{"id":20056,"date":"2026-01-15T10:13:54","date_gmt":"2026-01-15T09:13:54","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20056"},"modified":"2026-06-09T17:51:07","modified_gmt":"2026-06-09T15:51:07","slug":"underpinning","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/underpinning","title":{"rendered":"Underpinning"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Underpinning is a central method of structural safeguarding when foundations need to be strengthened, deepened, or transferred to more load-bearing soil layers. It is used primarily in inner-city existing buildings, adjacent new construction, special foundation engineering, and conversions when settlements, increased loads, or new excavations are planned deeper than existing foundations. Critical are <em>low-vibration<\/em>, controlled working methods to minimize cracking, vibrations, and impacts on the surroundings. In this context, selective deconstruction tools such as concrete pulverizers as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">stone and concrete splitters<\/a> from Darda GmbH play an important role, because they enable controlled, precise work on foundations and load-bearing components. In professional practice, underpinning is closely linked to structural safety, geotechnical assessment, and construction phase planning to ensure reliable load paths with verifiable documentation.<\/p>\n<h2>Definition: What is meant by underpinning?<\/h2>\n<p>Underpinning refers to the subsequent construction of a load-bearing, usually deeper foundation beneath an existing footing in order to transfer loads into suitable soil layers or to increase load-bearing capacity. Reasons can include changes in use and higher loads, settlement phenomena, ground improvement, lowering of the ground level, or deeper neighboring excavations. Underpinning is executed <strong>in sections<\/strong> to ensure the structural stability of the building at all times. Depending on the subsoil and boundary conditions, different methods are used &#8211; from traditional hand underpinning through micropiles and pressed piles to jet grouting. In contrast to shoring (temporary load transfer), underpinning is generally a <em>permanent<\/em> adaptation of the foundation with a documented load path and durable connections.<\/p>\n<ul>\n<li><strong>Typical triggers<\/strong>: differential settlements, increased vertical or horizontal loads, adjacent deep excavations, change of use, insufficient existing foundation depth, or variable subsoil conditions.<\/li>\n<li><strong>Objectives<\/strong>: stabilize, lower or re-level foundation bases, improve load distribution, and reduce deformation under service conditions.<\/li>\n<\/ul>\n<h2>Methods and construction techniques of underpinning<\/h2>\n<p>The choice of method depends on subsoil, groundwater, accessibility, sensitivity to vibration, and the required load level. The goal is always controlled load redistribution with minimal deformations. Selection should be supported by comparative design checks and, where useful, preliminary trials or method statements with measurable acceptance criteria.<\/p>\n<ul>\n<li><strong>Key selection criteria<\/strong>: available working height and width, permissible vibration and noise thresholds, groundwater management needs, interaction with neighboring structures, and interface to waterproofing systems.<\/li>\n<\/ul>\n<h3>Traditional hand underpinning in sections<\/h3>\n<p>For masonry and reinforced concrete foundations, small sections are underpinned one after the other. Each section is excavated, secured, filled with underpinning concrete, and connected monolithically to the existing foundation. Low-vibration cutting and exposure work are critical here. Concrete pulverizers are suitable for the selective removal of edges, plinths, and concrete bulges. Stone and concrete splitters help to open compact concrete or rock constituents <em>with minimal induced stress<\/em> where percussive methods would be too risky. Careful joint preparation and verification of bond and bearing are decisive for durable load transfer.<\/p>\n<h3>Micropile and pressed pile underpinning<\/h3>\n<p>Micropiles (e.g., grouted steel anchors or drilled, grouted piles) transfer loads into deeper, more competent layers. They are advantageous in confined access conditions and can be installed in sections. Pressed piles use the building\u2019s weight as a reaction force to press in pile elements. The load path is then established via a new bearing (pile clamp or reinforced concrete shoe). For precise exposure of pile connections, concrete pulverizers are helpful; reinforcing steel can be cleanly cut with steel shears or Multi Cutters. Verification typically includes pile load tests, proof of serviceability under cyclic loads, and controlled preloading where applicable.<\/p>\n<h3>Jet grouting (HDI\/jet grouting)<\/h3>\n<p>With jet grouting, soil is broken up with high-pressure, binder-bearing jets and solidified into columns or panels. These elements serve as underpinning bodies beneath the existing structure. Advantages include adaptability to heterogeneous subsoil and reduced vibrations. At contact zones with the existing structure, selective pre-deconstruction is often necessary &#8211; here, concrete pulverizers are suitable for precise edge work. Quality control requires confirmation of geometry and strength (e.g., cores, pressure tests) and secure structural coupling to the existing foundation.<\/p>\n<h3>Underpinning in rock and heterogeneous subsoil<\/h3>\n<p>If underpinning encounters rocky zones or rock lenses, controlled widening without impact energy is important. Stone and concrete splitters generate defined crack patterns and create precise fracture lines that are then selectively refined. This reduces settlement risks and vibrations in the existing structure. Pre-splitting along planned planes facilitates predictable break-out behavior and supports high-quality interfaces for concrete bonding.<\/p>\n<h2>Construction sequence and work steps<\/h2>\n<p>A structured sequence minimizes risks and ensures traceable quality assurance.<\/p>\n<ol>\n<li>Preliminary investigation: building survey, geotechnical investigation, identification of utilities, vibration sensitivities, and neighboring structures.<\/li>\n<li>Planning: selection of the method, section sizes, intermediate supports, drainage and groundwater control, and monitoring concept.<\/li>\n<li>Temporary safeguarding: propping\/shoring, creating auxiliary structures and protective measures.<\/li>\n<li>Selective deconstruction: exposing foundation edges, removing obstructive components. Concrete pulverizers enable material-friendly separation; reinforcement is separated with steel shears or Multi Cutters.<\/li>\n<li>Construction of underpinning elements: excavation per section, reinforcement\/formwork, concreting or installation of piles\/HDI elements, load-transferring connection.<\/li>\n<li>Load redistribution: step-by-step transfer of loads, controlled re-tensioning if required, intermediate inspections.<\/li>\n<li>Backfilling and reinstatement: cavity fillings, waterproofing, connection details, removal of temporary measures.<\/li>\n<li>Documentation and monitoring: crack logs, settlement measurements, vibration and groundwater checks until stabilization.<\/li>\n<\/ol>\n<ul>\n<li><strong>Best-practice checkpoints<\/strong>: confirm bearing capacity before advancing to the next section, verify contact pressure and grout\/concrete strength, and maintain clear access for inspection and emergency measures.<\/li>\n<\/ul>\n<h2>Design, dimensioning, and geotechnics<\/h2>\n<p>Underpinning requires structural and geotechnical design considering soil parameters, groundwater conditions, construction phases, neighboring loads, and potential settlements. Central aspects are the analysis of the existing structure, load redistribution, sizing of underpinning bodies, and detailing of connections. Monitoring (settlement pins, crack monitors, vibration measurements) accompanies execution. The recognized rules of the art and the relevant standards and guidelines apply; the selection of methods and threshold values should be project-specific and aligned with serviceability and ultimate limit states.<\/p>\n<ul>\n<li><strong>Monitoring options<\/strong>: precision leveling, in-place inclinometers, vibration and noise monitoring, strain gauges at critical connections, and groundwater observation wells.<\/li>\n<li><strong>Design details<\/strong>: shear keys, dowel patterns, surface preparation classes, corrosion protection for exposed reinforcement, and watertight joint concepts where required.<\/li>\n<\/ul>\n<h2>Tools and equipment in the underpinning environment<\/h2>\n<p>Underpinning requires tools that work <strong>precisely<\/strong>, <strong>with low vibration<\/strong>, and in confined spaces. Depending on the task, the following equipment is relevant:<\/p>\n<ul>\n<li>Concrete pulverizers: selective removal of foundation edges, plinths, and irregularities; exposing reinforcement; controlled deconstruction in the immediate vicinity of sensitive components.<\/li>\n<li>Stone and concrete splitters: splitting strong concrete and rock without percussive action; creating defined fracture lines in narrow excavations; reducing noise and vibration.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power packs<\/a>: power supply for hydraulic tools in confined spaces; matched to changing performance requirements.<\/li>\n<li>Steel shears and Multi Cutters: cutting reinforcing steel, sections, and embedded parts; a useful complement to concrete pulverizers in selective deconstruction.<\/li>\n<li>Combination shears: for mixed tasks of concrete breaking and steel cutting in composite components and hybrid sections.<\/li>\n<li>Hydraulic wedge splitters: pinpoint widening in natural stone or very dense concrete; useful for rock lenses beneath foundation soles.<\/li>\n<\/ul>\n<p>The selection of equipment depends on material, member thickness, accessibility, and the permissible vibration and noise thresholds of the project. Additional criteria include tool reach in confined pits, compatibility with available power supply, and dust and slurry management during exposure and cutting.<\/p>\n<h2>Application areas and typical scenarios<\/h2>\n<p>Underpinning is required in different constellations. The use of concrete pulverizers and stone and concrete splitters from Darda GmbH shows its strengths especially where low vibrations and precision are required. Typical fields range from foundation deepening in dense urban fabric to load path corrections in conversions with tight tolerances.<\/p>\n<h3>Concrete demolition and specialized deconstruction<\/h3>\n<p>For subsequent lowering of foundation soles, strengthening of basement slabs, or creating deep excavations adjacent to existing buildings, controlled separation works are essential. Concrete pulverizers allow millimeter-accurate removal of edges and protrusions at the foundation; splitters open massive zones without impact energy &#8211; an advantage in avoiding settlements and crack formation. Interface roughening and cleanliness of contact surfaces are crucial for reliable composite action.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before underpinning, utilities, inserts, and non-load-bearing components are often removed. In confined basements or shafts, hydraulic pulverizers and shears help to size components for handling and create safe working spaces. Systematic sequencing reduces unplanned load paths and shortens intervention times near sensitive structures.<\/p>\n<h3>Rock demolition and tunnel construction<\/h3>\n<p>For underpinning near rock or connected to tunnel structures, controlled splitting is a proven approach. Stone and concrete splitters enable defined fracture surfaces, protecting the stability of adjacent structures. Where permissible, pre-cutting and targeted splitting reduce overbreak and preserve designed bearing areas.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Tasks adjacent to underpinning in natural stone &#8211; for example, exposing and securing foundations on bedrock &#8211; benefit from splitting methods. Extraction techniques provide guidance for precise, crack-controlled work beneath existing edges. The result is predictable excavation geometry with minimized disturbance.<\/p>\n<h3>Special applications<\/h3>\n<p>In areas with restricted access, sensitive neighboring buildings, or highly sensitive facilities (e.g., laboratories, hospitals), low vibration, dust, and noise emissions are essential. Concrete pulverizers and splitters support safe execution in such special applications. Supplementary shielding, negative pressure zones, and timed working windows can further limit impacts.<\/p>\n<h2>Risks, protective measures, and monitoring<\/h2>\n<p>Underpinning intervenes in the stability of the existing structure. Careful risk management is therefore indispensable.<\/p>\n<ul>\n<li>Settlements and cracks: execute in sections, provide adequate intermediate supports, dose load redistribution, and conduct continuous measurements.<\/li>\n<li>Vibrations and noise: prefer <em>splitting<\/em> and cutting methods instead of percussive techniques; the use of concrete pulverizers and stone and concrete splitters reduces vibration peaks.<\/li>\n<li>Groundwater: sealing, temporary lowering or dewatering; protect neighboring foundations against hydraulic heave.<\/li>\n<li>Building materials and reinforcement: clean exposure and cutting; use steel shears\/Multi Cutters for controlled cuts without inadmissible edge damage.<\/li>\n<li>Neighboring structures: vibration monitoring, crack logs, suitable stand-off distances, and documentation of the as-is condition before starting work.<\/li>\n<li><strong>Contingency planning<\/strong>: define stop criteria, emergency propping, and communication channels in case of unexpected movements or groundwater ingress.<\/li>\n<\/ul>\n<h2>Peculiarities in existing structures and heritage conservation<\/h2>\n<p>Historic masonry, natural stone foundations, and mixed existing sections are sensitive to vibrations and moisture changes. Gentle underpinning combines small-format sections, minimal interventions, and precise tools. Concrete pulverizers allow subtle edge finishing; splitters limit crack propagation in a controlled manner &#8211; both support a material-friendly approach. Reversible measures and mortar compatibility should be considered where conservation requirements apply.<\/p>\n<h2>Quality assurance and documentation<\/h2>\n<p>Quality arises from traceable processes: inspection plans, approvals for each underpinning section, concrete records, injection logs, pile load tests, and ongoing monitoring. Finally, as-built documentation, measurement series, and maintenance instructions for any measuring points must be handed over. A clear separation between temporary and permanent elements, including labeling, facilitates future inspections.<\/p>\n<ul>\n<li><strong>Acceptance criteria<\/strong>: verified bearing contact, achieved strengths, tolerances for settlement and inclination, watertightness at critical interfaces, and complete monitoring records.<\/li>\n<li><strong>Documentation set<\/strong>: method statements, risk assessments, calibration certificates for monitoring devices, inspection and test plans, and final performance reports.<\/li>\n<\/ul>\n<h2>Distinction: underpinning, shoring, re-foundation<\/h2>\n<p>Shoring assumes loads temporarily (e.g., during excavation). Underpinning is the subsequent, permanent construction of deeper foundation bodies beneath the existing structure. Re-foundation includes supplementary measures to increase load-bearing capacity, such as micropiles adjacent to existing foundations. In practice, these terms overlap; decisive are the permanent load path and the documented load redistribution.<\/p>\n<h2>Practical execution notes<\/h2>\n<ul>\n<li>Keep section sizes small and begin the next section only after sufficient hardening or proof of load-bearing capacity.<\/li>\n<li>Prepare contact joints and connections carefully and construct them to transfer loads; remove loose existing parts with concrete pulverizers.<\/li>\n<li>Identify reinforcement before cutting; use steel shears and Multi Cutters in a controlled manner to avoid unintended load redistribution.<\/li>\n<li>Prefer splitting where rock is encountered; stone and concrete splitters reduce microcracks and unwanted fracture propagation.<\/li>\n<li>Start monitoring early, define thresholds project-specifically, and log measurements consistently.<\/li>\n<li>Plan logistics in tight spaces: position hydraulic power packs ergonomically, keep hose routing secure underfoot and orderly.<\/li>\n<li>Coordinate interfaces with waterproofing and drainage concepts to maintain durability and avoid leakage paths.<\/li>\n<li>Use trial sections or mock-ups where feasibility, vibration limits, or contact preparation methods require validation.<\/li>\n<li>Maintain clear access for inspections, load transfer checks, and emergency propping throughout all phases.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Underpinning is a central method of structural safeguarding when foundations need to be strengthened, deepened, or transferred to more load-bearing soil layers. It is used primarily in inner-city existing buildings, adjacent new construction, special foundation engineering, and conversions when settlements, increased loads, or new excavations are planned deeper than existing <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/underpinning\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20056","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Underpinning - Foundation Strengthening Methods<\/title>\n<meta name=\"description\" content=\"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques &amp; safety.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/underpinning\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Underpinning - Foundation Strengthening Methods\" \/>\n<meta property=\"og:description\" content=\"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques &amp; safety.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/underpinning\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-09T15:51:07+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/underpinning\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/underpinning\",\"name\":\"Underpinning - Foundation Strengthening Methods\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-15T09:13:54+00:00\",\"dateModified\":\"2026-06-09T15:51:07+00:00\",\"description\":\"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques & safety.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/underpinning#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/underpinning\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/underpinning#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Underpinning\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Underpinning - Foundation Strengthening Methods","description":"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques & safety.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/underpinning","og_locale":"en_US","og_type":"article","og_title":"Underpinning - Foundation Strengthening Methods","og_description":"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques & safety.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/underpinning","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-09T15:51:07+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/underpinning","url":"https:\/\/www.darda.de\/en\/knowledge\/underpinning","name":"Underpinning - Foundation Strengthening Methods","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-15T09:13:54+00:00","dateModified":"2026-06-09T15:51:07+00:00","description":"Discover how underpinning stabilizes building foundations \u2713 methods, low vibration techniques & safety.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/underpinning#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/underpinning"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/underpinning#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Underpinning"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20056"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20056\/revisions"}],"predecessor-version":[{"id":28196,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20056\/revisions\/28196"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}