{"id":20046,"date":"2026-01-14T16:39:49","date_gmt":"2026-01-14T15:39:49","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20046"},"modified":"2026-09-12T19:53:35","modified_gmt":"2026-09-12T17:53:35","slug":"environmental-impact-on-the-construction-site","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site","title":{"rendered":"Environmental impact on the construction site"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Construction sites affect air, water, soil, and the surroundings of people and nature. Whether <a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and deconstruction<\/a>, gutting works in an industrial building, or rock excavation in tunnel heading &#8211; every activity generates emissions such as dust, noise, vibrations, wastewater, or waste. Professional handling of methods and tools &#8211; for example, the use of <strong>concrete demolition shear<\/strong> or <strong>hydraulic splitter<\/strong> &#8211; helps mitigate environmental effects, control processes, and conserve resources.<\/p>\n<h2>Definition: What is meant by environmental impact on the construction site?<\/h2>\n<p>\u201cEnvironmental impact on the construction site\u201d refers to the totality of <em>environmental impacts<\/em> that arise from construction, demolition, and deconstruction processes. These include emissions to air (fine dust, exhaust gases), noise and vibrations, effects on water and soil (discharges, inputs, contamination), the handling of material flows (waste, recycling), as well as the consumption of energy and raw materials. The focus is on reducing these burdens through appropriate planning, low-emission methods, and careful execution &#8211; particularly in sensitive environments such as inner-city locations, near bodies of water, industrial areas, or underground construction sites. In line with the mitigation hierarchy, priority is given to avoidance, then reduction, then safe treatment or compensation.<\/p>\n<h2>Emissions and protective measures on the construction site<\/h2>\n<p>Construction site emissions can be grouped into air, noise\/vibrations, water\/soil, waste, and energy. Effective protective measures start with selecting the right method and extend to continuous monitoring, with source control preferred over downstream treatment.<\/p>\n<h3>Air: dust and exhaust gases<\/h3>\n<p>Dust is generated primarily during crushing, cutting, and material handling. The carbon footprint and NOx profile are shaped by inbound and outbound transport, power units, and machine operation. Dust generation from <strong>concrete splitters<\/strong> and <strong>concrete demolition shears<\/strong> depends on the material, tool configuration, and controls and must be measured for the selected application.<\/p>\n<ul>\n<li>Dust reduction: localized water misting, extraction, low-dust methods (concrete demolition shear, hydraulic splitter)<\/li>\n<li>Exhaust reduction: electric hydraulic power pack, efficient work planning, avoid idling<\/li>\n<li>Additional controls: sealed cabs with filtration, pre-cleaning of workfaces, sequencing to minimize concurrent dust sources<\/li>\n<\/ul>\n<h3>Noise and vibrations<\/h3>\n<p>Impacting methods produce high sound pressure levels and vibration. <strong>Hydraulic splitter<\/strong> and <strong>Concrete demolition shear<\/strong> operate with low vibration, which offers advantages in inner-city settings or near sensitive structures.<\/p>\n<ul>\n<li>Noise mitigation: low-vibration tools, low-noise operation, shielding<\/li>\n<li>Vibration control: geotechnical preliminary investigation, ground vibration monitoring, splitting rather than impacting methods<\/li>\n<li>Operational good practice: tool maintenance, speed control, and phased work to limit peak levels<\/li>\n<\/ul>\n<h3>Water and soil<\/h3>\n<p>Risks arise from process water, slurries, oils, and fines. Clean separation of water circuits and tight construction logistics are crucial.<\/p>\n<ul>\n<li>Water protection: closed-loop circulation, separators, sedimentation, pH neutralization as required<\/li>\n<li>Soil protection: containment pans, sealed work surfaces, emergency kits for leaks<\/li>\n<li>Site logistics: defined refueling and washing areas, sump management, and controlled discharge points<\/li>\n<\/ul>\n<h3>Waste and resources<\/h3>\n<p>Selective deconstruction facilitates recycling. Tools such as <strong>concrete demolition shear<\/strong>, <strong>steel shear<\/strong>, or <strong>hydraulic demolition shear<\/strong> pre-separate material types, reduce transport volume, and improve the recycling rate.<\/p>\n<ul>\n<li>Separate collection: concrete, steel, non-ferrous metals, wood, insulating material<\/li>\n<li>Resource efficiency: source-pure separation, low secondary breakage, reuse of elements<\/li>\n<li>Quality assurance: contamination avoidance, clear labeling, and predefined recycling routes<\/li>\n<\/ul>\n<h2>Environmental effects in typical application areas<\/h2>\n<p>Depending on the activity, the emissions profile, protection needs, and technical options change.<\/p>\n<h3>Concrete demolition and special demolition<\/h3>\n<p>In heavy deconstruction, dust, noise, and vibrations dominate. <strong>Concrete demolition shears<\/strong> avoid percussive impact energy and create controlled separation joints. <strong>Hydraulic splitters<\/strong> open concrete members in a targeted manner; vibration and noise effects must be assessed for the selected application. Sequenced removal and pre-weakening further reduce peak loads.<\/p>\n<h3>Gutting works and cutting<\/h3>\n<p>For interior dismantling, dust avoidance and source-pure material streams take priority. <strong>Multi cutters<\/strong> and <strong>hydraulic demolition shears<\/strong> facilitate selective separation; <strong>steel shears<\/strong> enable sectioning without thermal cutting. With <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">electric hydraulic power units<\/a>, exhaust emissions can be avoided inside the building. Enclosures and negative pressure concepts help retain particulates.<\/p>\n<h3>Rock excavation and tunnel construction<\/h3>\n<p>Underground, air quality, vibrations, and material logistics are critical. <strong>Rock wedge splitter<\/strong> and <strong>Hydraulic splitter<\/strong> enable low-vibration advance or enlargement work; the lower dust and pressure wave load eases the ventilation demand. Defined blast-free zones and precision splitting protect existing structures and lining.<\/p>\n<h3>Natural stone extraction<\/h3>\n<p>Resource conservation means releasing rock with as few cracks as possible. Splitting methods create smooth separation faces and minimize offcuts. This protects adjacent layers and reduces secondary fragmentation. Orientation along natural bedding additionally improves yield and preserves block quality.<\/p>\n<h3>Special operations<\/h3>\n<p>For tanks, vessels, or in explosion-hazard environments, the focus is on low-spark operation, leakage protection, and controlled cutting. <strong><a href=\"https:\/\/www.darda.de\/en\/product\/tank-cutter-tc120\">tank cutters<\/a><\/strong> support safe dismantling under special constraints; accompanying measures include gas-free certification and containment systems. Hot-work permits and atmosphere monitoring round off the safety concept.<\/p>\n<h2>Process engineering in the context of environmental compatibility<\/h2>\n<p>The choice of tool shapes emissions, quality, and safety. Hydraulic technology enables controlled, pinpoint interventions; surrounding dust, noise and vibration loads must be measured or predicted for the project. Matching tool geometry and power unit to the substrate further reduces rework and waste.<\/p>\n<h3>Concrete demolition shear<\/h3>\n<p>Concrete demolition shears from Darda GmbH crush and shear concrete; dust and noise depend on tool configuration, material, operating sequence and accompanying controls &#8211; especially valuable in <em>selective deconstruction<\/em> and densely built environments.<\/p>\n<h3>Hydraulic splitter<\/h3>\n<p>Splitters produce controlled crack lines instead of impact breakage. Vibration and noise peaks must be measured for the selected non-percussive method and compared with a defined percussive alternative under equivalent conditions. In <strong>tunnel construction<\/strong>, at sensitive foundations, or near existing buildings, this is a major advantage.<\/p>\n<h3>Hydraulic power pack<\/h3>\n<p>The choice of power unit influences exhaust, noise, and energy efficiency. Electrically driven hydraulic power packs from Darda GmbH produce no direct combustion-exhaust emissions at the point of use. Noise, power demand, idle time and electricity-related emissions must be assessed separately for the selected setup.<\/p>\n<h3>Combination shears, Multi cutters, steel shears<\/h3>\n<p>These tools promote source-pure separation of steel, cables, and composite elements. Clean cut edges simplify recycling and reduce rework. Interchangeable jaw concepts increase flexibility and reduce the number of machines required on site.<\/p>\n<h3>Tank cutters<\/h3>\n<p>For vessels and pipelines, a low-spark, controlled cutting path is essential. Combined with gas-free certification, extraction, and containment systems, environmental and safety risks can be reduced. Decontamination and residue handling should be defined prior to cutting.<\/p>\n<h2>Minimizing dust, noise, and vibrations<\/h2>\n<p>A bundle of technology, working methods, and shielding leads to measurable relief.<\/p>\n<ul>\n<li>Dust: targeted wetting, enclosed work areas, extraction, splitting and shearing methods ahead of impacting ones<\/li>\n<li>Noise: quiet tool selection (concrete demolition shear, hydraulic splitter), damping underlays, time scheduling<\/li>\n<li>Vibrations: preliminary investigation, ground vibration monitoring, splitting approach, stepwise release instead of full removal in one pass<\/li>\n<li>Smart sequencing: pre-cut, pre-split, and lift-out strategies to avoid uncontrolled breakage<\/li>\n<\/ul>\n<h2>Water and soil protection in the construction process<\/h2>\n<p>Protecting environmental media starts at the source and relies on separation rather than mixing.<\/p>\n<h3>Process water and slurries<\/h3>\n<p>Water from cooling and cutting processes is collected, sediments are separated, and &#8211; if required &#8211; conditioned. A closed loop minimizes discharges. Defined turbidity and pH targets support compliant discharge or reuse.<\/p>\n<h3>Leakage and substance release protection<\/h3>\n<p>Sealed surfaces, containment pans, and emergency kits belong in the daily setup. In hydraulic systems, careful maintenance reduces the risk of oil loss. Low-leak couplings and hose protection sleeves add an extra safeguard.<\/p>\n<h2>Resource conservation and circular economy<\/h2>\n<p>Any effect of selective deconstruction on primary raw material demand or the carbon footprint must be calculated against a defined alternative with stated system boundaries and documented data.<\/p>\n<ul>\n<li>Pre-segmentation with <strong>concrete demolition shear<\/strong> to expose reinforcement<\/li>\n<li>Split instead of crush to preserve larger elements<\/li>\n<li>Early sorting: concrete, steel, non-ferrous metals, plastics, wood<\/li>\n<li>Documentation of material flows for quality assurance<\/li>\n<li>Digital material passports and clear handover criteria to recyclers<\/li>\n<\/ul>\n<h2>Planning, measurement, and documentation<\/h2>\n<p>Environmental objectives become achievable when they are measurable and anchored in the workflow.<\/p>\n<h3>Planning<\/h3>\n<ul>\n<li>Identify environment-relevant risks (dust, noise, water, soil, vibration)<\/li>\n<li>Prioritize method selection: splitting\/shearing ahead of impacting where technically feasible<\/li>\n<li>Optimize construction logistics: short routes, consolidated transport, clean separation<\/li>\n<li>Define method statements, permit matrices, and responsibilities<\/li>\n<\/ul>\n<h3>Monitoring<\/h3>\n<ul>\n<li>Air: measure PM10\/PM2.5 at hotspots<\/li>\n<li>Noise and vibrations: monitor levels and thresholds<\/li>\n<li>Water\/soil: visual checks, inspect separators, leakage drills<\/li>\n<li>Quality: use calibrated devices, set action thresholds, and trend data for early intervention<\/li>\n<\/ul>\n<h3>Documentation<\/h3>\n<ul>\n<li>Maintain work and measurement logs<\/li>\n<li>Keep records of material flows<\/li>\n<li>Analyze deviations and sharpen measures<\/li>\n<li>Ensure traceability and data retention according to project requirements<\/li>\n<\/ul>\n<h2>Legal framework and good practice<\/h2>\n<p>Depending on the location, different requirements apply to noise, dust, water, waste, and hazardous substances. In practice, a precautionary approach has proven itself: conservative assumptions, early coordination with stakeholders, and the choice of environmentally compatible methods. Legal requirements are case-specific; binding information is issued by the competent authorities. This text does not constitute legal advice and cannot replace project-specific approvals.<\/p>\n<h2>Practical steps for environmentally conscious construction sites<\/h2>\n<ol>\n<li>Set targets (dust, noise, vibration, water, recycling rates)<\/li>\n<li>Define methods (e.g., <strong>concrete demolition shear<\/strong>, <strong>hydraulic splitter<\/strong>) and select power units<\/li>\n<li>Plan construction logistics (separation, routes, time windows)<\/li>\n<li>Set up protective measures (misting, shielding, containment systems)<\/li>\n<li>Start monitoring, document results, and adjust workflows<\/li>\n<li>Conduct post-project review to capture lessons learned and optimize future works<\/li>\n<\/ol>\n<p>The dust, noise and vibration effects of splitting and shearing technology must be assessed against a defined alternative under comparable conditions. Effects on neighboring uses, environmental receptors, existing structures and material recovery are project-specific.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction sites affect air, water, soil, and the surroundings of people and nature. Whether concrete demolition and deconstruction, gutting works in an industrial building, or rock excavation in tunnel heading &#8211; every activity generates emissions such as dust, noise, vibrations, wastewater, or waste. Professional handling of methods and tools &#8211; <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20046","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Site Environmental Impact Guide<\/title>\n<meta name=\"description\" content=\"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Site Environmental Impact Guide\" \/>\n<meta property=\"og:description\" content=\"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:35+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-impact-on-the-construction-site\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-impact-on-the-construction-site\",\"name\":\"Construction Site Environmental Impact Guide\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-14T15:39:49+00:00\",\"dateModified\":\"2026-09-12T17:53:35+00:00\",\"description\":\"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-impact-on-the-construction-site#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-impact-on-the-construction-site\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/environmental-impact-on-the-construction-site#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Environmental impact on the construction site\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Site Environmental Impact Guide","description":"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site","og_locale":"en_US","og_type":"article","og_title":"Construction Site Environmental Impact Guide","og_description":"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:35+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site","url":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site","name":"Construction Site Environmental Impact Guide","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-14T15:39:49+00:00","dateModified":"2026-09-12T17:53:35+00:00","description":"Guide to construction-site environmental impacts \u2713 dust, noise, vibration, air, water and soil controls.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/environmental-impact-on-the-construction-site#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Environmental impact on the construction site"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20046","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20046"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20046\/revisions"}],"predecessor-version":[{"id":29155,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20046\/revisions\/29155"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20046"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}