortar), be executed as a cast-in anchor rod or anchor channel, or function as a special cavity anchor. Wall anchors are used to take up tension, shear, and transverse loads, occasionally also transferring moments via anchor plates, and they often act in groups. Typical applications range from brackets, facade substructures, and guardrails to temporary shoring, saw guides, lifting eyes, and auxiliary structures in deconstruction. Materials are usually carbon steel with corrosion protection or stainless steel; selection depends on environment, durability, and fire protection requirements. Approvals and standards define performance categories for cracked or uncracked concrete, minimum spacings and edge distances, and, where relevant, seismic and fire performance.<\/p>\n<h2>Use and significance in concrete demolition and special deconstruction<\/h2>\n<p>In <strong>concrete demolition and special deconstruction<\/strong>, wall anchors appear in two roles: as load-bearing fixings of existing components (e.g., column base plates, facade beams) and as temporary anchors for auxiliary systems (e.g., guide rails for sawing or guying). Before any cutting or breaking work, the position, number, embedment depth, and condition of the anchors must be determined. Local exposure can be achieved with <strong>concrete crushers<\/strong> to selectively remove concrete around the anchor, or with <strong>stone and concrete splitters<\/strong> to create controlled cracks. Steel parts such as anchor rods or plates can then be cut with <em>steel shears<\/em>, <em>multi cutters<\/em>, or &#8211; on large plates &#8211; with <em>combination shears<\/em>. Hydraulically operated tools use <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">project-matched hydraulic power units<\/a><\/em>. This approach reduces uncontrolled fractures, minimizes vibration, and preserves adjacent structures. Complementary steps include non-destructive scanning of reinforcement, establishing exclusion zones, and defining lift and cut sequences in the method statement.<\/p>\n<h2>Types and working principles of wall anchors<\/h2>\n<p>The design determines load behavior, installation sequence, and suitability for the substrate. An overview of common types helps with planning, execution, and deconstruction.<\/p>\n<ul>\n<li>Mechanical wall anchors: expansion anchors, through-bolts, sleeve anchors, undercut anchors, concrete screws (thread-forming anchors)<\/li>\n<li>Bonded anchors (chemical anchors): anchor rods with injection mortar or capsules, often for large embedment depths and proximity to edges<\/li>\n<li>Cast-in anchors: anchor rods, headed studs, anchor plates, <em>anchor channels<\/em> for post-adjustable fixings<\/li>\n<li>Special anchors for cavities and masonry: toggle bolts, injection systems with mesh sleeves, spiral plugs<\/li>\n<\/ul>\n<h3>Mechanical wall anchors<\/h3>\n<p>Mechanical anchors generate holding force through form and\/or force fit. Expansion anchors require sufficient edge distances and compact substrates. Concrete screws form a load-bearing internal thread in the concrete and are removable. Undercut anchors engage behind an undercut and are particularly capable in cracked concrete. Correct drilling tolerances and verified setting torque are decisive for repeatable performance and removability.<\/p>\n<h3>Bonded anchors<\/h3>\n<p>Bonded anchors connect threaded rods to the substrate via a cured mortar. Advantages include large embedment depths, small edge distances, and flexible diameters. Precise borehole cleaning is essential; curing times are temperature-dependent. The combination of deep embedment and full-surface bond favors high tensile capacities. The drilling method influences bond quality &#8211; hollow-drill extraction or diamond coring minimizes dust and microcracking. For overhead installations or water-influenced holes, system-specific accessories (e.g., plugs or sleeves) secure the mortar.<\/p>\n<h3>Cast-in anchors and anchor channels<\/h3>\n<p>Cast-in systems are positioned before concreting and bond integrally with the component. Anchor channels allow subsequent adjustment using bolts, are often found on facades and at machine foundations in existing structures, and require clean exposure and steel separation during deconstruction. Headed studs and plates provide predictable load transfer; in existing structures, cutting sequences must respect potential composite action with reinforcement.<\/p>\n<h2>Substrates and load behavior<\/h2>\n<p>The load-bearing capacity of a wall anchor depends significantly on the substrate. Concrete (cracked\/uncracked), masonry (solid and hollow units), and natural stone respond differently to drilling, expansion pressure, and bond.<\/p>\n<ul>\n<li>Concrete: In cracked concrete, suitable anchors must be selected; governing modes include concrete cone breakout, steel failure, pull-out, and edge failures. Drilling perpendicular to the surface and observing minimum spacings reduce eccentricities and premature concrete failure.<\/li>\n<li>Masonry: Bonded anchors with mesh sleeves distribute loads in hollow units; edge and axial spacings are critical, and the drilling method must be gentle on the masonry. Units and mortar joints differ in strength &#8211; verification and test installations are advisable.<\/li>\n<li>Natural stone: High strength but brittle; avoid small edge distances and percussion drilling. For <strong>natural stone extraction<\/strong> and moving blocks, temporary anchor points are often required; controlled splitting with <strong>stone and concrete splitters<\/strong> limits stress cracks. Variability of rock fabric and moisture must be considered in the selection of drill bit and anchoring system.<\/li>\n<\/ul>\n<h2>Design and loads<\/h2>\n<p>Wall anchors transfer <em>tension<\/em>, <em>shear<\/em>, and combined loads and occasionally moments via anchor plates. Influencing factors include substrate strength, embedment depth, edge and axial distances, group effects, bearing pressures in holes, eccentricities, temperature, and durability. Demands may be static, quasi-static, fatigue-related, or impact-like. For projects with dynamic actions &#8211; such as controlled separation of massive components &#8211; additional safety reserves should be planned. Serviceability criteria (e.g., slip and deformation) should accompany ultimate limit state checks, and prying forces at plates need explicit consideration.<\/p>\n<h3>Edge distances, spacing, embedment depth<\/h3>\n<p>Adequate edge and axial distances prevent concrete breakout and splitting failure. Greater embedment depths generally increase tensile capacity and reduce edge sensitivity, but they lengthen installation time. In anchor groups, load shares influence each other; uniform load distribution via anchor plates and defined pretension are advantageous. Where required spacings cannot be maintained, design reductions apply and supplementary reinforcement or alternative systems should be evaluated.<\/p>\n<h2>Installation and execution<\/h2>\n<p>Installation quality determines load behavior and durability. Care during drilling, cleaning, and setting is essential &#8211; especially for bonded anchors.<\/p>\n<ol>\n<li>Check the substrate: visual inspection, rebound or core indications, crack pattern, edge distances, reinforcement location.<\/li>\n<li>Drilling: diameter, depth, and method suited to the system; in crack-prone substrates, prefer rotary or diamond drilling.<\/li>\n<li>Borehole cleaning: blow out, brush, blow out again; specified per system.<\/li>\n<li>Setting: position the anchor; for bonded systems, inject mortar homogeneously; observe torque or setting control.<\/li>\n<li>Pretension\/torqueing: with a calibrated torque wrench; mark for visual inspection.<\/li>\n<li>Inspect\/document: visual inspection, pull-out test if required; record with batch and environmental data.<\/li>\n<\/ol>\n<p>Integrated dust extraction and slurry management improve adhesion in bonded systems and protect adjacent components; curing and waiting times must be observed before loading temporary or permanent fixings.<\/p>\n<h2>Testing, inspection, and documentation<\/h2>\n<p>Depending on risk and load profile, sample or full-scale tests are common, for example with defined test loads and dial gauges. Recurring inspections primarily concern temporary anchors in deconstruction situations with changing loads. Documented are installation parameters, environmental conditions, components used, and test results. Requirements arise from applicable standards, approvals, and project-specific specifications; these must always be interpreted on a project basis. Test frequency, acceptance criteria, and retesting intervals should be set in the method statement and verified at handover.<\/p>\n<h2>Corrosion protection, fire protection, and durability<\/h2>\n<p>Corrosion affects load-bearing capacity and removability. Depending on exposure, hot-dip galvanized or stainless steels are used. Galvanic corrosion between dissimilar metals must be avoided by suitable separation layers. At elevated temperatures, load behavior changes &#8211; fire scenarios require proven systems and constructive measures. Moisture, chlorides, and freeze-thaw cycles accelerate corrosion and necessitate careful material selection. Crevice and pitting corrosion must be considered where water accumulation or de-icing salts are present.<\/p>\n<h2>Wall anchors in strip-out and cutting<\/h2>\n<p>In <strong>strip-out and cutting<\/strong>, wall anchors serve as fixings for rail systems of sawing or drilling equipment and as attachment points for lifting gear. Before <em>severing<\/em> wall panels, beams, or machine foundations, temporary anchors must safely take the loads. After lowering or lifting, anchors are removed: bonded anchors are unscrewed and the surroundings touched up with <strong>concrete crushers<\/strong>; mechanical anchors can usually be released and pulled out. Remaining steel at anchor plates can be cut with <em>multi cutters<\/em> or <em>combination shears<\/em>. Where components \u201chang\u201d on anchors, controlled <em>pre-cutting<\/em> prevents sudden release &#8211; the planning defines cut sequences and catching measures. Remote positioning of hydraulic tools and clear signaling increase safety in confined work areas.<\/p>\n<h2>Wall anchors in rock excavation, tunnel construction, and natural stone extraction<\/h2>\n<p>In <strong>rock excavation and tunnel construction<\/strong>, anchored elements (e.g., brackets, cable trays) are often fixed to rock or shotcrete walls. Releasing them requires precise exposure and separation of the steel parts. <strong>Stone and concrete splitters<\/strong> can unload the anchor zone by splitting the rock in a controlled manner and thus relieving stresses. In <strong>natural stone extraction<\/strong>, temporary anchors are used to fix guide systems or lifting points to block faces; after repositioning, they are removed with suitable cutting and shearing tools (e.g., <em>steel shears<\/em>), while the surroundings are slightly split to preserve visible faces. Differences in shotcrete quality and moisture ingress call for conservative edge distances and gentle drilling methods.<\/p>\n<h2>Safely removing wall anchors<\/h2>\n<p>Removing wall anchors is a recurring step in deconstruction. The goal is a controlled workflow with minimal loss of substance on the remaining component.<\/p>\n<ul>\n<li>Expose: locally remove the concrete matrix around the anchor with <strong>concrete crushers<\/strong>; make reinforcement layers visible.<\/li>\n<li>Unload: shore components, rehang loads; install temporary supports.<\/li>\n<li>Cut: unscrew the anchor rod or cut it flush; for thick anchor plates, use <em>multi cutters<\/em> or <em>combination shears<\/em>. Longer rods can be segmented with <em>steel shears<\/em>.<\/li>\n<li>Extract\/relocate: for bonded anchors, disassemble after curing time; for stuck remnants, proceed with <strong>stone and concrete splitters<\/strong> or break locally in a controlled manner.<\/li>\n<li>Finish the surface: trim recesses, break edges, and prepare joints for follow-on trades.<\/li>\n<\/ul>\n<p>In industrial plants with bolted shell or anchor plates &#8211; for example on tanks &#8211; large steel sheets can additionally be segmented; besides shears, specialized cutting tools such as <em>tank cutters<\/em> are available if the work scope requires it. Final patching should match substrate texture and provide corrosion protection where steel remains.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Insufficient borehole cleaning for bonded anchors: loss of capacity &#8211; clean strictly according to manufacturer specifications.<\/li>\n<li>Incorrect drilling diameter or embedment depth: substrate damage or inadequate holding force &#8211; verify drilling parameters.<\/li>\n<li>Edge and axial distances too small: concrete breakout &#8211; adapt layout to geometry or change the system selection.<\/li>\n<li>Unsuitable material: corrosion in aggressive environments &#8211; choose appropriate steel and protection systems.<\/li>\n<li>Missing tightening torque: setting errors with mechanical anchors &#8211; use calibrated tools.<\/li>\n<li>Ignored cracking and creep: select a system for cracked concrete and long-term loads.<\/li>\n<li>Unplanned cut sequence in deconstruction: uncontrolled release &#8211; define catching and pre-cut concepts.<\/li>\n<li>Disregarded curing times and temperatures for bonded systems: premature loading &#8211; observe specified waiting periods.<\/li>\n<li>Percussive drilling in brittle natural stone: microcracking &#8211; use rotary or diamond drilling with reduced feed.<\/li>\n<\/ul>\n<h2>Planning in the context of Darda GmbH products<\/h2>\n<p>When planning a project with wall anchors, the interaction of fastening technology and work methods should be considered from the outset. Where anchors must be exposed, <strong>concrete crushers<\/strong> enable precise concrete removal with good visibility of the steel. Where anchor zones need controlled stress relief or components must be released along defined crack lines, <strong>stone and concrete splitters<\/strong> support the process. Steel components such as rods, plates, or rails can be separated with <em>steel shears<\/em>, <em>multi cutters<\/em>, or <em>combination shears<\/em>; the energy supply is provided by <em>hydraulic power packs<\/em>. In addition, <em>stone splitting cylinders<\/em> are useful for tight workspaces and &#8211; if large sheet segments must be dismantled &#8211; <em>tank cutters<\/em> can be used. Selection is based on material, component thickness, accessibility, and the goal of preserving adjacent structures. Low-vibration, low-dust procedures and short tool engagement times protect sensitive environments and reduce rework.<\/p>\n<h2>Occupational safety and organizational notes<\/h2>\n<p>Work on wall anchors requires a careful hazard analysis, trained personnel, and suitable personal protective equipment. Load assumptions, shoring measures, and cut sequences must be defined in advance. Until verified load-bearing capacity is confirmed, an anchor must not be treated as load-carrying. Testing and documentation follow recognized rules of engineering and project-specific requirements. Legal requirements and approvals must be observed in general; a binding assessment can only be made on a case-by-case basis by qualified parties. Clearly marked exclusion zones, controlled lifting communication, and planned emergency procedures are integral parts of safe execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wall anchors securely connect components to a wall made of concrete, masonry, or natural stone. They transfer tension, shear, and combined loads and are used in new construction, refurbishment, strip-out, and deconstruction. In demolition and cutting projects, wall anchors directly influence the work process: they serve as attachment points for <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20137","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wall Anchor for Concrete &amp; Masonry | Types &amp; Uses<\/title>\n<meta name=\"description\" content=\"Guide \u2713 to wall anchors in construction - fastening for concrete &amp; masonry, types, loads, safe installation and removal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wall Anchor for Concrete &amp; Masonry | Types &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Guide \u2713 to wall anchors in construction - fastening for concrete &amp; masonry, types, loads, safe installation and removal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T13:35:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-anchor\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-anchor\",\"name\":\"Wall Anchor for Concrete & Masonry | Types & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-23T11:17:34+00:00\",\"dateModified\":\"2026-06-15T13:35:03+00:00\",\"description\":\"Guide \u2713 to wall anchors in construction - fastening for concrete & masonry, types, loads, safe installation and removal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-anchor#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-anchor\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-anchor#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wall anchor\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wall Anchor for Concrete & Masonry | Types & Uses","description":"Guide \u2713 to wall anchors in construction - fastening for concrete & masonry, types, loads, safe installation and removal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor","og_locale":"en_US","og_type":"article","og_title":"Wall Anchor for Concrete & Masonry | Types & Uses","og_description":"Guide \u2713 to wall anchors in construction - fastening for concrete & masonry, types, loads, safe installation and removal.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T13:35:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor","url":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor","name":"Wall Anchor for Concrete & Masonry | Types & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-23T11:17:34+00:00","dateModified":"2026-06-15T13:35:03+00:00","description":"Guide \u2713 to wall anchors in construction - fastening for concrete & masonry, types, loads, safe installation and removal.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wall-anchor"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-anchor#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wall anchor"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20137"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20137\/revisions"}],"predecessor-version":[{"id":28352,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20137\/revisions\/28352"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}