{"id":20129,"date":"2026-01-22T14:36:19","date_gmt":"2026-01-22T13:36:19","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20129"},"modified":"2026-06-15T10:24:03","modified_gmt":"2026-06-15T08:24:03","slug":"natural-stone-weathering","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering","title":{"rendered":"Natural stone weathering"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Weathering of natural stone describes the slow, <em>natural change<\/em> of rock at the Earth\u2019s surface. For planning, extraction, demolition and deconstruction of mineral construction materials, this topic is fundamental: weathering processes determine structural stability, workability, and the choice of suitable methods. In practice, the spectrum ranges from freshly exposed, compact, strong rock to highly decomposed, cracked zones. Especially at interfaces with structures, in the stone quarry, or during rock excavation, weathering influences the decision whether mechanical splitting, cutting, shear techniques, or scissor tools are appropriate. Tools such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, rock wedge splitters, hydraulic power packs, as well as concrete demolition shears from Darda GmbH are combined according to the rock condition to work in a controlled, material-appropriate, and resource-efficient manner. A precise assessment reduces unforeseen detachment risks, avoids rework, and supports low-emission execution.<\/p>\n<ul>\n<li><strong>Context-sensitive method selection:<\/strong> Weathering governs whether splitting, cutting, or shear techniques are optimal.<\/li>\n<li><strong>Process reliability:<\/strong> Matching drill patterns and force introduction to the fabric stabilizes outcomes and improves block yield.<\/li>\n<li><strong>Sustainability:<\/strong> Resource use, noise, vibration, and dust can be minimized when weathering is correctly classified early.<\/li>\n<\/ul>\n<h2>Definition: What is meant by natural stone weathering?<\/h2>\n<p>Natural stone weathering refers to the totality of <strong>physical<\/strong>, <strong>chemical<\/strong>, and <strong>biological<\/strong> processes that alter, weaken, or decompose rock in situ. Unlike erosion, where material is transported away, weathering acts at the place of occurrence. It affects fabric, porosity, water uptake, compressive and flexural tensile strength, cleavability, and crack distribution. These properties are decisive for selecting and executing methods in natural stone extraction, rock excavation and tunnel construction, as well as in concrete demolition and special demolition. Existing joints and bedding planes, for example, favor controlled widening of borehole rows with hydraulic splitter; at built structures of concrete and natural stone, concrete demolition shears are often additionally used to separate and remove the concrete portion. In practice, qualitative stages from <em>fresh<\/em> to <em>completely weathered<\/em> are used to characterize the degree of alteration and to align drilling and splitting strategies.<\/p>\n<h2>Mechanisms and influencing factors of natural stone weathering<\/h2>\n<p>The depth and type of weathering depend on the mineral composition of the rock, its fabric, climatic influences, and exposure. Three process groups are central:<\/p>\n<h3>Physical weathering<\/h3>\n<p>Mechanical stresses without significant material transformation. Typical are freeze-thaw cycles (ice volume increase in pores and cracks), salt crystallization (crystallization pressure), thermal stresses due to day-night temperature amplitudes, and unloading at exposed rock faces. Consequences include grain loosening, crack widening, and exfoliation or block detachment. For processing this means: Existing discontinuities facilitate splitting along joints; highly decayed zones require sensitive placement of splitting wedges and an adapted drill pattern. In near-surface zones, repeated thermal shock and insolation accentuate edge fragility, which should be considered when sequencing cuts and lifts.<\/p>\n<h3>Chemical weathering<\/h3>\n<p>Reactions with water, carbon dioxide, and oxygen alter minerals. In carbonate rocks (e.g., limestone), dissolution leads to enlarged pores; gypsum formation can cause volume changes. In silicate rocks, feldspars transform via hydrolysis into clay minerals; iron-bearing minerals oxidize. The resulting weakening of grain bonding reduces strength, affects cleavability, and can impair cut edge quality. Acidic waters and moisture residence times intensify these effects, making <strong>moisture management<\/strong> and timing of operations relevant process parameters.<\/p>\n<h3>Biological weathering<\/h3>\n<p>Roots, lichens, and microorganisms promote crack formation, acid inputs, and moisture fluctuations. In surface zones they intensify chemical and physical weathering, which must be considered for visible natural stone surfaces as well as on slopes and tunnel wall faces. On masonry and exposed rock, biological skins can mask loosened grains; gentle removal and re-inspection before drilling prevent misclassification.<\/p>\n<h2>Effects on material properties and workability<\/h2>\n<p>Weathering alters natural stone gradually. The most important technical consequences for planning, drilling and splitting processes, as well as shear and cutting operations are:<\/p>\n<ul>\n<li>Increased porosity and water absorption; reduced compressive, flexural tensile, and splitting tensile strength.<\/li>\n<li>Development and opening of crack networks, changes in joint apertures and bedding boundaries.<\/li>\n<li>Heterogeneous zones: transitions from strong to friable over short distances.<\/li>\n<li>Influence on tool application: In loosened areas, lower partial forces and closer borehole spacing are appropriate.<\/li>\n<li>Changed edge stability: In strongly weathered sandstones and slates, edges tend to chip &#8211; choose cutting sequence and removal steps accordingly.<\/li>\n<li>Changed abrasivity and drillability: Tool wear and penetration rate can shift markedly with increasing granular disintegration.<\/li>\n<li>Moisture-driven behavior: Wet rock often appears stronger in cutting but weaker in splitting; drainage and timing affect outcomes.<\/li>\n<\/ul>\n<h2>Investigation and evaluation of the degree of weathering<\/h2>\n<p>Careful classification of the weathering condition forms the basis for safe and economical execution. Proven approaches include:<\/p>\n<ul>\n<li>Visual mapping of joints, bedding planes, exfoliation, discolorations (e.g., iron staining) and granular disintegration.<\/li>\n<li>Simple on-site checks such as scratch tests, scribing, indicative rebound hammer measurements, point load tests, or ultrasonic pulse velocity measurements.<\/li>\n<li>Core extraction to examine fabric and to determine strength parameters, bulk density, and water absorption.<\/li>\n<li>Observation of moisture regime, exposure (south or north facing), frost susceptibility, and salt sources (de-icing salt, marine influence).<\/li>\n<\/ul>\n<p><strong>Suggested workflow:<\/strong><\/p>\n<ol>\n<li>Pre-map discontinuities and zoning, then assign a qualitative weathering class from fresh to completely weathered.<\/li>\n<li>Calibrate drill pattern and force levels in a short test field; verify split propagation and edge stability.<\/li>\n<li>Monitor during execution via visual control and simple index tests; adapt spacing, stroke, and sequence as heterogeneities appear.<\/li>\n<\/ol>\n<h3>Practical notes for the construction site and stone quarry<\/h3>\n<ul>\n<li>Adapt the drill pattern to the degree of weathering: in friable sections use smaller hole spacing and shorter spreading strokes; in sound core rock use wider spacing.<\/li>\n<li>Prefer low-crack zones for force introduction; secure or remove loose layers in advance.<\/li>\n<li>Plan the removal sequence so that relaxed material is taken first; release load-bearing cores last.<\/li>\n<li>Continuously check tool condition; wear increases in abrasive, sandy rocks.<\/li>\n<li>Clean boreholes and control roughness before inserting wedges; dust or slurry residues reduce friction and guidance.<\/li>\n<li>Define protection zones beneath potential fall lines; adjust handling and lifting points to avoid unplanned prying.<\/li>\n<\/ul>\n<h2>Relevance across application areas<\/h2>\n<p>Weathering affects all practice-relevant fields &#8211; from natural stone extraction through rock excavation and tunnel construction to deconstruction tasks where natural stone meets concrete or steel. Depending on the task, hydraulic splitter for rock and concrete, rock wedge splitters, concrete demolition shears, steel shears, hydraulic shears, cutting torch, and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">matching hydraulic power units<\/a> from Darda GmbH are combined.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In the stone quarry, alternations between sound core and weathered rim zones are common. Along existing joints, controlled release is possible with borehole rows and hydraulic splitter; in weak sections, lower spreading forces and a finer sequence are advisable. Rock wedge splitters enable targeted widening of natural discontinuities without unnecessary additional crack formation. The hydraulic power pack provides the required energy consistently, which supports process stability in heterogeneous rock sections. These steps reflect typical approaches in <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\">natural stone quarrying<\/a>. A balanced pattern improves block geometry and reduces waste, especially where weathered rims transition abruptly to fresh cores.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Weathered rock masses possess lower stability yet are often strongly jointed. This favors splitting methods with tight drill patterns and controlled load distribution. Where embedded elements or reinforcement steel must be cut, steel shears or hydraulic shears complement the rock work. In rock with alternating strength, a coordinated sequence of preliminary investigation, drilling, splitting, and local securing is appropriate to avoid uncontrolled detachments. Groundwater, humidity, and ventilation conditions affect cohesion and friction; adjust timing and hold points to maintain face stability.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In existing structures, natural stone masonry, historic ashlar walls, or rock exposure often lie directly next to concrete additions. Concrete demolition shears are practical tools for targeted removal of the concrete portion; in the adjacent natural stone area, splitters are used to separate along existing discontinuities. This task division respects different material responses: concrete tends to brittle fracture with reinforcement pull, natural stone follows joints and bedding planes. Multi cutters and hydraulic shears can cut reinforcement, while the cutting torch can segment metallic tanks in a mineral environment in special deconstruction configurations.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>When removing mineral coatings or cutting natural stone components to size, the degree of weathering is decisive for cutting quality and edge stability. In strongly weathered sandstones, a reduced feed and a tuned cutting sequence are advisable; in sound granite, drill-split methods can release precise blocks. Concrete demolition shears are added where concrete parts near natural stone must be deconstructed. Coolant, dust control, and appropriate tooling geometry reduce microchipping in decayed surface zones.<\/p>\n<h3>Special application<\/h3>\n<p>In sensitive environments with limited vibration and emission requirements, combining precise drilling and splitting is an option. Selection of Darda GmbH tools is situation-based: hydraulic splitter for the rock, supplemented by steel or hydraulic shears for embedded elements. The decisive factor remains the weathering condition, which governs force introduction and the removal sequence.<\/p>\n<h2>Planning, technology, and execution<\/h2>\n<p>Technical preparation is guided by rock type, weathering depth, and target geometry. Borehole diameter, depth, row spacing, and the sequence of load application must be matched to the local fabric. In weathered zones, stepwise splitting with moderate pressure increase is advisable. Temperature and moisture influence pore pressure and friction; the working window should be adjusted accordingly. Dust and water management must be controlled, for example by tuned drilling techniques and appropriate dust extraction and dust suppression measures, including a water spray system where applicable.<\/p>\n<ul>\n<li><strong>Parameter harmonization:<\/strong> Keep borehole straightness and cleanliness high; align spacing with joint frequency and expected split paths.<\/li>\n<li><strong>Force control:<\/strong> Increase spreading force progressively; observe acoustic feedback and crack opening to avoid overdriving weak rims.<\/li>\n<li><strong>Interface management:<\/strong> Where natural stone meets concrete or steel, define clear cut or split boundaries and remove composite restraints early.<\/li>\n<\/ul>\n<h3>Tool and technology selection<\/h3>\n<ul>\n<li>Hydraulic splitter where discontinuities are clear, block geometry is specified, and workspace is limited.<\/li>\n<li>Rock wedge splitters for pinpoint widening in borehole rows, particularly along existing joints.<\/li>\n<li>Concrete demolition shears where concrete portions or composite zones with reinforcement must be separated without unnecessarily affecting adjacent natural stone.<\/li>\n<li>Hydraulic power pack with sufficient power reserve to ensure uniform pressure profiles even with varying rock responses.<\/li>\n<li>Supplementary cutting and shear tools (multi cutters, steel shears, hydraulic shears, cutting torch) where metallic elements embedded in rock must be separated.<\/li>\n<li>Accessories such as borehole cleaning brushes and depth gauges to ensure consistent insertion depth and friction conditions.<\/li>\n<\/ul>\n<h2>Materials: natural stone types and typical weathering patterns<\/h2>\n<h3>Igneous rocks (e.g., granite, basalt)<\/h3>\n<p>High intrinsic strength, usually low porosity. Weathering along joints and by thermal stresses; in feldspar-rich variants, chemical transformation to clay minerals. Cleavability is good along joint systems; in strongly weathered feldspar zones, edge spalling risk increases. Onion-skin type exfoliation may occur near surfaces, requiring cautious sequencing when releasing larger faces.<\/p>\n<h3>Metamorphic rocks (e.g., gneiss, slate)<\/h3>\n<p>Pronounced anisotropy due to foliation or banding. Weathering along planar structures; slate tends to split into plates. Splitting methods exploit this anisotropy but require careful force introduction across the foliation. High quartz contents raise abrasivity; drill tool selection and cooling must reflect this.<\/p>\n<h3>Sedimentary rocks (e.g., sandstone, limestone)<\/h3>\n<p>Wide strength range. Sandstone shows grain bonding by silica or carbonate; chemical weathering weakens the bonding and promotes granular disintegration. Limestone is prone to dissolution; cracks can evolve through enlargement of joints. Cut edges in weathered sandstones are susceptible to breakouts; in limestone, moisture strongly influences behavior. In variable beds, alternating laminae can deflect split paths; adapt spacing and wedge position accordingly.<\/p>\n<h2>Occupational safety, environmental protection, and legal notes<\/h2>\n<p>When working on weathered natural stone, hazards from rockfall, slippage, and unpredictable detachments must be considered. Personal protective equipment, stable access, regular hazard analysis, and appropriate securing measures are essential. Emissions such as dust and noise emission must be minimized technically. In protected areas, at cultural heritage sites, or where water is present, special requirements may apply; required permits and coordination must be checked for each project. The notes given are general in nature and do not replace a case-by-case assessment.<\/p>\n<ul>\n<li>Define load-free zones and install catch devices where necessary; inspect after each splitting cycle.<\/li>\n<li>Use water management and dust suppression adapted to the site; collect and dispose of slurry appropriately.<\/li>\n<li>Document key parameters and adjustments to maintain traceability and compliance.<\/li>\n<\/ul>\n<h2>Terminology and practical examples<\/h2>\n<p>Weathering is the in situ alteration of natural stone; erosion describes the removal and transport. In practice, transitions appear: karstification in limestone, exfoliation on rock heads, rust discoloration due to oxidation. For a mixed inventory of natural stone masonry with subsequent concrete additions, deconstruction can proceed in sections: Concrete portions are removed with concrete demolition shears, the natural stone is separated along existing discontinuities with hydraulic splitter. Execution thus follows the material &#8211; the degree of weathering determines the sequence, force introduction, and tool selection.<\/p>\n<ul>\n<li><strong>Key takeaway:<\/strong> Map, test, and adapt iteratively &#8211; weathering is spatially variable.<\/li>\n<li><strong>Quality focus:<\/strong> Clean boreholes, controlled forces, and tuned sequences protect edges and improve yield.<\/li>\n<li><strong>Risk control:<\/strong> Stabilize loosened zones early and maintain clear fall protection protocols.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Weathering of natural stone describes the slow, natural change of rock at the Earth\u2019s surface. For planning, extraction, demolition and deconstruction of mineral construction materials, this topic is fundamental: weathering processes determine structural stability, workability, and the choice of suitable methods. In practice, the spectrum ranges from freshly exposed, compact, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20129","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Natural Stone Weathering in Geology &amp; Construction<\/title>\n<meta name=\"description\" content=\"Discover \u2713 how natural stone weathering drives geology insights &amp; safe construction methods from quarry to demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Natural Stone Weathering in Geology &amp; Construction\" \/>\n<meta property=\"og:description\" content=\"Discover \u2713 how natural stone weathering drives geology insights &amp; safe construction methods from quarry to demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T08:24:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/natural-stone-weathering\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/natural-stone-weathering\",\"name\":\"Natural Stone Weathering in Geology & Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-22T13:36:19+00:00\",\"dateModified\":\"2026-06-15T08:24:03+00:00\",\"description\":\"Discover \u2713 how natural stone weathering drives geology insights & safe construction methods from quarry to demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/natural-stone-weathering#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/natural-stone-weathering\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/natural-stone-weathering#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Natural stone weathering\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Natural Stone Weathering in Geology & Construction","description":"Discover \u2713 how natural stone weathering drives geology insights & safe construction methods from quarry to demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering","og_locale":"en_US","og_type":"article","og_title":"Natural Stone Weathering in Geology & Construction","og_description":"Discover \u2713 how natural stone weathering drives geology insights & safe construction methods from quarry to demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T08:24:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering","url":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering","name":"Natural Stone Weathering in Geology & Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-22T13:36:19+00:00","dateModified":"2026-06-15T08:24:03+00:00","description":"Discover \u2713 how natural stone weathering drives geology insights & safe construction methods from quarry to demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/natural-stone-weathering#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Natural stone weathering"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20129","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20129"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20129\/revisions"}],"predecessor-version":[{"id":28342,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20129\/revisions\/28342"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20129"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}