{"id":20092,"date":"2026-01-19T12:49:58","date_gmt":"2026-01-19T11:49:58","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20092"},"modified":"2026-06-12T07:22:03","modified_gmt":"2026-06-12T05:22:03","slug":"compactor-roller","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller","title":{"rendered":"Compactor roller"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A compactor roller is a central piece of equipment in earthworks and road construction used to create load-bearing, frost-resistant, and homogeneous layers made of soil, gravel, or asphalt. In the construction sequence, it often stands at the end of a process chain that begins with demolition, cutting, and removal. Especially where areas are rebuilt after concrete demolition, building gutting, or rock excavation, compaction complements the preceding steps performed with <em>concrete demolition shear<\/em> or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH. This turns the deconstruction area into a load-bearing formation level or a layered structure that will permanently support subsequent uses such as traffic routes, foundations, or tunnel inverts. Correctly executed, it mitigates frost heave, improves stiffness uniformity, and establishes a durable platform for subsequent construction phases.<\/p>\n<h2>Definition: What is a compactor roller?<\/h2>\n<p>A compactor roller is a self-propelled or towed machine that increases the packing density of soils, unbound base courses, or asphalt through static load, vibration, or oscillation. The goal is a sufficiently high degree of compaction that ensures load-bearing capacity, deformation stability, and durability. In practice, different designs are encountered, such as tandem rollers (smooth drums, often for asphalt), single drum rollers (with an articulated carrier for earth and gravel layers), pneumatic-tire rollers, trench rollers for confined areas, and padfoot (sheepsfoot) rollers for cohesive soils. Key parameters such as static linear load, vibration frequency, amplitude, and drum width determine suitability for the material and layer thickness. Modern machines often provide dual-frequency and dual-amplitude settings to adapt to thin vs. thick lifts and to site-specific vibration limits.<\/p>\n<h2>Function and types<\/h2>\n<p>Compaction takes place as static load action, as dynamic compaction by vibration (increasing the rearrangement of grain skeletons), or as oscillating shear motion (acting with lower excitation forces on adjacent structures). Smooth drums produce an even surface; padfoot drums penetrate pointwise into cohesive soils. Pneumatic-tire rollers knead asphalt mixes, improving density and texture. Trench rollers work by remote control in utility trenches where turning radii are small and slopes are sensitive. Selecting high vs. low amplitude, and choosing the appropriate frequency range, governs energy input and effective depth of influence while limiting disturbance to neighboring structures.<\/p>\n<h3>Key components and control variables<\/h3>\n<ul>\n<li><strong>Drum<\/strong>: smooth or profiled roller bodies whose diameter and width define the contact area.<\/li>\n<li><strong>Exciter unit<\/strong>: generates vibration or oscillation; frequency and amplitude are matched to the material and layer thickness.<\/li>\n<li><strong>Static linear load<\/strong>: weight per drum width; influences the penetration depth of compaction.<\/li>\n<li><strong>Drive and steering system<\/strong>: from articulated single drum rollers to remote-controlled trench rollers for tight spaces.<\/li>\n<li><strong>Sprinkler and scrapers (asphalt)<\/strong>: water spray and scraper systems prevent mix pickup and help maintain surface finish.<\/li>\n<li><strong>Measurement and documentation<\/strong>: roller-integrated measurement and mapping can log passes, frequency, amplitude, and temperatures for quality assurance.<\/li>\n<li><strong>Operator station and visibility<\/strong>: vibration-damped platforms, clear sightlines, and lighting improve control and safety.<\/li>\n<\/ul>\n<h2>Fields of application and interfaces with deconstruction<\/h2>\n<p>Compactor rollers are used wherever layers are installed, stabilized, or built over. In interaction with deconstruction and material recovery, clear interfaces can be identified:<\/p>\n<h3>After concrete demolition and specialist deconstruction<\/h3>\n<p>Concrete areas are often pre-crushed with <em>concrete demolition shear<\/em> or separated into defined segments with <em>rock and concrete splitter<\/em> from Darda GmbH. After removal and construction waste separation of the concrete debris, recycled construction material (e.g., RC aggregate) is reinstalled and compacted with single drum rollers. This creates load-bearing base courses without or with binder under pavers, asphalt, or industrial surfaces. Where subgrades have been disturbed by demolition traffic, preleveling and an initial proof-rolling step help identify weak spots before final compaction.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>Inside buildings, building gutting and selective deconstruction lead to localized ground interventions: shafts, trenches, foundation zones. Where combination shears, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">high-performance multi cutters<\/a>, or concrete demolition shears separate and remove components, backfilling must then be placed in layers and re-compacted with suitable, often compact compactor rollers or trench rollers to avoid settlement. Clearance to existing foundations and utilities requires reduced amplitude, smaller equipment, and continuous documentation of achieved densities.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>In tunnel and gallery construction, rock wedge splitter and rock and concrete splitter enable low-vibration breakouts. During expansion phases, working platforms, inverts, and backfills are installed in layers and homogenized with rollers (or alternative compaction equipment where space is limited). Oscillation rollers are advantageous in vibration-sensitive areas. This aligns with practices in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>. Interfaces with support elements and waterproofing call for calibrated amplitudes, short sections, and frequent intermediate checks.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>After loosening natural stone, haul roads and setup areas must be constructed to be load-bearing. Compactor rollers compact gravel base layers made of crushed rock. This ensures drivability for heavy haulage. Regular reshaping and surface dressing maintain crossfall and traction under varying weather conditions.<\/p>\n<h3>Special deployment<\/h3>\n<p>In areas with sensitive structures, utilities, or tanks (e.g., when decommissioning installations using tank cutters, steel shear, or combination shears), reduced amplitude, oscillation, or smaller rollers are often used to minimize vibrations. Where thresholds apply, ground vibration monitoring and defined trigger levels provide additional assurance.<\/p>\n<h2>Workflow: From deconstruction to a load-bearing surface<\/h2>\n<ol>\n<li><strong>Pre-investigation<\/strong>: Determine soil type, water content, and bearing capacity requirements; record adjoining vibration-sensitive components. Define target density or stiffness criteria and acceptance methods.<\/li>\n<li><strong>Demolition\/cutting<\/strong>: Segmented deconstruction with concrete demolition shears, rock and concrete splitters, or combination shears from Darda GmbH for controlled material recovery.<\/li>\n<li><strong>Removal and separation<\/strong>: Clean separation of reinforcing steel, concrete, and rock; processing into recycled construction material where applicable. Stockpile management avoids segregation of grain sizes.<\/li>\n<li><strong>Installation<\/strong>: Layered installation of frost protection, base courses, or backfills at defined layer thicknesses. Maintain uniform moisture and avoid contamination with fines or organic material.<\/li>\n<li><strong>Compaction<\/strong>: Selection of suitable compactor rollers (vibration, oscillation, pneumatic tire, padfoot) and setting of frequency\/amplitude; define overlap and rolling pattern strategy. Adjust parameters based on on-site feedback such as deflection, texture, or intelligent compaction readouts.<\/li>\n<li><strong>Control<\/strong>: Tests for degree of compaction (e.g., density determination, Ev2, light falling weight deflectometer) and documentation. Correlate spot tests with roller-integrated logs where available.<\/li>\n<li><strong>Surface finishing<\/strong>: Smoothing, texturing, or edge compaction; for asphalt, adhere to the temperature window. Protect finished layers from traffic until specified curing or cooling is reached.<\/li>\n<\/ol>\n<h2>Soil and material science for compaction<\/h2>\n<p>Optimal compaction depends on gradation and water content. Cohesionless soils (sand, gravel) respond well to vibration; cohesive soils (loam, clay) require padfoot rollers or oscillation and an adjusted moisture content. For unbound base courses made from natural or recycled aggregates, the gradation governs void filling. For asphalt, temperature and mix composition define the limited compaction window. In quality assurance, a reference degree of compaction compared to a laboratory target density is often used. Target values are typically established from standardized laboratory tests (e.g., Proctor) and verified by field density or stiffness methods.<\/p>\n<h3>Layer thickness and number of passes<\/h3>\n<p>Rollable layer thickness correlates with drum width, linear load, and excitation power. Layers that are too thick lead to voids; too many passes can promote aggregate crushing. <em>Uniform overlap<\/em> of rolling lanes reduces density differences. As a rule of thumb, granular layers are compacted in moderate lifts matched to the chosen amplitude and frequency, while cohesive fills benefit from thinner lifts with padfoot drums and moisture conditioning. Always confirm lift thickness and pass count with project specifications and machine guidance.<\/p>\n<h2>Selection criteria and sizing<\/h2>\n<ul>\n<li><strong>Material<\/strong>: soil, RC aggregate, asphalt, cohesive\/cohesionless soils.<\/li>\n<li><strong>Environment<\/strong>: proximity to existing structures, utilities, sensitive installations; observe vibration limits.<\/li>\n<li><strong>Roller type<\/strong>: vibratory rollers for non-cohesive materials, padfoot for cohesive, oscillation in sensitive areas, pneumatic tire for asphalt.<\/li>\n<li><strong>Weight and linear load<\/strong>: sufficient penetration depth without overloading the subgrade.<\/li>\n<li><strong>Frequency\/amplitude<\/strong>: tie to layer thickness and material; high frequencies for thin layers, larger amplitudes for thicker layers.<\/li>\n<li><strong>Maneuverability<\/strong>: turning radius and machine size for gutting works, shafts, and trenches; use trench rollers when access is limited.<\/li>\n<li><strong>Emissions<\/strong>: noise, exhaust, dust; organizational and technical measures for reduction.<\/li>\n<li><strong>Instrumentation<\/strong>: availability of roller-integrated measurement and data export for documentation and continuous improvement.<\/li>\n<li><strong>Transport and logistics<\/strong>: transport width, axle loads, and site access constraints for safe mobilization and sequencing.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>On construction sites, measurement-supported procedures for ongoing compaction control are becoming established. Density and stiffness measurements, bearing capacity indicators, and temperature measurements during asphalt compaction provide evidence of homogeneity. Digital logging of rolling parameters (lanes, passes, frequency, amplitude) improves traceability. Coordination with site management is important, especially if the subsoil was previously affected by deconstruction works with devices from Darda GmbH. Intelligent compaction approaches with geo-referenced pass mapping and roller response indices help target weak zones early and reduce rework.<\/p>\n<h3>Transitions and tie-in areas<\/h3>\n<p>At edges, near shafts, or along structural faces, compactability is limited. Smaller rollers, vibratory plate compactor, or rammer are used there to avoid voids. Transitions must be documented in particular. Attention to edge restraint, gradual build-up of layers, and additional passes at overlaps reduces the risk of post-construction settlement.<\/p>\n<h2>Risks, safety, and operational aspects<\/h2>\n<ul>\n<li><strong>Vibrations<\/strong>: Near buildings or sensitive installations, provide reduced amplitudes, oscillation, or alternative equipment; ground vibration monitoring can be useful.<\/li>\n<li><strong>Slope safety<\/strong>: Risk of tipping at trench edges; observe safety distances and permissible inclinations.<\/li>\n<li><strong>Subgrade damage<\/strong>: Excessive linear loads can affect utilities or cavities; consider probing and as-built information.<\/li>\n<li><strong>Traffic and logistics<\/strong>: Coordinate the rolling train with material deliveries, demolition logistics, and crane movements.<\/li>\n<li><strong>Visibility and separation<\/strong>: Manage blind spots with spotters, barriers, and lighting; implement clear work zones and access routes.<\/li>\n<li><strong>Daily checks<\/strong>: Inspect drums, scrapers, sprinklers, vibration systems, and tire condition; verify emergency stops and safety interlocks.<\/li>\n<\/ul>\n<h2>Environmental and resource aspects<\/h2>\n<p>Proper compaction extends the service life of surfaces and reduces maintenance effort. Using recycled construction material from deconstruction &#8211; recovered with concrete demolition shears or rock and concrete splitters from Darda GmbH &#8211; conserves primary resources. Dust suppression and noise reduction measures, optimized rolling strategies, and appropriate machine sizes mitigate environmental impacts. In sensitive zones, oscillating methods can offer advantages.<\/p>\n<ul>\n<li><strong>Fuel and emissions<\/strong>: Select appropriate machine classes, use eco-modes, and minimize idling.<\/li>\n<li><strong>Noise control<\/strong>: Schedule high-vibration activities within permitted windows and apply acoustic shielding where feasible.<\/li>\n<li><strong>Runoff protection<\/strong>: Manage water from asphalt sprinklers and dust suppression to avoid contamination.<\/li>\n<\/ul>\n<h2>Practical application cases<\/h2>\n<h3>Area rehabilitation after slab deconstruction<\/h3>\n<p>After the segmented deconstruction of a concrete slab using concrete demolition shears and combination shears, the area is re-profiled, a frost protection layer is installed, and compacted with a single drum compactor roller. Finish: base course and, if applicable, asphalt with a tandem roller. Proof-rolling and spot testing confirm readiness for the next trade.<\/p>\n<h3>Trench construction in dense inner cities<\/h3>\n<p>Building gutting, utility trench excavation, layered backfilling. A trench roller with reduced amplitude compacts where vibrations to adjacent existing buildings must be minimized. Supplemental edge compaction with plates or rammers secures tie-ins to existing pavements and structures.<\/p>\n<h3>Tunnel invert and backfill<\/h3>\n<p>After rock breakout with rock wedge splitter, invert layers are installed. Compaction is carried out section by section with compact rollers; at structural tie-ins, plates or rammers are additionally used. Short work cycles with immediate checks maintain uniformity where access is limited.<\/p>\n<h2>Typical failure patterns and how to avoid them<\/h2>\n<ul>\n<li><strong>Insufficient density<\/strong> due to layers that are too thick: reduce layer thickness, adjust amplitude, plan passes.<\/li>\n<li><strong>Aggregate crushing<\/strong> as a result of too many passes or excessive amplitude: reduce parameters, check the mix.<\/li>\n<li><strong>Edge voids<\/strong>: supplement edge compaction with smaller equipment, arrange rolling lanes with overlap.<\/li>\n<li><strong>Settlement<\/strong> due to varying moisture: control water content, pre-dry or moisten as required.<\/li>\n<li><strong>Vibration-induced damage<\/strong>: maintain distance to sensitive components, use oscillation or static compaction.<\/li>\n<li><strong>Asphalt defects<\/strong> from temperature mismatch: avoid rolling mixes that are too cold or over-rolling when too hot to prevent cracking or flushing.<\/li>\n<\/ul>\n<h2>Demarcation from other compaction equipment<\/h2>\n<p>Vibratory plate compactor and rammer are indispensable in edge areas and tight trenches but do not achieve the area performance and homogeneity of a compactor roller. In the construction sequence, the devices complement each other: large, flat areas with rollers; tie-ins and details with handheld tool. After deconstruction with tools from Darda GmbH, this creates a coordinated system of packing density, flatness, and load-bearing capacity. Selecting the right combination by area size and access constraints yields consistent results with efficient resource use.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A compactor roller is a central piece of equipment in earthworks and road construction used to create load-bearing, frost-resistant, and homogeneous layers made of soil, gravel, or asphalt. In the construction sequence, it often stands at the end of a process chain that begins with demolition, cutting, and removal. Especially <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20092","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Compactor Roller for Soil &amp; Asphalt - Types &amp; Uses<\/title>\n<meta name=\"description\" content=\"Guide to compactor roller equipment for soil &amp; asphalt compaction \u27a4 types, uses, settings, and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Compactor Roller for Soil &amp; Asphalt - Types &amp; Uses\" \/>\n<meta property=\"og:description\" content=\"Guide to compactor roller equipment for soil &amp; asphalt compaction \u27a4 types, uses, settings, and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T05:22:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-roller\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-roller\",\"name\":\"Compactor Roller for Soil & Asphalt - Types & Uses\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T11:49:58+00:00\",\"dateModified\":\"2026-06-12T05:22:03+00:00\",\"description\":\"Guide to compactor roller equipment for soil & asphalt compaction \u27a4 types, uses, settings, and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-roller#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-roller\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compactor-roller#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Compactor roller\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Compactor Roller for Soil & Asphalt - Types & Uses","description":"Guide to compactor roller equipment for soil & asphalt compaction \u27a4 types, uses, settings, and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller","og_locale":"en_US","og_type":"article","og_title":"Compactor Roller for Soil & Asphalt - Types & Uses","og_description":"Guide to compactor roller equipment for soil & asphalt compaction \u27a4 types, uses, settings, and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-12T05:22:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller","url":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller","name":"Compactor Roller for Soil & Asphalt - Types & Uses","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T11:49:58+00:00","dateModified":"2026-06-12T05:22:03+00:00","description":"Guide to compactor roller equipment for soil & asphalt compaction \u27a4 types, uses, settings, and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/compactor-roller"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/compactor-roller#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Compactor roller"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20092"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20092\/revisions"}],"predecessor-version":[{"id":28270,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20092\/revisions\/28270"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}