{"id":20079,"date":"2026-01-17T16:36:42","date_gmt":"2026-01-17T15:36:42","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20079"},"modified":"2026-06-11T11:46:03","modified_gmt":"2026-06-11T09:46:03","slug":"shoring-box","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box","title":{"rendered":"Shoring box"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A shoring box is one of the central means in utility and sewer civil engineering to safely support narrow trenches and small excavation pits against earth and traffic loads. In everyday language, the term is often equated with trench shoring, shoring box, or trench box. If properly planned and executed, the shoring box protects workers from collapses, stabilizes the in-situ soil, and enables a fast, orderly construction process &#8211; from pipe installation to subsequent backfilling. In practice, shoring operations touch numerous interfaces with concrete demolition and rock excavation: boulders, foundation remnants, or heavily reinforced concrete along the alignment often require methods with low vibration levels. In the vicinity of a shoring box, <strong>concrete demolition shears<\/strong> as well as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a><\/strong> from Darda GmbH are used in particular when obstacles must be removed in a controlled, quiet manner without blasting. Well-chosen methods keep trench widths minimal, limit wall movements, and help preserve adjacent pavements and utilities.<\/p>\n<h2>Definition: What is meant by a shoring box?<\/h2>\n<p>A shoring box is a modular, temporary earth pressure shoring system for linear trenches. Typically, it consists of two opposing shoring panels (steel or aluminum plates) connected by adjustable spreading elements (spindles\/cross struts). The box is installed into the ground, keeps the trench walls open, and forms a safe working space for earthworks, pipeline, and cable installation. Shoring boxes are among the <em>non-permanent<\/em> safety systems and are dismantled section by section after the utilities have been installed. They differ from slide rail shoring by their compact box shape and from sheet piles by generally lower installation effort. Use depends on soil type, trench width and depth, and superimposed loads, for example from construction site traffic, storage areas, or nearby buildings. In many jurisdictions, the shoring box is part of the protective system for temporary works, to be selected, verified, and operated within the project-specific method statement.<\/p>\n<h2>Design and components of a shoring box<\/h2>\n<p>A shoring box combines robust components into a shape-stable unit. The key components are:<\/p>\n<ul>\n<li>Shoring panels: large-area plates that absorb earth and surcharge loads. Usually made of steel, for lower loads also aluminum.<\/li>\n<li>Cross struts\/spreaders: adjustable spindles or telescopic elements that keep the panels apart and transfer forces. They define the free trench width.<\/li>\n<li>Corner and lifting points: attachment and lifting points that enable safe repositioning by excavator or mobile crane.<\/li>\n<li>Top or base extension elements: for adapting to greater depths or different trench geometries.<\/li>\n<li>Optional bottom shoes or cutting edges: improve penetration behavior and support uniform load transfer into the subsoil.<\/li>\n<\/ul>\n<p>The selection of a suitable system is based on the required depth, soil parameters, and load cases. Decisive parameters are permissible installation depth, maximum deformation, spacing of the spreaders, and self-weight for transport and handling. <em>Important<\/em> is a coherent interaction of trench profile, subsoil, and shoring system so that load paths are reliably introduced into the components. Identification plates and certified lifting points support traceability and safe handling in daily operation.<\/p>\n<h2>Fields of application, limits, and typical boundary conditions<\/h2>\n<p>Shoring boxes are used predominantly in utility installation for water, wastewater, gas, district heating, and power. They are particularly suitable for:<\/p>\n<ul>\n<li>narrow, linear alignments with varying depths<\/li>\n<li>inner-city construction sites with constrained construction logistics<\/li>\n<li>staggered construction sequences (section-by-section advance)<\/li>\n<li>service connections and short maintenance pits with repetitive moves<\/li>\n<\/ul>\n<p>Limits arise with very large depths, large excavation pits with complex geometries, high groundwater inflow, or sensitive adjacent foundations. Alternatives such as slide rail shoring, sheet piles, or combined systems should be examined. In rocky or blocky subsoil, installation can be more difficult; obstacles often have to be removed in a targeted manner &#8211; preferably with <strong>low vibration levels<\/strong> so that no impermissible additional loads are transferred to the shoring box and adjacent utilities. Where groundwater is present, uplift and erosion risks must be assessed and, if required, combined with dewatering or filter-stable backfills.<\/p>\n<h2>Installation, operation, and dismantling in practice<\/h2>\n<p>Construction follows proven procedures that ensure safe presence in the trench:<\/p>\n<ol>\n<li>Pre-excavation down to installation depth, adapted to trench width and excavator reach.<\/li>\n<li>Lowering the shoring box into place and aligning the panels; setting the spreaders to the specified dimension.<\/li>\n<li>Section-by-section sinking (alternating with excavation if necessary) down to final position, compacting the ground beneath the panel toe as specified.<\/li>\n<li>Utility installation, installation of fittings, tests, and documentation.<\/li>\n<li>Dismantling: layer-by-layer backfilling, compaction, and incremental extraction of the shoring box.<\/li>\n<\/ol>\n<p>Prior to these steps, utility locating, permit checks, and, where necessary, gas and atmosphere measurements are completed. Particular attention is paid to the protection of existing utility lines, to handling groundwater, and to safe material flow. Warping, notch effects, or cold deformation on panels and spreaders are signs of overload or improper handling and require immediate inspection. Clear exclusion zones under suspended loads and coordinated signaling between excavator operator and ground personnel prevent conflicts at the trench edge.<\/p>\n<h2>Interfaces with concrete demolition and rock excavation in shoring<\/h2>\n<p>Alignments frequently cross foundations, old pipe pedestals, curb channels, or rocky subsoil. To keep the shoring box low in stress and avoid endangering adjacent infrastructure, methods with low vibration levels and good control are preferred. These include:<\/p>\n<ul>\n<li><strong>concrete splitter and rock wedge splitter<\/strong> from Darda GmbH: They generate controlled splitting forces in the borehole and divide obstacles quietly, with low dust, and without explosives. Ideal for inner-city areas and in the immediate vicinity of shoring panels.<\/li>\n<li><strong>concrete demolition shears<\/strong> from Darda GmbH, such as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/combi-shears-hcs8\">Darda Combi-Shears HCS8<\/a>: For biting off foundation edges, opening service penetrations, or removing capping with precise metering.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> from Darda GmbH: Supply splitters and shears with the necessary energy, even in tight work areas.<\/li>\n<li>Core drilling and saw cutting to create defined edges and prepare boreholes for controlled splitting where access is limited.<\/li>\n<\/ul>\n<p>The result is that trench widths can be kept small, load redistributions avoided, and the service life of the shoring optimized. This has a positive effect on schedules, noise emission and vibration levels, and reduces consequential damage to pavements and adjacent buildings. Sequenced working steps and clean debris management ensure that demolition interfaces do not delay utility installation.<\/p>\n<h2>Design, load assumptions, and subsoil<\/h2>\n<p>The structural analysis and sizing of a shoring box consider earth and surcharge loads, groundwater, subsoil parameters, and geometry. Influencing factors include, among others:<\/p>\n<ul>\n<li>Soil type and condition (cohesive, non-cohesive, perched water, compaction)<\/li>\n<li>Trench width and installation depth, spacing of spreaders<\/li>\n<li>Traffic and storage loads at the edge, buildings near the excavation<\/li>\n<li>Settlement requirements of the newly installed utilities<\/li>\n<\/ul>\n<p>Using simplified earth pressure approaches or the manufacturer\u2019s system verifications, permissible installation depths and spacings are defined. With uncertain boundary conditions, conservative planning with measurement and control points during construction is recommended. Information on civil engineering standards and rules is always to be understood in general terms; binding interpretations are the responsibility of design, supervision, and the applicable regulations. Where groundwater acts, consider hydrostatic effects, filter stability, and potential piping; monitoring points enable timely adjustments to sequence or support spacing.<\/p>\n<h2>Occupational safety and organization<\/h2>\n<p>Occupational safety has top priority in trench excavation. Principles are:<\/p>\n<ul>\n<li><strong>Securing before entry:<\/strong> No presence in unshored trenches; shore in time.<\/li>\n<li><strong>Access and rescue:<\/strong> Provide ladder or platform access, keep the escape route clear.<\/li>\n<li><strong>Inspection:<\/strong> Daily visual inspection of panels, spreaders, and lifting points; documentation of damage.<\/li>\n<li><strong>Hazard analysis:<\/strong> Consider traffic management, crane and excavator operations, utility lines, and contaminated sites.<\/li>\n<li><strong>Atmosphere control:<\/strong> Gas measurements in deeper or confined sections; ensure ventilation where necessary.<\/li>\n<li><strong>Edge protection and load management:<\/strong> Keep heavy loads away from trench edges, prevent falling objects, and define exclusion zones.<\/li>\n<\/ul>\n<p>Training of construction site personnel, clear responsibilities, and a clear communication chain are essential. Notes on protective measures are general in nature and do not replace project-specific planning.<\/p>\n<h2>Quality assurance, maintenance, and service life<\/h2>\n<p>Shoring boxes are durable but highly stressed operating equipment. For safe use, the following are required:<\/p>\n<ul>\n<li>Regular inspections of weld seams, panel stiffeners, and threads<\/li>\n<li>Lubrication and protection of spindles, protection against impact and notch damage<\/li>\n<li>Documented repairs and sorting out of damaged elements<\/li>\n<li>Appropriate lifting gear and correct load distribution when lifting<\/li>\n<li>Traceable component IDs and inspection intervals to maintain service history<\/li>\n<\/ul>\n<p>Proper storage prevents corrosion and warping. During dismantling, contamination must be removed; damage is reported immediately and assessed. Periodic third-party checks and calibrated measuring devices for spreader settings increase process reliability.<\/p>\n<h2>Environmental and surrounding aspects<\/h2>\n<p>When used professionally, a shoring box minimizes soil movements, reduces noise emission thanks to short open times, and protects trees as well as adjacent structures. <em>Low vibration levels<\/em> demolition methods &#8211; such as splitting with devices from Darda GmbH &#8211; avoid vibration inputs that could otherwise be transferred to the shoring and neighboring buildings. Resources are conserved because shoring boxes are reusable many times; the choice of suitable logistics (transport, crane use) further reduces emissions. Additional benefits arise from coordinated spoil management, dust control, and short transport routes for backfill and pipe bedding.<\/p>\n<h2>Typical failure patterns and how to avoid them<\/h2>\n<ul>\n<li>Insufficient sinking depth: panels not deep enough; consequences can be underwashing and slope failures. Remedy: ensure installation depth and soil contact.<\/li>\n<li>Overloaded spreaders: incorrect width or additional surcharges; signs are bent spindles. Remedy: check load assumptions, reduce spacings.<\/li>\n<li>Unsuitable trench width: too narrow for components or compaction equipment; results in damage to the shoring. Remedy: consider construction sequence and equipment widths in planning.<\/li>\n<li>Uncontrolled dismantling: extraction with insufficiently compacted backfill; settlement and utility drift threaten. Remedy: compact in layers, extract in a controlled manner.<\/li>\n<li>Obstacles within the shoring: rock or concrete remnants pressing on panels. Remedy: probe in advance and remove obstacles with <strong>concrete demolition shears<\/strong> or <strong>concrete splitter and rock wedge splitter<\/strong> from Darda GmbH in a targeted manner.<\/li>\n<li>Misalignment and twisting: skewed panels or uneven strut settings. Remedy: align during lowering and verify dimensions at each move.<\/li>\n<li>Unsupported openings: penetrations left unprotected. Remedy: provide sleeves or local reinforcement and verify edge distances.<\/li>\n<\/ul>\n<h2>Coordination with concrete demolition, special demolition, and utility installation<\/h2>\n<p>Shoring work intervenes in existing structures and requires close coordination between civil engineering, specialist foundation engineering, and deconstruction. In phases with obstacle removal in the trench space, combinations of a small excavator, hydraulically driven tools, and compact <strong>hydraulic power pack<\/strong> from Darda GmbH have proven themselves. This keeps workspaces clear, and the interfaces to utility installation, <em>concrete demolition and special demolition<\/em> can be managed without time-consuming retooling. In rocky subsoil or in the area of tunnel interfaces, controlled splitting supports a gentle connection to existing shoring elements. An interface matrix with hold points for inspection helps synchronize demolition, shoring moves, and pipe installation.<\/p>\n<h2>Planning, logistics, and documentation<\/h2>\n<p>For a smooth process, robust subsoil and utility research, coordinated traffic and construction logistics, and seamless documentation are crucial. These include:<\/p>\n<ul>\n<li>Surveying and utility detection, probing where there are uncertainties<\/li>\n<li>Selection of shoring elements based on availability and verification of structural stability<\/li>\n<li>Planning of lifting gear and attachment equipment, safe storage and interim areas<\/li>\n<li>Construction-accompanying monitoring of settlements and any deformations<\/li>\n<li>Dewatering and groundwater management concepts, including discharge permits where required<\/li>\n<li>Photo and measurement documentation of each shoring position and of as-built utilities<\/li>\n<\/ul>\n<p>Careful documentation facilitates later repairs, supports quality assurance, and creates transparency for clients and authorities &#8211; especially in sensitive locations such as inner-city main traffic corridors or within protected areas. Early logistics planning reduces idle times and ensures that suitable shoring modules, struts, and lifting accessories are on site when needed.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A shoring box is one of the central means in utility and sewer civil engineering to safely support narrow trenches and small excavation pits against earth and traffic loads. In everyday language, the term is often equated with trench shoring, shoring box, or trench box. If properly planned and executed, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shoring-box\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20079","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Shoring Box Guide for Utility Trench Safety<\/title>\n<meta name=\"description\" content=\"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/shoring-box\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Shoring Box Guide for Utility Trench Safety\" \/>\n<meta property=\"og:description\" content=\"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/shoring-box\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T09:46:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shoring-box\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shoring-box\",\"name\":\"Shoring Box Guide for Utility Trench Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-17T15:36:42+00:00\",\"dateModified\":\"2026-06-11T09:46:03+00:00\",\"description\":\"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shoring-box#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shoring-box\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/shoring-box#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Shoring box\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Shoring Box Guide for Utility Trench Safety","description":"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box","og_locale":"en_US","og_type":"article","og_title":"Shoring Box Guide for Utility Trench Safety","og_description":"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-11T09:46:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box","url":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box","name":"Shoring Box Guide for Utility Trench Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-17T15:36:42+00:00","dateModified":"2026-06-11T09:46:03+00:00","description":"Guide to the shoring box \u2713 trench support for safe utility trenches, installation steps, hazards, and best practices.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/shoring-box"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/shoring-box#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Shoring box"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20079","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20079"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20079\/revisions"}],"predecessor-version":[{"id":28253,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20079\/revisions\/28253"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20079"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}