{"id":20058,"date":"2026-01-15T12:52:24","date_gmt":"2026-01-15T11:52:24","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20058"},"modified":"2026-06-09T16:10:09","modified_gmt":"2026-06-09T14:10:09","slug":"basement-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition","title":{"rendered":"Basement demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Basement demolition is among the most demanding disciplines in deconstruction. Tight access, low room heights, load-bearing interior walls, adjacent buildings, utility routing, and frequent groundwater contact require precise planning and low-vibration methods. In particular, <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete pulverizers suitable for selective demolition<\/a><\/strong> as well as <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> enable controlled, low-emission demolition in the basement area. In combination with compact hydraulic power packs and complementary tools from Darda GmbH, components can be safely separated, downsized, and removed as single-material streams &#8211; from <em>building gutting<\/em> and selective <em>concrete demolition<\/em> through to <em>special demolition<\/em>. In dense urban settings and confined basements, these approaches support schedule reliability, neighbor protection, and high recycling yields.<\/p>\n<h2>Definition: What is meant by basement demolition?<\/h2>\n<p>Basement demolition means the selective or complete deconstruction of components below the ground level (finished grade). This includes basement exterior walls, interior walls, columns, beams, floor slabs, slabs, stair flights, shafts, and foundation elements. Basement demolition takes place in existing structures, during repurposing, in damage remediation, or as part of full <em>demolition works<\/em>. It is closely related to <em>concrete demolition and special demolition<\/em>, often includes preceding <em>building gutting and concrete cutting<\/em>, and can &#8211; e.g., for rock-contacting structures or tunnel connections &#8211; touch on aspects of <em>rock excavation and tunnel construction<\/em>. The goal is controlled, low-vibration deconstruction that ensures <em>structural stability<\/em>, neighbor protection, emission limitation, and clean <em>construction waste separation<\/em>. In practice, pre-demolition audits, utility isolation, and documented release protocols are integral parts of the scope.<\/p>\n<h2>Project preparation and structural boundary conditions<\/h2>\n<p>The foundation of safe and economical basement demolition is thorough preparation. Survey of the existing structure, structural analysis, and definition of the demolition sequence are closely interlinked. Components are separated so that load transfer and deformations remain controlled at all times, while construction logistics, dust protection, noise control, and disposal are planned in parallel. Robust method statements, a risk register, and clear interface management with adjacent trades strengthen execution certainty.<\/p>\n<h3>Survey, investigation, and clearance<\/h3>\n<ul>\n<li>Review documents and as-built drawings; reconcile with reality through a site walkdown.<\/li>\n<li>Locate utility lines (power, gas, water, district heating, communications) and clear the areas.<\/li>\n<li>Identify construction materials: concrete compressive strength class, reinforcement densities, masonry, waterproofing, potential hazardous substances. For drilling holes for hydraulic wedge splitters, wet drilling is recommended to reduce dust.<\/li>\n<li>Basement constraints: room height, access, escape routes, ventilation, natural and artificial lighting.<\/li>\n<li>Augment with digital capture: 3D scan or point cloud to detect deviations from drawings and to plan tool access paths.<\/li>\n<li>Perform hazardous materials surveys and define clearance concepts for contaminated materials; integrate approval procedures where required.<\/li>\n<li>Coordinate stakeholder notifications and permits in advance, including neighbor information and delivery time windows.<\/li>\n<\/ul>\n<h3>Structural analysis and demolition sequence<\/h3>\n<ul>\n<li>Clarify load transfer: load-bearing walls\/columns, support zones, bracing, construction stages.<\/li>\n<li>Design and install temporary shoring and underpinning in time.<\/li>\n<li>Define demolition sequence: first separate, then downsize, finally remove. Low-vibration methods such as concrete pulverizers reduce risks in the existing structure.<\/li>\n<li>Define hold points and inspections for critical stages; verify remaining wall and slab thicknesses before proceeding.<\/li>\n<li>Plan segment weights, lifting points, and transport routes to ensure safe handling under tight clearances.<\/li>\n<\/ul>\n<h3>Water, ground, and neighborhood<\/h3>\n<ul>\n<li>Consider groundwater level, drainage, sump pumps, and the waterproofing system.<\/li>\n<li>Protect adjacent foundations and partition walls by using low-vibration methods.<\/li>\n<li>Set up monitoring of noise emission, dust exposure, and ground vibration monitoring; coordinate time windows with the neighborhood.<\/li>\n<li>Manage drilling and cutting water: sedimentation, filtration, and discharge only with approval; prevent entry into the groundwater.<\/li>\n<li>Seal openings and penetrations promptly to avoid water ingress and uncontrolled air exchange.<\/li>\n<\/ul>\n<h2>Method selection: working with low vibration and low emissions<\/h2>\n<p>In the basement, methods that generate low vibration, low noise levels, and controllable fracture patterns are preferred. Hydraulic tools from Darda GmbH are designed for confined spaces and high precision requirements. Selection is based on component thickness, reinforcement content, accessibility, and the desired fragment size. Where feasible, electric-hydraulic operation and remote handling improve emission control and operator protection, while compliance with specified vibration and noise limits is maintained by measurement.<\/p>\n<h3>When are concrete pulverizers suitable?<\/h3>\n<p><strong>Concrete pulverizers<\/strong> grip components mechanically and crush them in a controlled manner. Advantages include <em>very low vibration levels<\/em>, defined removal edges, and the absence of impact energy. Typical applications in the basement:<\/p>\n<ul>\n<li>Deconstruction of interior walls, wall bases, and creation of openings in basement walls.<\/li>\n<li>Removal of slab edges, beams, and brackets in existing structures.<\/li>\n<li>On-site downsizing to produce hand- or crane-manageable piece sizes.<\/li>\n<li>Exposure of embedded parts and careful separation at construction joints with precise bite control.<\/li>\n<li>Removal of strip footings, plinths, and small foundations with defined breaking lines.<\/li>\n<\/ul>\n<p>In heavily reinforced zones, reinforcement is cut after crushing with <em>steel shear<\/em> or <em>Multi Cutters<\/em> from Darda GmbH, or by pre-cutting with diamond tools where required.<\/p>\n<h3>When are hydraulic wedge splitters suitable?<\/h3>\n<p><strong>Hydraulic wedge splitters<\/strong> operate via hydraulically driven wedges in pre-drilled holes. This creates defined separation joints without impact. They are particularly suitable for:<\/p>\n<ul>\n<li>Thick basement walls, massive foundations, and floor slabs with access from only one side.<\/li>\n<li>Areas requiring high neighbor protection, sensitive equipment, or heritage structures in the immediate vicinity.<\/li>\n<li>Segmenting large components into transportable blocks; then downsizing with a concrete pulverizer.<\/li>\n<li>Low headroom and confined geometries where impact tools are impractical.<\/li>\n<li>Elements near vibration-sensitive installations where fracture propagation must be guided precisely.<\/li>\n<\/ul>\n<p>The hole pattern, wedge position, and release direction are selected to guide cracks deliberately. Wet drilling reduces dust; the drilling water must be collected in a controlled way.<\/p>\n<h3>Complementary devices and power packs<\/h3>\n<ul>\n<li><strong>Hydraulic power packs<\/strong> (<a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Power Units<\/a>): compact, powerful energy sources positioned outside the basement and connected to the tools via hoses. This reduces noise and heat in the basement.<\/li>\n<li><strong>Combination hydraulic shear (demolition shear)<\/strong>: flexible for mixed sections when concrete and steel must be separated in one step.<\/li>\n<li><strong>Multi Cutters<\/strong> and <strong>steel shear<\/strong>: for cutting reinforcement, structural steel, pipes, and embedded components.<\/li>\n<li><strong>Cutting torch<\/strong>: for dismantling tanks, boilers, or thick-walled pipelines in basements where spark- and heat-reduced methods are required.<\/li>\n<li><strong>Core drills and wall or wire saws<\/strong>: for controlled release cuts, openings, and predetermined breaking notches.<\/li>\n<li><strong>Dust extraction and water treatment units<\/strong>: for point-of-origin capture and compliant discharge or disposal.<\/li>\n<\/ul>\n<h2>Procedure in the basement: step by step<\/h2>\n<p>A structured procedure ensures safety, quality, and schedule transparency. Typical steps:<\/p>\n<ol>\n<li>Isolate and secure utilities; cordon off areas and define escape routes.<\/li>\n<li>Install temporary shoring; selectively relieve slab and wall areas.<\/li>\n<li>Preparatory <em>cutting<\/em> (predetermined breaking notches), core drilling, or slots.<\/li>\n<li>Separate components with low vibration using concrete pulverizers or hydraulic wedge splitters.<\/li>\n<li>Cut reinforcement with steel shear\/Multi Cutters; downsize components into hand- or equipment-manageable sizes.<\/li>\n<li>Remove materials separately: concrete, masonry, steel, wood, plastics, waterproofing.<\/li>\n<li>Intermediate cleaning, measurement, and verification of remaining structures; update documentation and release for next stage.<\/li>\n<li>Temporary closures, backfilling, or waterproofing reinstatement where required by design.<\/li>\n<\/ol>\n<h3>Logistics in tight existing conditions<\/h3>\n<ul>\n<li>Hose and cable management: protected routing, avoiding trip hazards.<\/li>\n<li>Material flow: chutes, conveyors, or hoists for removal; coordinate street-side container service (waste disposal).<\/li>\n<li>Access optimization: create openings in time, provide edge protection, avoid tipping and shear hazards.<\/li>\n<li>Define staging areas and sequencing for interim storage without overloading floors.<\/li>\n<li>Plan just-in-time deliveries to minimize on-site stock and keep escape routes clear.<\/li>\n<\/ul>\n<h3>Dust, noise, and vibration control<\/h3>\n<ul>\n<li>Dust-binding measures: localized water misting, local dust extraction, wet drilling.<\/li>\n<li>Noise reduction: tool selection, position the power pack outside, acoustic cladding within permitted limits.<\/li>\n<li>Low-vibration techniques: prioritize concrete pulverizers and splitting technology instead of impact tools; monitor vibrations.<\/li>\n<li>Establish threshold values with alarms and trigger actions; log exceedances with corrective measures.<\/li>\n<li>Document measurement data continuously to demonstrate compliance and optimize methods.<\/li>\n<\/ul>\n<h3>Ventilation and power supply<\/h3>\n<ul>\n<li>Plan fresh air supply and air ducting; minimize heat loads in the basement.<\/li>\n<li>Electrical supply lines according to code; set up and monitor hydraulic power packs safely.<\/li>\n<li>Water and slurry management for wet operations: collect, filter, dispose.<\/li>\n<li>Prefer electric tools and drives where feasible to reduce exhaust gases and noise.<\/li>\n<li>Provide CO\/NOx monitoring and alarms when combustion equipment is used; verify safe oxygen levels.<\/li>\n<\/ul>\n<h2>Special basement scenarios<\/h2>\n<p>Basement demolition is often a <strong>special demolition<\/strong> with heightened constraints:<\/p>\n<ul>\n<li>Deconstruction during ongoing use: low-vibration work windows, dust protection wall\/airlocks, separated traffic routes.<\/li>\n<li>Heritage-compliant partial deconstruction: separation cuts, splitting technology, and carefully dosed use of concrete pulverizers to protect preservable components.<\/li>\n<li>Rock contact: For basements on slopes or in in-situ rock, <em>rock wedge splitters<\/em> are used for controlled rock removal; linkage to <em>rock excavation and tunnel construction<\/em>.<\/li>\n<li>Tank systems and pipelines: controlled opening with <em>cutting torch<\/em>, draining and cleaning in advance; focus on spark- and heat-reduced procedures.<\/li>\n<li>Prestressed or post-tensioned elements: require specialist release procedures and controlled step-by-step separation.<\/li>\n<li>Confined-space classified rooms: permit-to-work, gas measurements, rescue plan, and communication concept.<\/li>\n<\/ul>\n<h2>Material separation, recycling, and disposal<\/h2>\n<p>Clean material separation increases the recycling rate and reduces disposal costs. Concrete is preferably removed free of reinforcing parts, steel is bundled separately. Concrete pulverizers enable targeted exposure of the reinforcement; steels are cut with steel shear or Multi Cutters. Splitting work creates defined fragments that can be loaded efficiently. Cohesive drilling slurries must be collected and treated properly. Materials with special properties (e.g., bituminous waterproofing) must be recorded separately. Traceable documentation of material streams, correct waste codes, and, where applicable, pre-approval for on-site processing improve compliance and cost control.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Continuous control of construction states, photo documentation, and measurements (e.g., vibration, dust, noise) secure project success. Demolition edges, remaining wall thicknesses, and bearing areas are logged. Changes in the construction process are coordinated with structural planning. After demolition, the accompanying confirmation of the structural stability of the remaining structure is provided. Method statements, inspection and test plans, and updated as-built information form the basis for verifiable quality.<\/p>\n<h2>Typical mistakes and how to avoid them<\/h2>\n<ul>\n<li>Unclear load paths: check structural effects before demolition and plan shoring.<\/li>\n<li>Unsuitable methods: impact tools increase vibration; in basements, prefer concrete pulverizers or splitting technology.<\/li>\n<li>Oversized components: segment in time to enable manual or mechanical handling.<\/li>\n<li>Underestimated reinforcement: investigate reinforcement layers and provide suitable cutting tools (steel shear\/Multi Cutters).<\/li>\n<li>Insufficient ventilation and dust control: set up air routing, misting, and extraction.<\/li>\n<li>Water ingress: provide drainage and pumps, collect drilling water.<\/li>\n<li>Missing permits and notifications: clarify approvals, protection zones, and work windows early.<\/li>\n<li>Neglected waterproofing interfaces: protect and reinstate membranes and joints without delay.<\/li>\n<li>Under-dimensioned logistics: verify load-bearing capacities, container turnover, and transport routes.<\/li>\n<\/ul>\n<h2>Occupational safety and legal notes<\/h2>\n<p>Work in basements requires special attention to ventilation, lighting, escape routes, and communication. Personal protective equipment, qualified operators, and a clear hazard analysis are indispensable. Regulations and permits can vary regionally; compliance must be checked project-specifically. ATEX zones, pipelines, and contaminated sites must be clarified in advance and handled with suitable spark- and heat-reduced methods. Tools and hydraulic power packs from Darda GmbH must be operated according to the respective operating manuals and maintained regularly. Confined-space procedures, gas detection, lockout\/tagout for electrical and fluid energy, and practiced emergency drills are mandatory safeguards.<\/p>\n<h2>Suitability of tools for basement components<\/h2>\n<ul>\n<li>Thin to medium wall thicknesses and slab edges: concrete pulverizers for controlled removal and good edge quality.<\/li>\n<li>Massive foundations, thick floor slabs, isolated foundations: hydraulic wedge splitters for targeted opening without impact energy.<\/li>\n<li>High reinforcement content: combination of concrete pulverizer and subsequent steel separation with steel shear or Multi Cutters.<\/li>\n<li>Mixed materials and embedded components: combination hydraulic shear (demolition shear) for variable sections.<\/li>\n<li>Tank systems and pipelines: cutting torch for defined, spark-reduced separations.<\/li>\n<li>Confined geometry and low headroom: compact tools with remote operation and external power units for reduced noise and heat in the work area.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Basement demolition is among the most demanding disciplines in deconstruction. Tight access, low room heights, load-bearing interior walls, adjacent buildings, utility routing, and frequent groundwater contact require precise planning and low-vibration methods. In particular, concrete pulverizers suitable for selective demolition as well as hydraulic rock and concrete splitters enable controlled, <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20058","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Basement Demolition - Methods, Safety &amp; Planning<\/title>\n<meta name=\"description\" content=\"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Basement Demolition - Methods, Safety &amp; Planning\" \/>\n<meta property=\"og:description\" content=\"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-09T14:10:09+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basement-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basement-demolition\",\"name\":\"Basement Demolition - Methods, Safety & Planning\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-15T11:52:24+00:00\",\"dateModified\":\"2026-06-09T14:10:09+00:00\",\"description\":\"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basement-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basement-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/basement-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Basement demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Basement Demolition - Methods, Safety & Planning","description":"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition","og_locale":"en_US","og_type":"article","og_title":"Basement Demolition - Methods, Safety & Planning","og_description":"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-09T14:10:09+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition","name":"Basement Demolition - Methods, Safety & Planning","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-15T11:52:24+00:00","dateModified":"2026-06-09T14:10:09+00:00","description":"Expert guide to basement demolition \u2713 in construction with low vibration methods, selective deconstruction & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/basement-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/basement-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Basement demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20058","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20058"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20058\/revisions"}],"predecessor-version":[{"id":28192,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20058\/revisions\/28192"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}