{"id":20091,"date":"2026-01-19T16:07:57","date_gmt":"2026-01-19T15:07:57","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20091"},"modified":"2026-06-12T11:58:03","modified_gmt":"2026-06-12T09:58:03","slug":"compaction-verification","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification","title":{"rendered":"Compaction verification"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Compaction verification confirms that soil, gravel, recycled construction material, or other unbound layers have been placed and compacted to the required quality. It is a central basis for load-bearing capacity, settlement safety, and durability &#8211; whether in concrete demolition, special demolition, rock excavation and tunnel construction, in interior demolition or in natural stone extraction. Especially when materials from deconstruction &#8211; such as crushed concrete or loosened rock &#8211; are reused and installed as backfilling or base course, the <em>traceable<\/em> compaction verification determines technical reliability. This creates the content-related link to tools from Darda GmbH such as concrete demolition shears (e.g., <a href=\"https:\/\/www.darda.de\/en\/product-overview\/combi-shears-hcs8\">Combi-Shears HCS8<\/a>) or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a>: they influence the particle size distribution and particle edge shape of the material and thus its compactability &#8211; without being compaction equipment themselves. As part of performance-based quality assurance, compaction verification contributes to predictable life-cycle behavior and enables auditable documentation for acceptance.<\/p>\n<h2>Definition: What is meant by compaction verification?<\/h2>\n<p>Compaction verification is understood as the documented confirmation that installed material has achieved a required density, stiffness, or load-bearing capacity. Depending on project specifications, the verification is provided through indicators such as the degree of compaction (e.g., relative to Proctor dry density), plate load parameters (e.g., EV<sub>2<\/sub>) or dynamic test values (e.g., measurements with a light drop weight). The verification typically includes the test concept, test scope, measured values, device information, placement conditions, and the associated evaluation. The aim is <strong>reproducible<\/strong> quality assurance that minimizes settlements, ensures load reserves, and avoids subsequent damage such as cracks, edge spalling, or unevenness. Clear traceability from sampling to acceptance, including calibration data and measurement uncertainty, strengthens the evidentiary value.<\/p>\n<h2>Significance of compaction verification in deconstruction and earthworks<\/h2>\n<p>In concrete demolition and special demolition, construction materials are produced that are often reinstalled as recycled construction material. Whether foundation base, work platform, pipeline trench, backfilling of structures, or base course: Without compaction verification, uneven settlements and limited serviceability are likely. Tools from Darda GmbH such as concrete demolition shears and stone and concrete splitters enable selective deconstruction with defined fragments. This favors a suitable gradation and reduces the need for additional processing &#8211; an essential prerequisite for well-compacting mixed aggregates. The same applies in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>: Larger, brittle blocks are selectively released by splitting; the resulting particle shape (angular, rough) promotes interlock and layer stiffness but requires adapted lift thicknesses and compaction energy, which must subsequently be demonstrated by test values. In addition to structural safety, robust verification reduces rework, interfaces with subsequent trades, and overall construction risk.<\/p>\n<h2>Key indicators and test methods in compaction verification<\/h2>\n<p>The suitability and quality of compacted layers are demonstrated using procedures regulated by standards or contractually specified. In practice, the following groups of tests have become established. Acceptance criteria should be defined with regard to function, measurement uncertainty, and material-specific behavior:<\/p>\n<h3>Proctor test and degree of compaction<\/h3>\n<p>The laboratory Proctor test determines the maximum achievable dry density as a function of water content. On site, the achieved dry density is measured and stated as a ratio to the laboratory reference (e.g., 97-103%). This approach is particularly suitable for homogeneous, sufficiently fine-grained materials and blends with a fine matrix. The choice of standard vs. modified Proctor and the specimen preparation must match the expected field compaction energy and aggregate size.<\/p>\n<h3>Plate load test (static)<\/h3>\n<p>Over two loading cycles, the static plate load test provides stiffness parameters (e.g., EV<sub>1<\/sub>, EV<sub>2<\/sub>) and the ratio EV<sub>2<\/sub>\/EV<sub>1<\/sub>. It assesses both the compaction and the load-bearing capacity of the layer system. For base courses made of crushed concrete or natural stone, this method is highly informative. Target value ranges depend on the layer function; correlations to pavement or foundation design should be established in the test plan.<\/p>\n<h3>Dynamic tests with light drop weight<\/h3>\n<p>The light drop weight measures the dynamic deformation modulus of a small test area. It is suitable for close-meshed checks, including in trenches and hard-to-access areas. The values should, as a rule of thumb, be calibrated against plate load results. Seating effects, grain size, and support conditions influence the readings and must be considered in interpretation.<\/p>\n<h3>Density and water content determination<\/h3>\n<p>Sand replacement, core cutter, or alternative density procedures provide the local bulk density. Together with the water content, a comparison to the Proctor optimum is possible. For coarse recycled construction material, adapted procedures should be chosen. Where permitted, in-situ density gauges can support control; for large maximum grain sizes, corrections and representative sampling are decisive.<\/p>\n<h2>Practice-relevant factors influencing compactability<\/h2>\n<p>Whether compaction verification succeeds depends largely on the material properties and the placement process:<\/p>\n<ul>\n<li><strong>Gradation:<\/strong> A well-graded mix (fines to coarse particles) compacts better than a uniform skeleton. Materials produced with concrete demolition shears or stone and concrete splitters deliver angular grains with high interlock; moderate control of the fines content prevents voids and particle breakdown.<\/li>\n<li><strong>Water content:<\/strong> The position relative to the optimum water content is crucial. Too dry leads to insufficient rearrangement; too wet leads to softening and pumping.<\/li>\n<li><strong>Lift thickness:<\/strong> Lifts that are too thick are not adequately compacted in the lower zone. For coarse recycled construction material layers, smaller lift thicknesses are advisable.<\/li>\n<li><strong>Compaction equipment and energy:<\/strong> Compaction rollers, vibratory plate compactors, and rammers should be selected based on the material and lift. High-frequency equipment can promote particle breakdown with angular coarse aggregate; adapted travel speeds and overlaps are important.<\/li>\n<li><strong>Climate and boundary conditions:<\/strong> Temperature, frost\/de-icing salt, rain, and the presence of lateral confinement influence compaction success.<\/li>\n<li><strong>Subgrade and confinement:<\/strong> Weak or wet subgrades and missing edge restraints reduce achievable stiffness; precompaction, drainage, or temporary confinement improve results and repeatability.<\/li>\n<\/ul>\n<h2>Procedure for a robust compaction verification<\/h2>\n<ol>\n<li><strong>Clarify requirements:<\/strong> Define the governing indicators (e.g., degree of compaction, EV<sub>2<\/sub>), test frequency, and permissible tolerances in accordance with the contract and applicable standards.<\/li>\n<li><strong>Material characterization:<\/strong> Determine gradation, fines content, water absorption, and, if applicable, frost and filter criteria. For recycled construction material from concrete or rock, evaluate foreign matter and oversize content.<\/li>\n<li><strong>Set up a trial area:<\/strong> Determine optimal settings using real equipment and lift thicknesses; document test values as reference.<\/li>\n<li><strong>Placement in lifts:<\/strong> Uniform lift thicknesses, defined travel patterns, reproducible passes; control moisture within the permissible range.<\/li>\n<li><strong>Continuous testing:<\/strong> Measure density, EV<sub>2<\/sub>, or dynamic moduli at regular intervals; if deviations occur, implement measures (e.g., recompaction, adjust water content, reduce lift thickness).<\/li>\n<li><strong>Documentation:<\/strong> Record test logs, equipment parameters, weather, placement sequences, delivery notes, and material origin in a traceable manner.<\/li>\n<li><strong>Acceptance and review:<\/strong> Define hold points, evaluate against threshold values with statistical plausibility checks, and archive calibrations and location references for later audits.<\/li>\n<\/ol>\n<h2>Recycled construction materials from concrete and rock: specifics<\/h2>\n<p>When materials from deconstruction and rock excavation are used, specific aspects arise for compaction verification:<\/p>\n<ul>\n<li><strong>Particle shape and interlock:<\/strong> Angular grains from splitting processes exhibit high shear strength but require sufficient fines to fill voids. Excessive fines can increase water sensitivity.<\/li>\n<li><strong>Particle breakdown:<\/strong> Under high compaction energy, coarse particles may fracture. An iterative approach with adapted energy and lift thickness reduces the risk and stabilizes test results.<\/li>\n<li><strong>Water absorption:<\/strong> Porous recycled construction material influences the optimum water content. Moisture checks before placement help prevent systematic shortfalls in the degree of compaction.<\/li>\n<li><strong>Cross-check of test methods:<\/strong> Combinations of density testing and plate load testing are often more robust for coarse recycled layers than density comparison alone.<\/li>\n<li><strong>Oversize management:<\/strong> Limit oversize content or pre-crush single boulders to avoid bridging effects that impair compaction and bias test outcomes.<\/li>\n<\/ul>\n<h2>Interfaces to the application areas of Darda GmbH<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> Selective removal with concrete demolition shears produces usable aggregates for backfilling and base courses, whose compaction must be verified.<\/li>\n<li><strong>Interior demolition and cutting:<\/strong> Local deconstruction in existing buildings requires load-bearing work platforms; the compact construction and the verification of their stiffness are crucial.<\/li>\n<li><strong>Rock excavation and tunnel construction:<\/strong> Backfill and shoulder areas as well as temporary access roads require reliable, documented compaction; aggregates obtained by splitting require adapted lift thicknesses.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Processed natural stone fractions are used as fills; the plate load test provides reliable evidence of load-bearing capacity.<\/li>\n<li><strong>Special operations:<\/strong> In sensitive areas with low-vibration deconstruction, a controlled sequence of removal, placement, compaction, and verification is important to limit settlements.<\/li>\n<\/ul>\n<h2>Common error patterns and practical remedies<\/h2>\n<ul>\n<li>Insufficient test values despite many passes: Lift thickness too large &#8211; reduce lift thickness, adjust moisture.<\/li>\n<li>Scatter in EV<sub>2<\/sub> results: Non-homogeneous mix &#8211; reclassify material or homogenize fines content.<\/li>\n<li>\u201cPumping\u201d under the plate: Installation too wet or lacking lateral confinement &#8211; adhere to the placement window, adjust the construction sequence.<\/li>\n<li>Degree of compaction not achieved with coarse recycled construction material: Shift suitability assessment to the plate load method and review specimen definition.<\/li>\n<li>Settlements along pipeline trenches: Increase compaction at edge zones, consistently maintain lift thicknesses.<\/li>\n<li>Unstable subgrade influences results: Precompaction, drainage improvement, or temporary separation layers enhance uniformity and reduce variability.<\/li>\n<\/ul>\n<h2>Distinction from other verifications<\/h2>\n<p>Compaction verification in the narrow sense confirms density and placement quality. A <em>load-bearing capacity verification<\/em>, on the other hand, assesses the deformation stiffness of the overall system (e.g., via EV<sub>2<\/sub>). In many projects, both perspectives are combined to cover material quality and system behavior. In sensitive areas near existing structures, additional deformation monitoring can be useful &#8211; compaction verification nevertheless remains the cornerstone of quality control.<\/p>\n<h2>Documentation and general legal classification<\/h2>\n<p>The specific design of test procedures, limit values, and frequencies generally arises from the contract and the relevant technical regulations (e.g., DIN\/EN and ZTV regulations). Specifications must be defined on a project-specific basis and may vary depending on the application. Compaction verification does not replace legally binding assessments; it serves as the technical basis for evaluating construction execution. Careful, complete documentation &#8211; including test location layout, devices, calibrations, weather, and georeferenced photos &#8211; significantly increases traceability and supports subsequent audits.<\/p>\n<h2>Practical checklist for the construction site<\/h2>\n<ul>\n<li>Record requirements, test concept, and limit values before starting construction.<\/li>\n<li>Check material from deconstruction (e.g., from shear or splitting processes) for gradation and moisture.<\/li>\n<li>Establish a trial area, optimize equipment settings and lift thickness.<\/li>\n<li>Control placement moisture, consistently maintain layer thicknesses.<\/li>\n<li>Carry out tests at regular intervals (density, EV<sub>2<\/sub>, dynamic procedures) and evaluate results immediately.<\/li>\n<li>In case of deviations, perform root cause analysis, document measures, and arrange for retesting.<\/li>\n<li>Define hold points for intermediate acceptance and ensure device calibrations are current and archived.<\/li>\n<li>Secure location references of test points (e.g., coordinates) and attach photo documentation to test logs.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Compaction verification confirms that soil, gravel, recycled construction material, or other unbound layers have been placed and compacted to the required quality. It is a central basis for load-bearing capacity, settlement safety, and durability &#8211; whether in concrete demolition, special demolition, rock excavation and tunnel construction, in interior demolition or <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20091","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Compaction Verification for Soil &amp; Earthworks<\/title>\n<meta name=\"description\" content=\"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Compaction Verification for Soil &amp; Earthworks\" \/>\n<meta property=\"og:description\" content=\"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-12T09:58:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-verification\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-verification\",\"name\":\"Compaction Verification for Soil & Earthworks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T15:07:57+00:00\",\"dateModified\":\"2026-06-12T09:58:03+00:00\",\"description\":\"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-verification#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-verification\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-verification#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Compaction verification\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Compaction Verification for Soil & Earthworks","description":"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification","og_locale":"en_US","og_type":"article","og_title":"Compaction Verification for Soil & Earthworks","og_description":"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-12T09:58:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification","url":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification","name":"Compaction Verification for Soil & Earthworks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T15:07:57+00:00","dateModified":"2026-06-12T09:58:03+00:00","description":"Ensure earthworks quality with compaction verification \u2713 methods for soil and aggregate testing, density and stiffness.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/compaction-verification"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-verification#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Compaction verification"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20091","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20091"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20091\/revisions"}],"predecessor-version":[{"id":28278,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20091\/revisions\/28278"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20091"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}