{"id":20086,"date":"2026-01-19T14:02:48","date_gmt":"2026-01-19T13:02:48","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20086"},"modified":"2026-06-11T09:25:04","modified_gmt":"2026-06-11T07:25:04","slug":"composite-system","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/composite-system","title":{"rendered":"Composite system"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>In construction, a <strong>composite system<\/strong> is understood as a structure or component in which different materials are connected in such a way that they jointly take loads and achieve specific properties. In planning, execution, and especially in deconstruction, this composite has a direct impact on the choice of method: <em>selective separation<\/em>, the controlled release of adhesive bonds, and the safe separation of components determine tactics, tools, and sequence. Particularly when working with concrete pulverizers, <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a>, as well as supplementary cutting and shearing tools from Darda GmbH, understanding the composite is crucial &#8211; for example, to separate steel and concrete cleanly, achieve controlled crack propagation, and improve recycling fractions. A sound grasp of the composite logic reduces collateral damage, stabilizes schedules, and supports regulatory and environmental compliance.<\/p>\n<h2>Definition: What is meant by a composite system?<\/h2>\n<p>A composite system is the purposeful coupling of two or more materials with different properties (e.g., concrete and steel, masonry and insulation, rock and shotcrete) to achieve <em>composite action<\/em>. This coupling can occur through <strong>adhesion<\/strong>, <strong>mechanical interlock<\/strong> (e.g., ribs, shear connectors, profiles), or <strong>frictional contact<\/strong>. Typical examples include reinforced concrete components, steel-concrete composite beams, composite slabs, bracing with fibre composite material laminates, as well as external thermal insulation composite systems on fa\u00e7ades. In deconstruction, composite action leads to specific requirements for the separation cut, splitting technique, and sequence, because the materials must first be released from each other before they can be separated by type and removed. Early identification and documentation of bonding lines and expected failure planes supports precise method statements and risk control.<\/p>\n<h2>Typical composite systems in construction and deconstruction<\/h2>\n<p>Composite systems occur in many parts of a structure. For the planning of demolition, strip-out, and special deconstruction, it is helpful to know the common types and their separation logic:<\/p>\n<ul>\n<li><strong>Reinforced concrete and prestressed concrete<\/strong>: Concrete with embedded reinforcement; the high compressive strength of the concrete and the tensile capacity of the steel act together. In deconstruction, concrete pulverizers are often used to remove the concrete, and steel shears to cut the reinforcement separately. For prestressed members, controlled stress release and strand cutting sequences are essential.<\/li>\n<li><strong>Steel-concrete composite constructions<\/strong>: Composite beams, composite slabs with shear connectors; particular attention is paid to shear joints and headed studs. Profiled decking and connectors must be exposed in a defined manner to avoid uncontrolled slip.<\/li>\n<li><strong>External thermal insulation composite systems<\/strong>: Multilayer fa\u00e7ade assemblies of insulation, plaster, and fastening elements; separation proceeds layer by layer, often with mechanical removal and controlled segmentation. Adhesive layers and dowels determine the necessary tool engagement and segment size.<\/li>\n<li><strong>Masonry with bonded anchors<\/strong>: Coupled wythes or retrofitted anchored components; anchors and the mortar bond must be deliberately exposed and separated. Local test openings help locate anchors and reduce rework.<\/li>\n<li><strong>Fibre-reinforced composite strengthening<\/strong>: CFRP\/GFRP laminates or fabrics on concrete; the pull-off bond strength of the adhesive layer determines the separation strategy. Edge priming and termination zones often define safe starting points.<\/li>\n<li><strong>Shotcrete, lattice girders, and anchors<\/strong> in tunneling: Composite of rock mass, shotcrete, reinforcement, and anchors; removal in defined panels with controlled crack guidance. Meshes and plates should be cut only after sufficient relief of the surrounding field.<\/li>\n<li><strong>Composite pipes and tanks<\/strong>: Multilayer assemblies of metal and coatings; thermal or mechanical separation with consideration of media and safety zones. Gas testing and inerting procedures influence tool choice and sequencing.<\/li>\n<\/ul>\n<h2>Challenges in separating composite systems<\/h2>\n<p>Composite systems store forces via adhesive bond and mechanical interlock. In deconstruction, these bonds must be released in such a way that uncontrolled load redistribution, spalling, and unintended crack formation are avoided. Different material properties (compressive\/tensile strength, toughness, density), layer thicknesses, and installation positions require coordinated steps. <strong>Concrete pulverizers<\/strong> enable selective breakout of concrete to expose reinforcement. <strong>Rock wedge splitters and concrete splitters<\/strong> generate defined crack lines along the desired separation plane, for example, at wall openings or foundation heads. Combination shears, Multi Cutters, and steel shears complement the separation chain for metal components. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> supply the tools with the necessary power, and pressure and oil-flow control increase process safety.<\/p>\n<ul>\n<li><strong>Key risks<\/strong>: hidden connectors and inserts, residual prestress, brittle-ductile transitions at interfaces. Short, observable work cycles and intermediate inspections reduce these risks.<\/li>\n<\/ul>\n<h2>Method selection: mechanical, hydraulic, thermal<\/h2>\n<p>The choice of method is oriented to the composite type, boundary conditions (vibrations, noise control, dust), and the objective (segment size, recycling quality). In sensitive environments, low-vibration and low-emission methods have advantages. Access, media hazards, and permits for hot works or water use also influence the decision.<\/p>\n<ul>\n<li><strong>Hydraulic splitting<\/strong>: Rock wedge splitters and concrete splitters transfer the separating energy into the component and generate controlled cracks. Suitable for thick cross-sections, massive foundations, and natural stone. Low vibration and minimal flying debris support work in confined or occupied areas.<\/li>\n<li><strong>Hydraulic crushing<\/strong>: Concrete pulverizers break out concrete with low fines and open cracks while exposing reinforcement; comparable <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers for low fines<\/a> can achieve similar results; downstream steel shears cut the rebar. Jaw geometry and closing force should match cover thickness and aggregate hardness.<\/li>\n<li><strong>Cutting and shearing<\/strong>: Multi Cutters, combination shears, and steel shears process sheet metal, profiles, pipelines, and reinforcement &#8211; usually after exposure with concrete pulverizers. Pre-cut relief slots and staged cuts reduce clamping and rebound.<\/li>\n<li><strong>Thermal methods<\/strong>: For tanks and vessels, tank cutters are used where conditions (media, explosion protection) allow; separation is carried out in a structured way with appropriate protective measures. Continuous gas monitoring and spark control are integral parts of the method statement.<\/li>\n<\/ul>\n<h2>Applications in the fields of use<\/h2>\n<h3>Concrete demolition and special deconstruction<\/h3>\n<p>In reinforced concrete, reinforcement density, concrete cover, and composite joints are decisive. A common sequence: pre-separation with rock wedge splitters and concrete splitters, removal with concrete pulverizers in partial areas, exposing the reinforcement, and subsequently cutting it with steel shears. In composite beams, shear connections are deliberately released to separate steel and concrete in a controlled manner. For prestressed members, detensioning is performed only in a defined sequence with temporary shoring and exclusion zones.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>In multilayer assemblies (e.g., interior fit-out, fa\u00e7ades with composite systems) removal proceeds layer by layer. Concrete pulverizers are used to open load-bearing layers; Multi Cutters and combination shears process fixtures, lines, and metals. The sequence minimizes spring-back and prevents residual composites from cracking uncontrollably. Service isolation, material mapping, and clear labeling of fractions improve throughput and recycling quality.<\/p>\n<h3>Rock excavation and tunneling<\/h3>\n<p>The composite of rock mass, shotcrete, meshes, and anchors requires a controlled approach. Rock splitting cylinders set defined cracks in the rock; concrete pulverizers remove shotcrete panels section by section. Where anchors hold the composite, they are deliberately cut after exposure before the next panel is processed. Ventilation, water ingress, and ground response are monitored to adapt panel size and advance rate.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Natural joints and bedding form the composite in the rock. Rock splitting cylinders exploit these weak zones for dimensionally accurate blocks. When releasing backside bonds or consolidations, pull-off bond strength must be checked to adjust the split line and force demand. Feather-wedge orientation is aligned with bedding to limit edge damage and oversize.<\/p>\n<h3>Special operations<\/h3>\n<p>In areas with sensitive media or strict emission control, low-noise and low-vibration methods are preferred. Tank cutters structure cutting sequences on vessels, while Multi Cutters and steel shears separate fixtures and beams. Hydraulic power packs with fine pressure control support safe work in the composite. Zoning, continuous atmosphere checks, and defined tool switching points contribute to process stability.<\/p>\n<h2>Planning and structural analysis: understanding composite action<\/h2>\n<p>Composite constructions transfer forces via shear and adhesion. In deconstruction, these paths must be identified in advance to avoid <em>unintended redistributions<\/em>. Load release, temporary shoring, and step-by-step separation are part of a structure-appropriate strategy. Statements regarding load-bearing capacity and the regulatory framework are always to be understood as general; the specific assessment lies with those responsible in planning and execution. Non-destructive testing (e.g., cover meters, GPR), selective trial openings, and mock-ups validate assumptions and calibrate tool settings.<\/p>\n<h2>Material separation and recycling<\/h2>\n<p>Single-grade separation increases recovery rates. Concrete pulverizers generate aggregate with low oversize and facilitate the separation of reinforcement, which is then cut into transportable lengths with steel shears. For fa\u00e7ade composite systems, layer-by-layer dismantling is recommended to avoid mixing. Early exposure of the composite reduces rework, dust, and costs in processing. Coatings, embedded utilities, and regulated materials are identified in advance to maintain clean fractions and protect downstream crushers and sorters.<\/p>\n<h2>Practical procedure in composite systems<\/h2>\n<ol>\n<li>Existing-condition analysis: drawings, site visits, material samples; identification of composite joints, reinforcement zones, anchors. Include tolerances and unknowns in the method statement.<\/li>\n<li>Risk assessment: residual stresses, media, emissions; definition of protective and safety measures. Establish exclusion zones and monitoring points.<\/li>\n<li>Pre-separation: placing splitting wedges or splitting cylinders to initiate cracks along defined lines. Mark separation planes and support points.<\/li>\n<li>Selective removal: concrete pulverizers for concrete, steel shears\/Multi Cutters for metals; step-by-step release of composite interfaces. Avoid overstressing connectors and interface adhesives.<\/li>\n<li>Segmentation: cutting to lifting and transport sizes; use of combination shears on mixed profiles. Verify lifting points and center of gravity.<\/li>\n<li>Separation and logistics: collect by type, intermediate storage, haulage to recovery. Keep routes short and dust controlled.<\/li>\n<li>Inspection: visual check of separation surfaces, rework residual composites if necessary; documentation. Close with acceptance of the work area before the next sequence.<\/li>\n<\/ol>\n<h2>Technical parameters and selection criteria<\/h2>\n<p>Key parameters for method selection include the <strong>pull-off bond strength<\/strong> of composite layers, <strong>shear capacity<\/strong> at connectors, component thicknesses, degree of reinforcement, material toughness, and accessibility. Environmental requirements (noise, vibrations, dust) influence the decision between splitting, crushing, cutting, and thermal methods. Concrete pulverizers and rock wedge splitters\/concrete splitters show their strengths when controlled crack formation, low side effects, and clean separation surfaces are required. Hydraulic power packs are sized so that pressure, flow rate, and cycle time match the component and the desired segment size. Tool-specific parameters such as jaw opening width, crushing force, wedge travel, and required approach clearances are matched to geometry and reinforcement layout.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Complete documentation supports verification and recycling. Practical measures include photo documentation of separation joints, logs of cutting and splitting sequences, and mass balances of the fractions. For critical composites, simple checks (e.g., tapping, trial slot, local pull-off tests) can help verify assumptions and adjust the sequence. Recorded KPIs (e.g., vibration, noise, dust values) and as-built sketches of released joints increase traceability and facilitate lessons learned.<\/p>\n<h2>Terminology: composite, adhesion, and shear connection<\/h2>\n<p><strong>Composite<\/strong> describes the interaction of the materials. <strong>Adhesion<\/strong> refers to bonding between layers, while <strong>shear connection<\/strong> denotes force transfer transverse to the member axis (e.g., via connectors). For deconstruction it is crucial whether the composite acts predominantly through adhesion, mechanical interlock, or friction &#8211; this determines the approaches for splitting, crushing, and cutting. The term <em>debonding<\/em> is used for the targeted release of adhesive or frictional bonds at the interface.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>In construction, a composite system is understood as a structure or component in which different materials are connected in such a way that they jointly take loads and achieve specific properties. In planning, execution, and especially in deconstruction, this composite has a direct impact on the choice of method: selective <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/composite-system\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20086","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Composite System in Construction &amp; Deconstruction<\/title>\n<meta name=\"description\" content=\"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/composite-system\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Composite System in Construction &amp; Deconstruction\" \/>\n<meta property=\"og:description\" content=\"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/composite-system\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T07:25:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-system\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-system\",\"name\":\"Composite System in Construction & Deconstruction\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T13:02:48+00:00\",\"dateModified\":\"2026-06-11T07:25:04+00:00\",\"description\":\"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-system#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-system\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-system#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Composite system\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Composite System in Construction & Deconstruction","description":"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/composite-system","og_locale":"en_US","og_type":"article","og_title":"Composite System in Construction & Deconstruction","og_description":"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/composite-system","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-11T07:25:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-system","url":"https:\/\/www.darda.de\/en\/knowledge\/composite-system","name":"Composite System in Construction & Deconstruction","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T13:02:48+00:00","dateModified":"2026-06-11T07:25:04+00:00","description":"Engineering guide to composite system in construction and deconstruction \u2713 Methods for safe separation, clean recycling.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-system#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/composite-system"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-system#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Composite system"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20086"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20086\/revisions"}],"predecessor-version":[{"id":28248,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20086\/revisions\/28248"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}