{"id":20123,"date":"2026-01-22T08:46:03","date_gmt":"2026-01-22T07:46:03","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20123"},"modified":"2026-06-15T11:52:03","modified_gmt":"2026-06-15T09:52:03","slug":"reinforcement-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system","title":{"rendered":"Reinforcement system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Reinforcement systems are a central topic in structural repair, strengthening, and the safe remodelling of existing load-bearing structures. They are used when the load-bearing capacity, serviceability, or durability of components must be specifically increased &#8211; for example in cases of change of use, damage, seismic requirements, or during partial deconstruction and the creation of new openings. In practice, they directly influence the selection of work methods and tools in concrete demolition and special demolition. Where concrete members are strengthened or subsequently braced, mechanical cutting and splitting methods behave differently: <strong>concrete pulverizers<\/strong> must expose and sever reinforcement and bond layers, while <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> exploit defined split lines to open components with low vibration. Proper preparation determines safety, emissions, and efficiency. Sound planning integrates structural analysis with method statements, temporary works design, and logistics to ensure predictable outcomes under site constraints.<\/p>\n<h2>Definition: What is meant by a reinforcement system?<\/h2>\n<p>A reinforcement system is the entirety of structural measures and components that increase the load-bearing capacity and stiffness of existing components or improve their ductility. These include bonded steel or fiber\u2011reinforced polymer laminates (e.g., CFRP\/GFRP), section enlargement by concrete jacketing, sprayed mortar\/shotcrete, external or internal prestressing, additional reinforcement with bonded anchors, steel sections and frames, temporary shoring, and local detail strengthening at supports and connection zones. The goal is reliable load transfer with a sound bond to the existing structure, controlled crack width limitation, and sufficient durability with minimal impact on the structure. Design is based on recognized engineering standards; execution and supervision account for substrate preparation, bonding and anchorage techniques, anchor spacing, corrosion protection, and quality assurance testing. Depending on exposure class and use, verification may also include fatigue, temperature effects, fire resistance, and long-term behaviour (creep and shrinkage) to ensure consistent performance over the service life.<\/p>\n<h2>Configuration, materials, and working principles of reinforcement systems<\/h2>\n<p>Reinforcement systems combine materials and joining techniques to increase flexural, shear, or torsional resistance in a targeted way. In reinforced concrete construction, three principles dominate:<\/p>\n<ul>\n<li><strong>Section enlargement<\/strong>: Concrete jacketing or shotcrete with additional embedded reinforcement improves flexural and shear capacity and protects against environmental influences.<\/li>\n<li><strong>Externally bonded elements<\/strong>: CFRP laminates, CFRP fabrics, or steel plates provide additional capacity with minimal added depth; performance depends strongly on substrate preparation and bond quality.<\/li>\n<li><strong>External prestressing\/tensioning<\/strong>: Tendons or bar anchors carry forces outside the original section, reducing cracking and deflection; prestressing requires particular attention during deconstruction works.<\/li>\n<\/ul>\n<p>Robust detailing of <em>anchorage zones<\/em>, <em>load paths<\/em>, and <em>compatibility of deformations<\/em> is decisive to avoid premature debonding or stress concentrations at discontinuities.<\/p>\n<p>In masonry, injection, flat steel anchors, strapping, and fabric-reinforced render systems are used. In steel construction, strengthening of girders is implemented by plating, coupling plates, and stiffeners. In tunnelling and rock engineering, shotcrete, anchors (rock bolts), spiles, lattice girders, and steel rings act together as a composite system to stabilize the ground. The interaction of these elements modifies system stiffness and ductility, which directly affects dismantling strategies.<\/p>\n<h2>Relevance in concrete demolition and special demolition<\/h2>\n<p>Reinforcement systems alter fracture patterns, bond behaviour, and load redistribution &#8211; and thus the approach to dismantling, gutting works, and cutting operations. Members with CFRP laminates or steel plates show higher tensile and shear capacity in the strengthened zone; members with external prestressing store energy that can be released suddenly if severed uncontrollably. In special demolition, careful identification and sequencing are therefore crucial:<\/p>\n<ul>\n<li><strong>Expose the system<\/strong>: Using <em>concrete pulverizers<\/em> to remove cover concrete in a controlled manner makes reinforcement, laminates, or plates visible.<\/li>\n<li><strong>Targeted separation<\/strong>: <em>steel shears<\/em>, <em>multi cutters<\/em>, or <em>combination shears<\/em> cut reinforcing bars, sections, or strapping, while <em>concrete splitters<\/em> open components along defined lines with low vibration.<\/li>\n<li><strong>Stepwise stress relief<\/strong>: For prestressed or tied systems, perform controlled stress relief and sequential removal, supported by temporary shoring.<\/li>\n<\/ul>\n<p>The choice of tool and sequence reduces vibration, noise, and dust and increases construction site safety. Early coordination with structural design and temporary works limits unintended load paths during intermediate states and prevents progressive damage.<\/p>\n<h2>Work preparation: investigation, design, and documentation<\/h2>\n<p>Preliminary investigations clarify structural behaviour, bond quality, and the location of critical elements. A combination of document review and low\u2011impact testing has proven effective:<\/p>\n<ul>\n<li>Component diagnostics: locating reinforcement, laminates, and anchors; cover depth measurement; assessment of crack patterns, concrete carbonation, and chloride content.<\/li>\n<li>Structural assessment: reserve capacities, load redistribution, demolition and assembly states; verification of intermediate conditions.<\/li>\n<li>Work and safety concept: sequence plans, exclusion zones, shoring concept, emissions protection (dust suppression, noise reduction measures, low vibration levels), emergency procedures.<\/li>\n<li>Documentation: photo records, approvals, test certificates, and inspections &#8211; careful, traceable, and continuous.<\/li>\n<li>Permits and interfaces: coordination with building services isolation, fire protection measures, and necessary permits for hot works and confined spaces.<\/li>\n<\/ul>\n<p>These steps are generally carried out in accordance with recognized engineering standards and with reference to the relevant codes and guidelines. The statements are general and do not replace a project\u2011specific assessment. Where uncertainties remain, targeted opening-up and non-destructive testing (e.g., GPR, cover meters, pull-off tests) reduce risk before full-scale intervention.<\/p>\n<h2>Selecting suitable methods: cutting, splitting, separating<\/h2>\n<p>Strengthened members respond heterogeneously. Methods are therefore combined to selectively release material bonds:<\/p>\n<ul>\n<li><strong>Concrete pulverizers<\/strong>: For removing cover concrete, controlled breaking of edges, and exposing reinforcement and bonded elements.<\/li>\n<li><strong>Steel shears<\/strong>: For cutting reinforcing bars, steel sections, strapping, and plate strengthening.<\/li>\n<li><strong>Combination shears and multi cutters<\/strong>: When concrete and steel must be processed immediately one after the other or in a single pass.<\/li>\n<li><strong>Concrete splitters<\/strong>: For low-vibration split openings, targeted crack initiation, and detaching partial areas in dense urban settings or near sensitive neighbouring structures.<\/li>\n<li><strong>Hydraulic power packs<\/strong>: Reliably supply the tools; power reserves and hose routing influence cycle time and reach on site.<\/li>\n<li><strong>Cutting torch<\/strong>: In <em>special application<\/em> on strengthened tanks, steel shells, or complex internals, when stiffeners or strengthening shells must be severed.<\/li>\n<\/ul>\n<p>The combination of methods depends on member thickness, reinforcement ratio, type of strengthening, space constraints, emission requirements, and the planned reuse or disposal of materials. Cooling water, spark, and fume management, as well as access for lifting and removal, should be integrated into the method statement from the outset.<\/p>\n<h2>Step-by-step procedure for openings in strengthened members<\/h2>\n<ol>\n<li>Investigation: drawings, locating reinforcement and strengthening elements, marking cut and split lines.<\/li>\n<li>Temporary stabilization: shoring of the affected zone, establishing exclusion areas.<\/li>\n<li>Removal of cover layers: selective removal with <em>concrete pulverizers<\/em>, exposing laminates\/plates and anchors.<\/li>\n<li>Cutting the strengthening: cutting CFRP\/steel strengthening, rebar, and connections with <em>steel shears<\/em> and\/or <em>combination shears<\/em>.<\/li>\n<li>Splitting and releasing: creating the opening with <em>concrete splitters<\/em> along prepared lines; lifting out the segments.<\/li>\n<li>Finishing: edge treatment, corrosion protection on remaining steel, check of residual load\u2011bearing capacity.<\/li>\n<li>Final inspection: visual checks, measurements, documentation.<\/li>\n<\/ol>\n<p>Where necessary, implement dust suppression and temporary coverings to protect adjacent finishes and equipment. Waste is segregated early to streamline recycling and disposal.<\/p>\n<h2>Special systems: CFRP laminates, steel plates, and external prestressing<\/h2>\n<p>CFRP laminates and fabrics provide high tensile strength at low weight. During deconstruction, the bond is critical: before cutting, expose adhesive joints and mechanically release laminates to avoid uncontrolled spalling. Adhesive systems can be sensitive to temperature and moisture; plan removal sequences accordingly and maintain clean, defined release edges.<\/p>\n<p>Steel plate strengthening is more ductile and can be cut well with <em>steel shears<\/em> and <em>multi cutters<\/em>; consider contact corrosion and residual bonding mortar. Prepare supports for any temporary load transfer where plates act as primary tension elements.<\/p>\n<p>External prestressing systems require special care: reduce prestress forces in a controlled manner, secure anchorage points, and relieve the tendon stretch step by step. The sequence is defined and supervised on a project\u2011specific basis. Locking devices, protective shields, and monitored force release minimize hazards from stored energy.<\/p>\n<h2>Reinforcement systems in rock and tunnel construction<\/h2>\n<p>In underground construction, shotcrete, rock bolts, lattice girders, and steel rings stabilize the ground. For modifications or deconstruction, these systems act like a composite body of rock, shotcrete, and steel. <em>Concrete splitters<\/em> are suitable for controlled openings in rock or shotcrete linings, while <em>steel shears<\/em> and <em>combination shears<\/em> cut reinforcement, stirrups, and lattice girders. The sequence minimizes vibration and maintains the stability of the excavation profile. Groundwater conditions, advance support, and monitoring (convergence, bolt load) are incorporated to keep the observational method effective during change works.<\/p>\n<h2>Impact on gutting works and cutting<\/h2>\n<p>In gutting works, strengthening often meets building services, fire protection claddings, and built\u2011ins. Removing jacketing and exposing the load\u2011bearing structure with <em>concrete pulverizers<\/em> provides visibility of relevant details. Under tight space constraints and in sensitive surroundings, <em>concrete splitters<\/em> are advantageous due to low vibration. <em>Multi cutters<\/em> help separate mixed layers of concrete, mortar, metal sections, or strapping before components are segmented for manageable logistics. Prior isolation of services, fire watch during hot works, and surface protection reduce interface risks and rework.<\/p>\n<h2>Safety, emissions, and environmental protection<\/h2>\n<p>Safety takes priority. Regulated procedures, certified tools, and clear responsibilities are essential. Particular risks include stored energy in prestressed systems, spring-back of laminates, swinging segments, and concealed anchors. Emission control includes dust suppression, noise reduction measures, and limiting vibration. Material\u2011separated dismantling facilitates recycling: <strong>concrete pulverizers<\/strong> and <strong>steel shears<\/strong> support clean separation of concrete and steel, improving recovery as recycled concrete and scrap. Compliance with limit values for respirable crystalline silica, proper water management, and controlled handling of residue from bonded systems complete the protection concept.<\/p>\n<h2>Quality assurance and performance control<\/h2>\n<p>Work quality is ensured through visual and dimensional checks, substrate strength tests, pull\u2011off tests for bonded systems, and monitoring of shoring in intermediate states. For remaining strengthening measures, follow\u2011up inspections for cracking, bond, and corrosion protection are advisable. All findings are continuously documented; deviations lead to adjusted measures. Defined hold points, checklists, and photographic evidence create traceability and support acceptance by site supervision.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ul>\n<li>Incomplete investigation: concealed strengthening elements remain undetected; countermeasure: systematic locating and exposure.<\/li>\n<li>Incorrect sequence: premature cutting of load\u2011bearing elements; countermeasure: structurally verified sequences, temporary shoring.<\/li>\n<li>Insufficient substrate preparation when releasing bonded systems: spalling; countermeasure: defined cut and release lines, stepwise removal with <em>concrete pulverizers<\/em>.<\/li>\n<li>Unplanned release of prestress forces: countermeasure: controlled stress relief, securing of anchorage points.<\/li>\n<li>Poor separation of material streams: countermeasure: early segregation with <em>steel shears<\/em> and <em>concrete splitters<\/em>.<\/li>\n<li>Insufficient coordination at interfaces: countermeasure: integrate building services isolation, fire protection, and logistics into the method statement.<\/li>\n<\/ul>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>Reinforcement systems can extend service lives and conserve resources. During deconstruction, selective dismantling enables reuse of components, high\u2011quality recovery of concrete and steel, and minimization of transports. Low\u2011vibration methods and precise sequencing reduce impacts on neighbouring structures and increase acceptance in urban environments. Pre\u2011demolition audits, material passports, and clear separation on site improve circularity and the overall life\u2011cycle assessment of the measure.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Reinforcement systems are a central topic in structural repair, strengthening, and the safe remodelling of existing load-bearing structures. They are used when the load-bearing capacity, serviceability, or durability of components must be specifically increased &#8211; for example in cases of change of use, damage, seismic requirements, or during partial deconstruction <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20123","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Reinforcement System for Concrete Structures<\/title>\n<meta name=\"description\" content=\"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety &amp; low-vibration demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Reinforcement System for Concrete Structures\" \/>\n<meta property=\"og:description\" content=\"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety &amp; low-vibration demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-15T09:52:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/reinforcement-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/reinforcement-system\",\"name\":\"Reinforcement System for Concrete Structures\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-22T07:46:03+00:00\",\"dateModified\":\"2026-06-15T09:52:03+00:00\",\"description\":\"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety & low-vibration demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/reinforcement-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/reinforcement-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/reinforcement-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Reinforcement system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Reinforcement System for Concrete Structures","description":"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety & low-vibration demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system","og_locale":"en_US","og_type":"article","og_title":"Reinforcement System for Concrete Structures","og_description":"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety & low-vibration demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-15T09:52:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system","url":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system","name":"Reinforcement System for Concrete Structures","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-22T07:46:03+00:00","dateModified":"2026-06-15T09:52:03+00:00","description":"Discover reinforcement systems in structural engineering \u2713 boosting strength, safety & low-vibration demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/reinforcement-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Reinforcement system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20123"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20123\/revisions"}],"predecessor-version":[{"id":28346,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20123\/revisions\/28346"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}