{"id":20085,"date":"2026-01-19T15:17:52","date_gmt":"2026-01-19T14:17:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20085"},"modified":"2026-06-11T16:23:04","modified_gmt":"2026-06-11T14:23:04","slug":"composite-mortar","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar","title":{"rendered":"Composite mortar"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Composite mortar is a central element of modern fastening and deconstruction technology. It enables load\u2011bearing connections between steel and mineral substrates such as concrete, masonry, or natural stone. In the context of products from Darda GmbH &#8211; for example in <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\"><em>concrete demolition and special deconstruction<\/em><\/a>, in <em>gutting and cutting<\/em>, in <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\"><em>rock excavation and tunnel construction<\/em><\/a> as well as in <a href=\"https:\/\/www.darda.de\/en\/applications\/natural-stone-quarrying\"><em>natural stone extraction<\/em><\/a> &#8211; composite mortar is used to reliably set anchors, post-installed reinforcement, and temporary safeguards in the structural element. In this way, work steps with concrete demolition shears or stone and concrete splitters can be specifically prepared, controlled, and secured without uncontrollably weakening the load-bearing capacity of the existing structure. Through precise load transfer and edge-compatible installation, <strong>structural integrity<\/strong> and <strong>process reliability<\/strong> are maintained even under demanding boundary conditions.<\/p>\n<h2>Definition: What is meant by composite mortar?<\/h2>\n<p>Composite mortar refers to reactive resin or cementitious injection systems that bond anchor rods, threaded anchors, or reinforcing bars into a borehole with a frictional connection. The hold results from a combination of adhesion to the borehole wall, encapsulation of the steel, and micro-mechanical interlock of the mortar matrix in the substrate. Typical applications include post-installed fixings, post-installed reinforcement connections, temporary shoring and safeguards in concrete and masonry &#8211; both in uncracked and cracked concrete, depending on system and approval. The term is frequently used synonymously with <em>bonded anchors<\/em> and <em>chemical anchors<\/em>, and also encompasses <em>capsule<\/em> and <em>cartridge<\/em> solutions in addition to bulk injection systems.<\/p>\n<p>Key performance drivers include <strong>substrate quality and moisture state<\/strong>, <strong>hole geometry and roughness<\/strong>, and <strong>mixing quality<\/strong> of the two components. Consistent processing in line with the respective approval is decisive for reproducible results.<\/p>\n<h2>Structure and mode of action of composite mortar<\/h2>\n<p>Composite mortar generally consists of two components that are homogeneously mixed by a mixing nozzle during extrusion: the reactive resin with fillers and a hardener. Alternatively, cementitious, mineral systems are used. After being introduced into the cleaned borehole, the mortar envelops the anchor bar, fills pores and roughness, and cures into a dimensionally stable matrix. The characteristic load-bearing capacity arises from <strong>adhesion<\/strong>, <strong>cohesion<\/strong> (mortar strength), and <strong>mechanical interlock<\/strong> (keying). Load transfer can include tension, transverse tension, shear, and combined actions; design takes into account edge and spacing distances, concrete strength, borehole depth, bar diameter, as well as temperature and moisture.<\/p>\n<ul>\n<li><strong>Adhesion<\/strong>: influenced by surface cleanliness, substrate moisture, drilling method, and resin chemistry.<\/li>\n<li><strong>Cohesion<\/strong>: governed by mortar formulation, cure state, and temperature history.<\/li>\n<li><strong>Mechanical interlock<\/strong>: promoted by borehole roughness, correct hole diameter, and adequate embedment depth.<\/li>\n<\/ul>\n<h2>Typical applications in concrete demolition, special deconstruction, and rock<\/h2>\n<p>Composite mortar is used wherever anchors are intended to safely and controllably transfer loads into mineral substrates &#8211; especially when components are processed with concrete demolition shears or selectively separated with stone and concrete splitters. It proves advantageous in vibration- and noise-sensitive environments, in confined spaces, and when working on existing structures with limited edge distances.<\/p>\n<h3>Post-installed reinforcement connections<\/h3>\n<p>During repurposing or partial deconstruction, reinforcing bars can be post-installed to modify load paths, temporarily stabilize components, or secure cut edges for processing with concrete demolition shears. Design is performed according to the applicable approval and structural model, including verification of anchorage length, bar grade, and bond stresses.<\/p>\n<h3>Temporary safeguards and auxiliary structures<\/h3>\n<p>Anchorage for suspensions, tie rods, lifelines, dust protection walls, or guide rails of cutting tools is often executed with composite mortar &#8211; for example during strip-outs, when opening slabs, or when splitting component segments with stone and concrete splitters. After completion, fixtures can usually be removed with minimal intervention, preserving the substrate and facilitating orderly progress.<\/p>\n<h3>Rock excavation, tunneling, and natural stone<\/h3>\n<p>In rock and quarries, bonded anchors are used to secure blocks, to transfer loads during controlled splitting, and as anchorage points. The combination of a precise splitting process and chemical anchoring enables a controlled joint with minimal collateral damage. Depending on geology and temperature, systems approved for damp or water-filled holes ensure robust adhesion.<\/p>\n<h2>Interaction with concrete demolition shears and stone and concrete splitters<\/h2>\n<p>The targeted combination of anchoring and mechanical separation increases safety, precision, and efficiency in deconstruction.<\/p>\n<ul>\n<li>Segmented removal: Before using concrete demolition shears, anchors are installed to secure component segments or redirect loads.<\/li>\n<li>Split control: When working with stone and concrete splitters, bonded anchors can limit crack propagation or flank defined fracture lines.<\/li>\n<li>Low\u2011vibration methods: Chemical anchoring minimizes additional vibrations and is therefore ideal for sensitive special deconstruction in existing buildings.<\/li>\n<li>Attachment and guiding points: Load-bearing, near-edge fixings are required for hoists, slings, and guiding systems of separation and cutting technology, which can be realized with suitable composite mortars.<\/li>\n<li>Preload and monitoring: Defined pretension and accessible anchorage points enable controlled handling, visual checks, and integration into lifting and fall-arrest concepts.<\/li>\n<\/ul>\n<h2>Material types and selection criteria<\/h2>\n<p>The choice of system depends on substrate, load level, installation conditions, and environmental conditions.<\/p>\n<ul>\n<li>Epoxy systems: High bond strengths, good resistance, suitable for heavy loads and post-installed reinforcement; longer curing times.<\/li>\n<li>Vinyl ester systems: Fast curing, wide temperature range, often approved for cracked concrete.<\/li>\n<li>Polyester systems: Economical, predominantly for uncracked concrete or masonry.<\/li>\n<li>Cementitious systems: Mineral, low-emission, advantageous for damp holes and as a fire protection option; usually with broader installation boundary conditions.<\/li>\n<\/ul>\n<p>Further criteria include borehole moisture (dry, damp, water-filled), drilling method (hammer drilling, diamond drilling), concrete age, chemical exposure, temperature range, fire protection requirements, and anchoring in cracked concrete. Where available, long-term resistance data, freeze-thaw performance, and approvals for seismic actions inform selection. Styrene-free formulations can reduce emissions and odor during interior work.<\/p>\n<h2>Planning and design<\/h2>\n<p>The design of bonded anchors is based on approval-relevant parameters and structural requirements. Key influencing factors are concrete compressive strength, borehole depth, bar diameter, edge and spacing distances, load and combination cases, crack widths, concrete temperature, member thickness, minimum concrete cover, installation positions (overhead\/upward installation), as well as dynamic or seismic actions. For post-installed reinforcement connections, anchorage lengths, bar grades, and bond stresses must be considered. Careful planning is particularly necessary when work steps with concrete demolition shears take place simultaneously and temporary load redistributions occur.<\/p>\n<ul>\n<li>Coordinate construction stages: verify interim load paths, temporary supports, and permissible deformation.<\/li>\n<li>Check interaction with existing reinforcement and embedded items to avoid conflicts and unintended weakening.<\/li>\n<li>Account for tolerances in drilling, edge distances, and embedment; define acceptance criteria in the execution plan.<\/li>\n<\/ul>\n<h2>Execution: from the borehole to curing<\/h2>\n<p>The load-bearing capacity of chemical connections stands and falls with execution quality. Clean, reproducible installation is therefore essential.<\/p>\n<ol>\n<li>Drilling: Diameter and depth as specified; select suitable drilling methods (hammer drilling for concrete, diamond drilling for small edge distances and dimensional accuracy).<\/li>\n<li>Borehole cleaning: At least the sequence principle <em>blow out &#8211; brush &#8211; blow out<\/em> (multiple times), adapted to the drilling method and system specifications.<\/li>\n<li>Injection: Prepare the cartridge, discard the first extrudate, introduce the mortar bubble-free from the bottom of the borehole.<\/li>\n<li>Setting the anchor: Insert the bar while slowly rotating, observe overfill level, withdraw the nozzle while filling.<\/li>\n<li>Curing: Observe waiting time according to temperature; assembly and loading only after reaching the minimum hardness.<\/li>\n<li>Documentation and control: Records of batch and mixing nozzle, ambient temperature, visual check of fill level; document tightening torque if applicable.<\/li>\n<\/ol>\n<p>Suitable accessories (cleaning brushes, blow-out pumps, mixing nozzles) must be system-compatible and replaced when worn. Mark curing times conspicuously at the installation point to avoid premature loading.<\/p>\n<h2>Curing times, temperature, and weather<\/h2>\n<p>Reactive resins react in a temperature-dependent manner. Low temperatures extend working and curing time, high temperatures shorten them and require faster work. Damp boreholes, standing water, or frost affect adhesion and must be evaluated on a system-specific basis. Cementitious mortars require adequate aftertreatment to avoid shrinkage and early damage. For outdoor applications, UV, moisture cycles, and chemical exposure must be considered.<\/p>\n<ul>\n<li>Cold conditions: Store cartridges warm, temper substrates if permitted, and extend waiting times according to the instructions.<\/li>\n<li>Heat and sun: Shade work areas, cool cartridges, and check maximum substrate temperatures to prevent flash curing.<\/li>\n<\/ul>\n<h2>Quality assurance and testing<\/h2>\n<p>To support planning, suitability or application tests are performed in critical cases, such as pull-off bond tests on trial boreholes. During the project, spot checks, torque checks, and pull-out tests help assess workmanship quality. Complete documentation of cartridge batches, processing temperatures, and installation times supports traceability. Photo documentation of cleaning steps and fill levels further increases transparency and facilitates acceptance.<\/p>\n<h2>Safety and health protection<\/h2>\n<p>When handling composite mortar, personal protective equipment, dust extraction during drilling, adequate ventilation, and skin and eye protection are important. Reactive resins can have sensitizing effects; safety data sheets must be observed. In deconstruction, low-dust and low-vibration methods should be used &#8211; an advantage of combining chemical anchoring with targeted hydraulic processing using tools such as concrete demolition shears or stone and concrete splitters from Darda GmbH. Appropriate storage, spill management, and disposal procedures prevent environmental contamination.<\/p>\n<h2>Typical failure modes and their causes<\/h2>\n<ul>\n<li>Low capacities or pull-out at initial loading: inadequate borehole cleaning, incorrect bore diameter, anchorage length too short.<\/li>\n<li>Anchor rotation: voids in the mortar bed, incomplete filling, loading applied too early.<\/li>\n<li>Edge breakouts: edge distances not maintained or setting and tightening torques too high.<\/li>\n<li>Temperature-related impairments: curing time not observed, processing outside the permissible temperature window.<\/li>\n<li>Crack-related reduction in load-bearing capacity: system used without suitability for cracked concrete.<\/li>\n<li>Expulsion of mortar in water-filled holes: insufficient displacement injection or unsuitable system for wet installation.<\/li>\n<li>Mixing defects: blocked or reused nozzles, expired cartridges, or interrupted extrusion causing unmixed material.<\/li>\n<\/ul>\n<h2>Role in the deconstruction workflow: cut guidance and load management<\/h2>\n<p>In practice, bonded anchors are often installed before separation to guide segment loads, control fall directions, or attach protective and guiding devices. When removing sections with concrete demolition shears, segment size can thus be optimized. During controlled splitting with stone and concrete splitters, crack lines can be stabilized by flanking anchors and undesired spalling at edges can be avoided. Clear color coding and labeling of anchor functions (load-bearing, guiding, securing) streamline coordination with lifting and cutting plans.<\/p>\n<h2>Sustainability and disposal<\/h2>\n<p>The selection of low-emission systems, low-dust drilling methods, and minimizing additional damage contribute to resource conservation. Cartridge remnants and mortar components must be collected and disposed of in accordance with the respective regulations. With cementitious systems, the mineral base can offer advantages in terms of emissions; overall, the specific application determines the environmental assessment. Efficient planning and durable anchorage reduce rework and material consumption over the project lifecycle.<\/p>\n<h2>Normative framework and notes<\/h2>\n<p>Applicable rules of technology are decisive for planning and execution. These include recognized assessment and approval procedures for anchors in concrete and masonry, specifications for the design of post-installed reinforcement connections, as well as contractual and structural requirements. Fire protection, seismic action, and edge distances must be addressed in a concept-appropriate manner on a case-by-case basis. Where relevant, reference should be made to valid national and international approvals and technical reports for the selected system. These notes are general and do not replace project-specific planning.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Composite mortar is a central element of modern fastening and deconstruction technology. It enables load\u2011bearing connections between steel and mineral substrates such as concrete, masonry, or natural stone. In the context of products from Darda GmbH &#8211; for example in concrete demolition and special deconstruction, in gutting and cutting, in <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20085","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Composite Mortar for Concrete &amp; Masonry Anchors<\/title>\n<meta name=\"description\" content=\"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Composite Mortar for Concrete &amp; Masonry Anchors\" \/>\n<meta property=\"og:description\" content=\"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T14:23:04+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-mortar\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-mortar\",\"name\":\"Composite Mortar for Concrete & Masonry Anchors\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-19T14:17:52+00:00\",\"dateModified\":\"2026-06-11T14:23:04+00:00\",\"description\":\"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-mortar#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-mortar\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/composite-mortar#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Composite mortar\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Composite Mortar for Concrete & Masonry Anchors","description":"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar","og_locale":"en_US","og_type":"article","og_title":"Composite Mortar for Concrete & Masonry Anchors","og_description":"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-11T14:23:04+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar","url":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar","name":"Composite Mortar for Concrete & Masonry Anchors","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-19T14:17:52+00:00","dateModified":"2026-06-11T14:23:04+00:00","description":"Discover composite mortar for chemical anchoring and bonded anchors in concrete and masonry \u2713 installation and safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/composite-mortar"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/composite-mortar#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Composite mortar"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20085","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20085"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20085\/revisions"}],"predecessor-version":[{"id":28262,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20085\/revisions\/28262"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20085"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}