{"id":20135,"date":"2026-01-23T09:39:02","date_gmt":"2026-01-23T08:39:02","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20135"},"modified":"2026-06-15T16:54:03","modified_gmt":"2026-06-15T14:54:03","slug":"honeycomb-structure-in-concrete","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete","title":{"rendered":"Honeycomb structure in concrete"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Honeycomb structures in concrete are among the typical defects that become visible during production, alteration, or deconstruction of reinforced concrete components. They impair load-bearing capacity and durability, can reduce cover to the reinforcement, and promote the ingress of water and contaminants. In the context of concrete demolition and special demolition, building gutting and concrete cutting as well as work in tunnel construction, it is important to identify, evaluate, and properly remove such areas. In practice, <strong>concrete pulverizers<\/strong> or <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> are often used to remove the damaged area in a controlled, low-vibration manner and protect the adjacent structure. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> provide the necessary power supply without placing excessive load on the construction site.<\/p>\n<p>In engineering practice, the phenomenon is also referred to as <em>honeycombing<\/em> or <em>gravel pockets<\/em>. Early, structured assessment and low-vibration remediation reduce secondary damage, limit downtime, and support compliance with project quality objectives.<\/p>\n<h2>Definition: What is meant by the honeycomb structure in concrete?<\/h2>\n<p>Honeycomb structure in concrete refers to unevenly distributed voids, gravel nests, or blowholes caused by insufficient mortar encapsulation of the maximum aggregate size and lack of compaction. The matrix then shows a porous, <em>honeycomb-like<\/em> surface up to deeper defects in which coarse aggregate is visible. Such areas exhibit lower density and strength, capillarity is increased, and the concrete cover of the reinforcement can be locally greatly reduced. Honeycombs are often visible in zones remote from the formwork, in areas with congested reinforcement, or in geometrically demanding component regions (corners, nodes, supports).<\/p>\n<p>Decisive criteria for classification are <strong>extent, depth, and proximity to reinforcement<\/strong>. While fine surface pores affect mainly appearance, pronounced honeycombing alters bond, permeability, and thus service life.<\/p>\n<h2>Causes and conditions of formation<\/h2>\n<p>Honeycomb structures are almost always the result of an interplay of concrete mix design, placement and compaction, as well as formwork and geometric influences. Segregation, lack of mortar flow, and uneven compaction cause gaps not to be filled.<\/p>\n<h3>Concrete mix design and consistency<\/h3>\n<p>Overly stiff consistency, insufficient fines, or unfavorable grading promote gravel nests. Excessive water content may ease flow but leads to porosity and reduces strength. Admixtures and entrained air must be matched to temperature, placing time, and member geometry so that the aggregate is properly coated with mortar. If required, a suitable concrete admixture (plasticizer) should be considered.<\/p>\n<h3>Placement, compaction, and formwork<\/h3>\n<p>Errors during concreting are among the main causes: excessive drop heights, placing against congested reinforcement without proper layering, compaction that is too short or uneven, and insufficient re-vibration at overlaps. Leaky formwork joints allow mortar to escape, leaving aggregate without binder. Cold, heat, or wind also change the working time and thus compactability.<\/p>\n<h3>Geometry, reinforcement, and placement boundary conditions<\/h3>\n<p>Complex nodes, small member thicknesses, embedded items, and tight reinforcement spacing hinder mortar flow. In haunch areas, under corbels, and at changes of cross-section, shadow zones frequently develop that lead to honeycombs when compaction is inadequate.<\/p>\n<ul>\n<li>Risk increases where cross-sections change abruptly or access for the vibrator is restricted.<\/li>\n<li>Unfavorable sequencing or interrupted concreting promotes cold joints and voids.<\/li>\n<\/ul>\n<h2>Detection and assessment of honeycomb structures<\/h2>\n<p>The assessment follows the principle: extent, depth, and influence on the reinforcement determine the urgency of measures. Near-surface honeycombs can be detected visually; if deeper defects are suspected, low-destructive testing is helpful.<\/p>\n<h3>Typical indicators<\/h3>\n<ul>\n<li>visible coarse aggregate without mortar fraction<\/li>\n<li>porous, nest-like depressions with irregular edges<\/li>\n<li>spalling edges under mechanical loading (hammer sounding gives a dull tone)<\/li>\n<li>locally reduced concrete cover, exposed reinforcement<\/li>\n<\/ul>\n<h3>Test and measurement methods<\/h3>\n<ul>\n<li>hammer sounding, endoscopy, or core drills to estimate depth<\/li>\n<li>surface examinations to detect voids in combination with probing<\/li>\n<li>ultrasonic pulse echo, cover meter readings, and localized rebound measurements to qualify extent and compaction<\/li>\n<li>documentation via mapping, photography, and dimensioned sketches as the basis for repair<\/li>\n<\/ul>\n<p>For prioritization, consider exposure conditions, design function of the member, and the remaining cover to reinforcement. Where doubts persist, escalate to structural verification and define interim safeguards.<\/p>\n<h2>Effects on load-bearing capacity and durability<\/h2>\n<p>Honeycombed areas reduce section performance and bond. Increased porosity promotes the ingress of water, chlorides, and CO\u2082 (concrete carbonation), which raises the corrosion risk of the reinforcement. Under freeze-thaw and de-icing salt exposure the risks intensify. In dynamically loaded areas, cracks can concentrate. The closer the defect lies to the reinforcement or to zones in compression or tension, the more significant it is for structural safety.<\/p>\n<p>Beyond immediate strength effects, permeability and capillary suction increase, impairing watertightness and accelerating the progression of carbonation and chlorides. This shortens maintenance intervals and can necessitate subsequent cathodic protection or extensive repair if not addressed early.<\/p>\n<h2>Repair and remediation: procedures<\/h2>\n<p>The goal is to remove the poorly compacted concrete completely, create sound load-bearing flanks, and restore the original function through suitable reprofiling. Depending on location and extent, different tools are used.<\/p>\n<ol>\n<li><strong>Exposure and removal:<\/strong> The honeycombed, weak concrete is removed down to dense, load-bearing material. <strong>Concrete pulverizers<\/strong> enable controlled, low-vibration removal with good edge control, especially during building gutting and concrete cutting in existing structures. <strong>Hydraulic splitters<\/strong> are suitable for quiet, crack-controlled opening of compact zones, for example in sensitive areas or with massive cross-sections. Hydraulic power packs supply these tools efficiently.<\/li>\n<li><strong>Cleaning and preparation:<\/strong> Remove loose material, roughen the surface, eliminate dust and debris. Expose and clean corroded reinforcement as required. Ensure bond improvement and edge interlock.<\/li>\n<li><strong>Reprofiling:<\/strong> Install suitable repair mortars or fine-aggregate concrete observing the placing conditions and compact carefully. Shape transitions smoothly, restore concrete cover, and ensure proper concrete curing.<\/li>\n<li><strong>Quality assurance:<\/strong> Visual inspection, hammer sounding, possibly adhesion pull-off tests, and documentation. In the case of recurring honeycombs, perform root-cause analysis and adjust execution.<\/li>\n<\/ol>\n<ul>\n<li>Where corrosion is detected, apply reinforcement cleaning and, if specified, corrosion protection coatings and bonding primers before reprofiling.<\/li>\n<li>Observe ambient conditions and curing regimes to limit shrinkage and ensure bond continuity at interfaces.<\/li>\n<\/ul>\n<h3>Advantages of hydraulic cutting and splitting methods in existing structures<\/h3>\n<ul>\n<li>low vibration levels, minimized risk of unwanted crack formation in the remaining cross-section<\/li>\n<li>precise, quantity-reduced removal with good control of demolition edges<\/li>\n<li>reduced noise and dust emissions with appropriate working methods<\/li>\n<li>suitable for work in sensitive environments such as hospitals, laboratories, or operating buildings<\/li>\n<li>compact tool geometry allows access in confined spaces and complex geometries<\/li>\n<\/ul>\n<h2>Planning in concrete demolition and special demolition<\/h2>\n<p>Honeycombs affect the demolition strategy: In areas of low density, uncontrolled spalling may occur. Planning that maps honeycombs in advance and adapts the cutting or splitting sequence increases safety. <strong>Concrete pulverizers<\/strong> are suitable for section-by-section, low-load removal of honeycomb-rich zones, for example at beam edges or walls during building gutting. <strong>Hydraulic splitters<\/strong> help to open massive members with locally weakened areas in a controlled manner before larger segments are separated with hydraulic demolition shear or multi cutters.<\/p>\n<p>Coordinate load paths, temporary shoring, and debris management so that weakened edges are stabilized and forces are introduced in a controlled way. Sequencing should limit vibration transfer to adjacent components and critical installations.<\/p>\n<h2>Honeycomb structure in tunnel construction and shotcrete<\/h2>\n<p>In tunnel and shaft construction as well as with shotcrete, shadowed areas behind reinforcement mats or embedded items can lead to nest-like defects. Rebound and insufficient layer coverage promote pores and gravel nests. For rework, controlled removal is crucial to avoid weakening the excavation profile. Hydraulically powered tools support targeted removal without excessive vibrations &#8211; an advantage in geologically sensitive sections.<\/p>\n<p>Special attention is required at interfaces between sprayed layers and cast elements, around lattice girders, and in sealing zones where watertightness is critical.<\/p>\n<h2>Occupational safety and environmental protection<\/h2>\n<p>Work on honeycomb-rich concrete requires special care: fall and crushing hazards must be avoided, the residual load-bearing capacity of the remaining cross-section should be assessed conservatively, and shoring or hangers should be planned before removal where needed. Plan for noise reduction measures and dust suppression, suitable dust extraction, and safety equipment. Select work equipment for low vibration levels, controlled force introduction, and minimized particulate emissions.<\/p>\n<ul>\n<li>Control silica dust with wet methods and extraction; verify compliance with applicable exposure limits.<\/li>\n<li>Plan handling and disposal of concrete rubble and slurry in accordance with environmental requirements.<\/li>\n<\/ul>\n<h2>Relation to products and application areas of Darda GmbH<\/h2>\n<p>When dealing with honeycomb structures, different tools are combined depending on the task: <strong>concrete pulverizers<\/strong> for selective concrete removal, <strong>hydraulic splitters<\/strong> for controlled splitting, supplemented by hydraulic power packs. In advanced deconstruction steps, combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a>, steel shear, or tank cutters can be used for adjacent materials (e.g., reinforcing steel, attachments, tanks). Relevant application areas are concrete demolition and special demolition, building gutting and concrete cutting, rock excavation and tunnel construction, as well as special operations with high demands on precision and low vibration levels.<\/p>\n<h2>Distinction and clarity of terms in context<\/h2>\n<p>Honeycomb structures differ from fine surface pores in that they are structurally significant and usually form coarser voids with exposed aggregate. Blowholes can occur locally, while gravel nests often extend along concentrations of reinforcement or along formwork joints. Decisive is the assessment by depth, distribution, and influence on bond &#8211; from this the appropriate approach is derived, from local patch repair to targeted removal.<\/p>\n<p>In visual inspection protocols, it is useful to differentiate between superficial bugholes with no structural effect and deep honeycombing with reduced cover so that repair scope and urgency can be assigned reliably.<\/p>\n<h2>Prevention: planning and execution tips<\/h2>\n<p>The best repair is prevention. Construction-accompanying quality assurance significantly reduces the risk of honeycombs.<\/p>\n<ol>\n<li>Match consistency and mix to member geometry, temperature, and placing time; choose grading and mortar content so that voids are reliably filled.<\/li>\n<li>Place in layered sequence with limited drop height; ensure sufficient, uniform concrete compaction &#8211; particularly at overlaps, embedded items, and nodes.<\/li>\n<li>Tight formwork with carefully detailed joints; plan critical zones (corners, supports, penetrations) in advance.<\/li>\n<li>Detail reinforcement so that concrete can flow well; ensure spacers and concrete cover.<\/li>\n<li>Inspect, document, rework: visual inspections, hammer sounding, and prompt correction of small defects prevent larger damage.<\/li>\n<\/ol>\n<ul>\n<li>Conduct trial placements where geometry is complex, and verify access for vibrators and compaction tools.<\/li>\n<li>Coordinate placing rate and re-vibration to avoid segregation and to close potential shadow zones.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Honeycomb structures in concrete are among the typical defects that become visible during production, alteration, or deconstruction of reinforced concrete components. They impair load-bearing capacity and durability, can reduce cover to the reinforcement, and promote the ingress of water and contaminants. In the context of concrete demolition and special demolition, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20135","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Honeycomb Structure in Concrete - Defects &amp; Repair<\/title>\n<meta name=\"description\" content=\"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Honeycomb Structure in Concrete - Defects &amp; Repair\" \/>\n<meta property=\"og:description\" content=\"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T14:54:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/honeycomb-structure-in-concrete\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/honeycomb-structure-in-concrete\",\"name\":\"Honeycomb Structure in Concrete - Defects & Repair\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-23T08:39:02+00:00\",\"dateModified\":\"2026-06-15T14:54:03+00:00\",\"description\":\"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/honeycomb-structure-in-concrete#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/honeycomb-structure-in-concrete\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/honeycomb-structure-in-concrete#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Honeycomb structure in concrete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Honeycomb Structure in Concrete - Defects & Repair","description":"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete","og_locale":"en_US","og_type":"article","og_title":"Honeycomb Structure in Concrete - Defects & Repair","og_description":"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T14:54:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete","url":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete","name":"Honeycomb Structure in Concrete - Defects & Repair","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-23T08:39:02+00:00","dateModified":"2026-06-15T14:54:03+00:00","description":"Understand honeycomb structure in concrete as a defect \u2713 causes, detection, risks, and low-vibration repair for safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/honeycomb-structure-in-concrete#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Honeycomb structure in concrete"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20135"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20135\/revisions"}],"predecessor-version":[{"id":28360,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20135\/revisions\/28360"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}