{"id":20109,"date":"2026-01-20T10:08:17","date_gmt":"2026-01-20T09:08:17","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20109"},"modified":"2026-06-13T14:08:07","modified_gmt":"2026-06-13T12:08:07","slug":"interlock","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/interlock","title":{"rendered":"Interlock"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p><strong>Interlock<\/strong> describes the mechanical meshing of components, materials, or surfaces &#8211; intended or unintended. In concrete and rock demolition, in special deconstruction, and in natural stone extraction, interlock significantly influences separation and fracture behavior, load transfer, and jobsite safety. It occurs on the micro scale as the toothing of rough crack faces and aggregates and on the macro scale as the snagging of components, inserts, or tools. For field practice with concrete demolition shears and <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH, understanding interlocks is central to steering fractures, releasing residual connections in a controlled manner, and avoiding hazardous situations. Systematic control of interlock supports method selection, improves risk assessment, and stabilizes process quality across varying site conditions.<\/p>\n<h2>Definition: What is meant by interlock?<\/h2>\n<p>Interlock is understood as the <em>form-fit<\/em> or quasi form-fit meshing of surfaces, contours, or elements that impedes or prevents relative movement. In concrete this is primarily the toothing of aggregates and the roughness of crack flanks, complemented by bond to the reinforcement. In rocks, interlock arises from the roughness and anisotropy of joints. In practical application, interlock also includes components getting set on embedded parts, nets, overlapping reinforcement, or cutting edges snagging in the material. Interlock can be beneficial (e.g., to guide a controlled fracture) or undesirable (e.g., when components hang on residual connections and tear unpredictably). In engineering terms, interlock is distinct from pure friction: it relies on geometry and roughness under normal stress, scales with crack width, and diminishes if surfaces polish or fines fill asperities.<\/p>\n<h2>Mechanical interlock in concrete and rock: causes and mechanisms<\/h2>\n<p>The formation of interlock is based on roughness, edges, protrusions, and fiber or reinforcement contents that strike each other under load or mutually block movement. In concrete, the so-called <strong>aggregate interlock<\/strong> transmits shear forces across cracks until the residual connections are exhausted. Reinforcement ribs and hooks on bars increase bond and generate local resistances that appear as stubborn interlocks during deconstruction. In rock, asperity-bearing joint surfaces mesh; in anisotropic rock (foliation, bedding) directionally stable block assemblages form that yield only when split along favorable planes. Interlock effectiveness depends on confinement and crack opening, exhibits size effects, and reduces with moisture, fines, or repeated cycling that blunt asperities. Dilatancy effects can temporarily raise normal stress and thus apparent resistance during separation.<\/p>\n<h2>Relevance of interlock in concrete demolition and special deconstruction<\/h2>\n<p>In deconstruction processes, interlock governs how quickly, cleanly, and safely components separate. Remaining interlocks cause suspended loads, unpredictable secondary breakage, and elevated noise and vibration levels. The goal is to use interlocks where they favor fracture guidance and to release them where they hinder the method. This is particularly relevant when working with concrete demolition shears and stone and concrete splitters from Darda GmbH in the following application areas: <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a>, strip-out and cutting, rock demolition and tunneling, natural stone extraction, and special operations. Where interlock is managed proactively, cycle times shorten, surface quality improves, and selective dismantling with reduced collateral damage becomes feasible.<\/p>\n<h2>Interlock and concrete shears: gripping, cutting, breaking<\/h2>\n<p>Concrete demolition shears generate, through their kinematics, a combined gripping, crushing, and shearing process. A limited interlock at the cutting edge or tooth contours is desirable so the component does not deflect and the cut initiates in a controlled way. Undesirable, by contrast, is interlock on internal embedded parts, closely spaced reinforcement meshes, or bearing components that impede lifting. Typical situations include snagging on reinforcement overlaps (laps), getting set in hollow-core slabs, or residual interlock on rough fracture surfaces. Edge geometry, correct alignment, and tool maintenance reduce unintended snagging and improve repeatability in tight working envelopes.<\/p>\n<h3>Practice-oriented guidance for using shears<\/h3>\n<ul>\n<li>Control the initial bite: Preferably start at edges or weakened zones to minimize interlock on large-scale aggregate toothing.<\/li>\n<li>Identify residual connections: After the first break, locate reinforcement remnants and separate them specifically with steel shears, combi shears, or Multi Cutters.<\/li>\n<li>Observe cutting direction: Choose a direction counter to the interlock direction to avoid self-reinforcing snagging.<\/li>\n<li>Coordinate load control: When releasing slab or wall panels, prop or secure the component so that released interlocks do not lead to uncontrolled tipping.<\/li>\n<li>Stage the cut: Use short, progressive closures to feel for interlock and avoid sudden releases when crossing bars or inserts.<\/li>\n<li>Monitor feedback: Vibrations, pitch changes, or tool rebound indicate growing interlock and call for an adapted attack angle or interim re-cut.<\/li>\n<\/ul>\n<h2>Interlock and stone and concrete splitters: wedge effect and crack control<\/h2>\n<p>Stone and concrete splitters use a wedge motion to build tensile stresses and initiate a crack in a targeted way. Here, interlock appears as residual toothing between crack flanks, as local bridges across closely spaced aggregates, or as block interlock along joints. Good crack control reduces unwanted interlocks and favors smooth, readable fracture surfaces. Preconditioning by cleaning boreholes, verifying depth, and orienting the wedge set perpendicular to expected interlock directions improves predictability.<\/p>\n<h3>Optimize crack guidance<\/h3>\n<ol>\n<li>Select borehole locations so that known interlock directions (e.g., reinforcement orientations, bedding) are loaded transversely.<\/li>\n<li>For tough aggregate interlock, provide additional initiation points to minimize residual interlocks.<\/li>\n<li>In reinforced components, locate reinforcement and expose it before splitting, or cut it quickly after the break.<\/li>\n<li>Use relief drilling or shallow notches to steer crack initiation and prevent unintended branching under high interlock.<\/li>\n<\/ol>\n<h2>Interlock caused by reinforcement, meshes, and embedded parts<\/h2>\n<p>Reinforcement overlaps, hooks on bars, reinforcement meshes, cable trays, mounting parts, or inserts (e.g., corbels) create macroscopic interlocks. In concrete demolition and strip-out, clean management of these residual connections is crucial. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel Shears<\/a>, combi shears, and Multi Cutters from Darda GmbH cut such elements in a controlled manner to avoid hanging components and accelerate the workflow. Where feasible, prior detection with simple cover measurement or cautious exposure reduces surprises and limits secondary damage.<\/p>\n<h3>Indicators of residual interlocks<\/h3>\n<ul>\n<li>Movement with a tendency to spring back despite visible cracking.<\/li>\n<li>Metallic noises or local vibrations during pulling\/lifting.<\/li>\n<li>Sluggish crack advance with abrupt secondary breaks.<\/li>\n<li>Unexpected rotation around a point that acts as a hidden hinge.<\/li>\n<li>Localized dust plumes or scuff marks at edges that indicate contact and toothing.<\/li>\n<\/ul>\n<h2>Interlock in rock demolition and tunneling<\/h2>\n<p>In rock, the roughness of joint surfaces provides load-bearing toothing. When loosening blocks, interlocks on asperities and bedding edges can hinder extraction or cause sudden release. Targeted placement of split cylinders, exploiting natural anisotropy, and the sequence of releasing adjacent blocks reduce these effects. In tunnel headings or niches, stabilizing adjacent areas is important to avoid undesired interlocks due to load redistribution. Confinement, groundwater, and scale effects can amplify interlock; adapting wedge spacing and release order mitigates snap-through events.<\/p>\n<h2>Interlock in natural stone extraction<\/h2>\n<p>In natural stone extraction, bridging remnants and microscopic interlocks often prevent clean detachment of raw blocks. With coordinated splitting sequences, suitable drilling spacings, and orientation of split lines along directions weak in shear, interlocks can be minimized, surface quality improved, and rework reduced. Consistent tool alignment and seasonal adjustments for temperature-induced brittleness further enhance surface finish and yield.<\/p>\n<h2>Safe workflows when dealing with interlocks<\/h2>\n<p>Safety aspects always take precedence. Interlocks can create hidden load paths and lead to unpredictable movements. Shoring, defined retreat zones, and clear team communication are therefore essential. Notes are to be understood in general terms and do not replace project-specific planning. Exclusion zones, remote operation options, and verified lifting points reduce exposure during the critical release of residual interlocks.<\/p>\n<h3>Organizational and technical measures<\/h3>\n<ul>\n<li>Pre-investigation: Determine component build-up, reinforcement routing, and embedded parts to anticipate interlock locations.<\/li>\n<li>Sequencing: Separate first, then transport &#8211; systematically remove residual connections.<\/li>\n<li>Cut guidance: Make pre-cuts or notches to guide fractures and release interlocks.<\/li>\n<li>Relieve: Define loads and secure components before releasing interlocks.<\/li>\n<li>Tooling strategy: Match shear jaw geometry and splitter sets to material thickness and expected interlock scale.<\/li>\n<li>Monitoring: Assign spotters and use simple markers on potential hinge lines to visualize movement trends.<\/li>\n<li>Contingencies: Prepare backup access and emergency stop procedures for cases of stuck components.<\/li>\n<\/ul>\n<h2>Planning, investigation, and documentation<\/h2>\n<p>Systematic planning reduces interlock risks. This includes documenting component connections, locating reinforcement and embedded parts, and assessing potential interlock directions. In special deconstruction, an iterative approach has proven effective: investigation, trial separation, assessment of interlock, adjustment of the method. For verification, a traceable documentation of the selected sequences and separation points is used. Supplementary 3D scans or annotated photos of crack paths and release points build a knowledge base that improves subsequent cycles and comparable projects.<\/p>\n<h2>Technical measures for releasing interlocks<\/h2>\n<p>Interlocks can be released through a combination of geometry, cut, and force path. In practice with concrete demolition shears and stone and concrete splitters, the following approaches have become established:<\/p>\n<ol>\n<li>Pre-separation of critical areas (e.g., along known overlaps such as rebar lap splices).<\/li>\n<li>Targeted re-cutting of reinforcement with steel shears or combi shears after the concrete break has occurred.<\/li>\n<li>Redirecting the force direction (changing the attack or pull angle) to reduce the interlock effect.<\/li>\n<li>Crack tracking: renewed, metered application of the splitting tool to break residual toothing.<\/li>\n<li>Introduce small counter-notches or shallow relief cuts at expected hinge points to neutralize meshing before the main action.<\/li>\n<li>Use temporary packers or spacers to slightly open the gap and lower normal stress across the interlock prior to the final release.<\/li>\n<\/ol>\n<h2>Terminological distinctions in the context of interlock<\/h2>\n<p>In practical language, interlock, wedging, and jamming are often used interchangeably. Interlock emphasizes the meshing of contours. Wedging describes the wedge effect between elements, typical in splitting processes. Jamming highlights frictional blockage without a clear form-fit geometry. In concrete, toothing and bond are additionally used when the force-transferring interaction of aggregate and reinforcement is meant. These distinctions help select the appropriate solution method. In addition, <em>bond<\/em> combines chemical adhesion and mechanical anchorage, whereas <em>aggregate interlock<\/em> is a geometric shear transfer across cracks.<\/p>\n<h2>Application-oriented examples from the fields of use<\/h2>\n<p>In the concrete demolition of a reinforced wall, a concrete shear can break the concrete cleanly while the reinforcement still holds the separated panel. The interlock then lies in the lap splices of the bars; it is released by a follow-up cut with a steel shear. In rock demolition, the asperity-controlled interlock of two joint surfaces prevents a block from tilting off despite a visible separation plane &#8211; an additional splitting point in the right orientation overcomes the residual toothing. In natural stone extraction, minor residual interlock can impair surface quality; an adapted splitting sequence reduces secondary breakage and improves separation sharpness. In hollow-core slabs, ribs can form unanticipated interlocks; short preliminary bites across rib lines and immediate bar cutting restore a predictable release.<\/p>\n<h2>Quality, efficiency, and sustainability through controlled interlock<\/h2>\n<p>Those who understand and purposefully influence interlock separate components with higher precision, reduce rework, and minimize uncontrolled secondary breaks. This protects adjacent structures, lowers dust and noise, and increases safety. Concrete demolition shears and stone and concrete splitters from Darda GmbH unfold their potential particularly when cutting and splitting strategies account for the interlock mechanisms of concrete and rock. Competent interlock management supports selective dismantling, raises recovery rates for reusable fractions, and contributes to efficient, low-impact workflows.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Interlock describes the mechanical meshing of components, materials, or surfaces &#8211; intended or unintended. In concrete and rock demolition, in special deconstruction, and in natural stone extraction, interlock significantly influences separation and fracture behavior, load transfer, and jobsite safety. It occurs on the micro scale as the toothing of rough <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/interlock\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20109","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Interlock Mechanics in Concrete &amp; Rock Demolition<\/title>\n<meta name=\"description\" content=\"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/interlock\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Interlock Mechanics in Concrete &amp; Rock Demolition\" \/>\n<meta property=\"og:description\" content=\"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/interlock\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-13T12:08:07+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/interlock\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/interlock\",\"name\":\"Interlock Mechanics in Concrete & Rock Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-20T09:08:17+00:00\",\"dateModified\":\"2026-06-13T12:08:07+00:00\",\"description\":\"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/interlock#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/interlock\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/interlock#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Interlock\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Interlock Mechanics in Concrete & Rock Demolition","description":"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/interlock","og_locale":"en_US","og_type":"article","og_title":"Interlock Mechanics in Concrete & Rock Demolition","og_description":"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/interlock","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-13T12:08:07+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/interlock","url":"https:\/\/www.darda.de\/en\/knowledge\/interlock","name":"Interlock Mechanics in Concrete & Rock Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-20T09:08:17+00:00","dateModified":"2026-06-13T12:08:07+00:00","description":"Mechanical interlock explained for concrete and rock demolition \u27a4 steer fractures, cut residual ties, boost safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/interlock#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/interlock"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/interlock#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Interlock"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20109"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20109\/revisions"}],"predecessor-version":[{"id":28324,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20109\/revisions\/28324"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}