{"id":20042,"date":"2026-01-14T12:38:42","date_gmt":"2026-01-14T11:38:42","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20042"},"modified":"2026-09-12T19:53:35","modified_gmt":"2026-09-12T17:53:35","slug":"substation-demolition","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition","title":{"rendered":"Substation demolition"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Substation demolition is a technically demanding special demolition. It combines electrical safety, environmental and emission protection, and precise mechanics. In switchyards, transformer stations, and switchgear installations, massive steel and concrete components meet sensitive infrastructure. Foundations, cable ducts, transformer sumps, switchgear structures, operations buildings, and noise protection structures must be selectively dismantled, materials cleanly separated, and transport routes kept short. For controlled concrete demolition, <em>concrete pulverizers<\/em> as well as hydraulic wedge splitters &#8211; i.e., <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> &#8211; are frequently used. <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Mobile hydraulic power units<\/a> reliably supply mobile tools even where electrical energy is only available to a limited extent. In this way, precise, low-vibration deconstruction is achieved that meets the requirements for safety, recycling, and repurposing. Careful phasing, lockout procedures, and verifiable documentation underpin execution quality and compatibility with nearby operations.<\/p>\n<h2>Definition: What is meant by substation demolition?<\/h2>\n<p>Substation demolition refers to the orderly, professional deconstruction of voltage conversion and distribution facilities, including all structural and technical components. This includes dismantling electrical equipment, removing steel construction and concrete structures, and remediating containment systems. The <strong>selective<\/strong> sequence is essential: first de-cabling, gutting works and material stream separation, then mechanical dismantling. The goal is safe decommissioning with a high recycling rate of materials, low emissions, and minimal impact on the surroundings. Tools such as concrete pulverizers, hydraulic wedge splitters, and steel shears are combined as needed to cut, split, or size components in a controlled manner.<\/p>\n<ul>\n<li><strong>Scope of works:<\/strong> primary and secondary equipment, steel and concrete structures, cable systems, containment systems, and civil elements.<\/li>\n<li><strong>Objectives:<\/strong> verifiable de-energization and grounding, material purity for recycling, and minimized dust, noise, and vibration.<\/li>\n<\/ul>\n<h2>Special challenges in substation demolition<\/h2>\n<p>Demolition work in substations is shaped by boundary conditions that are rarely found in such density in ordinary deconstruction projects. Residual voltages and magnetic fields, potentially hazardous residual substances, restricted access, large component thicknesses, high reinforcement ratios, and strict emission limits meet sensitive neighboring facilities. In many cases, sections remain in operation, or active utility lines run in the immediate vicinity. Therefore, low-vibration methods are preferred. <em>Hydraulic wedge splitters<\/em> generate controlled splitting forces in boreholes and reduce oscillations. <em>Concrete pulverizers<\/em> break components precisely and improve material purity, facilitating recycling. For steel frameworks and switchgear structures, steel shears, hydraulic demolition shears, and multi cutters are used to safely cut profiles, plates, and composite assemblies.<\/p>\n<ul>\n<li><strong>Typical constraints:<\/strong> tight outage windows, access limitations, live-adjacent work zones, and stringent monitoring requirements.<\/li>\n<li><strong>Residual media:<\/strong> legacy insulating media, oils, and residues managed under defined handling and disposal plans.<\/li>\n<li><strong>Protection of interfaces:<\/strong> safeguarding of active lines, control cables, and neighboring buildings through shielding and staging.<\/li>\n<\/ul>\n<h2>Process and methodology: from concept to the final joint<\/h2>\n<p>A structured process increases safety, efficiency, and quality. A multi-stage approach has proven effective:<\/p>\n<ol>\n<li>Preparation: as-built survey, isolation and grounding certificates, route and line detection, material flow planning, site setup, and a rescue and fire protection concept.<\/li>\n<li>Strip-out and dismantling of electrical systems: removal of cables, switchgear, and fixtures; dismantling switch frames and linkages; removal of secondary systems.<\/li>\n<li>Selective deconstruction: creation of separate material streams (metals, concrete, masonry, wood, insulation), establishment of collection and interim storage areas.<\/li>\n<li>Mechanical dismantling: use of concrete pulverizers, hydraulic wedge splitters, steel shears, hydraulic demolition shears, and cutting torch depending on component, thickness, and reinforcement.<\/li>\n<li>Surface reinstatement: removal of foundations, paving, and upstands; backfilling, compaction, and finishing of surfaces according to future use.<\/li>\n<li>Documentation and evidence: weigh tickets and disposal receipts, photo documentation, acceptance records.<\/li>\n<\/ol>\n<h3>Pre-demolition surveys and interfaces<\/h3>\n<p>Condition assessments, hazardous materials surveys, and utility detection refine the method statement and sequence. Interfaces to live systems are mapped, and permit-to-work procedures, lockout-tagout, and grounding plans are aligned with outage schedules.<\/p>\n<h2>Tools and methods in detail<\/h2>\n<h3>Concrete demolition: splitting and pulverizer work<\/h3>\n<p>Massive foundations, transformer sumps, cable ducts, and mast bases are often made of high-strength, heavily reinforced concrete. <strong>Concrete pulverizers<\/strong> crush and shear components in a controlled manner, expose reinforcement, and create transportable pieces with good cut edges. <em>Hydraulic wedge splitters<\/em> &#8211; including <em>rock wedge splitters<\/em> &#8211; act as a static method directly within the component. They reduce vibrations, protect adjacent lines, and prevent uncontrolled crack propagation. Hydraulic power packs provide the required energy, even in areas with limited power supply. Comparable outcomes can be achieved with <a href=\"https:\/\/www.darda.de\/en\/product-overview\/concrete-crushers\">concrete crushers<\/a>. Combining splitting and pulverizing yields low fines, high material purity, and predictable fragment sizes for handling and haulage.<\/p>\n<h3>Steel and composite structures<\/h3>\n<p>Switchgear structures, cable trays, lattice masts, roof canopies, and enclosures are efficiently dismantled with steel shears, multi cutters, and hydraulic demolition shears. Combination shears are suitable for composites of sheet, structural steel, and inserts. Multi cutters cut beams, pipes, and cables in confined areas with high cutting performance. For tanks, sumps, and thick-walled vessels, the cutting torch is available as a specialized solution. Sequenced cuts and controlled setting down minimize sparking and protect adjacent systems.<\/p>\n<h3>Strip-out and cutting<\/h3>\n<p>Before the main demolition, the strip-out of operations buildings and switch houses takes place. Here, cutting, drilling, and localized chiseling are performed. Cables, ducts, and trays can be shortened section by section. Strip-out and cutting benefit from precise, low-emission tools that enable clean cut faces and single-grade separation. Anchors, inserts, and embedded plates are exposed and prepared to avoid secondary damage.<\/p>\n<h2>Typical substation components and suitable demolition concepts<\/h2>\n<h3>Foundations, mast bases, and transformer sumps<\/h3>\n<p>Large foundation blocks are first purposefully weakened. Boreholes create predetermined splitting lines for <em>hydraulic wedge splitters<\/em>. Subsequently, <em>concrete pulverizers<\/em> downsize the blocks and separate reinforcing steel. Transformer sumps are opened and removed in segments after emptying and cleaning. The material-friendly approach improves reuse and recycling. Where required, localized shoring and temporary covers maintain safe access and prevent soil ingress.<\/p>\n<h3>Switch fields and steel frameworks<\/h3>\n<p>Light steel structures can be sectioned with steel shears and multi cutters. Heavier profiles call for high-capacity shears. The combination of pre-cutting, setting down, and final sizing reduces lifting loads and facilitates haulage. Tag lines, exclusion zones, and verified lifting points ensure controlled handling.<\/p>\n<h3>Cable ducts and line bundles<\/h3>\n<p>Concrete cable ducts are opened by controlled splitting and removed in slab form. Reinforced lids can be gripped and downsized with concrete pulverizers. Cables are cut with appropriate cutting tools, taking isolation into account. Identification and segregation of copper, aluminum, and armoring improve recycling revenue and traceability.<\/p>\n<h3>Operations buildings, enclosures, and noise protection<\/h3>\n<p>Masonry, precast concrete, and steel structures are dismantled section by section. Strip-out and cutting prepare the clearance. Concrete pulverizers minimize vibrations affecting neighboring buildings and maintain high separation accuracy between mineral construction materials and metals. Where acoustic constraints apply, water mist and shielding reduce airborne noise and dust.<\/p>\n<h2>Safety and emission protection<\/h2>\n<p>Protecting people, facilities, and the environment has priority. Measures include isolation, grounding, marking, and access control. Spark formation, fire load, and media release are addressed by safe cutting sequences and suitable extinguishing agents. Water mist reduces dust, and shielding mitigates noise. Low-vibration methods such as splitting and pulverizer work help to meet limits and protect sensitive lines or structures. Work plans are adapted to wind and weather. Personal protective equipment, briefings, and escape routes are integral parts of the planning.<\/p>\n<ul>\n<li><strong>Core controls:<\/strong> permit-to-work, lockout-tagout, grounding verification, and continuous gas and dust monitoring.<\/li>\n<li><strong>Environmental protection:<\/strong> containment for residues, spill kits, and compliant segregation and storage.<\/li>\n<li><strong>Emission management:<\/strong> real-time noise and vibration thresholds with adaptive work sequencing.<\/li>\n<\/ul>\n<h2>Legal and organizational framework<\/h2>\n<p>Permits, notifications, and coordination follow local requirements. These typically include notification or approval obligations for demolition and disposal measures, traffic and access regulations, as well as noise and dust protection requirements. Agreements with the grid operator, records for utility power isolation, and documentation for the waste management chain are added. Legal requirements can change and must be examined project-specifically. These are general notes without claim to binding force.<\/p>\n<ul>\n<li><strong>Typical records:<\/strong> demolition and transport permits, hazardous materials inventories, waste transfer notes, and acceptance protocols.<\/li>\n<li><strong>Stakeholder coordination:<\/strong> grid operator, authorities, neighbors, and logistics providers with defined points of contact and time windows.<\/li>\n<\/ul>\n<h2>Resource efficiency and recycling<\/h2>\n<p>Value creation in deconstruction arises from clean separation. Steel and non-ferrous metals from frames, cables, and reinforcement are recorded in single grades. Concrete is processed into defined aggregate sizes. The use of <em>concrete pulverizers<\/em> produces favorable particle shapes, reduces contaminants, and facilitates classification. Static splitting avoids unwanted secondary breakage and reduces fines. This increases recycling rates and reduces transport volumes. A material flow and waste disposal logistics plan established early &#8211; with short transport routes and clear transfer points &#8211; prevents mixing.<\/p>\n<ul>\n<li><strong>Material purity:<\/strong> targeted pre-sorting and contamination control for higher recycling classes.<\/li>\n<li><strong>Logistics:<\/strong> coordinated container concepts and short-cycle pickups to avoid rehandling.<\/li>\n<\/ul>\n<h2>Planning and logistics in an active grid environment<\/h2>\n<p>The entire area is not always fully de-energized. In that case, work proceeds in sections with clear separation points and barriers. Compact, hydraulically powered tools are suitable for tasks with limited maneuvering space and reduce lifting loads. Hydraulic power packs enable autonomous operation and provide the required performance. In special deployments &#8211; such as at night, in dense urban settings, or over sensitive lines &#8211; quiet methods with low vibration levels such as splitting and pulverizer work prove their worth, improving compatibility for residents and facilities. Outage planning, access sequencing, and material flows are synchronized to keep interfaces short and predictable.<\/p>\n<h2>Selection criteria for tools and methods<\/h2>\n<ul>\n<li>Component geometry and thickness: determines splitting distance, pulverizer jaw opening, and shear capacity.<\/li>\n<li>Reinforcement and material mix: influences the combination of splitting, sizing, and cutting.<\/li>\n<li>Accessibility and lifting technology: defines tool size, weight, and gripping paths.<\/li>\n<li>Emission targets: noise, dust, vibration, and sparking govern method selection.<\/li>\n<li>Energy supply: hydraulic power packs ensure stable performance in the field.<\/li>\n<li>Repurposing concept: consider particle shape and purity for recycling materials.<\/li>\n<li>Safety distances: plan proximity to active lines, buildings, and traffic areas.<\/li>\n<li>Operating windows and outage planning: align method sequences with permitted times and isolation states.<\/li>\n<li>Regulatory and client specifications: incorporate documentation, monitoring, and acceptance criteria.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>A consistent documentation system links construction sequence, safety, and disposal. It includes isolation records, control measurements, visual inspections, material balances, and weigh tickets. Ongoing internal control and third-party supervision strengthen execution safety. In case of deviations, the sequence is adjusted. The choice of efficient, precise tools &#8211; such as <em>concrete pulverizers<\/em>, <em>hydraulic wedge splitters<\/em>, hydraulic demolition shears and steel shears, or cutting torch &#8211; supports reproducible results in concrete demolition and special demolition.<\/p>\n<ul>\n<li><strong>QA instruments:<\/strong> pre-start checks, calibrated measurement devices, vibration and noise logs, and photographic evidence.<\/li>\n<li><strong>Handover:<\/strong> documented inspections, punch lists, and final acceptance with as-built and disposal records.<\/li>\n<\/ul>\n<h2>Application areas and interfaces to other tasks<\/h2>\n<p>Substation demolition overlaps with several fields of activity. In <strong>concrete demolition and special demolition<\/strong>, foundations, sumps, and manhole structures are downsized in a controlled manner. <strong>Strip-out and cutting<\/strong> prepare buildings and steel structures. Interfaces with <strong>rock excavation and tunnel construction<\/strong> arise in cable tunnels, conventionally mined shafts, or rock foundations, where wedge splitters also work precisely in natural stone. At sites with rock exposure, there can be a link to <strong>stone extraction<\/strong> when block release instead of blasting &#8211; i.e., <strong>non-explosive rock removal<\/strong> &#8211; is required. In tight time windows or under difficult conditions, <strong>special deployments<\/strong> demonstrate the advantages of low-vibration, controlled methods. Coordinated execution across these interfaces ensures consistent quality, predictable schedules, and transparent material flows.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Substation demolition is a technically demanding special demolition. It combines electrical safety, environmental and emission protection, and precise mechanics. In switchyards, transformer stations, and switchgear installations, massive steel and concrete components meet sensitive infrastructure. Foundations, cable ducts, transformer sumps, switchgear structures, operations buildings, and noise protection structures must be selectively <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20042","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Substation Demolition - Electrical Safety &amp; Tools<\/title>\n<meta name=\"description\" content=\"Expert substation demolition for electrical switchyards &amp; transformer stations \u2713 using safe, low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Substation Demolition - Electrical Safety &amp; Tools\" \/>\n<meta property=\"og:description\" content=\"Expert substation demolition for electrical switchyards &amp; transformer stations \u2713 using safe, low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-12T17:53:35+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation-demolition\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation-demolition\",\"name\":\"Substation Demolition - Electrical Safety & Tools\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-14T11:38:42+00:00\",\"dateModified\":\"2026-09-12T17:53:35+00:00\",\"description\":\"Expert substation demolition for electrical switchyards & transformer stations \u2713 using safe, low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation-demolition#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation-demolition\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation-demolition#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Substation demolition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Substation Demolition - Electrical Safety & Tools","description":"Expert substation demolition for electrical switchyards & transformer stations \u2713 using safe, low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition","og_locale":"en_US","og_type":"article","og_title":"Substation Demolition - Electrical Safety & Tools","og_description":"Expert substation demolition for electrical switchyards & transformer stations \u2713 using safe, low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-09-12T17:53:35+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition","url":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition","name":"Substation Demolition - Electrical Safety & Tools","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-14T11:38:42+00:00","dateModified":"2026-09-12T17:53:35+00:00","description":"Expert substation demolition for electrical switchyards & transformer stations \u2713 using safe, low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/substation-demolition"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/substation-demolition#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Substation demolition"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20042","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20042"}],"version-history":[{"count":4,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20042\/revisions"}],"predecessor-version":[{"id":29329,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20042\/revisions\/29329"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}