{"id":20062,"date":"2026-01-16T16:51:58","date_gmt":"2026-01-16T15:51:58","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20062"},"modified":"2026-06-10T13:39:07","modified_gmt":"2026-06-10T11:39:07","slug":"bottom-of-slab-elevation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation","title":{"rendered":"Bottom of slab elevation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The bottom of slab elevation is a central reference in structural engineering, fit-out, and deconstruction. It determines clear room heights, guides trades reliably through planning, and significantly influences the selection and use of tools for concrete demolition, strip-out, and cutting works. In practice, precise determination of the bottom of slab elevation directly affects cut alignment, shoring, and the choice of concrete pulverizers and stone and concrete splitters. A clearly defined elevation prevents clashes with utilities, ensures clear tolerance chains, and provides the basis for <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">controlled, low-vibration concrete demolition and deconstruction<\/a>.<\/p>\n<p><strong>Also referred to as the slab soffit or underside of slab<\/strong>, the bottom of slab elevation is a shared coordination benchmark across structural and MEP disciplines. Consistently maintained underside values support clash-free routing, predictable installation zones, and reliable method statements for deconstruction.<\/p>\n<h2>Definition: What is meant by the bottom of slab elevation?<\/h2>\n<p>The bottom of slab elevation is the lowest, structurally relevant plane of a slab. It refers to the underside visible or load-bearing plane of the structural slab, i.e., the <em>bottom of slab elevation<\/em>. This must be distinguished from the underside of suspended ceilings (underside of the substructure or cladding), which lies lower on the room side and is non-load-bearing. In drawings, the bottom of slab elevation is often indicated with a height value (e.g., in meters above a reference level). It is the counterpart to the top of slab elevation and determines the clear height between the finished floor surface and the underside of the slab. For deconstruction and the creation of openings, <strong>the bottom of slab elevation of the load-bearing structural slab<\/strong> is decisive, as cutting, splitting, and safeguarding measures are referenced to it.<\/p>\n<ul>\n<li><strong>Typical notation<\/strong>: Elevation values referenced to project zero or an official benchmark, recorded with units and reference description.<\/li>\n<li><strong>Scope boundary<\/strong>: Excludes finishes, suspended ceilings, and non-structural claddings; includes locally deepened areas such as downstand beams.<\/li>\n<li><strong>Design vs. as-is<\/strong>: Design values serve planning; <em>as-is<\/em> surveys govern execution in existing structures.<\/li>\n<\/ul>\n<h2>Standards, reference elevations, and tolerances of the bottom of slab elevation<\/h2>\n<p>The height specification of the bottom of slab elevation follows a project-specific reference system (e.g., project zero, grid lines, official height system). Tolerances result from applicable codes and contractually agreed accuracy requirements. In cast-in-place slabs, height deviations occur due to formwork deflection, creep, and shrinkage; in prestressed or voided slabs, directed deflections (prestress, cantilever action) can influence the actual underside. A common practice is to measure the structural slab bottom of slab elevation on a grid and compare it, with documentation, to the design elevations.<\/p>\n<p>Robust practice defines <strong>control points<\/strong> and a <strong>datum strategy<\/strong> early on, documents the accuracy class, and sets acceptance criteria for deviations. Where long spans or variable loading are present, consider camber and long-term deflection in both the design and the acceptance survey.<\/p>\n<ul>\n<li><strong>Reference hierarchy<\/strong>: Site benchmark, secondary benchmarks, grid intersections, local checks at critical details.<\/li>\n<li><strong>Tolerance management<\/strong>: Record measured deviations and communicate them to affected trades to adjust cut lines, MEP fall gradients, and shoring heights.<\/li>\n<\/ul>\n<h2>Significance of the bottom of slab elevation in deconstruction, strip-out, and fit-out<\/h2>\n<p>The bottom of slab elevation determines the available working height for equipment, the position of cut joints, and the need for shoring. In concrete demolition and special demolition, cut lines and splitting lines are aligned with the underside to execute openings safely between existing utilities, downstand beams, and service shafts. Concrete pulverizers engage the slab\u2019s underside in a controlled manner to detach concrete pieces, while stone and concrete splitters set targeted wedges to separate the slab without overbreak. In strip-out and cutting, the bottom of slab elevation defines the position of cable trays, ventilation ducts, and sprinkler lines; it prevents clashes and facilitates sequencing of work steps. In tunnel construction and heavy civil structures, the underside of slab panels in caverns, stations, and interfaces to intermediate levels is a key dimension for safety, structure gauge clearance, and construction logistics.<\/p>\n<ul>\n<li><strong>Installation zones<\/strong>: Ceiling void heights, service corridors, and coordination with downstand elements are derived from verified underside values.<\/li>\n<li><strong>Method statements<\/strong>: Piece size, cut sequence, and handling paths are calculated against the underside elevation and available headroom.<\/li>\n<li><strong>Interface control<\/strong>: Ensures consistent transitions at movement joints, openings, and changes in slab thickness.<\/li>\n<\/ul>\n<h2>Survey, measuring methods, and documentation of the bottom of slab elevation<\/h2>\n<p>For planning and execution, a reliable survey is required. The objective is a verified structural slab bottom of slab elevation as the as-is condition, supplemented with notes on embedded components, downstand beams, rib fields, and local spalls. The measurement strategy should be reproducible, safe, and traceable.<\/p>\n<h3>Typical procedure<\/h3>\n<ol>\n<li>Pre-clarification: Define the reference level, grid spacing, and safety zones beneath the slab.<\/li>\n<li>Select measuring tools: Rotary laser with receiver, leveling instrument, or total station; additionally, spot hand measurements at accessible areas.<\/li>\n<li>Measure the grid: Regular points (e.g., every 2-3 m) and additional points at downstand beams, column heads, penetrations.<\/li>\n<li>Documentation: Height list with date, measurement method, device, deviations, and photos; mark components only where permitted structurally and for fire protection.<\/li>\n<li>Sanity check: Compare with design revisions; assess deflections and spans; verify against tolerance requirements.<\/li>\n<\/ol>\n<h3>Practice notes<\/h3>\n<ul>\n<li>For suspended ceilings: First expose the plenum and measure the <em>bottom of slab elevation<\/em>, not the cladding.<\/li>\n<li>In existing buildings: Hidden downstand beams and girders can locally reduce the underside; plan exposure before cutting.<\/li>\n<li>Consider temperature and load states: Temporary props or site installations influence deflections.<\/li>\n<li>Use suitable non-destructive testing where required: Bar cover meters and ground-penetrating techniques assist in locating reinforcement before cutting.<\/li>\n<li>Quality assurance: Independent check measurements and instrument calibration logs reduce systematic errors.<\/li>\n<\/ul>\n<h2>Influence of the bottom of slab elevation on equipment selection<\/h2>\n<p>The bottom of slab elevation determines the working space for handheld and hydraulic tools. Limited headroom favors compact, low-vibration methods. Selection is based on slab thickness, reinforcement ratio, the desired demolition method, and permissible vibrations.<\/p>\n<ul>\n<li>Concrete pulverizers: Precise removal at the underside, favorable load control when taking down pieces.<\/li>\n<li>Stone and concrete splitters: Split holes along the cut line; minimal edge removal and reduced dust and noise.<\/li>\n<li>Hydraulic power packs: Power supply for attachments and handheld tools; <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> can be positioned based on the underside and accessibility.<\/li>\n<li>Combination shears and multi cutters: For mixed components (concrete with inserts) when metals near the underside also need to be cut.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel shears<\/a>: Cutting beams, rebar bundles, and steel deck composite parts near the slab underside.<\/li>\n<li>Tank cutters: Relevant in industrial facilities with downstand beams when vessels and hoods are deconstructed in the ceiling area.<\/li>\n<\/ul>\n<p><strong>Decision criteria<\/strong> include allowable emissions, access routes, required cut quality, and the feasibility of sectional removal. Where water use is restricted, prioritize dry splitting and shearing methods with integrated dust control.<\/p>\n<h3>Example applications<\/h3>\n<ul>\n<li>Openings for shafts: Splitters along the intended contour, then removal of remaining web areas with a concrete pulverizer.<\/li>\n<li>Deconstruction during operations: Equipment use with restricted height, dust and vibration limitations, defined piece sizes for short load paths.<\/li>\n<li>Edge-adjacent measures: Gentle removal at the underside to avoid spalling on adjacent components.<\/li>\n<li>Service penetrations: Align to reinforcement and cover depth; finalize with shears at exposed bars for clean edges.<\/li>\n<\/ul>\n<h2>Cut alignment, edge distances, and reinforcement at the underside<\/h2>\n<p>Cutting and splitting plans are aligned to the bottom of slab elevation, cover depth, and reinforcement layout. The goal is a controlled separation path without impairing remaining components. Local reinforcement detection (e.g., suitable testing methods) reduces the risk of unintended reinforcement hits.<\/p>\n<ul>\n<li>Edge distances: Maintain sufficient distance to free edges to prevent spalling; place split holes uniformly.<\/li>\n<li>Reinforcement: Primary tension bars are often near the underside in ribbed slabs; also consider additional reinforcement in composite slabs.<\/li>\n<li>Piece size: Choose dimensions that keep handling, load transfer, and drop heights safe.<\/li>\n<li>Post-processing: Clean edges, cut rebar ends with steel shears, and reinstate fire protection and corrosion protection if required.<\/li>\n<li>Water and debris management: Plan for slurry containment, filtration, and safe disposal where wet cutting is necessary.<\/li>\n<\/ul>\n<h2>Specifics by slab type<\/h2>\n<h3>Cast-in-place slabs<\/h3>\n<p>Varying underside due to formwork deflection and downstand beams. Splitting and pulverizer work along ribs requires dense shoring and smaller piece sizes.<\/p>\n<p>Check for local thickenings at supports and drop panels. Record underside steps at construction joints and transitions to beams for accurate cut alignment.<\/p>\n<h3>Voided and precast slabs<\/h3>\n<p>Avoid local break-ins at webs; align splitting lines with web axes. When working at the underside, watch for unexpected voids.<\/p>\n<p>Confirm manufacturer-specific web spacing and bearing details before drilling split holes. Temporary edge protection prevents breakout over voids during handling.<\/p>\n<h3>Prestressed slabs<\/h3>\n<p>Prestressing tendons are critical. Perform separation works only with clear approval and a structural concept; controlled, sectional removal. Use concrete pulverizers and splitters cautiously and sequentially.<\/p>\n<p>Verify tendon profiles and anchorage zones with appropriate testing. Define no-cut corridors, and adapt piece sizes to limit force redistribution.<\/p>\n<h3>Composite slabs with steel trapezoidal decking<\/h3>\n<p>The underside is defined by the deck profile. After concrete removal, steel shears or multi cutters are suitable for cutting the decking.<\/p>\n<p>Account for deck rib orientation during splitting and shearing. Protect cut edges against corrosion and restore required fire protection systems.<\/p>\n<h2>Occupational safety, fire protection, and temporary shoring<\/h2>\n<p>Work at the bottom of slab elevation is overhead and carries specific risks. Proactive safeguarding protects both people and the structure.<\/p>\n<ul>\n<li>Shoring: Verify load-bearing capacity and load redistribution concepts before cutting or splitting; size and document temporary props.<\/li>\n<li>Overhead work: Personal protective equipment, protection against falling objects, clearly defined exclusion zones.<\/li>\n<li>Dust, noise, vibrations: Choose methods that meet occupational and environmental protection requirements.<\/li>\n<li>Fire protection: Minimize sparks and heat input; restore firestopping and claddings where required.<\/li>\n<li>Electrical and media: Identify and get prior approval for utilities at the underside.<\/li>\n<li>Permitting and controls: Apply hot work permits where relevant, establish a fire watch, and use lockout-tagout procedures for affected services.<\/li>\n<\/ul>\n<p>Legal and regulatory requirements are project-specific. The information provided is general; binding decisions are made by the responsible parties in the project.<\/p>\n<h2>Planning, coordination, and communication<\/h2>\n<p>The bottom of slab elevation is an essential coordination metric between shell construction, building services, and fit-out. In design, underside values are managed as height benchmarks; in existing structures, reliable as-is data is crucial. Consistent communication of target-actual elevations, construction status, and approvals facilitates the choice of working method, the sequencing of cutting and splitting works, and the deployment of hydraulic power packs and handheld tools from Darda GmbH.<\/p>\n<p>Integrate underside data into model-based coordination and exchange structured elevation lists. Maintain change logs for survey updates and distribute interface drawings with clearly annotated underside references.<\/p>\n<h2>Common mistakes and how to avoid them<\/h2>\n<ol>\n<li>Confusing the structural slab underside with the underside of a suspended ceiling: Determine and document the load-bearing bottom of slab elevation before any measures.<\/li>\n<li>Insufficient survey: Densify the grid; additionally capture critical points (downstand beams, embedded items).<\/li>\n<li>No shoring: Verify structural behavior and install temporary shoring before separation works.<\/li>\n<li>Unclear cut alignment: Mark splitting and cut lines at the underside precisely; define piece sizes.<\/li>\n<li>Insufficient equipment reach: Verify headroom and maneuvering space; choose equipment with a suitable working range (e.g., concrete pulverizers or stone and concrete splitters).<\/li>\n<li>Missing coordination with utilities: Confirm isolation status and clearance to active services prior to drilling or cutting.<\/li>\n<li>Inadequate documentation: Store measurement files, photos, and acceptance records with traceable references to benchmarks and grid locations.<\/li>\n<\/ol>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The bottom of slab elevation is a central reference in structural engineering, fit-out, and deconstruction. It determines clear room heights, guides trades reliably through planning, and significantly influences the selection and use of tools for concrete demolition, strip-out, and cutting works. In practice, precise determination of the bottom of slab <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20062","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Bottom of Slab Elevation in Structural Engineering<\/title>\n<meta name=\"description\" content=\"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Bottom of Slab Elevation in Structural Engineering\" \/>\n<meta property=\"og:description\" content=\"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-10T11:39:07+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bottom-of-slab-elevation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bottom-of-slab-elevation\",\"name\":\"Bottom of Slab Elevation in Structural Engineering\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-16T15:51:58+00:00\",\"dateModified\":\"2026-06-10T11:39:07+00:00\",\"description\":\"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bottom-of-slab-elevation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bottom-of-slab-elevation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/bottom-of-slab-elevation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Bottom of slab elevation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Bottom of Slab Elevation in Structural Engineering","description":"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation","og_locale":"en_US","og_type":"article","og_title":"Bottom of Slab Elevation in Structural Engineering","og_description":"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-10T11:39:07+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation","url":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation","name":"Bottom of Slab Elevation in Structural Engineering","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-16T15:51:58+00:00","dateModified":"2026-06-10T11:39:07+00:00","description":"Understand bottom of slab elevation in structural engineering \u2713 clear heights, tolerances, surveying and demolition.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/bottom-of-slab-elevation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Bottom of slab elevation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20062","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20062"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20062\/revisions"}],"predecessor-version":[{"id":28214,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20062\/revisions\/28214"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}