{"id":20102,"date":"2026-01-20T14:04:51","date_gmt":"2026-01-20T13:04:51","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20102"},"modified":"2026-06-12T14:12:02","modified_gmt":"2026-06-12T12:12:02","slug":"backfilling-shaft","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft","title":{"rendered":"Backfilling shaft"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A backfilling shaft is a shaft structure that is permanently taken out of service and properly filled with suitable material, or used as a controlled intake point for backfill. The term appears in mining, tunnel and sewer construction, in the deconstruction of industrial facilities, and in municipal infrastructure. In all cases, safe decommissioning or controlled backfilling is paramount-with attention to structural stability, low settlement, tightness, and occupational safety. In addition to risk assessment and a geotechnical model, compliance with applicable codes and local approvals is essential. Preparatory deconstruction work on the shaft head and shaft wall is often part of the scope; for non-explosive methods, <strong>concrete demolition shears<\/strong> as well as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> are particularly suitable.<\/p>\n<h2>Definition: What is meant by a backfilling shaft?<\/h2>\n<p>A backfilling shaft is either a shaft to be filled and decommissioned (e.g., inspection, mining, or service shaft) or a shaft through which backfill material is introduced and distributed in a controlled manner. The goal is the permanent abandonment of the shaft\u00e2\u0080\u0099s function, the creation of a load-bearing, void-free fill body, and-depending on requirements-a sealed shaft closure. The term covers both the construction-technical preparation (e.g., demolition of shaft covers, opening of shaft walls, removal of built-in components) and the actual backfilling method (granular backfilling, <em>flowable backfill material<\/em>, cement or injection backfilling). In practice, the definition also encompasses monitoring and documentation to verify stability and watertightness over the full service life of the closure.<\/p>\n<h2>Objectives and application scenarios<\/h2>\n<p>Backfilling a shaft serves traffic safety, prevents settlement, separates groundwater from surface water, decommissions underground structures that are no longer needed, and prepares for deconstruction. Typical scenarios include shaft backfilling in historic mining, decommissioning of pump and inspection shafts in concrete demolition and special demolition, abandonment of excavation shoring shafts, or creating a shaft closure in tunnel construction. Preparatory work on the shaft structure is often carried out with hydraulic demolition tools and splitting technology; particularly low-vibration methods such as <strong>rock and concrete splitters<\/strong> are established in sensitive environments. Where structures are to be built over, the backfill design targets defined bearing capacity, deformation limits, and long-term durability under environmental exposure.<\/p>\n<h2>Planning and preparation<\/h2>\n<p>Planning starts with a technical survey of geometry, material composition, and surroundings. Utility isolation, boundary structural conditions, groundwater conditions, and adjacent buildings must be clarified, as must access, logistics, and emissions control. In confined conditions, the sequence is often organized in small work packages to ensure material flow and safety. Early coordination with authorities and neighbors reduces disruption, while a digital model of the shaft and subsoil supports clash detection and quantity planning.<\/p>\n<h3>Survey and concept<\/h3>\n<ul>\n<li>Survey and subsoil: shaft depth, cross-section, wall build-up, connection to utility lines, rock or soil interface.<\/li>\n<li>Water and gas management: inflows and outflows, potential gas formation, drainage concept.<\/li>\n<li>Component inspection: cover, bearing-support, built-in parts, reinforcement, inlet openings, shaft heads.<\/li>\n<li>Backfilling strategy: granular layers, <em>flowable backfill material<\/em>, cement or grouting mortar, or mixed variants.<\/li>\n<li>Structural verification: load transfer to surrounding ground, bearing capacity of the closure, settlement prognosis.<\/li>\n<li>Monitoring concept: reference points, settlement markers, and-if needed-endoscopic checks of fill progression.<\/li>\n<\/ul>\n<h3>Permitting and stakeholder coordination<\/h3>\n<ul>\n<li>Clarify permit requirements, environmental constraints, and working time windows.<\/li>\n<li>Coordinate with utility owners, site operations, and emergency services for access and shutdowns.<\/li>\n<li>Define transport routes, staging areas, and washout or cleaning zones for equipment and hoses.<\/li>\n<li>Prepare a communication plan for noise, vibration, and dust management in sensitive neighborhoods.<\/li>\n<\/ul>\n<h3>Occupational safety in focus<\/h3>\n<ul>\n<li>Entry only after clearance measurement and safeguarding; shaft work is classified as work in confined spaces.<\/li>\n<li>Rescue plan, anchorage points, suitable lifting devices, and communication equipment.<\/li>\n<li>Dust, noise, and vibration management, especially in inner-city locations.<\/li>\n<li>Continuous gas detection and ventilation concept; explosion protection measures in potentially explosive atmospheres.<\/li>\n<li>Use of remote-controlled tools where fall or pinch hazards exist; clear exclusion zones and tag-out procedures.<\/li>\n<\/ul>\n<h2>Construction preparatory work on the shaft structure<\/h2>\n<p>Before backfilling, covers, superstructures, and obstructive built-in components must be removed and inlet openings created or sealed. Hydraulic tools that do not require explosives are suitable for controlled opening and careful deconstruction. Edge protection, debris containment, and temporary bracing help maintain stability and prevent uncontrolled material fall into the shaft.<\/p>\n<h3>Use of concrete demolition shears<\/h3>\n<p><strong>Concrete demolition shears<\/strong> target shaft heads, slabs, and concrete walls. They allow edge severing, nibbling off obstructions, and exposing reinforcement with low-vibration performance. In combination with <em>steel shears<\/em>, exposed reinforcement and built-in parts are separated. Defined jaw geometry and controllable closing forces enable selective removal with minimal collateral damage to remaining components.<\/p>\n<h3>Rock and concrete splitters for massive cross-sections<\/h3>\n<p><strong>Rock and concrete splitters<\/strong> as well as rock splitting cylinders generate high splitting forces in the borehole, enabling controlled, crack-free release of thick concrete and natural-stone cross-sections. This is advantageous in areas with sensitive adjacent buildings, on listed surfaces, or in shafts with limited accessibility. Proper borehole pattern, spacing, and sequencing reduce noise, dust, and vibration further.<\/p>\n<h3>Supplementary cutting and separation works<\/h3>\n<ul>\n<li>Combination shears and Multi Cutters separate composite components made of concrete with inserts, pipes, and sections.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a> cut reinforcement, frames, risers, and anchors without sparking in confined areas.<\/li>\n<li>Cutting torches are used in special operations to separate tanks or double-walled steel components in shafts.<\/li>\n<li>Core drilling creates starter holes for splitting cylinders and provides vent or inspection points before and during backfilling.<\/li>\n<\/ul>\n<h2>Methods of shaft backfilling<\/h2>\n<p>The choice of method depends on depth, diameter, material, water conditions, and the required end use (e.g., to be built over). The following methods are common and can be combined. Staged filling with intermediate checks and preload phases improves void closure and settlement control.<\/p>\n<h3>Granular backfilling with compaction<\/h3>\n<ul>\n<li>Material: gravel, sand, crushed stone, or graded mineral mixtures.<\/li>\n<li>Placement: layered placement, compaction with vibrators, rammers, or drop weight.<\/li>\n<li>Advantages: robust, well draining, immediately loadable; suitable under dry conditions.<\/li>\n<li>Limitations: restricted compaction energy in narrow shafts and reduced suitability where continuous water ingress occurs.<\/li>\n<\/ul>\n<h3>Flowable backfill and self-compacting materials<\/h3>\n<ul>\n<li>Material: pumpable, soil- or cement-stabilized mixes with low bulk density and a defined modulus of elasticity.<\/li>\n<li>Placement: pump or gravity placement via the backfilling shaft; self-compacting, low compaction effort.<\/li>\n<li>Advantages: void-free filling, low-vibration process, suitable for complex geometries.<\/li>\n<li>Considerations: control of setting time, heat of hydration, and venting to avoid air trapping.<\/li>\n<\/ul>\n<h3>Cement and grouting backfilling<\/h3>\n<ul>\n<li>Material: cement suspensions, flowable grout, injection materials with defined strength.<\/li>\n<li>Placement: grouting lances, staged fill and vent points for controlled air displacement.<\/li>\n<li>Advantages: dense, low-settlement fill bodies; suitable where water ingress occurs and for shaft closures with a sealing function.<\/li>\n<li>Considerations: pressure staging to prevent uplift, bleed control, and compatibility with groundwater chemistry.<\/li>\n<\/ul>\n<h2>Material selection and technical criteria<\/h2>\n<p>Material selection is based on load-bearing capacity and sealing requirements, subsoil, water flow, and planned overbuild. Important criteria include gradation, bulk density, water-cement ratio, modulus of elasticity, compressive strength, freeze-de-icing-salt resistance, and chemical compatibility. For granular backfilling, the ability to achieve compaction in narrow shafts must be considered; for pumpable materials, flow behavior, venting, shrinkage or expansion behavior, and heat of hydration must be taken into account. Where sealing is critical, permeability and long-term durability under alternating wetting and drying are decisive.<\/p>\n<h3>Sustainability and environmental aspects<\/h3>\n<ul>\n<li>Use of recycled aggregates or excavated material after suitability testing and contamination clearance.<\/li>\n<li>Low-clinker binders or supplementary cementitious materials to reduce embodied carbon while meeting performance targets.<\/li>\n<li>Environmental compatibility: leachate testing and avoidance of materials that could impair groundwater quality.<\/li>\n<li>End-of-life perspective: reversibility is not intended for closures, but documentation should enable future proof of benign behavior.<\/li>\n<\/ul>\n<h2>Equipment selection and hydraulics around the shaft<\/h2>\n<p>Hydraulic tools enable controlled interventions with a small footprint. <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">hydraulic power units<\/a><\/strong> reliably supply <strong>concrete demolition shears<\/strong>, <strong>rock and concrete splitters<\/strong>, combination shears, Multi Cutters, steel shears, and cutting torches with energy. In sensitive environments, low-vibration splitting technology is advantageous to avoid crack formation in adjacent structures. The choice of equipment depends on wall thicknesses, reinforcement density, accessibility, and emission requirements. Hose routing, leak protection, and quick-change interfaces increase productivity and safety in confined spaces.<\/p>\n<h3>Emission control and remote operation<\/h3>\n<ul>\n<li>Preference for electric or low-emission power sources in enclosed or densely built environments.<\/li>\n<li>Integrated dust capture at cutting points and wetting to minimize airborne particles.<\/li>\n<li>Remote operation or extended control stands for work at the shaft edge to reduce fall risk.<\/li>\n<li>Noise-reducing tool selection and sequencing to comply with site-specific thresholds.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Traceable documentation of the backfilling process is essential for verification and future use. This includes material certificates, placement data, compaction records, sampling, and-for flowable materials-records on consistency and density. Settlement measurements at the surface and inspections of shafts with endoscopy or probes help detect voids early and regrout them. Acceptance should be based on defined criteria for density, strength, and sealing performance, with corrective actions planned if thresholds are not met.<\/p>\n<h3>Acceptance criteria and monitoring<\/h3>\n<ul>\n<li>Fresh and hardened material tests: consistency, density, compressive strength, and, where relevant, permeability.<\/li>\n<li>Documentation of fill levels, venting points, and injection pressures for each stage.<\/li>\n<li>Geodetic settlement monitoring at benchmark points over a defined observation period.<\/li>\n<li>Non-destructive checks: thermal imaging or endoscopy to identify segregation or voids, followed by targeted rework.<\/li>\n<\/ul>\n<h2>Typical challenges and solutions<\/h2>\n<ul>\n<li>Water ingress: preliminary or accompanying dewatering, adjustable flow grouts, multi-stage grouting.<\/li>\n<li>Limited accessibility: segmental removal with <strong>concrete demolition shears<\/strong>, borehole splitting technology, compact hydraulic power packs.<\/li>\n<li>High reinforcement ratio: combination of <em>concrete demolition shear<\/em> and steel shear; preliminary separation cuts with Multi Cutters.<\/li>\n<li>Neighboring structures: low-vibration methods (<strong>rock and concrete splitters<\/strong>), low drop heights, noise-reduced work sequences.<\/li>\n<li>Complex geometries: pumpable, self-compacting materials, vent points, controlled fill levels.<\/li>\n<li>Contaminated or gassy atmosphere: gas monitoring, inerting if needed, and encapsulation or disposal of hazardous residues before backfilling.<\/li>\n<li>Buoyancy of lightweight components: ballast or anchoring during filling and staged grouting to prevent uplift.<\/li>\n<\/ul>\n<h2>Procedure for professional shaft backfilling<\/h2>\n<ol>\n<li>Cordon off, perform clearance measurement, and set up safety equipment. Establish exclusion zones and rescue access.<\/li>\n<li>Remove covers, support rings, and built-in parts (e.g., with <strong>concrete demolition shears<\/strong>, steel shears, Multi Cutters). Protect edges and install temporary guards.<\/li>\n<li>Create fill and vent openings; seal unused connections. Verify flow paths and venting effectiveness.<\/li>\n<li>Dewatering and preparation of the subgrade (a blinding layer if applicable). Check bearing condition and cleanliness.<\/li>\n<li>Place the backfill material: in layers or pumpable, with accompanying compaction or venting. Control rates to avoid segregation and lock in air.<\/li>\n<li>Check for voids; regrout if required. Use inspection ports or endoscopy where feasible.<\/li>\n<li>Create the shaft closure (e.g., cover slab, load-bearing cover, or superstructure) according to the planned use. Ensure sealing details and load transfer are documented.<\/li>\n<li>Documentation and final inspection of the surface and adjacent structural elements. Implement settlement monitoring over the agreed observation period.<\/li>\n<\/ol>\n<h2>Backfilling shafts in application areas<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In the deconstruction of industrial facilities and foundations, shafts are decommissioned and backfilled. Non-load-bearing superstructures and upstands can be removed in a controlled manner using <strong>concrete demolition shears<\/strong>, and massive shaft walls opened with <strong>rock and concrete splitters<\/strong>. Backfilling and closure are coordinated with the subsequent surface use, including traffic loads, drainage concept, and potential utility corridors.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In existing buildings, decommissioning service shafts requires low-vibration methods. Combination shears, Multi Cutters, and steel shears separate built-ins, while splitting technology and concrete demolition shears control the concrete structure. Pumpable materials are suitable for long, slender shafts with many built-in components, as they achieve void-free filling at limited access points.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In underground works, backfilling shafts serve to abandon blind shafts or to grout voids. Rock splitting cylinders act directly in the rock to release embedments. Cementitious grouting seals permanently against water and stabilizes the adjacent rock mass, often in staged injection cycles coordinated with monitoring of inflows and convergence.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>In quarries, old hoisting or exploration shafts can be decommissioned. Splitting technology is obvious due to the geology; granular backfill or grouting mortar provides structural stability. Where faces are heritage sensitive, low-vibration opening and careful placement minimize visual and structural impacts.<\/p>\n<h3>Special operations<\/h3>\n<p>For shafts with steel built-ins, tanks, or contaminated components, controlled separation and packaging workflows are crucial. Steel shears and cutting torches enable safe segmentation before backfilling and closure. Additional shielding, fire watch, and fume extraction can be required depending on the material and depth.<\/p>\n<h2>Practice-oriented guidance for selecting the approach<\/h2>\n<ul>\n<li>Depth and diameter: slender, deep shafts favor pumpable, self-compacting materials.<\/li>\n<li>Water flow: with continuous inflow, dense grouted bodies offer advantages; the construction phase may require dewatering.<\/li>\n<li>Surroundings: in vibration-sensitive environments, <strong>rock and concrete splitters<\/strong> and <em>concrete demolition shears<\/em> are the first choice.<\/li>\n<li>Overbuild: for future traffic areas, consider load-bearing capacity, low settlement, and surface build-up.<\/li>\n<li>Permitting and documentation: select methods that provide verifiable records and testing options demanded by authorities and asset owners.<\/li>\n<li>Resource footprint: balance performance with recycled content, low-clinker binders, and minimized transport distances.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A backfilling shaft is a shaft structure that is permanently taken out of service and properly filled with suitable material, or used as a controlled intake point for backfill. The term appears in mining, tunnel and sewer construction, in the deconstruction of industrial facilities, and in municipal infrastructure. In all <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20102","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Backfilling Shaft Guide for Mining &amp; Construction<\/title>\n<meta name=\"description\" content=\"Expert guide to backfilling shaft in mining &amp; civil works \u27a4 safe decommissioning, materials, methods, and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Backfilling Shaft Guide for Mining &amp; Construction\" \/>\n<meta property=\"og:description\" content=\"Expert guide to backfilling shaft in mining &amp; civil works \u27a4 safe decommissioning, materials, methods, and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T12:12:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfilling-shaft\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfilling-shaft\",\"name\":\"Backfilling Shaft Guide for Mining & Construction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-20T13:04:51+00:00\",\"dateModified\":\"2026-06-12T12:12:02+00:00\",\"description\":\"Expert guide to backfilling shaft in mining & civil works \u27a4 safe decommissioning, materials, methods, and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfilling-shaft#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfilling-shaft\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfilling-shaft#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Backfilling shaft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Backfilling Shaft Guide for Mining & Construction","description":"Expert guide to backfilling shaft in mining & civil works \u27a4 safe decommissioning, materials, methods, and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft","og_locale":"en_US","og_type":"article","og_title":"Backfilling Shaft Guide for Mining & Construction","og_description":"Expert guide to backfilling shaft in mining & civil works \u27a4 safe decommissioning, materials, methods, and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-12T12:12:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft","url":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft","name":"Backfilling Shaft Guide for Mining & Construction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-20T13:04:51+00:00","dateModified":"2026-06-12T12:12:02+00:00","description":"Expert guide to backfilling shaft in mining & civil works \u27a4 safe decommissioning, materials, methods, and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/backfilling-shaft#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Backfilling shaft"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20102"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20102\/revisions"}],"predecessor-version":[{"id":28288,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20102\/revisions\/28288"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}