{"id":20136,"date":"2026-01-23T16:07:11","date_gmt":"2026-01-23T15:07:11","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20136"},"modified":"2026-06-15T10:09:03","modified_gmt":"2026-06-15T08:09:03","slug":"wall-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition","title":{"rendered":"Wall demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Wall demolition refers to the controlled removal of interior and exterior walls made of masonry, concrete, or reinforced concrete. In practice, the spectrum ranges from a small wall opening for a doorway to selective deconstruction in complex existing buildings. Decisive factors are precise planning, the appropriate method, and suitable tools such as <strong>concrete pulverizers<\/strong> or <strong>hydraulic wedge splitters<\/strong> to ensure work proceeds with low vibration, low emissions, and high safety. In addition, permits, utility isolation, structural verification, and an environmental management plan are integral to setup so that selective demolition and engineered strip-out can be executed efficiently and with traceable quality.<\/p>\n<h2>Definition: What is meant by wall demolition?<\/h2>\n<p>Wall demolition is the complete or partial removal of a wall, including its reinforcement, cladding, and built-in components. This covers non-load-bearing lightweight partitions as well as load-bearing masonry and reinforced concrete walls. The demolition is carried out deliberately after structural analysis, often in segments, and includes measures for dust and noise reduction, material separation, and orderly disposal. Typical reasons include floor plan changes, refurbishment works, building gutting, or special demolition. It is distinct from bulk demolition by emphasizing selective, engineered removal with controlled interfaces to adjoining components and compliance with applicable codes and environmental rules.<\/p>\n<h2>Methods and procedures for wall demolition<\/h2>\n<p>Different procedures are used for wall demolition depending on the structure, wall material, reinforcement content, accessibility, and environmental requirements. Methods are often combined to balance precision, speed, and the protection of adjoining components. In interior demolition, low-vibration, low-noise, and low-dust methods are particularly important. Selection criteria include allowable emissions, required tolerances at cut edges, and the feasibility of segmenting heavy wall elements for safe handling.<\/p>\n<h3>Mechanical separation and press breaking<\/h3>\n<p><strong>Concrete pulverizers<\/strong> crush concrete and reinforced concrete using high pressing forces between the jaws. They are suitable for biting off wall edges, removing wall panels, and exposing reinforcement. With adapted jaw geometry, thicker reinforced zones can also be processed. In combination with cutting areas or supplemental shears, exposed reinforcing bars can be cut. Carrier choice, jaw type, and rotation capability improve access in confined spaces and help maintain clean break lines with minimal secondary damage to adjacent finishes.<\/p>\n<h3>Controlled splitting<\/h3>\n<p><strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> operate via hydraulic split cylinders inserted into predrilled holes. Targeted pressure creates defined cracks that split the wall in a controlled manner. The method generates very low vibration and is suitable for thick wall cross-sections, high-strength concretes, or areas with sensitive neighboring structures. It can also be used in confined conditions, such as in tunnel construction or special operations. Proper hole patterns, spacing, and insertion depth govern crack propagation and allow segment-by-segment dismantling with predictable forces.<\/p>\n<h3>Sawing, cutting, drilling<\/h3>\n<p>Wall sawing, joint cutting, and core drilling structure the demolition: they create separation joints, define openings, and provide pick-up points for lifting gear. When adjacent components are to be preserved, precise separation cuts are essential to avoid unintended load redistribution and spalling. For thicker sections or rebar-dense areas, wire sawing and stitch drilling help avoid overcuts while maintaining required tolerances; water supply and slurry management must be planned accordingly.<\/p>\n<h3>Combined approaches<\/h3>\n<p>In practice, separation cuts and core drillings are often combined with concrete pulverizers or split cylinders: first divide the wall into manageable segments, then selectively bite off or split the segments and remove them in a controlled manner. This keeps the load on the building low and enables clean material separation. Where necessary, lifting anchors or through-holes are created in advance so that segments can be secured and guided without shock loading.<\/p>\n<h2>Structural assessment and preparation<\/h2>\n<p>Before starting demolition, determine whether a wall is load-bearing or bracing. This includes checking load paths, slab bearings, shear walls, and any composite action. For load-bearing walls, plan temporary shoring and, if necessary, permanent replacement beams. Monitoring concepts, permits, and a sequenced work plan with hold points support safe progress in stages.<\/p>\n<h3>Investigation and exposure<\/h3>\n<p>Materials, reinforcement layout, and utility routing are examined. Probes, non-destructive testing, and targeted openings provide the basis for selecting the method. Hazardous substance surveys (for example, for old plasters) should be planned early; handling follows the applicable general and project-specific rules. Typical investigation tools include cover meters, rebar scanners, GPR, and endoscopes to verify wall build-up, voids, and embedded services before cutting.<\/p>\n<h3>Work and site logistics<\/h3>\n<p>Access routes, floor load-bearing capacities, escape routes, and material paths are defined. Lifting gear, interim storage, and container logistics prevent disruptions and reduce risks. Clear marking of restricted zones and safe load pick-up points are part of the preparation. Traffic routes, noise-sensitive zones, and crane or hoist capacities are coordinated with building operations to maintain safe separation from public areas.<\/p>\n<h2>Tool selection: concrete pulverizers, splitters, and supplemental technology<\/h2>\n<p>Tool selection follows the wall type, accessibility, and requirements for vibration and noise emissions. Hydraulic systems are supplied via <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/em>, whose output and hose management are adapted to the site conditions. Compatibility with carriers, quick-change options, and hose protection influence uptime and safety, while tool geometry and reach determine whether interior or exterior approaches are feasible.<\/p>\n<h3>Concrete pulverizers in wall demolition<\/h3>\n<p>Concrete pulverizers deliver high pressing forces in a compact form. They are suitable for interior spaces, selective deconstruction, and exposing reinforcement. Advantages include good controllability and segment-by-segment working. For heavily reinforced walls, precutting the reinforcement or combining with shears is recommended. Interchangeable jaw profiles and 360-degree rotation enhance precision at supports, corners, and interfaces to preserved finishes.<\/p>\n<h3>Stone and concrete splitters<\/h3>\n<p>Split cylinders require drilled holes that determine spacing and crack propagation. The technique is much quieter than percussive methods and reduces the risk of secondary damage. It is ideal for massive wall sections, high-strength concretes, and sensitive environments, such as hospitals or laboratories. The absence of impact energy helps protect vibration-sensitive equipment, and controlled splitting lines support accurate segment weights for safe lifting.<\/p>\n<h3>Supplementary cutting technology<\/h3>\n<p>Wall saws and joint cutters produce defined separation joints at nodes. Core drillings serve as corner holes, crane hook holes, or for exposing utilities. This allows crack lines to be controlled and the risk of uncontrolled cracking to be minimized. Pre-drilled relief holes at re-entrant corners further reduce spalling and help maintain specified tolerances for subsequent installation work.<\/p>\n<h3>Shears for metal<\/h3>\n<p>For reinforcing bars, sections, and embedded metal, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a><\/em> or <em>hydraulic shears<\/em> are used. <em>Multi-cutters<\/em> support cutting mixed materials in a single pass. In industrial plants, <em>tank cutters<\/em> play a role in special operations, for example when tank walls must be separated from enclosing walls prior to deconstruction. Cutting sequences should avoid re-tensioning residual forces and ensure that freed bars do not spring back into the work area.<\/p>\n<h2>Process steps in wall demolition<\/h2>\n<ol>\n<li>Investigation and assessment of structural behavior, materials, utilities, and environmental conditions.<\/li>\n<li>Deconstruction concept with method selection (for example, concrete pulverizer, splitter, sawing\/drilling) and emission control.<\/li>\n<li>Temporary shoring and creation of separation cuts and core drillings.<\/li>\n<li>Segmenting the wall into manageable elements and defining the sequence.<\/li>\n<li>Dismantling the segments: biting off with a concrete pulverizer or splitting via split cylinders.<\/li>\n<li>Material separation: remove concrete\/masonry and reinforcing steel separately.<\/li>\n<li>Transport, interim storage, and disposal\/recycling according to requirements.<\/li>\n<li>Final checks, documentation, and any touch-ups at edges and bearings.<\/li>\n<\/ol>\n<h2>Vibration and emissions control<\/h2>\n<p>In existing buildings: as quiet, dust-low, and low-vibration as possible. <strong>Hydraulic wedge splitters<\/strong> and <strong>concrete pulverizers<\/strong> support this by applying controlled pressure instead of impact energy. Where required, vibration and noise are measured at defined control points to verify compliance with project thresholds.<\/p>\n<h3>Dust reduction<\/h3>\n<p>Wet cutting, water mist, or local extraction reduce dust. Enclosures and negative pressure systems can protect areas. Clean cut surfaces facilitate follow-up work. Where slurry is generated, containment and filtration prevent contamination of drainage systems and help meet regulatory limits.<\/p>\n<ul>\n<li>Use water-fed tooling or mist cannons near the source.<\/li>\n<li>Seal openings and maintain negative pressure with suitable filtration.<\/li>\n<li>Deploy H-class vacuums with HEPA filters for dry capture where water is not permitted.<\/li>\n<\/ul>\n<h3>Noise reduction<\/h3>\n<p>Hydraulic splitting and shear work generate less airborne noise than hammer methods. Time windows, low-noise sequences, and damped interim storage provide additional mitigation. Mobile acoustic screens and resilient mats under interim storage points further reduce transmission.<\/p>\n<h3>Vibration<\/h3>\n<p>Segment-by-segment working and splitting techniques minimize oscillations, protecting adjacent components and installations. If sensitive equipment is nearby, establish vibration criteria and monitor with geophones or accelerometers, adjusting the sequence where thresholds approach limits.<\/p>\n<h2>Material separation, disposal, and recycling<\/h2>\n<p>Source-separated sorting improves recyclability. Reinforcing steel is cut with shears and collected separately. Mineral demolition debris is processed and reused as <em>recycled construction material<\/em>, provided quality and guidelines permit. Documentation of waste streams, transport records, and acceptance certificates supports compliance and circular economy targets.<\/p>\n<h3>Logistics and routes<\/h3>\n<p>Short transport routes, secured edges, and load-bearing interim storage prevent damage. Forward-looking container planning avoids waiting times and rehandling. Vertical transport by hoists or cranes is coordinated with segment weights and clearances, with routes kept free from conflicting trades.<\/p>\n<h2>Typical challenges and solutions<\/h2>\n<ul>\n<li>Unexpected reinforcement: investigate in advance; if necessary, switch to splitting or add shears.<\/li>\n<li>Confined access: use hand-held shears and compact split cylinders; choose smaller segments.<\/li>\n<li>Sensitive environments: select a low-vibration sequence; prioritize water\/dust management.<\/li>\n<li>Unclear structural behavior: open step by step, design shoring with redundancy, monitor load paths.<\/li>\n<li>Hidden services: expand scanning scope and expose test openings; isolate and reroute before cutting.<\/li>\n<li>Weak substrates at bearings: reduce segment size, add temporary spreaders, and install bearing protection.<\/li>\n<\/ul>\n<h2>Application areas and particularities<\/h2>\n<p>Wall demolition occurs in many fields: <em>concrete demolition and special demolition<\/em> with high demands on precision, <em>building gutting and cutting<\/em> in interior demolition, <em>rock breakout and tunnel construction<\/em> on massive structures, <em>natural stone extraction<\/em> when splitting stone, and <em>special operations<\/em> in sensitive areas. <strong>Concrete pulverizers<\/strong> and <strong>hydraulic wedge splitters<\/strong> are central tools because they enable controlled, low-vibration work. In heritage structures or operational facilities, method choice prioritizes reversibility of interventions, minimal dust, and traceable documentation of interfaces.<\/p>\n<h2>Technical notes on parameters<\/h2>\n<p>For splitting, drill-hole diameter and spacing determine crack propagation; wall thickness, concrete strength, and reinforcement ratio influence the required pressure. For concrete pulverizers, jaw opening, jaw geometry, and pressing force are decisive. A segment size adapted to the component facilitates safe handling and reduces risks during transport. Tool reach, available power, and permissible edge distances at connections further refine the parameter window for a stable, low-risk sequence.<\/p>\n<h2>Occupational safety and organization<\/h2>\n<p>Personal protective equipment, restricted zones, and clear communication are fundamental prerequisites. Hydraulic lines are protected against damage, and depressurization is performed in an orderly manner. Loads are guided with suitable <em>lifting clamps\/tongs<\/em>; demolition edges remain secured until acceptance. Information on protective measures is always to be understood as general and specified for the project. Lockout-tagout of utilities, silica dust controls, and permit-to-work procedures are integrated into the plan, with toolbox talks and supervision ensuring consistent implementation.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Wall demolition refers to the controlled removal of interior and exterior walls made of masonry, concrete, or reinforced concrete. In practice, the spectrum ranges from a small wall opening for a doorway to selective deconstruction in complex existing buildings. Decisive factors are precise planning, the appropriate method, and suitable tools <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20136","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wall Demolition in Construction - Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration &amp; safety indoors &amp; outdoors.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wall Demolition in Construction - Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration &amp; safety indoors &amp; outdoors.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T08:09:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-demolition\",\"name\":\"Wall Demolition in Construction - Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-23T15:07:11+00:00\",\"dateModified\":\"2026-06-15T08:09:03+00:00\",\"description\":\"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration & safety indoors & outdoors.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/wall-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Wall demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wall Demolition in Construction - Methods & Safety","description":"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration & safety indoors & outdoors.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition","og_locale":"en_US","og_type":"article","og_title":"Wall Demolition in Construction - Methods & Safety","og_description":"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration & safety indoors & outdoors.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T08:09:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition","name":"Wall Demolition in Construction - Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-23T15:07:11+00:00","dateModified":"2026-06-15T08:09:03+00:00","description":"Practical guide to wall demolition in construction \u2713 Controlled methods, low vibration & safety indoors & outdoors.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/wall-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/wall-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Wall demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20136","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20136"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20136\/revisions"}],"predecessor-version":[{"id":28340,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20136\/revisions\/28340"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}