{"id":20089,"date":"2026-01-19T10:44:47","date_gmt":"2026-01-19T09:44:47","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20089"},"modified":"2026-06-11T09:02:03","modified_gmt":"2026-06-11T07:02:03","slug":"compaction-equipment","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment","title":{"rendered":"Compaction equipment"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Compaction equipment is a central tool in earthworks and road construction, in utility line installation, as well as in deconstruction and special demolition. It increases the density of soil and bulk materials, reduces voids, and establishes the load-bearing capacity of subgrades. In the context of Darda GmbH, compaction operations are often a downstream step: when concrete structures are removed with <em>concrete demolition shears<\/em> or rock is loosened using <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">Hydraulic Rock and Concrete Splitters<\/a><\/em>, bulk materials and voids are created that must be professionally compacted in layers &#8211; for example, when refilling an excavation pit, in tunnel heading, or during the deconstruction of foundations. Properly executed compaction limits post-settlement, increases stiffness for temporary traffic, and supports durable load transfer for subsequent construction phases.<\/p>\n<h2>Definition: What is meant by compaction equipment?<\/h2>\n<p>Compaction equipment is machinery used to increase the dry bulk density of soils, gravel, recycled construction material (RC), or other granular construction materials. Through dynamic (vibratory), impact-like, or static loading, particles are packed more closely, particle rearrangement is promoted, and load-bearing capacity is increased. Typical application areas are the formation level and base layers, trench backfills, foundation bases, work areas, and traffic surfaces. Compaction equipment operates depending on material characteristics such as grain size distribution, fines content, and water content. Target values include, among others, degree of compaction, stiffness modulus, and uniform freedom from settlements. As a rule of thumb, suitable equipment and the correct lift thickness must be matched to the material\u2019s grading and moisture to reach the specified density uniformly.<\/p>\n<h2>Design and operating principle of compaction equipment<\/h2>\n<p>Most compaction equipment generates a varying contact force with the ground via vibrations or impulses. Core assemblies are the drive (combustion engine or hydraulics), exciter (eccentric shaft or hydraulic breaker principle), mass elements (baseplate\/roller), and guiding and control elements. The combination of <strong>frequency<\/strong> and <strong>amplitude<\/strong> defines the compaction energy and penetration behavior in different materials; contact area and applied static load supplement the effect. With static compaction (e.g., static rollers), the primary effect is dead weight; with dynamic compaction (vibratory plates, trench rollers), the compaction effect results from weighted acceleration. Variable-frequency control and adequate isolation of the carrier can reduce the transmission of disturbing vibrations. In narrow excavation pits, compactor attachments are frequently used, operated on a carrier machine &#8211; a solution favored in Darda GmbH deconstruction projects thanks to the existing hydraulic infrastructure.<\/p>\n<h2>Types and designs of compaction equipment<\/h2>\n<p>Selection depends on soil type, layer thickness, and accessibility. Common designs include:<\/p>\n<ul>\n<li><strong>Vibratory plates<\/strong>: Vibrating plates for sand, gravel, and mixed aggregates, suitable for base layers and paver sub-bases; reversible versions for greater layer thicknesses and increased area output.<\/li>\n<li><strong>Rammers<\/strong>: High dynamic peak for cohesive soils (clay, silt) and narrow trenches; ideal for small-area compaction and detail work at edges or around utilities.<\/li>\n<li><strong>Smooth drum and pneumatic-tire rollers<\/strong>: High area performance for large, flat areas; smooth drum for bound or well-graded layers, pneumatic tires for a kneading effect on mixed aggregates and to close surface pores.<\/li>\n<li><strong>Trench rollers<\/strong>: Padfoot\/drum rollers for cohesive, moist materials in trenches and excavation pits; remote control improves safety in confined zones.<\/li>\n<li><strong>Compactor attachments<\/strong>: Hydraulically operated on excavators\/carriers; predestined for deep, narrow work areas and for zones with drop edges, e.g., after deconstruction with concrete demolition shears. Matching the attachment mass to the carrier improves efficiency and reduces wear.<\/li>\n<\/ul>\n<h2>Compaction in the context of concrete demolition and special demolition<\/h2>\n<p>During deconstruction, foundations, floor slabs, or walls are fragmented with <em>concrete demolition shears<\/em>, <em>hydraulic demolition shears<\/em>, or <em>steel shears<\/em>; massive structural elements can be loosened with low vibration using <em>hydraulic splitters<\/em> and <em>rock wedge splitters<\/em>. The resulting material is separated, processed, and reinstalled as RC bulk material in the excavation pit area or for temporary site roads. Compaction equipment ensures uniform layer stiffness, minimizes settlements, and creates a load-bearing base for equipment movements and subsequent trades. Especially in <strong>special demolition<\/strong> projects with sensitive neighboring structures, vibrations must be limited; carefully choosing frequency\/amplitude, layer thickness, and work sequence supports compliance with vibration limits. Where required by permit, vibration monitoring and precondition surveys of neighboring structures add transparency and reduce risk.<\/p>\n<h2>Material and soil properties: What can be compacted &#8211; and how<\/h2>\n<p>Compaction behavior is determined by grain size distribution, fines content, and water content.<\/p>\n<ul>\n<li><strong>Non-cohesive soils<\/strong> (sand, gravel): Good compactability with vibratory equipment; optimum effect at approximately optimum water content, typical layer thicknesses 15\u201335 cm. Uniform, single-sized gravels may require higher amplitudes or thinner lifts to avoid particle arching.<\/li>\n<li><strong>Cohesive soils<\/strong> (silt, clay): Better compacted with rammers, padfoot or trench rollers; highly sensitive to water content and weather. Over-wet conditions lead to pore pressure buildup &#8211; allow drainage or reduce lift thickness.<\/li>\n<li><strong>Recycled construction material (RC concrete\/RC mixed aggregate)<\/strong>: Pay attention to gradation and particle shape; fines content governs water demand and compaction energy. RC arising from the use of concrete demolition shears is often angular &#8211; the voids require a well-graded mix. Remove deleterious inclusions (wood, gypsum, asphalt chunks) to ensure consistent stiffness and durability.<\/li>\n<\/ul>\n<h2>Quality assurance: Tests and target values<\/h2>\n<p>Professional installation requires traceable testing. Common are laboratory references for optimum water content and maximum dry density, as well as field tests for bearing capacity and degree of compaction. In practice, <em>load tests<\/em> and <em>degree of compaction tests<\/em> are among the methods used. The goal is a defined degree of compaction and adequate stiffness modulus for the intended use. Typical field methods include sand cone density tests, light weight deflectometer measurements, dynamic plate or plate load tests, nuclear density gauge measurements (where permitted), and dynamic probing. Test locations and checkpoints should be sensibly sequenced in the construction process &#8211; especially when sections are backfilled and compacted after deconstruction phases with <strong>hydraulic splitters<\/strong>. Document any moisture adjustments and lift changes alongside test outcomes to keep cause-and-effect transparent.<\/p>\n<h2>Selection criteria for the right compaction equipment<\/h2>\n<ul>\n<li><strong>Soil material<\/strong>: Cohesive vs. non-cohesive, fines content, gradation, sensitivity to moisture and frost.<\/li>\n<li><strong>Layer thickness<\/strong>: Thinner lifts often require higher frequencies; thicker lifts need more amplitude\/mass and sufficient dwell time.<\/li>\n<li><strong>Accessibility<\/strong>: Narrow trenches or under struts favor compactor attachments\/rammers; consider overhead constraints and safe stand-off distances.<\/li>\n<li><strong>Vibration and noise control<\/strong>: Requirements in sensitive environments (hospitals, historic buildings); special applications may require specific parameters or monitoring.<\/li>\n<li><strong>Carrier machine and hydraulics<\/strong>: For compactor attachments, match flow rate, operating pressure, and return conditions with the carrier\u2019s hydraulics; existing <em>hydraulic power packs<\/em> in the project context can influence logistics.<\/li>\n<li><strong>Area performance<\/strong>: Project schedule, number of lifts, weather windows, and the need for interim testing.<\/li>\n<\/ul>\n<h2>Step by step: Compaction of RC material after concrete demolition<\/h2>\n<ol>\n<li><strong>Check material<\/strong>: Assess RC gradation, fines content, and moisture; remove coarse contaminants. Blend oversize with fines if segregation is evident.<\/li>\n<li><strong>Define layer thickness<\/strong>: Install in layers (e.g., 20\u201330 cm) per equipment and material. Reduce lift thickness near edges, under pipelines, and at interfaces.<\/li>\n<li><strong>Adjust water content<\/strong>: Moisten if too dry; allow to air off if too wet. Re-mix locally to distribute moisture evenly.<\/li>\n<li><strong>Travel and vibration plan<\/strong>: Overlapping passes, uniform rearrangement, sufficient number of passes. Avoid abrupt changes in direction that can cause surface shear.<\/li>\n<li><strong>Edges and details<\/strong>: Use appropriate equipment at edges, utility lines, and building interfaces (rammers\/compactor attachments). Provide temporary edging or confinement if required.<\/li>\n<li><strong>Interim testing<\/strong>: Check bearing capacity\/settlement; adjust parameters as needed. Increase passes or modify frequency\/amplitude if target values are not reached.<\/li>\n<li><strong>Documentation<\/strong>: Record lifts, equipment parameters, weather, and measurements. Include locations, material certificates (if any), and corrective actions.<\/li>\n<li><strong>Final proof<\/strong>: Conduct a final surface check or proof-rolling of the finished layer before the next construction step.<\/li>\n<\/ol>\n<h2>Application areas and interfaces with Darda GmbH products<\/h2>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>After removing structural elements with <em>concrete demolition shears<\/em>, <em>hydraulic demolition shears<\/em>, or <em>Multi Cutters<\/em>, compaction equipment is required to stabilize backfill layers, machine standing areas, or access roads. Low-vibration preliminary work (e.g., <em>hydraulic splitters<\/em>) reduces risks to neighboring buildings; compaction vibrations must be controlled accordingly.<\/p>\n<h3>Building gutting and cutting<\/h3>\n<p>Loads are redistributed and openings are created in buildings. During subsequent filling of chases, shafts, or foundation steps, small-format compaction equipment helps; logistics benefit when <em>hydraulic connections<\/em> for <em>concrete demolition shears<\/em> and compactor attachments are available on the same carrier. Short setup times and consistent hydraulic parameters streamline the sequence from cutting to backfilling.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>In rock works, controlled fractures are created using <em>rock wedge splitters<\/em> and <em>hydraulic splitters<\/em>. In tunnel and gallery construction, niches, inverts, and drainage layers are compacted in a targeted manner, often under confined conditions. Compactor attachments on the excavator ensure reachability without personnel in the hazard zone and support precise installation in small cross-sections.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>When loosening blocks and constructing haul roads, compacting gravel and crushed material is central for traffic safety and machine load-bearing capacity. Uniform layer stiffness improves tire life and reduces rutting under repeated loads.<\/p>\n<h3>Special applications<\/h3>\n<p>In vibration-sensitive areas (heritage sites, laboratory zones, near utility lines), compaction parameters are reduced, layer thicknesses minimized, or alternative equipment is chosen. Low-vibration preparatory tools from Darda GmbH facilitate compliance with restrictive limits during subsequent compaction. Where necessary, schedule shorter vibration intervals with pauses to keep cumulative effects low.<\/p>\n<h2>Safety, health protection, and emissions<\/h2>\n<ul>\n<li><strong>Vibrations<\/strong>: Adapt compaction energy to building sensitivity; monitoring can be useful. Respect stand-off distances to excavation supports and existing structures.<\/li>\n<li><strong>Noise and dust<\/strong>: Consider working hours, shielding, dust suppression; moisten RC material if necessary. Use clean travel paths to limit tracking of fines.<\/li>\n<li><strong>Hand-arm vibration<\/strong>: Limit exposure times for handheld equipment; plan ergonomic breaks. Rotate tasks and use low-vibration handles where available.<\/li>\n<li><strong>Work area and fall protection<\/strong>: Maintain safe distances to slopes, shoring, and edges &#8211; relevant after deconstruction with concrete demolition shears and deep excavation pits.<\/li>\n<li><strong>Exhaust and fluids<\/strong>: Observe local emission requirements; use appropriate hydraulic oils and maintain hose integrity to prevent spills.<\/li>\n<\/ul>\n<p>Legal requirements and recognized rules of practice must always be reviewed for the specific project; requirements may vary by location and use.<\/p>\n<h2>Maintenance, operation, and service life factors<\/h2>\n<ul>\n<li><strong>Exciter and bearings<\/strong>: Regular inspection and lubrication; avoid vibration losses. Check for unusual noise or heat as early indicators of wear.<\/li>\n<li><strong>Contact surfaces<\/strong>: Clean baseplates\/drums for uniform energy input. Replace worn pads or edges that cause smearing or surface tearing.<\/li>\n<li><strong>Hydraulics<\/strong>: For compactor attachments, keep flow, pressure, and temperature within allowable ranges; minimize return line pressure. Inspect couplings and filters to maintain stable performance.<\/li>\n<li><strong>Operating strategy<\/strong>: Proper travel speed, overlap, and number of passes extend equipment life and improve quality. Avoid prolonged idling with engaged vibration on a stationary spot.<\/li>\n<\/ul>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li><strong>Layer too thick<\/strong>: Leads to non-uniform compaction; solution: install thinner lifts or select heavier equipment.<\/li>\n<li><strong>Incorrect water content<\/strong>: Too dry or too wet reduces density; solution: adjust moisture.<\/li>\n<li><strong>Unsuitable equipment<\/strong>: Rammers on coarse gravel or pure vibration on plastic clay are ineffective; solution: match equipment to material.<\/li>\n<li><strong>Insufficient edge treatment<\/strong>: Settlements at edges; solution: recompact edges with handheld equipment.<\/li>\n<li><strong>Lack of interim testing<\/strong>: Quality issues remain undetected; solution: staged testing per lift.<\/li>\n<li><strong>Overworking the surface<\/strong>: Excessive passes can cause particle breakdown or segregation; solution: stop when target values are reached and surface response stabilizes.<\/li>\n<\/ul>\n<h2>Hydraulic interfaces and power supply<\/h2>\n<p>In deconstruction projects, carrier machines and <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">existing hydraulic power units<\/a><\/em> for hydraulic tools from Darda GmbH are often available. This infrastructure facilitates the use of compactor attachments that can use the same carrier. Coordinated flow rates, pressure limiting, and a sufficiently sized return line are important. Where specified, use case-drain lines to protect seals and avoid heat buildup. A clean separation of work phases (e.g., breaking with <em>concrete demolition shears<\/em>, loading, subsequent compaction) increases efficiency and occupational safety.<\/p>\n<h2>Practical parameters and key figures<\/h2>\n<p>For planning, the following variables are relevant, among others: <strong>frequency<\/strong> (Hz), <strong>amplitude<\/strong> (mm), <strong>centrifugal force<\/strong> (kN), <strong>surface pressure<\/strong> (kN\/m\u00b2), <strong>layer thickness<\/strong> (cm), <strong>passes<\/strong> (number), and <strong>degree of compaction<\/strong> (relative to a reference density). Clear documentation supports proof of performance to the client and supervision. Recording environmental conditions (temperature, precipitation, wind), any moisture conditioning, and observed vibration levels creates a consistent audit trail and facilitates reproducible quality on subsequent sections.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Compaction equipment is a central tool in earthworks and road construction, in utility line installation, as well as in deconstruction and special demolition. It increases the density of soil and bulk materials, reduces voids, and establishes the load-bearing capacity of subgrades. In the context of Darda GmbH, compaction operations are <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20089","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Compaction Equipment for Soil &amp; Earthworks<\/title>\n<meta name=\"description\" content=\"Essential guide \u2713 to compaction equipment for soil, gravel &amp; recycled materials in earthworks &amp; road building.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Compaction Equipment for Soil &amp; Earthworks\" \/>\n<meta property=\"og:description\" content=\"Essential guide \u2713 to compaction equipment for soil, gravel &amp; recycled materials in earthworks &amp; road building.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T07:02:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-equipment\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-equipment\",\"name\":\"Compaction Equipment for Soil & Earthworks\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T09:44:47+00:00\",\"dateModified\":\"2026-06-11T07:02:03+00:00\",\"description\":\"Essential guide \u2713 to compaction equipment for soil, gravel & recycled materials in earthworks & road building.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-equipment#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-equipment\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/compaction-equipment#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Compaction equipment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Compaction Equipment for Soil & Earthworks","description":"Essential guide \u2713 to compaction equipment for soil, gravel & recycled materials in earthworks & road building.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment","og_locale":"en_US","og_type":"article","og_title":"Compaction Equipment for Soil & Earthworks","og_description":"Essential guide \u2713 to compaction equipment for soil, gravel & recycled materials in earthworks & road building.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-11T07:02:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment","url":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment","name":"Compaction Equipment for Soil & Earthworks","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T09:44:47+00:00","dateModified":"2026-06-11T07:02:03+00:00","description":"Essential guide \u2713 to compaction equipment for soil, gravel & recycled materials in earthworks & road building.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/compaction-equipment#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Compaction equipment"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20089"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20089\/revisions"}],"predecessor-version":[{"id":28245,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20089\/revisions\/28245"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}