{"id":20095,"date":"2026-01-19T14:57:09","date_gmt":"2026-01-19T13:57:09","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20095"},"modified":"2026-06-12T14:12:02","modified_gmt":"2026-06-12T12:12:02","slug":"consolidation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/consolidation","title":{"rendered":"Consolidation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Consolidation describes the increase in strength and stability of a material through physical, chemical, or mechanical processes. In the context of structures, rock, and metals, it decisively influences how controlled demolition, selective separation, and low-vibration splitting are planned and executed. For the application areas of Darda GmbH\u2014from <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a> through rock excavation and tunnel construction to natural stone extraction\u2014understanding consolidation is key to safely and efficiently applying suitable methods with concrete pulverizer, rock wedge splitter, concrete splitter, and other hydraulic tools. Consistent use of terminology and a structured assessment of consolidation enable reproducible planning, verifiable risk control, and efficient tool selection.<\/p>\n<h2>Definition: What is meant by consolidation?<\/h2>\n<p>Consolidation is the <em>permanent increase in load-bearing capacity, dimensional stability, and resistance to mechanical loading<\/em> in a material. It can occur through the hardening of binders (e.g., cement hydration in concrete), through geological consolidation in natural stone and rock (e.g., cementation, recrystallization), or through cold work hardening in metals (e.g., plastic preforming of steel). Consolidation must be distinguished from compaction: while compaction describes the reduction of pore volume under external action, consolidation results in a <strong>microstructural change<\/strong> that increases strength. For practice in deconstruction this means: the higher the consolidation, the more precisely splitting forces, cutting forces, and work sequences must be selected. Time-dependent processes, moisture and temperature conditions, and local heterogeneities can lead to <em>gradients of consolidation<\/em> that must be reflected in the choice of drilling patterns and force introduction.<\/p>\n<h2>Material-dependent mechanisms of consolidation<\/h2>\n<p>The type of consolidation is material-dependent. This has direct effects on the selection and parameterization of rock wedge splitter and concrete splitter, concrete pulverizer, combination shears, Multi Cutters, steel shear, tank cutter, as well as the required hydraulic power pack. In addition, service life, exposure (carbonation, freeze-thaw, chemical attack), and manufacturing history (curing regime, cold forming) influence the resulting hardness profile and crack behavior, which in turn affects tool wear and the achievable cycle time.<\/p>\n<h3>Concrete: Hydration, hardening, and secondary consolidation<\/h3>\n<p>Concrete consolidates primarily through cement hydration: cement paste forms that binds the aggregates and significantly increases compressive strength over days and weeks. Secondary processes such as concrete carbonation lead to localized surface consolidation, while chemical damage (e.g., alkali-silica reaction) can impair microstructural integrity. In demolition practice, highly consolidated, thick concrete with a dense concrete structure requires <em>higher splitting or cutting energies<\/em>. Strategies include pre-splitting with rock wedge splitter and concrete splitter to induce tensile stresses, followed by crushing with a concrete pulverizer along the generated crack lines. Age, curing quality, and moisture content produce near-surface hardening with softer cores in some components; this should be considered in drilling depth, spacing, and the sequence of force introduction to maintain crack control and minimize overbreak.<\/p>\n<h3>Natural stone and rock: Geological consolidation<\/h3>\n<p>In rock and natural stone, consolidation and strength arise from diagenesis and metamorphism (cementation, grain interlock, recrystallization). Structural features such as joints, bedding, and faults determine fracture propagation. Highly consolidated, fine-grained rocks (e.g., granites) require tighter drilling patterns and higher splitting pressures, while layered, jointed rocks can be opened in a targeted manner along existing weakness zones with rock wedge splitter and concrete splitter. For special demolition near tunnel and rock works, low-vibration splitting methods are a proven response to highly consolidated masses in sensitive environments. Weathering zones and altered rims may show reduced consolidation compared to the fresh rock core; mapping these transitions supports reliable wedge orientation and pressure staging.<\/p>\n<h3>Metals: Cold work hardening and increase in hardness<\/h3>\n<p>In steels, plastic pre-deformation leads to cold work hardening: the yield strength rises, ductility decreases. In practice this applies, for example, to cold-formed sheets or sections. More highly consolidated local zones require adapted cutting forces and controlled cutting paths when using steel shear, Multi Cutters, or a tank cutter. Uniform, reproducible cut quality presupposes accounting for hardness differences and selecting the tool accordingly. Heat-affected or previously cut edges can further change hardness locally; anticipating these effects reduces springback, burr formation, and tool wear.<\/p>\n<h2>Assessment and metrics of consolidation on site<\/h2>\n<p>For planning and execution in deconstruction and extraction contexts, reliable indications of the consolidation level are crucial. They can be obtained through visual inspections, simple on-site tests, and\u2014if necessary\u2014more in-depth investigations. Combining rapid indicators with selective sampling provides a balanced ratio of effort and planning certainty.<\/p>\n<ul>\n<li>Compressive strength and splitting tensile strength as key parameters for concrete and rock<\/li>\n<li>Shear strength, modulus of elasticity, and brittleness to predict fracture behavior<\/li>\n<li>Porosity, moisture content, and depth of carbonation as indicators of local consolidation<\/li>\n<li>Rebound hammer, drilling resistance, and ultrasonic pulse velocity as practice-oriented indicators<\/li>\n<li>Hardness and microstructural state in metals (e.g., surface-hardened or cold-worked areas)<\/li>\n<li>Fracture toughness or energy release characteristics for advanced fracture guidance evaluation<\/li>\n<li>Core extraction with laboratory testing where boundary conditions or safety relevance require higher certainty<\/li>\n<\/ul>\n<h3>Practice-oriented testing and implications for process engineering<\/h3>\n<p>Concrete cores, soundings, and test boreholes provide a realistic picture of microstructural homogeneity. From the results, drilling patterns, splitting pressures, cutting sequences, and gripping directions are derived. This makes it possible to determine, for example, whether a concrete pulverizer should first expose reinforcement or whether concrete splitter should perform the initial crack initiation. Small-scale method trials and clearly documented parameter windows (pressure levels, wedge spacing, feed rates) support a controlled ramp-up and enable quick adaptation on site.<\/p>\n<h2>Effects of consolidation on demolition and separation methods<\/h2>\n<p>The degree of consolidation largely dictates whether brittle-fracture-dominated or ductile mechanisms prevail. The goal is fracture guidance that is controlled, material-appropriate, and low in vibration &#8211; especially in sensitive environments. Increasing consolidation typically raises the frequency content and amplitude of transient events during cracking; staged loading and defined relief steps reduce these effects and improve predictability.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>For highly consolidated concretes with a dense concrete structure, a combination is often recommended: <em>pre-splitting<\/em> with rock wedge splitter and concrete splitter for crack initiation, followed by <em>crushing<\/em> with a concrete pulverizer to selectively separate concrete elements. The sequence reduces noise, dust, and secondary damage and facilitates the separation of reinforcement, if necessary with supplemental cutting tools. Where appropriate, line drilling along intended break lines improves crack alignment and limits collateral damage to adjacent components.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In massively consolidated, homogeneous rocks, rock wedge splitter and concrete splitter enable predictable crack propagation along defined drilling patterns. In jointed, anisotropic masses, orienting the splitting wedges to joint systems is essential to follow natural weakness zones and avoid uncontrolled spalling. In underground works, consolidation-aware splitting supports overbreak control and contributes to maintaining clearance profiles with minimal disturbance to surrounding ground.<\/p>\n<h3>Interior demolition and cutting<\/h3>\n<p>In interior demolition, separating consolidated components\u2014such as edge zones of carbonated concrete or cold-worked sheets\u2014requires precise coordination of cutting forces and gripping directions. A concrete pulverizer can relieve compressive zones before steel shear or Multi Cutters separate reinforcing steel or metal components. A tank cutter is used where spark production must be avoided and material consolidation still demands a defined cutting path.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>The extraction of blocks from consolidated natural stone benefits from a <strong>low-vibration splitting technique<\/strong>. The higher the consolidation and grain interlock, the tighter the drilling pattern and the more carefully the splitting parameters must be controlled. The goal is a clean fracture surface along bedding without undesirable microcracks in the saleable block. Consistent parameter staging and attention to bedding or foliation reduce waste and increase the share of marketable blocks.<\/p>\n<h3>Special operations<\/h3>\n<p>In areas with adjacent sensitive use\u2014such as laboratories, hospitals, or protected historic structures\u2014consolidation-adapted, low-vibration methods are required. Rock wedge splitter and concrete splitter as well as a concrete pulverizer allow controlled interventions with minimal vibration transmission, provided the material condition and degree of consolidation are precisely assessed in advance. Where required, temporary vibration and noise monitoring with threshold management supports compliance with site-specific limits.<\/p>\n<h2>Planning: From consolidation level to tool selection<\/h2>\n<p>The methodical derivation of process and tool selection from the consolidation level increases process reliability and efficiency. A clear sequence helps to avoid misloading and unwanted fracture patterns. Embedding feedback from trial steps and continuous monitoring into the workflow creates a robust loop for optimization under changing boundary conditions.<\/p>\n<ol>\n<li>Material analysis: record microstructure, consolidation level, crack systems, reinforcement ratio, and installation situation.<\/li>\n<li>Define the goal: separate, split, crush, expose, cut &#8211; and specify the desired fracture guidance.<\/li>\n<li>Method selection: define splitting, gripping\/crushing, cutting, or a combination thereof.<\/li>\n<li>Design: size the hydraulic power pack, splitting cylinders, jaw geometries, cutting forces, and drilling patterns appropriately, including allowances for scatter.<\/li>\n<li>Set parameters: splitting pressure, feed, gripping and cutting sequence, order of load removal, and intermediate relief steps.<\/li>\n<li>Monitoring: observe crack advance, noise signature, vibrations, and spring-back, and adapt parameters dynamically.<\/li>\n<li>Follow-up: blunt edges, relieve residual stresses, secure components, and separate material for recycling with traceable documentation.<\/li>\n<\/ol>\n<h3>Illustrative assignment by consolidation level<\/h3>\n<ul>\n<li>High-strength, dense concrete: initial opening with rock wedge splitter and concrete splitter, then crushing with a concrete pulverizer; separate reinforcement as needed with steel shear.<\/li>\n<li>Strongly consolidated, homogeneous natural stone: tight drilling pattern, defined splitting direction, stepped pressure increase; fracture guidance along bedding.<\/li>\n<li>Jointed rock with variable consolidation: wedge orientation to joint systems, smaller splitting spans, iterative splitting passes for controlled fracture propagation.<\/li>\n<li>Cold-worked steel components: plan cutting paths, adapt cutting forces and tool selection (e.g., Multi Cutters, steel shear) to local hardness zones; consider spark avoidance for tank cutting.<\/li>\n<\/ul>\n<h2>Technical orientation and guide values (non-binding)<\/h2>\n<p>As a rough, non-binding orientation: with increasing consolidation, required splitting and cutting forces rise, drilling patterns become tighter, and the gripping\/cutting sequence becomes more incremental. For medium concrete strengths, combined approaches (pre-splitting, then crushing) are often appropriate; for very high strengths, a careful sequence with additional intermediate relief steps is recommended. Project- and object-specific assessments always take precedence over blanket guide values. Interdependencies between pressure, wedge size, drilling diameter, and advance rates should be tuned as a coherent parameter set rather than in isolation.<\/p>\n<h2>Safety and risk aspects in the context of consolidation<\/h2>\n<p>Consolidated materials store energy and can fracture in a brittle manner. Relevant risks include uncontrolled spalling, spring-back, and load redistribution. Safety distance, coverings, controlled pressure increases, and stepwise load removal are proven measures. Legal and normative requirements must be observed according to the situation; they do not replace the object-specific hazard analysis. Additional measures such as shielding mats, catch scaffolds, and defined relief cuts enhance energy dissipation and fragment control in critical stages.<\/p>\n<h2>Ecological and economic aspects<\/h2>\n<p>Consolidation-appropriate methods reduce vibrations, noise, and dust, lower energy demand, and increase the recycling rate through cleanly separated fractions. Precise adjustment of splitting and cutting parameters conserves tools, minimizes downtime, and supports resource-efficient working methods &#8211; especially in special demolition and natural stone extraction. Selective separation by guided fracture lines improves material purity and contributes to circular material strategies with reduced disposal volumes.<\/p>\n<h2>Terminology and distinction of terms<\/h2>\n<p>Consolidation (microstructural change with strength increase) differs from compaction (pore reduction without a necessary microstructural change) and from hardening (binder reaction in concrete). This distinction facilitates correct interpretation of test values and the precise assignment of a concrete pulverizer, rock wedge splitter, concrete splitter, and other tools in the respective application. In metals, the term cold work hardening is commonly used as a synonym for consolidation due to plastic deformation; in cementitious systems, hardening designates the chemical setting process rather than the broader consolidating effects of aging.<\/p>\n<h2>Fracture patterns and crack guidance under the influence of consolidation<\/h2>\n<p>With increasing consolidation, brittle-fracture behavior increases: cracks run more linearly and can progress suddenly. For practice, this means selecting the orientation of splitting wedges, the jaw geometry of the concrete pulverizer, and the sequence of load removal so that cracks are guided and edge spalling is minimized. Finely metered, stepwise force introduction improves control of the fracture front. Where consolidation varies within a component, subcritical crack growth and arrest behavior should be leveraged to steer the fracture into predefined corridors with minimal scatter.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Consolidation describes the increase in strength and stability of a material through physical, chemical, or mechanical processes. In the context of structures, rock, and metals, it decisively influences how controlled demolition, selective separation, and low-vibration splitting are planned and executed. For the application areas of Darda GmbH\u2014from concrete demolition and <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/consolidation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20095","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Consolidation for Demolition | Concrete &amp; Rock<\/title>\n<meta name=\"description\" content=\"Understand consolidation in materials science \u2713 strength gain in concrete, rock &amp; metals for demolition &amp; extraction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/consolidation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Consolidation for Demolition | Concrete &amp; Rock\" \/>\n<meta property=\"og:description\" content=\"Understand consolidation in materials science \u2713 strength gain in concrete, rock &amp; metals for demolition &amp; extraction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/consolidation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T12:12:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/consolidation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/consolidation\",\"name\":\"Consolidation for Demolition | Concrete & Rock\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T13:57:09+00:00\",\"dateModified\":\"2026-06-12T12:12:02+00:00\",\"description\":\"Understand consolidation in materials science \u2713 strength gain in concrete, rock & metals for demolition & extraction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/consolidation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/consolidation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/consolidation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Consolidation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Consolidation for Demolition | Concrete & Rock","description":"Understand consolidation in materials science \u2713 strength gain in concrete, rock & metals for demolition & extraction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/consolidation","og_locale":"en_US","og_type":"article","og_title":"Consolidation for Demolition | Concrete & Rock","og_description":"Understand consolidation in materials science \u2713 strength gain in concrete, rock & metals for demolition & extraction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/consolidation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-12T12:12:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/consolidation","url":"https:\/\/www.darda.de\/en\/knowledge\/consolidation","name":"Consolidation for Demolition | Concrete & Rock","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T13:57:09+00:00","dateModified":"2026-06-12T12:12:02+00:00","description":"Understand consolidation in materials science \u2713 strength gain in concrete, rock & metals for demolition & extraction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/consolidation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/consolidation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/consolidation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Consolidation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20095"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20095\/revisions"}],"predecessor-version":[{"id":28287,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20095\/revisions\/28287"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}