{"id":20128,"date":"2026-01-22T16:12:13","date_gmt":"2026-01-22T15:12:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20128"},"modified":"2026-06-15T15:09:03","modified_gmt":"2026-06-15T13:09:03","slug":"concrete-weathering","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering","title":{"rendered":"Concrete weathering"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Weathering of concrete describes the slow, progressive alteration and damage of cementitious building materials under the influence of environment, use, and time. It affects infrastructure as well as buildings and technical facilities. For planning, maintenance, and <em>deconstruction<\/em>, a solid understanding of the mechanisms is crucial &#8211; especially to correctly use suitable tools such as concrete demolition shear or stone splitter and concrete splitter, and to plan the steps in the application areas of <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, building gutting and concrete cutting, as well as special demolition safely and efficiently. Sound knowledge also supports <strong>resource efficiency<\/strong>, circular material flows, and predictable project scheduling.<\/p>\n<h2>Definition: What is meant by concrete weathering?<\/h2>\n<p>Concrete weathering refers to changes in the microstructure caused by physical, chemical, and occasionally biological processes, leading to loss of strength, crack formation, spalling, and increased susceptibility to further impacts. Key triggers include freeze-thaw with de-icing salts, concrete carbonation, chloride contamination, sulfate attack, and the alkali-silica reaction (ASR). Weathering can expose reinforcement or promote corrosion and thus significantly determines the approach to structural repair, selective deconstruction, or complete demolition &#8211; with direct relevance for the selection and operating mode of concrete demolition shear, stone splitter and concrete splitter, and complementary hydraulic tools from Darda GmbH. In addition, permeability, moisture transport, and the condition of the cover concrete influence the rate of deterioration and the <strong>splitability<\/strong> and cut guidance during deconstruction.<\/p>\n<h2>Causes and mechanisms of concrete weathering<\/h2>\n<p>The most important mechanisms often act together. In practice, the interaction of moisture, temperature fluctuations, and harmful agents leads to a complex damage pattern that influences the workability of concrete during deconstruction. Cyclic wetting and drying, salt crystallization in pores, and stress redistribution around reinforcement accelerate microcracking and delamination.<\/p>\n<ul>\n<li><strong>Typical interactions<\/strong>: carbonation along crack faces that facilitates chloride ingress; moisture gradients that intensify thermal stresses; ASR-induced expansion that opens new pathways for sulfates and chlorides.<\/li>\n<li><strong>Design and execution aspects<\/strong>: inadequate cover, heterogeneous compaction, or weak interfaces in repair layers can localize damage and predetermine separation planes.<\/li>\n<li><strong>Operational impacts<\/strong>: deteriorated zones lower required splitting pressures and enable <em>selective<\/em> shear removal with higher precision.<\/li>\n<\/ul>\n<h2>Physical weathering: Frost, moisture, temperature fluctuations<\/h2>\n<p>During freeze-thaw cycles, water penetrates pores and capillaries and expands upon freezing. Repeated cycles create microcracks, edge breakouts, and surface scaling. De-icing salts intensify the effect through moisture retention and chemical interactions. Thermal loads (heat, solar radiation, fire damage) can additionally induce tensile splitting stresses. Moisture gradients generate shrinkage and swelling cycles that exacerbate crack networks; salt scaling typically manifests as coarse granular loss near traffic-exposed surfaces. In heavily pre-damaged zones, local spalls can be removed in a controlled manner with concrete demolition shear applying finely metered force; in massive members, the increased crack susceptibility enables the use of <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> for low-vibration separation.<\/p>\n<h2>Chemical weathering: Carbonation, chlorides, sulfates, ASR<\/h2>\n<p>Concrete carbonation lowers the pH of the concrete and can eliminate the corrosion protection of the reinforcement. Chlorides from seawater or de-icing salts promote pitting and accelerate loss of strength near reinforcement. Sulfate attack causes volume increase (ettringite formation) and leads to map cracking. The alkali-silica reaction can trigger expansive gel formations. These processes weaken the bond between concrete and steel and often cause delaminations. Carbonation fronts frequently advance along cracks and porous repair interfaces; chloride accumulation is favored in splash and tidal zones and in spray areas of traffic structures. ASR typically requires reactive aggregates, sufficient alkalis, and sustained moisture.<\/p>\n<ul>\n<li><strong>Typical indicators<\/strong>: rust staining, hollow-sounding areas, map cracking, leaching or white efflorescence, soft or sandy surface layers.<\/li>\n<li><strong>Consequence for planning<\/strong>: estimate remaining cover, identify detachment planes, and align separation lines with weakened interfaces.<\/li>\n<\/ul>\n<p>This is relevant for deconstruction concepts: Corroded zones can often be removed in sections with concrete demolition shear, while stone splitter and concrete splitter separate larger blocks along existing planes of weakness.<\/p>\n<h2>Biological and environmental influences<\/h2>\n<p>In special environments, microorganisms and vegetation can chemically affect surfaces, retain moisture longer, and thus promote frost damage. Exhaust gases, industrial atmospheres, or seawater exposure accelerate chemical weathering. Recurrent exposure to fine aerosols and pollutants fosters biofilm growth that keeps surfaces damp, increasing freeze-thaw stress and ionic transport. These factors determine exposure classes and the appropriate approach in selective deconstruction and special demolition.<\/p>\n<h2>Typical damage patterns and their significance for deconstruction<\/h2>\n<p>Damage patterns provide clues to the mechanism and depth of weathering. They directly influence tool selection, points of attack, and cutting sequence. The orientation and width of cracks, the presence of delaminations, and the condition of the cover concrete inform whether to prioritize shearing, splitting, or combined methods.<\/p>\n<h3>Common findings<\/h3>\n<ul>\n<li><strong>Cracks<\/strong>: from microcracks to through-separating cracks; directional (thermal) or map-like (sulfates, ASR).<\/li>\n<li><strong>Spalling and edge breakouts<\/strong>: often at member edges, balconies, column heads.<\/li>\n<li><strong>Exposed reinforcement<\/strong>: corrosion products, loss of cross-section, lack of bond.<\/li>\n<li><strong>Surface scaling<\/strong>: sanding zones, open pores, weathered cement matrix.<\/li>\n<li><strong>Delaminations<\/strong>: shelling, behind-face voids.<\/li>\n<li><strong>Rust staining and efflorescence<\/strong>: indicators of reinforcement corrosion and leaching processes.<\/li>\n<\/ul>\n<h3>Practical consequences<\/h3>\n<ul>\n<li>Existing planes of weakness can be used as separation lines.<\/li>\n<li>In delaminated areas, concrete demolition shear enables gentle lifting of individual layers.<\/li>\n<li>Massive but crack-permeated members can be divided into transportable segments with stone splitter and concrete splitter using low-vibration methods.<\/li>\n<li>Exposed or heavily corroded reinforcement additionally requires <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">steel shears<\/a> for safe separation.<\/li>\n<li>Where needed, pre-weakening by drilling along intended split lines reduces required splitting pressure and limits secondary cracking.<\/li>\n<\/ul>\n<h2>Diagnostics and assessment before repair or deconstruction<\/h2>\n<p>A systematic investigation reduces risks, optimizes interfaces, and protects adjacent structures &#8211; especially in building gutting and concrete cutting. Representative sampling and clear documentation enable reproducible decisions and predictable work sequences.<\/p>\n<h3>Non-destructive and destructive testing<\/h3>\n<ul>\n<li>Rebound hammer and drill fines evaluation to estimate surface strength.<\/li>\n<li>Carbonation depth (e.g., with indicator), chloride content (core samples), petrographic analyses (ASR indicators).<\/li>\n<li>Rebar locating and concrete cover measurement to plan interventions with concrete demolition shear and splitting tools without collisions.<\/li>\n<li>Void and delamination testing using impact-echo or sounding.<\/li>\n<li>Ultrasonic pulse velocity and half-cell potential mapping to assess internal damage and corrosion activity.<\/li>\n<li>Moisture mapping and temperature logging to understand exposure-driven cycles.<\/li>\n<\/ul>\n<h3>Assessment<\/h3>\n<p>The results are interpreted per component: Exposure conditions, structural function, remaining service life, and protected assets (surroundings, infrastructure) determine whether to choose structural repair, selective deconstruction, or complete demolition. For tool deployment, material strength, crack paths, and reinforcement density are decisive. Project-specific constraints such as vibration limits, dust and noise requirements, and operating time windows are integrated into the method statement.<\/p>\n<h2>Tool selection for weathered concrete<\/h2>\n<p>The material response of weathered concrete differs significantly from fresh or high-strength concrete. A coordinated combination of hydraulic tools enhances control, precision, and occupational safety. Matching tool geometry and force application to the identified damage pattern minimizes collateral damage and supports low-emission workflows.<\/p>\n<h3>Concrete demolition shear<\/h3>\n<ul>\n<li><em>Strengths<\/em>: targeted removal, opening of delaminations, selectivity on sensitive components, good close-range visibility.<\/li>\n<li><em>Strengths<\/em>: metered force reduces secondary cracking and protects adjacent finishes.<\/li>\n<li><em>Typical applications<\/em>: building gutting, edge areas, reinforced concrete with locally weakened matrix, removal of overlays and repair layers.<\/li>\n<li><em>Typical applications<\/em>: exposing reinforcement for subsequent separation and opening construction joints or blisters.<\/li>\n<\/ul>\n<h3>Stone and concrete splitter<\/h3>\n<ul>\n<li><em>Strengths<\/em>: creation of defined split lines, low vibration levels, low emissions, good control in massive members.<\/li>\n<li><em>Strengths<\/em>: effective along pre-existing cracks and interfaces, enabling large-block separation with predictable fragment size.<\/li>\n<li><em>Typical applications<\/em>: separation of large component blocks, foundation partitioning, low-vibration deconstruction in sensitive environments (e.g., laboratories, hospitals, existing buildings).<\/li>\n<li><em>Typical applications<\/em>: pilaster and beam segmentation where saw cuts are restricted by access or emissions.<\/li>\n<\/ul>\n<h3>Complementary tools<\/h3>\n<ul>\n<li>Hydraulic wedge splitter for pinpoint splitting impulses in densely reinforced zones.<\/li>\n<li>Multi cutters for combined materials in interior demolition.<\/li>\n<li>Steel shear for reinforcing steel, embedded parts, and structural steel sections.<\/li>\n<li>Hydraulic power pack to supply the hydraulic tools with the required pressure and flow rate.<\/li>\n<li>Core drills to create pilot holes for splitters and to relieve stress at intended separation planes.<\/li>\n<\/ul>\n<h2>Application areas: Effects of weathering on the work strategy<\/h2>\n<p>Weathering influences the sequence, attack points, and cutting guidance in different application areas.<\/p>\n<ul>\n<li><strong>Concrete demolition and special demolition<\/strong>: Use existing cracks as separation aids, sectional removal with concrete demolition shear, member partitioning with stone splitter and concrete splitter to minimize vibration.<\/li>\n<li><strong>Building gutting and concrete cutting<\/strong>: Selectivity takes priority; weakened zones are secured and removed section by section before working on load-bearing parts.<\/li>\n<li><strong>Rock excavation and tunnel construction<\/strong>: For concrete linings or shotcrete with weathering signs, controlled splitting methods are particularly advantageous.<\/li>\n<li><strong>Natural stone extraction<\/strong>: Differences between artificial and natural stone sharpen the eye for splitability; stone splitter demonstrates the transferability of controlled splitting techniques.<\/li>\n<li><strong>Special demolition<\/strong>: In sensitive areas (asset protection, infrastructure, inner cities), low-vibration methods and precise shear work help avoid secondary damage.<\/li>\n<li><strong>Bridges and marine structures<\/strong>: Weathering-driven chloride ingress and frost action guide selective exposure, shear removal, and low-vibration segmentation.<\/li>\n<\/ul>\n<h2>Procedure in practice: Step by step<\/h2>\n<ol>\n<li><strong>Damage mapping<\/strong>: Visual inspection, documentation of cracks, spalling, delaminations, exposure indicators.<\/li>\n<li><strong>Testing concept<\/strong>: Selection of appropriate tests for strength, carbonation, chlorides, and reinforcement layout.<\/li>\n<li><strong>Technique planning<\/strong>: Define separation lines, accesses, sequence; select concrete demolition shear for precise removals and stone splitter and concrete splitter for member partitioning.<\/li>\n<li><strong>Safeguarding measures<\/strong>: Shoring, dust and noise control, barriers, load transfer planning.<\/li>\n<li><strong>Execution<\/strong>: First remove loose or delaminated areas with concrete demolition shear; then perform controlled splitting for segmentation; separate reinforcement with steel shear.<\/li>\n<li><strong>Follow-up<\/strong>: Check adjacent components, sort materials, document for compliance and recycling.<\/li>\n<li><strong>Quality assurance<\/strong>: Monitor vibration and dust, verify achieved separation lines and fragment sizes, update documentation for traceability and lessons learned.<\/li>\n<\/ol>\n<h2>Safety, emissions, and environmental protection<\/h2>\n<p>Weathered concrete can exhibit unpredictable fracture edges. A safe sequence, redundant safeguards, and clear communication paths are essential. Emissions such as dust and noise must be minimized; low-vibration splitting methods support the protection of sensitive neighboring structures. Appropriate PPE, water-assisted dust suppression, and local extraction reduce exposure. Source-separated removal facilitates the circular use of mineral construction materials through recycling, while careful handling preserves reusable components.<\/p>\n<h2>Special boundary conditions and exposures<\/h2>\n<ul>\n<li><strong>Marine and de-icing salt exposure<\/strong>: Focus on chlorides and reinforcement corrosion; targeted exposure and separation of corroded zones.<\/li>\n<li><strong>Industrial atmosphere<\/strong>: Chemical attack requires a cautious, layer-by-layer approach with concrete demolition shear.<\/li>\n<li><strong>Fire damage<\/strong>: Thermally damaged concrete shows loss of microstructure; controlled splitting and sectional removal are advantageous.<\/li>\n<li><strong>Freeze-thaw dominated climates<\/strong>: Expect surface scaling and edge spalling; align splitting pressure and shear approach with reduced residual strength.<\/li>\n<\/ul>\n<h2>Repair or deconstruction: Considerations<\/h2>\n<p>The decision between preservation and deconstruction depends on load-bearing capacity, remaining service life, cost-effectiveness, and environmental impacts. Generally, recognized regulations must be observed. In advanced weathering, especially with reinforcement corrosion relevant to structural safety, much speaks in favor of selective dismantling and component replacement. Concrete demolition shear enables precise interventions, while stone splitter and concrete splitter ensure controlled separations without unnecessary vibration. Documentation of material flows and the potential for reuse or high-quality recycling supports sustainability goals and regulatory compliance.<\/p>\n<h2>Distinction from natural stone weathering and lessons for practice<\/h2>\n<p>While natural stone weathering is primarily mineralogically driven, concrete additionally undergoes cement-chemistry processes and interactions with reinforcement. The splitting techniques established in natural stone extraction show how to guide split lines and meter forces &#8211; knowledge that can be usefully transferred to deconstruction of weathered concrete components with stone splitter and concrete splitter. Differences in anisotropy and bedding mean that pilot drilling patterns and splitting sequences must be adapted to the concrete&#8217;s reinforcement layout and crack network.<\/p>\n<h2>Conclusion: Significance for planning and tool strategy<\/h2>\n<p>Concrete weathering is not a uniform process but a composite of mechanisms and boundary conditions. For sound decisions in concrete demolition and special demolition, in building gutting, and in special demolition, a differentiated diagnosis and a coordinated combination of concrete demolition shear and stone splitter and concrete splitter are central. Hydraulically driven tools from Darda GmbH support controlled, low-emission work &#8211; crucial is their proper selection and application in the context of the specific damage pattern. Clear method statements, monitoring, and iterative adjustments ensure safe, efficient, and resource-conscious execution.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Weathering of concrete describes the slow, progressive alteration and damage of cementitious building materials under the influence of environment, use, and time. It affects infrastructure as well as buildings and technical facilities. For planning, maintenance, and deconstruction, a solid understanding of the mechanisms is crucial &#8211; especially to correctly use <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20128","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete Weathering - Causes, Effects &amp; Mitigation<\/title>\n<meta name=\"description\" content=\"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing &amp; safe deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete Weathering - Causes, Effects &amp; Mitigation\" \/>\n<meta property=\"og:description\" content=\"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing &amp; safe deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T13:09:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-weathering\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-weathering\",\"name\":\"Concrete Weathering - Causes, Effects & Mitigation\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-22T15:12:13+00:00\",\"dateModified\":\"2026-06-15T13:09:03+00:00\",\"description\":\"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing & safe deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-weathering#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-weathering\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/concrete-weathering#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Concrete weathering\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete Weathering - Causes, Effects & Mitigation","description":"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing & safe deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering","og_locale":"en_US","og_type":"article","og_title":"Concrete Weathering - Causes, Effects & Mitigation","og_description":"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing & safe deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T13:09:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering","url":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering","name":"Concrete Weathering - Causes, Effects & Mitigation","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-22T15:12:13+00:00","dateModified":"2026-06-15T13:09:03+00:00","description":"Understand concrete weathering \u2713 material degradation of concrete structures, causes, testing & safe deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/concrete-weathering#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Concrete weathering"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20128","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20128"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20128\/revisions"}],"predecessor-version":[{"id":28350,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20128\/revisions\/28350"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}