{"id":20050,"date":"2026-01-14T15:47:39","date_gmt":"2026-01-14T14:47:39","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20050"},"modified":"2026-06-09T15:29:10","modified_gmt":"2026-06-09T13:29:10","slug":"environmental-law-in-construction","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction","title":{"rendered":"Environmental law in construction"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Environmental law in construction governs how construction projects, deconstruction and demolition are planned and executed so that resources are conserved, emissions are minimized, and protected assets such as soil, water, air, fauna, and flora are preserved. For practical work in <strong>concrete demolition<\/strong>, <strong>building gutting<\/strong>, <strong>rock excavation<\/strong>, and <strong>special demolition<\/strong>, environmental law shapes the choice of methods and tools &#8211; for example, the use of <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong> in noise\u2011sensitive zones or within <strong>groundwater protection<\/strong>. The contents of this article connect fundamentals of environmental law in construction with practical guidance on Darda GmbH equipment technology and typical areas of application &#8211; fact\u2011based, objective, and without promotional claims. Sound environmental compliance mitigates permitting risks, avoids stoppages and claims, and strengthens acceptance among stakeholders.<\/p>\n<h2>Definition: What is meant by environmental law in construction?<\/h2>\n<p>Environmental law in construction refers to the body of public law provisions that regulate construction and deconstruction projects from the perspective of environmental and nature conservation, emissions control, waste and circular economy, water and soil protection, and species protection. This includes approval and notification procedures, precautionary and minimization principles, requirements for construction site organization, verification and documentation obligations, as well as stipulations regarding noise, vibrations, dust, harvest and breeding seasons, contaminated materials, and wastewater. As a result, these requirements directly influence the choice of methods in demolition and special demolition &#8211; whether with <em>splitting<\/em> or <em>cutting<\/em> methods, with hydraulically powered tools, or with conventional techniques.<\/p>\n<ul>\n<li><strong>Principle of prevention and precaution:<\/strong> Avoid environmental impacts at the source, plan buffers, and apply suitable safeguards.<\/li>\n<li><strong>Proportionality and polluter-pays:<\/strong> Measures must be effective and appropriate, with costs borne by the originator of impacts.<\/li>\n<li><strong>Best available techniques:<\/strong> Prefer low\u2011emission, low\u2011vibration, and resource\u2011efficient methods where feasible.<\/li>\n<li><strong>Waste hierarchy:<\/strong> Prevention before preparation for reuse, recycling, other recovery, and disposal.<\/li>\n<\/ul>\n<h2>Legal framework and duties on the construction site<\/h2>\n<p>The applicable environmental requirements depend on the specific project, the location (e.g., inner\u2011city, water protection area, natural environment), the substances used, and the applied process technology. Common sources include planning and building regulations, emissions control, water and soil protection, nature conservation, circular economy rules, and hazardous substances regulation. Typical conditions include:<\/p>\n<ul>\n<li>Limits or time windows for <strong>noise<\/strong>, <strong>vibrations<\/strong>, and <strong>dust<\/strong>, as well as requirements for enclosure and negative\u2011pressure containment during <strong>building gutting<\/strong>.<\/li>\n<li>Specifications for <strong>water protection<\/strong> (separators, drip trays, sealing, handling of cooling and process water).<\/li>\n<li>Rules for <strong>construction waste separation<\/strong>, recovery, and verification (keeping concrete, <strong>reinforcing steel<\/strong>, metals, timber, ceramics, insulation materials separate; hazardous waste separately).<\/li>\n<li>Precautions against soil contamination (ground protection, traffic routes, leakage prevention for <strong>hydraulic power pack<\/strong> systems).<\/li>\n<li>Species protection considerations (access, breeding and rearing seasons, bat and bird roosts in buildings and rock areas).<\/li>\n<li>Traffic and logistics management (transport routes, low\u2011emission zones, delivery time windows, on\u2011site routing).<\/li>\n<li>Temporary storage of hazardous substances (bunding, labelling, compatibility, fire and spill protection).<\/li>\n<\/ul>\n<h3>Typical permits and notifications<\/h3>\n<ul>\n<li>Demolition or deconstruction permits and required notifications to authorities and utilities.<\/li>\n<li>Permissions for works in water or groundwater protection areas, including discharge permits.<\/li>\n<li>Exemptions related to nature and trees, timing windows for species protection, access to habitats.<\/li>\n<li>Traffic management schemes, road occupancy permits, and noise time\u2011window approvals.<\/li>\n<\/ul>\n<p>For the selection of technical processes, low\u2011emission and low\u2011vibration methods are often advantageous. Where possible, contractors rely on <strong>hydraulic splitter<\/strong>, <strong>hydraulic wedge splitter<\/strong> and <strong>concrete demolition shear<\/strong> to avoid blasting or impact\u2011intensive methods and to reduce emissions.<\/p>\n<h2>Low\u2011emission demolition and deconstruction methods<\/h2>\n<p>Reducing noise, vibration, and dust is a core concern of environmental law. Tool selection and sequencing determine whether limits are met and whether residents, workforces, or sensitive facilities are protected. Method statements and small\u2011scale mock\u2011ups help validate emissions before full production starts.<\/p>\n<h3>Noise reduction through splitting and cutting methods<\/h3>\n<p>Splitting technology such as <strong>hydraulic splitter<\/strong> works with controlled, static pressure, typically generating lower peak sound levels than impact methods. <strong>Concrete demolition shear<\/strong>, <strong>hydraulic shear<\/strong>, <strong>steel shear<\/strong>, and <strong>Multi Cutters<\/strong> cut and downsize components precisely; in combination with suitable <strong>hydraulic power pack<\/strong>s, noise emissions can be influenced, for example via speed and <strong>operating pressure<\/strong> management. Positioning power packs remotely, using acoustic screens, and scheduling noisy steps in approved time windows further reduces exposure.<\/p>\n<ul>\n<li>Optimize tool settings (speed, pressure) for emission\u2011reduced operation.<\/li>\n<li>Use temporary acoustic barriers and enclosures where propagation must be limited.<\/li>\n<li>Separate cutting and handling zones to minimize cumulative noise.<\/li>\n<\/ul>\n<h3>Low\u2011vibration methods in sensitive areas<\/h3>\n<p>In buildings with vibration\u2011sensitive surroundings (medical technology, laboratories, heritage structures, inner\u2011city existing buildings), <em>static<\/em> or <em>hydraulic<\/em> methods are often advantageous. <strong>Concrete demolition shear<\/strong> and <strong>hydraulic wedge splitter<\/strong> transmit forces without impact pulses &#8211; an advantage where vibration guidelines limit what is permissible. Trial operations with real\u2011time monitoring and adjusted advance rates help safeguard compliance.<\/p>\n<h3>Dust minimization and material handling<\/h3>\n<p>Dust arises particularly when breaking and cutting mineral construction materials. A combination of <strong>wet methods<\/strong>, dust extraction, and closed material pathways (e.g., direct placement into bins) reduces emissions. In selective deconstruction, <strong>pre\u2011cutting<\/strong> with shears followed by <strong>splitting<\/strong> with hydraulic splitter can limit dust and secondary breakage.<\/p>\n<ul>\n<li>Apply fine water mist close to the source to suppress particles without excess runoff.<\/li>\n<li>Use local extraction with suitable filters and maintain equipment seals.<\/li>\n<li>Plan sealed chutes and short transfer paths to prevent dust release.<\/li>\n<\/ul>\n<h2>Waste law, circular economy, and material flow management<\/h2>\n<p>Environmental law requires high\u2011quality recovery of construction and demolition waste and robust documentation. Technology supports this by facilitating <strong>construction waste separation<\/strong> and producing clean fractions. Clear classification according to applicable waste codes and acceptance criteria is essential for compliant routing.<\/p>\n<ul>\n<li><strong>Concrete and masonry:<\/strong> Pre\u2011breaking with <strong>concrete demolition shear<\/strong> or splitting technology to expose reinforcement; targeted lifting of entire components promotes single\u2011grade processing.<\/li>\n<li><strong>Reinforcing steel and metals:<\/strong> <strong>steel shear<\/strong> and <strong>hydraulic shear<\/strong> cut reinforcement, railings, or beams; <strong>Multi Cutters<\/strong> assist with mixed materials.<\/li>\n<li><strong>Tanks and containers:<\/strong> Tools such as the <a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">tank cutter TC120<\/a> are used after proper emptying and cleaning to avoid contamination; vapors and residues must be captured safely.<\/li>\n<li><strong>Insulation and composite elements:<\/strong> Targeted cutting and separation with <strong>Multi Cutters<\/strong> enable clean fractions and prevent cross\u2011contamination.<\/li>\n<\/ul>\n<p>A clear process plan &#8211; from the gutting step through downsizing to transport &#8211; enables short routes, reduced rehandling, and seamless assignment to disposal and recovery pathways, supporting efficient <strong>haulage logistics<\/strong>. Container labelling, weigh tickets, and chain\u2011of\u2011custody records ensure traceability.<\/p>\n<h2>Water and soil protection during deconstruction<\/h2>\n<h3>Hydraulic power packs and leakage prevention<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power packs<\/a> are the heart of many tools &#8211; from <strong>concrete demolition shear<\/strong> to <strong>hydraulic splitter<\/strong>. Sealing surfaces, couplings, and hoses should be routed so that any drips are contained. Drip trays, laydown areas with impermeable liner, and spare absorbents are common measures. Maintenance and regular visual inspections reduce the risk of soil contamination. Where specified, biodegradable hydraulic fluids can further mitigate residual risks.<\/p>\n<h3>Wet methods and wastewater treatment<\/h3>\n<p>During wet cutting or dust suppression, coarse particles and fine sediments must be retained. Discharges should pass through separators; for mineral dusts, settling in sedimentation tanks helps. Process water must be handled separately from rainwater. Depending on local requirements, pH adjustment for concrete wash water and permits for discharge or off\u2011site treatment may be necessary.<\/p>\n<h2>Nature and species protection in rock excavation and tunnel construction<\/h2>\n<p>In <a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a>, species and biotope protection requirements apply. Breeding seasons, spawning grounds, bat roosts, and rock vegetation can influence the schedule. <strong>Splitting methods<\/strong> using <strong>hydraulic wedge splitter<\/strong> or <strong>hydraulic splitter<\/strong> create targeted crack patterns with limited far\u2011field effects. This reduces disturbance where vibration or noise requirements are stringent. Ecological supervision, defined access corridors, and adjusted working hours support compliance in sensitive habitats.<\/p>\n<h2>Special locations and sensitive environments<\/h2>\n<p>Inner cities, hospitals, educational facilities, industrial plants with ongoing production, or monuments impose heightened environmental requirements. In these settings, <strong>concrete demolition shear<\/strong>, <strong>hydraulic shear<\/strong>, and <strong>hydraulic splitter<\/strong> are established solutions to release components precisely, limit construction dust, and avoid vibrations. For <em>gutting and cutting<\/em>, <strong>Multi Cutters<\/strong> and <strong>steel shear<\/strong> offer flexible options before load\u2011bearing structures are systematically downsized. Coordinated logistics, clean access routes, and temporary enclosures maintain site hygiene and protect adjacent uses.<\/p>\n<h2>Planning, tendering, and documentation<\/h2>\n<p>Environmental requirements belong in every project phase &#8211; from feasibility to site supervision. A structured approach helps fulfill conditions reliably and avoid friction losses.<\/p>\n<ol>\n<li><strong>Identify boundary conditions:<\/strong> Site, protected areas, neighborhood, utility inventories, <strong>contaminated sites<\/strong>, water conditions, and species\u2011protection aspects.<\/li>\n<li><strong>Method selection and construction sequence:<\/strong> Prefer low\u2011emission technology (e.g., <strong>concrete demolition shear<\/strong>, <strong>hydraulic splitter<\/strong>), define sequences, plan material and traffic routes.<\/li>\n<li><strong>Waste and material flow concept:<\/strong> <strong>construction waste separation<\/strong>, interim storage, container logistics, recovery and disposal records, weigh tickets, and documentation.<\/li>\n<li><strong>Measurement and monitoring concept:<\/strong> Dust, noise, vibrations (with <strong>ground vibration monitoring<\/strong> as needed), and possibly groundwater; define measures for exceedances.<\/li>\n<li><strong>Documentation:<\/strong> Site diary, delivery notes, disposal certificates, photo documentation, test reports, and handover records.<\/li>\n<li><strong>Handover and lessons learned:<\/strong> Close\u2011out report with monitoring results, deviations, and improvement actions for future projects.<\/li>\n<\/ol>\n<h2>Organization, qualification, and occupational safety with environmental relevance<\/h2>\n<p>Training and instruction ensure safe handling of environmentally relevant equipment. This includes:<\/p>\n<ul>\n<li>Competent use of hydraulic tools (pressure, cutting forces, access for splitting) and environmentally responsible maintenance<\/li>\n<li>Proper response to leaks and media release (immediate actions, reporting, disposal)<\/li>\n<li>Dust\u2011reduced work methods (wet cutting, dust extraction, enclosure)<\/li>\n<li>Clean material flow to keep fractions separate and avoid mixing<\/li>\n<li>Regular toolbox talks and environmental incident drills to maintain awareness and readiness<\/li>\n<\/ul>\n<p>Good organization links environmental and <strong>occupational safety<\/strong>: clear responsibilities, checklists, regular walk\u2011downs, and pragmatic communication with site management and supervision ensure compliance with requirements.<\/p>\n<h2>Technology selection in line with environmental law in construction<\/h2>\n<p>The choice of tools directly affects environmental impacts and permitting. <strong>Concrete demolition shears<\/strong> are ideal for controlled release and downsizing of concrete components in noise\u2011sensitive areas. <strong>Hydraulic splitter<\/strong> show their strengths where vibrations must be limited, e.g., in <em>concrete demolition and special demolition<\/em> or in <em>rock excavation and tunnel construction<\/em>. <strong>Hydraulic shear<\/strong> and <strong>steel shear<\/strong> facilitate separation of reinforcement and steel sections, <strong>Multi Cutters<\/strong> support selective deconstruction of complex installations, and tank cutters are used in <em>gutting and cutting<\/em> of vessels once emptied and cleaned. In this way, environmental conditions &#8211; such as those on emissions, material flows, and water protection &#8211; can be addressed methodically. Early integration of environmental targets into method statements secures consistent execution on site.<\/p>\n<h2>Digital documentation and continuous improvement<\/h2>\n<p>Digital site diaries, photo documentation, and systematic recording of material flows support verification. Measurements of noise, vibrations, and dust, combined with maintenance records for <strong>hydraulic power packs<\/strong> and tools, make audits and internal evaluations easier. Those who analyze results and adapt processes reduce environmental impacts step by step &#8211; in the spirit of effective precaution and a lived circular economy. Integrating sensor data and dashboards allows transparent tracking of limits and timely corrective action.<\/p>\n<h3>Data protection and retention periods<\/h3>\n<p>Environmental and monitoring data should be stored securely for the required retention periods, with access rights defined. Calibration certificates, maintenance logs, and measurement reports must remain traceable; personal data in images or logs require appropriate protection in line with applicable privacy rules.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Environmental law in construction governs how construction projects, deconstruction and demolition are planned and executed so that resources are conserved, emissions are minimized, and protected assets such as soil, water, air, fauna, and flora are preserved. For practical work in concrete demolition, building gutting, rock excavation, and special demolition, environmental <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20050","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Environmental Law in Construction &amp; Demolition<\/title>\n<meta name=\"description\" content=\"How to comply with environmental law in construction \u2713 permits, noise &amp; dust, waste, water and species protection.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Environmental Law in Construction &amp; Demolition\" \/>\n<meta property=\"og:description\" content=\"How to comply with environmental law in construction \u2713 permits, noise &amp; dust, waste, water and species protection.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-09T13:29:10+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-law-in-construction\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-law-in-construction\",\"name\":\"Environmental Law in Construction & Demolition\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-14T14:47:39+00:00\",\"dateModified\":\"2026-06-09T13:29:10+00:00\",\"description\":\"How to comply with environmental law in construction \u2713 permits, noise & dust, waste, water and species protection.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-law-in-construction#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-law-in-construction\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-law-in-construction#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Environmental law in construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Environmental Law in Construction & Demolition","description":"How to comply with environmental law in construction \u2713 permits, noise & dust, waste, water and species protection.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction","og_locale":"en_US","og_type":"article","og_title":"Environmental Law in Construction & Demolition","og_description":"How to comply with environmental law in construction \u2713 permits, noise & dust, waste, water and species protection.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-09T13:29:10+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction","url":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction","name":"Environmental Law in Construction & Demolition","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-14T14:47:39+00:00","dateModified":"2026-06-09T13:29:10+00:00","description":"How to comply with environmental law in construction \u2713 permits, noise & dust, waste, water and species protection.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-law-in-construction#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Environmental law in construction"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20050"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20050\/revisions"}],"predecessor-version":[{"id":28190,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20050\/revisions\/28190"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}