{"id":20115,"date":"2026-01-21T10:59:43","date_gmt":"2026-01-21T09:59:43","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20115"},"modified":"2026-06-13T11:14:07","modified_gmt":"2026-06-13T09:14:07","slug":"grouting-cement","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement","title":{"rendered":"Grouting cement"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Grouting cement, also termed cement grout, is a fine-grained, pumpable cement slurry for injection into cracks, joints, pores, and voids in concrete, masonry, and rock. It provides bonded load transfer, sealing against water, consolidation of loose structures, and void filling. In the application areas of concrete demolition and special deconstruction, strip-out and cutting, rock excavation and tunnel construction, natural stone extraction, as well as in special operations, grouting cement enables controlled, safe, and predictable execution &#8211; often in direct interaction with concrete pulverizers and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from Darda GmbH.<\/p>\n<h2>Definition: What is meant by grouting cement?<\/h2>\n<p>Grouting cement is understood as a water-rich cement suspension (cement slurry) with defined particle fineness that is introduced under pressure via packers into structures or the ground. The goal is to fill capillaries, microcracks, and voids, restore load-bearing action, close water pathways, or stabilize subgrades. Depending on the task, standard or microfine cements are used; superplasticizers, stabilizers, and shrinkage compensators control <em>rheology<\/em>, pumpability, filtration stability, and hardening behavior. Grouting cement differs from reactive resins (epoxy, polyurethane resins) through mineral binding, an alkaline environment, and high temperature resistance, and from expansive mortar through its primary function as an injection suspension. Typical application thresholds include crack widths from about 0.1 to 0.2 mm for microfine systems; particle size distributions are selected so that d95 and filter stability suit the target fissure network.<\/p>\n<h2>Fields of application in deconstruction, rock works, and tunnel construction<\/h2>\n<p>Grouting cement is used in numerous scenarios that are directly linked to Darda GmbH\u2019s workflows and tools. In concrete demolition and special deconstruction, it stabilizes edge zones before concrete pulverizers selectively grip load-bearing components. In rock excavation and tunnel construction, it serves for pre-sealing of water-bearing fissures and consolidation, so that rock and concrete splitters produce controlled split lines. In strip-out and cutting, contact grouting prevents settlements and minimizes vibration input. In natural stone extraction, grouting cement improves block stability along the intended parting joints. In special operations, voids behind claddings, segment joints, or underpinning of foundations are reliably filled. In many settings, pre-injection and contact grouting reduce dust, noise, and secondary damage in subsequent mechanical operations.<\/p>\n<h2>Material properties and mix designs<\/h2>\n<p>The performance of grouting cement results from binder fineness, water-cement ratio, and targeted admixture use. A suitable mix design ensures sufficiently long working time, good injection depth, low water separation, and controlled strength development.<\/p>\n<ul>\n<li><strong>Target performance:<\/strong> penetration into the defined crack width class, limited bleeding and sedimentation, adequate cohesion for overhead work, and predictable setting.<\/li>\n<li><strong>Indicative ranges:<\/strong> water-cement ratios from about 0.5 to 1.2 by mass depending on fineness; bleed typically below 3 to 5 percent for contact grouting; workable times aligned with logistics and section lengths.<\/li>\n<\/ul>\n<h3>Particle fineness and binder selection<\/h3>\n<p>Microfine cements with high specific surface penetrate fine capillaries and tight cracks. Standard-fineness cements are suitable for larger voids, contact grouting, and fillings. Sulfate resistance and heat of hydration are considered on a project-specific basis. For microfine grouts, d95 values often fall below approximately 15 \u00b5m; for standard systems they can be markedly higher, with selection guided by sieve residue and required filtration stability.<\/p>\n<h3>Rheology and filtration stability<\/h3>\n<p>Optimized flow behavior (low viscosity, limited sedimentation) is crucial for long hose runs and tight crack networks. Superplasticizers and stabilizers reduce water demand, limit bleeding, and prevent filter cake formation on joint flanks. Practical control can include mini-slump spread or funnel time in combination with visual stability checks to verify pumpability over the planned delivery duration.<\/p>\n<h3>Water-cement ratio and shrinkage behavior<\/h3>\n<p>An adjusted water-cement ratio controls penetration depth and final strength. Shrinkage-compensating additives minimize the formation of voids and secure intimate contact, especially in contact grouting behind panels or slabs\/footings. Depending on boundary conditions, mild expansive components or shrinkage-reducing admixtures support dimensional stability without inducing harmful restraint stresses.<\/p>\n<h3>Hardening and durability<\/h3>\n<p>Hardening proceeds in a cement-typical manner; temperature and substrate moisture influence hydration. Durability is governed by dense cement matrix, low porosity, and chemical resistance. Exposure to flowing water, sulfates, freeze-thaw with de-icing agents, or elevated temperatures is addressed through binder selection, low permeability, and controlled curing conditions.<\/p>\n<h2>Processing: drilling, packers, mixing, and injection<\/h2>\n<p>The quality of grouting is the result of a coordinated process of drilling-pattern planning, packer selection, mixing technique, and controlled pressure management. Trial sections or mock-ups under site conditions help calibrate injection pressures, staging lengths, and mix variants before full deployment.<\/p>\n<h3>Drilling pattern and hole diameter<\/h3>\n<p>Borehole location and depth are aligned with crack paths, void positions, and member geometry. For subsequent work with concrete pulverizers or rock and concrete splitters, the drilling concept is coordinated so that work steps do not interfere and boreholes &#8211; where sensible &#8211; are reused or deliberately kept separate. Typical diameters range from about 12 to 40 mm; angles and edge distances are chosen to intersect target defects while safeguarding residual capacity.<\/p>\n<h3>Packer and sealing systems<\/h3>\n<p>Mechanical or rubber packers seal the borehole and transmit injection pressure. Selection criteria are borehole diameter, substrate strength, water pressure, and the required injection pressure. Surface packers can be used for shallow, accessible cracks; internally set packers are preferred for deeper or pressurized sections. Pressure ratings and sealing lengths are matched to the intended staging concept.<\/p>\n<h3>Mixing technique and equipment<\/h3>\n<p>Homogeneous suspensions are produced in high-shear or colloidal mixers. Residence times and speeds are chosen so that agglomerates are fully dispersed. Delivery is via injection pumps with pressure monitoring; short residence times in the system prevent premature setting. Water temperature, energy input, and recirculation time are coordinated to maintain a stable rheological window over the injection period.<\/p>\n<h3>Injection pressure, staging, and regrouting<\/h3>\n<p>Pressure must be selected so that pervasive penetration is achieved without uncontrolled crack widening. Sectional grouting with pressure hold and regrouting improves the degree of filling. Visible outflow at adjacent packer points serves as a control criterion. Stage lengths, hold durations, and maximum pressures are predefined; stepped pressurization and volume caps limit the risk of lift or blowouts.<\/p>\n<h3>Documentation<\/h3>\n<p>Delivery quantities, pressures, times, and material batches are recorded continuously. These records support quality assurance and traceability over the course of the project. Digital logs with time-stamped pressure-volume curves improve post-analysis and facilitate acceptance.<\/p>\n<h2>Interaction with concrete pulverizers and rock and concrete splitters<\/h2>\n<p>In complex deconstruction and rock works, the combination of injection and mechanical separation increases execution safety.<\/p>\n<ul>\n<li>Pre-stabilization: Before selective demolition with concrete pulverizers, near-edge cracks and pores are filled with grouting cement to limit spalling and locally secure residual load-bearing capacity.<\/li>\n<li>Water flow in rock: Prior to splitting with rock and concrete splitters, pre-sealing reduces water ingress in fissures and improves controlled crack guidance.<\/li>\n<li>Contact filling: After taking hold of individual component segments, voids are filled in a targeted manner to control load redistribution.<\/li>\n<li>Borehole management: Where statics allow, separate injection boreholes can be planned so that working spaces remain free for subsequent split cylinders.<\/li>\n<li>Process monitoring: Injection logs and visual checks inform the timing of gripping, cutting, and splitting to keep loads and movements within the planned envelope.<\/li>\n<\/ul>\n<h2>Quality assurance and testing<\/h2>\n<p>Practice-oriented tests accompany execution and demonstrate the suitability of the suspension for the intended purpose.<\/p>\n<ul>\n<li>Fresh-state testing: density, spread\/funnel time, tendency to sedimentation, water separation.<\/li>\n<li>Solids content and sieve residue: verification of fineness and filtration stability.<\/li>\n<li>Onset of hardening and final strengths: assessment of time windows and durability.<\/li>\n<li>Injection control: pressure\/volume logs, checks at egress points, if necessary endoscopy at reference boreholes.<\/li>\n<li>Performance criteria: agreed limits for bleeding, sedimentation height, and early strength ensure reproducible results during section changes and regrouting.<\/li>\n<\/ul>\n<h2>Typical scenarios in the fields of application<\/h2>\n<p>The following scenarios illustrate the breadth of using grouting cement in combination with Darda GmbH\u2019s working methods:<\/p>\n<ul>\n<li>Concrete demolition and special deconstruction: crack injection at column heads before lifting individual corbels; contact grouting behind anchor plates.<\/li>\n<li>Strip-out and cutting: undergrouting and contact injection to minimize vibrations at separation cuts; void filling behind facing panels.<\/li>\n<li>Rock excavation and tunnel construction: pre-injection into fissures for sealing prior to mechanical break-out; consolidation of crown zones.<\/li>\n<li>Natural stone extraction: stabilization along planned parting joints, reduction of uncontrolled spalling during subsequent splitting.<\/li>\n<li>Special operations: underpinning, filling of utility crossings and voids in heterogeneous existing structures.<\/li>\n<li>Structural detailing: local base leveling and bearing zone consolidation to enable precise sequencing of gripping, cutting, and lifting.<\/li>\n<\/ul>\n<h2>Distinction: grouting cement, reactive resins, and expansive mortar<\/h2>\n<p>The choice of injection material follows the task. Grouting cement is mineral, capillary-active, and temperature-resistant; it is suitable for large-volume voids, contact injections, and water-bearing areas. Reactive resins are intended for very fine, dry cracks or special sealing tasks requiring high elasticity. Expansive mortar develops controlled volumetric growth for non-explosive demolition and is not understood as an injection suspension. Mechanical methods with concrete pulverizers and rock and concrete splitters remain, in many cases, the most precise and low-emission separation method; grouting cement complements these processes as a securing and sealing material. A clear selection matrix based on substrate, moisture, crack width, and load path avoids misapplication and rework.<\/p>\n<h2>Planning and coordination within the project sequence<\/h2>\n<p>A coordinated sequence of work steps reduces risks and increases efficiency. Injection, drilling, splitting, cutting, and gripping are scheduled so that load paths are maintained, water ingress is minimized, and working spaces remain accessible. The interplay of trades (injection technology, drilling technology, operators of concrete pulverizers and rock and concrete splitters) is defined in advance; changes to the structure caused by grouting (e.g., increase in weight, moisture) are considered in logistics. Interfaces, curing windows, and access management are established in method statements, with contingency measures prepared for deviations.<\/p>\n<h2>Common failure modes and how to avoid them<\/h2>\n<ul>\n<li>Excessive water-cement ratio: leads to bleeding and low final strength &#8211; reduce via superplasticizer and optimization of mix water.<\/li>\n<li>Insufficient mixing: agglomerates clog packers &#8211; increase mixing time and energy, use sieves.<\/li>\n<li>Excessive pressures: uncontrolled crack widening &#8211; raise pressure stepwise and monitor.<\/li>\n<li>Premature setting in lines: minimize residence times, plan flushing and cleaning cycles.<\/li>\n<li>Missing regrouting: incomplete filling degrees &#8211; set up sequencing with pressure hold and repetition.<\/li>\n<li>Unsuitable packers: loss of sealing &#8211; match packers to substrate and borehole.<\/li>\n<li>Cold joints in staged sections: inadequate overlap &#8211; define stage lengths and overlaps, verify outflow indicators.<\/li>\n<li>Washout in flowing water: loss of fines &#8211; adapt mix stability and reduce pressure gradients or install temporary seals.<\/li>\n<\/ul>\n<h2>Occupational safety, environment, and sustainability<\/h2>\n<p>Cement suspensions are alkaline; hand and eye protection is required. Low-dust handling of dry material, closed mixing systems, and suitable extraction improve the working environment. Flushing and residual quantities are collected separately; hardened cement slurry can &#8211; within applicable regulations &#8211; be assigned to mineral construction debris. The mineral nature of grouting cement facilitates material integration into structures; in proximity to groundwater, the mix design is adjusted for potential interactions. Safety data sheets, pH considerations (typically in the range of 12 to 13), and spill containment procedures are incorporated into site-specific risk assessments.<\/p>\n<h2>Normative guidance and documentation<\/h2>\n<p>The selection and application of grouting cement are based on the relevant technical rules and project requirements. These include general product standards for cement, codes for repair and injection, and project-specific requirements from structural and tunnel engineering. Test certificates, factory conformity, and site records are maintained for the project; binding determinations are made in the respective construction contract and the associated specifications. Prequalification trials and documented trial injections provide evidence of suitability under boundary conditions representative of the works.<\/p>\n<h2>Equipment and deployment logistics<\/h2>\n<p>Injection equipment (mixer, storage tank, pump, hoses, packers) is positioned so that routes to drilling points are short and the work with hydraulically driven tools &#8211; such as concrete pulverizers and rock and concrete splitters via hydraulic power packs &#8211; is not impeded. Clear cleaning and flushing concepts prevent material residues in lines and reduce downtime. Redundant critical components (e.g., spare packers, seals, hose sections) and defined flushing water management support continuous operation.<\/p>\n<h2>Execution in steps: compact checklist<\/h2>\n<ol>\n<li>Define the objective: sealing, consolidation, contact grouting, or filling.<\/li>\n<li>Set the mix design: binder, water-cement ratio, additives.<\/li>\n<li>Plan the drilling pattern: location, depth, sequence in line with cutting and splitting works.<\/li>\n<li>Select and install packers: check tightness.<\/li>\n<li>Mix: homogeneous, lump-free, document fresh-state tests.<\/li>\n<li>Inject: monitor pressure\/quantity, observe staging and pressure hold.<\/li>\n<li>Control: egress points, regrouting, keep logs.<\/li>\n<li>Follow-up: close voids, fill boreholes, implement cleaning and disposal plan.<\/li>\n<li>Evaluate: review pressure-volume logs, verify acceptance criteria, and archive QA documentation.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Grouting cement, also termed cement grout, is a fine-grained, pumpable cement slurry for injection into cracks, joints, pores, and voids in concrete, masonry, and rock. It provides bonded load transfer, sealing against water, consolidation of loose structures, and void filling. In the application areas of concrete demolition and special deconstruction, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20115","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Grouting Cement for Injection in Concrete &amp; Rock<\/title>\n<meta name=\"description\" content=\"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization &amp; void filling in concrete, masonry &amp; rock.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Grouting Cement for Injection in Concrete &amp; Rock\" \/>\n<meta property=\"og:description\" content=\"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization &amp; void filling in concrete, masonry &amp; rock.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-13T09:14:07+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/grouting-cement\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/grouting-cement\",\"name\":\"Grouting Cement for Injection in Concrete & Rock\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-21T09:59:43+00:00\",\"dateModified\":\"2026-06-13T09:14:07+00:00\",\"description\":\"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization & void filling in concrete, masonry & rock.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/grouting-cement#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/grouting-cement\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/grouting-cement#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Grouting cement\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Grouting Cement for Injection in Concrete & Rock","description":"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization & void filling in concrete, masonry & rock.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement","og_locale":"en_US","og_type":"article","og_title":"Grouting Cement for Injection in Concrete & Rock","og_description":"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization & void filling in concrete, masonry & rock.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-13T09:14:07+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement","url":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement","name":"Grouting Cement for Injection in Concrete & Rock","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-21T09:59:43+00:00","dateModified":"2026-06-13T09:14:07+00:00","description":"Learn \u2713 how grouting cement injection slurry enables sealing, stabilization & void filling in concrete, masonry & rock.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/grouting-cement"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/grouting-cement#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Grouting cement"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20115"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20115\/revisions"}],"predecessor-version":[{"id":28310,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20115\/revisions\/28310"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}