{"id":20100,"date":"2026-01-20T10:44:26","date_gmt":"2026-01-20T09:44:26","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20100"},"modified":"2026-06-12T16:26:02","modified_gmt":"2026-06-12T14:26:02","slug":"backfill-material","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material","title":{"rendered":"Backfill material"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Backfill material is a central element in deconstruction, earthworks and civil engineering: it stabilizes voids, protects structural components, restores load-bearing capacity, and ensures controlled water management. Especially in projects where components are selectively separated with a <em>concrete demolition shear<\/em> or rock is released using <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">low-vibration rock and concrete splitters<\/a>, the appropriate choice of backfill material determines settlement resistance, durability, and the safety of adjacent structures. This article clarifies terms, describes material classes, explains selection criteria, and relates them to the typical application areas of Darda GmbH &#8211; objective, practice-oriented, and without promotional character.<\/p>\n<p>In practice, <strong>backfill<\/strong> is used as an umbrella term for engineered fill placed in voids, trenches, and recesses. Depending on the task, synonyms such as <em>select fill<\/em>, <em>engineered fill<\/em>, or <em>flowable fill<\/em> are used, each with distinct properties regarding compaction, permeability, and re-excavatability.<\/p>\n<h2>Definition: What Is Meant by Backfill Material?<\/h2>\n<p>Backfill material refers to natural, processed, or binder-containing construction materials used to fill, backfill, or seal voids, excavation pits, utility and pipeline trenches, foundation recesses, tunnel and gallery areas, as well as contact and annular spaces. The spectrum ranges from unbound mineral mixtures (e.g., sand, gravel, crushed stone) and recycled construction materials to <em>flowable backfill material<\/em>, lean concrete, foam concrete, and grouts. Functions are diverse: load transfer, side and backfilling, bedding, cavity filling, drainage, frost protection, and temporary or permanent stabilization.<\/p>\n<ul>\n<li><strong>Bedding<\/strong>: uniform support and embedment of components such as pipes or ducts.<\/li>\n<li><strong>Side and backfill<\/strong>: lateral stabilization and load transfer to surrounding soil or structures.<\/li>\n<li><strong>Cover and capping<\/strong>: frost protection, leveling, and surface preparation for subsequent layers.<\/li>\n<\/ul>\n<h2>Types of backfill material and typical applications<\/h2>\n<p>Backfill material can be broadly divided into unbound, bound, and specialized systems. Unbound mixtures are compacted in layers and are universally applicable. Bound variants such as flowable soils or lean concrete are used for complex geometries, restricted accessibility, or increased requirements for interlock and low settlement. Specialized solutions &#8211; such as contact and backfill mortars &#8211; are mainly found in tunnel, gallery, and pipeline construction. <em>Geosynthetics<\/em> can complement these systems as separation, filtration, or reinforcement layers where required by the design.<\/p>\n<h2>Overview of material groups<\/h2>\n<h3>Unbound mineral mixtures<\/h3>\n<p>These include sand, gravel, and crushed stone mixtures with graded particle size distributions (e.g., 0\/x). They compact well, exhibit low settlement when properly installed, and can be permeable or tight depending on the gradation. Typical applications include backfilling excavation pits after selective deconstruction with a concrete demolition shear, side backfilling in pipeline trenches, or profiling work areas in special deconstruction. With appropriate grading, unbound materials can also act as <em>capillary breaks<\/em> and as filter layers, reducing frost effects and mitigating fines migration.<\/p>\n<h3>Recycled construction materials (RC material)<\/h3>\n<p>Recycled mineral construction materials from processed concrete or masonry support the circular economy. Subject to suitable quality and approval, they are suitable for backfilling, leveling, and frost protection. In the context of concrete demolition, carefully separated construction debris can be reused as backfill material. This requires quality-assured processing and compliance with applicable technical standards. Attention must be paid to contaminant content, grain shape, and leaching behavior to ensure durability and environmental compatibility.<\/p>\n<h3>Bound backfill materials<\/h3>\n<ul>\n<li><strong>Flowable backfill material<\/strong> (soil-based, flowable fill): Can be pumped, envelops pipelines with full interlock, is self-compacting and &#8211; depending on the mix &#8211; can be re-excavated. Advantageous in narrow trenches and complex geometries as these occur after selective cutting and strip-out. Setting time and early strength development must be coordinated with the construction schedule.<\/li>\n<li><strong>Lean concrete<\/strong>: For load-bearing, low-settlement backfills where high interlock is required, for example in foundation recesses after using a concrete demolition shear. Joints, shrinkage behavior, and curing conditions are relevant to avoid restraint and cracking.<\/li>\n<li><strong>Foam concrete<\/strong>: Lightweight, thermally insulating, easily pumpable, suitable for cavity filling with low surcharge, e.g., beneath existing floors. The low density limits loads but reduces additional stresses on adjacent structures.<\/li>\n<li><strong>Injection and backfill mortars<\/strong>: For contact and annular space backfilling, void grouting, or planar load redistribution in tunnel and gallery construction. Mix design should control shrinkage and ensure adequate bond without impeding drainage concepts.<\/li>\n<\/ul>\n<h3>Special applications in rock excavation and tunnel construction<\/h3>\n<p>When releasing rock at low vibration levels with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/rock-splitters\">Rock splitters<\/a>, split planes and boreholes are deliberately arranged. Backfill material is used here for temporary securing, controlled water management, and permanent void treatment, for example using drainage material, filter gravel, or grouts. In tunnel headings, contact and annular space backfilling as well as protective and drainage layers are common applications. Where soils of different grain sizes meet, <em>separation layers<\/em> or filter criteria help prevent fines pumping and preserve long-term performance.<\/p>\n<h2>Requirements and key parameters<\/h2>\n<p>The suitability of a backfill material results from the combination of its properties, the subsoil, the load case, and the construction task. Important criteria include:<\/p>\n<ul>\n<li><strong>Particle-size distribution and gradation<\/strong>: Determine compactability, settlement behavior, and permeability.<\/li>\n<li><strong>Compactability<\/strong>: Layer-by-layer installation enables an adequate degree of compaction at reasonable installation energy.<\/li>\n<li><strong>Permeability<\/strong> (drain vs. sealing material): Influences stability, erosion resistance, and frost resistance.<\/li>\n<li><strong>Strength and interlock<\/strong>: Relevant at component connections, in foundation areas, or under point loads.<\/li>\n<li><strong>Chemical compatibility<\/strong>: Important where in contact with steel, concrete, bitumen, plastics, and in sulfate-\/chloride-laden environments.<\/li>\n<li><strong>Frost and weather resistance<\/strong>: For near-surface zones and changing moisture conditions.<\/li>\n<li><strong>Environmental compatibility<\/strong>: The use of recycled material requires quality-assured origin and suitable application.<\/li>\n<li><strong>Workability and setting behavior<\/strong>: For pumpable and bound systems, flowability, segregation resistance, and curing time determine feasibility.<\/li>\n<li><strong>Deformation behavior<\/strong>: Compressibility and stiffness affect serviceability under cyclic and long-term loading.<\/li>\n<\/ul>\n<h3>Typical tests and verification<\/h3>\n<ul>\n<li><strong>Compaction testing<\/strong>: Target density relative to laboratory reference values and moisture near the optimum.<\/li>\n<li><strong>Deformation and bearing capacity<\/strong>: Field measurements of stiffness or deflection to verify load transfer.<\/li>\n<li><strong>Hydraulic behavior<\/strong>: Permeability checks for drainage layers and verification of filter stability where gradients occur.<\/li>\n<li><strong>Environmental checks<\/strong>: Documentation of source material and, where required, leachate or contaminant screening for RC materials.<\/li>\n<\/ul>\n<h2>Planning: Practical selection criteria<\/h2>\n<h3>Context-related factors<\/h3>\n<ul>\n<li><strong>Subsoil and water<\/strong>: Bearing capacity, settlement tendency, groundwater and perched water, drainage concept.<\/li>\n<li><strong>Loading<\/strong>: Traffic loads, building connections, earth pressure, temporary construction states.<\/li>\n<li><strong>Geometry and accessibility<\/strong>: Narrow trenches and small voids favor flowable, pumpable systems.<\/li>\n<li><strong>Deconstruction method<\/strong>: Selective concrete demolition with a concrete demolition shear creates defined edges and interfaces, which influence the choice of gradation and compaction concept. Split lines from hydraulic wedge splitters may require drainage layers.<\/li>\n<li><strong>Sustainability and availability<\/strong>: Share of RC material, transport distances, on-site reuse.<\/li>\n<li><strong>Construction sequence and schedule<\/strong>: Setting times, curing, and re-excavatability must align with follow-on trades and access needs.<\/li>\n<li><strong>Logistics and weather<\/strong>: Delivery capability, storage, moisture sensitivity, and feasible installation windows.<\/li>\n<\/ul>\n<h2>Placement, compaction, and quality assurance<\/h2>\n<ol>\n<li><strong>Preparation<\/strong>: Clean voids, remove loose components, clarify water management, install protective and bedding layers. Provide separation or filter layers where materials with differing gradations interface.<\/li>\n<li><strong>Placement<\/strong>: Install unbound mixtures in layers; adapt layer thicknesses and equipment to the geometry. Convey flowable systems uniformly and fill voids without air entrapment. Avoid segregation by controlling drop heights and flow distances.<\/li>\n<li><strong>Compaction<\/strong>: Mechanical compaction using vibratory plate compactors, rollers, or rammers; flowable backfill material compacts by itself without vibration. Coordinate compaction energy near sensitive structures to prevent damage.<\/li>\n<li><strong>Control<\/strong>: Density or deformation tests, visual inspections, documentation of material origin and installation parameters. Adjust moisture to near-optimum ranges to improve compactability and uniformity.<\/li>\n<li><strong>Curing and opening to service<\/strong>: For bound systems, observe curing requirements before applying loads or closing excavations. Consider temperature effects on early strength.<\/li>\n<li><strong>Surface finish<\/strong>: Produce frost protection and base layers in accordance with the intended use; connect to existing concrete with proper force and interlock.<\/li>\n<\/ol>\n<h3>Particularities in pipeline trenches and component connections<\/h3>\n<p>In utility and pipeline trenches, backfilling includes bedding, side backfilling, and cover. After strip-out and cutting, edges, bearings, and protective layers must be designed so that pipelines are not subjected to point loads. Where connecting to existing concrete &#8211; such as after removal with a concrete demolition shear &#8211; ensure uniform load transfer and adequate interlock. Around pipes, well-graded fine to medium sands often facilitate embedment and reduce the risk of voids; compaction near the springline requires adapted, low-impact equipment.<\/p>\n<h2>Interfaces to demolition and cutting techniques<\/h2>\n<p>Backfill concepts benefit from precise, low vibration levels methods. With selective interventions using a concrete demolition shear, defined connection surfaces for backfills are created; load paths and drainage can be deliberately formed. In rock excavation with hydraulic wedge splitters, crack propagation is controlled; backfill material can be used here for void grouting, filter stabilization, and water drainage. In both cases, the controlled geometry facilitates the choice of gradation and binder content. Tolerances at cut faces, edge protection, and temporary sealing have a direct influence on material selection and installation sequence.<\/p>\n<h2>Sustainability and resource efficiency<\/h2>\n<p>The reuse of processed construction debris as backfill material reduces primary raw materials and transport effort. Prerequisites are clean separation during deconstruction, quality-assured processing, and suitable application. Methods with low vibration levels, such as using a concrete demolition shear or hydraulic wedge splitters, support material separation and thus improve recyclability.<\/p>\n<p>Environmental performance is strengthened by high recycled content, short haul distances, and mixes with optimized binder content. Transparent documentation of origin and declared properties supports assessment across the life cycle and facilitates future re-excavation or reuse.<\/p>\n<h2>Avoiding risks and common mistakes<\/h2>\n<ul>\n<li><strong>Insufficient drainage<\/strong>: Fine-grained materials without a drainage concept can lead to softening, erosion, or frost heave.<\/li>\n<li><strong>Incorrect gradation<\/strong>: Unfavorable particle mixes promote settlement or siltation.<\/li>\n<li><strong>Insufficient compaction<\/strong>: Excessive layer thicknesses or unsuitable equipment increase settlement risk.<\/li>\n<li><strong>Overdosage of binder<\/strong>: Backfills that are too stiff and brittle can induce restraint stresses.<\/li>\n<li><strong>Incompatibilities<\/strong>: Chemical influences (e.g., sulfates, chlorides) and material transitions require coordinated systems.<\/li>\n<li><strong>Water management<\/strong>: Uncontrolled hillside or groundwater can undermine backfills and endanger stability.<\/li>\n<li><strong>Segregation of mixes<\/strong>: Lack of care during placement can separate fine and coarse fractions and impair homogeneity.<\/li>\n<li><strong>Missing separation layers<\/strong>: Without filters or separators, fines migration may clog drainage and reduce performance.<\/li>\n<li><strong>Re-excavation overlooked<\/strong>: Non-re-excavatable fills installed in access zones complicate later interventions.<\/li>\n<\/ul>\n<h2>Practical relevance to the application areas of Darda GmbH<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>After selective deconstruction, excavation pits, wall breakthroughs, and core-drill openings are created. Unbound mixtures or lean concrete restore load-bearing capacity and interlock. Precise cut edges from the use of a concrete demolition shear make it easier to create defined connection and sealing joints; these contexts align with <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> practices. Consistent tolerances at interfaces reduce the need for corrective grouting and allow targeted formation of drainage or sealing zones.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In buildings, accessibility is often limited. Pumpable, self-compacting <em>flowable backfill material<\/em> enables safe cavity filling without heavy compaction equipment &#8211; a benefit in existing buildings after strip-out and cutting. Clean substrates and controlled filling rates improve bonding and minimize the risk of entrapped air or differential settlement.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In controlled rock release with hydraulic wedge splitters, drainage layers, filter gravels, and grouts are common backfilling components. They reduce water pressures, secure voids, and create uniform load redistribution. Staged backfilling and adherence to filter compatibility enhance long-term stability and maintain designed hydraulic paths.<\/p>\n<h3>Natural stone extraction and special applications<\/h3>\n<p>In quarries and special measures, voids are temporarily stabilized or permanently backfilled. Lightweight, pumpable backfills are suitable for hard-to-reach areas, while mineral mixtures offer robust, recoverable solutions. The selected approach depends on the required holding time, accessibility, and the planned sequence of extraction or construction steps.<\/p>\n<h2>Notes on quality assurance<\/h2>\n<p>Careful documentation of material origin, installation parameters, and spot checks supports verification. Test methods for compaction and deformability, visual inspections, and observing water conditions are practical tools. Standards and regional requirements must be observed; the statements in this article are of a general nature and do not replace project-specific planning. Clear acceptance criteria and responsibilities for sampling, testing frequency, and record-keeping ensure traceable execution and consistent performance.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Backfill material is a central element in deconstruction, earthworks and civil engineering: it stabilizes voids, protects structural components, restores load-bearing capacity, and ensures controlled water management. Especially in projects where components are selectively separated with a concrete demolition shear or rock is released using low-vibration rock and concrete splitters, the <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/backfill-material\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20100","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Backfill Material for Construction and Earthworks<\/title>\n<meta name=\"description\" content=\"Discover backfill material for construction &amp; civil engineering \u2713 types, selection, compaction and drainage explained.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/backfill-material\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Backfill Material for Construction and Earthworks\" \/>\n<meta property=\"og:description\" content=\"Discover backfill material for construction &amp; civil engineering \u2713 types, selection, compaction and drainage explained.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/backfill-material\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T14:26:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfill-material\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfill-material\",\"name\":\"Backfill Material for Construction and Earthworks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-20T09:44:26+00:00\",\"dateModified\":\"2026-06-12T14:26:02+00:00\",\"description\":\"Discover backfill material for construction & civil engineering \u2713 types, selection, compaction and drainage explained.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfill-material#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfill-material\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/backfill-material#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Backfill material\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Backfill Material for Construction and Earthworks","description":"Discover backfill material for construction & civil engineering \u2713 types, selection, compaction and drainage explained.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material","og_locale":"en_US","og_type":"article","og_title":"Backfill Material for Construction and Earthworks","og_description":"Discover backfill material for construction & civil engineering \u2713 types, selection, compaction and drainage explained.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-12T14:26:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material","url":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material","name":"Backfill Material for Construction and Earthworks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-20T09:44:26+00:00","dateModified":"2026-06-12T14:26:02+00:00","description":"Discover backfill material for construction & civil engineering \u2713 types, selection, compaction and drainage explained.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/backfill-material"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/backfill-material#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Backfill material"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20100"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20100\/revisions"}],"predecessor-version":[{"id":28294,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20100\/revisions\/28294"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}