{"id":20041,"date":"2026-01-14T15:29:09","date_gmt":"2026-01-14T14:29:09","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20041"},"modified":"2026-06-08T15:25:03","modified_gmt":"2026-06-08T13:25:03","slug":"substation","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/substation","title":{"rendered":"Substation"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>A <strong>substation<\/strong> &#8211; often also called a <em>switchyard<\/em> or <em>transformer station<\/em> &#8211; is a central node in the power grid. Voltage levels are converted here, electrical energy is distributed, and switching operations are coordinated. Beyond high-voltage technology, massive structural works define the setting: concrete foundations, cable ducts, switchgear buildings, noise barrier walls, and steel structures. In new construction, expansion, modernization, or deconstruction, construction-related activities are therefore always in focus. These work packages apply controlled methods for concrete and steel processing, for example with concrete pulverizers or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">rock and concrete splitters<\/a> from the Darda GmbH portfolio &#8211; not for the electrical equipment itself, but for building components around the facility. Work frequently occurs within tight work windows and in spatial proximity to energized assets, which increases the value of low-emission, precisely controllable mechanical methods.<\/p>\n<h2>Definition: What is meant by a substation?<\/h2>\n<p>A substation is a stationary, operationally secured facility of the electrical power supply that serves transformation between different voltage levels, the switching of circuits, and grid coupling. Core elements are transformers, switchgear <em>(AIS &#8211; air-insulated, GIS &#8211; gas-insulated)<\/em>, busbars, and protection and control systems. In addition, extensive structural components are part of the facility: foundations and machine foundations, equipment and operations buildings, cable ducts, grounding and drainage systems, internal roadways, and, where applicable, noise-control and enclosure structures. These structures are predominantly made of reinforced concrete and steel, which must be selectively processed or deconstructed when adapting the site. Fire-separation elements, oil containment systems, and access structures complement the setup and shape the civil interface.<\/p>\n<h2>Structure and components of a substation<\/h2>\n<p>The technical configuration comprises <strong>primary electrical equipment<\/strong> (transformers, circuit breakers, disconnectors), <strong>secondary equipment<\/strong> (measurement, protection, control, and communication systems), and the <strong>civil and structural facilities<\/strong>. The civil substructures in particular &#8211; concrete foundations for transformers and equipment frames, switchgear and operations buildings, cable ducts, transformer pits, transformer rails or crane runways, fence and gate systems, steel frames for covers &#8211; form the core of what is processed with mechanical methods during modification, repair, or deconstruction. Here, <strong>concrete pulverizers<\/strong> for the low-impact removal of reinforced concrete components and <em>rock and concrete splitters<\/em> for low-vibration separations are especially relevant. Interfaces between electrical and civil works define access routes, lifting paths, protection of sensitive assets, and sequencing.<\/p>\n<h2>Lifecycle: new build, expansion, modernization, and deconstruction<\/h2>\n<p>Over a substation\u2019s lifecycle, phases of intensive construction activity alternate with long operating periods. In new construction, earthworks and concrete works dominate; during expansion or retrofits, interfaces with the existing asset arise that require special care. Modernizations often increase the share of selective interventions: cable routes are relocated, foundations adjusted, openings created in walls, or noise control upgraded. In deconstruction &#8211; for example after a grid reconfiguration &#8211; the focus is on controlled dismantling and separation of structural systems. Tools such as concrete pulverizers and rock and concrete splitters support this, because they work precisely, with low vibration, and with finely metered force, thereby protecting adjacent components and infrastructure. Meticulous outage planning, stepwise phasing, and material logistics tailored to confined sites reduce risk and shorten work windows.<\/p>\n<h2>Construction and deconstruction aspects: concrete, steel, and earthworks<\/h2>\n<p>The civil components of a substation are designed for robustness. Concrete exhibits high strength, dense reinforcement, and often tight mix designs (oil containment basins, watertight concrete). Steel structures &#8211; from cover frames to support racks &#8211; are corrosion-protected and structurally connected. For interventions this means cutting, splitting, and crushing must be material-appropriate and low in emissions. That minimizes vibration, dust, and noise and protects nearby equipment. Particularly proven here are <strong>concrete pulverizers<\/strong> for selective concrete removal and <em>rock and concrete splitters<\/em> for controlled separation joints in massive blocks and foundations. Prior to intrusive work, surveying and non-destructive testing to detect reinforcement, anchors, and embedded services reduces unforeseen damage and enables clean separation lines.<\/p>\n<h3>Foundations and pedestals<\/h3>\n<p>Transformer and equipment foundations, cable foundations, and machine pedestals often have large cross-sections and dense reinforcement. Splitting techniques can deliberately break load paths; concrete pulverizers then size-reduce the reinforced concrete with a modest tool envelope. This also enables work in confined areas.<\/p>\n<ul>\n<li>Mark separation joints and establish relief holes for targeted crack initiation.<\/li>\n<li>Apply splitting to open the structure with low vibration, preserving adjacent elements.<\/li>\n<li>Use pulverizers to crush, expose, and separate reinforcement for efficient removal and sorting.<\/li>\n<\/ul>\n<h3>Cable routes and switchgear buildings<\/h3>\n<p>Cable ducts and basements, penetrations in switchgear and operations buildings, as well as shafts require precise openings without unnecessary edge damage. Mechanical splitting followed by removal with concrete pulverizers reduces secondary damage and facilitates subsequent reconstruction. Where required, pilot core drillings guide splitters or create defined starting points for selective removal while limiting dust and slurry.<\/p>\n<h3>Noise control, enclosures, and ancillary structures<\/h3>\n<p>Noise barrier walls, transformer roofs, and enclosures made of reinforced concrete or steel are adapted for modernizations. Steel components can be cut with shears; concrete members are separated in a controlled manner and removed section by section. Retaining temporary shielding elements as long as possible in the sequence maintains acoustic protection during construction.<\/p>\n<h2>Tools and methods for the controlled deconstruction of structural systems<\/h2>\n<p>For material-appropriate deconstruction around substations, hydraulic tools are suitable that combine high performance with fine controllability and can be integrated into existing construction logistics. Compatibility with common carriers and the option for remote or assisted operation further enhances safety and precision in sensitive zones.<\/p>\n<h3>Concrete pulverizers<\/h3>\n<p><strong>Concrete pulverizers<\/strong> size-reduce reinforced concrete elements through crushing force and bite pressure. They are suitable for slabs, walls, beams, cable duct covers, and foundation upstands. Advantages include low vibration, targeted removal, and good separating action at reinforcement when used with suitable cutting zones.<\/p>\n<ul>\n<li>Selective dismantling with minimal collateral effects on adjacent structures.<\/li>\n<li>Effective liberation of reinforcement for downstream metal separation and recycling.<\/li>\n<li>Controlled bite enables section-by-section progress and clean edges for rebuilding.<\/li>\n<\/ul>\n<h3>Rock and concrete splitters<\/h3>\n<p><em>Rock and concrete splitters<\/em> create controlled crack formation in massive components. They are ideal for thick foundations, massive blocks, oil containment basins, or heavily reinforced areas where sawing or drilling is of limited benefit. The technique is low-vibration and low-dust.<\/p>\n<ul>\n<li>Crack propagation can be steered via hole patterns and staging.<\/li>\n<li>Low emissions reduce disturbance in operational facilities and built-up areas.<\/li>\n<li>Particularly suited to zones with restricted permits for impact or blasting.<\/li>\n<\/ul>\n<h3>Hydraulic power units<\/h3>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a> supply the tools with the required output. Their compact design facilitates use in confined plant areas and supports a mobile, modular approach to selective deconstruction. Depending on the site concept, electric or engine-driven variants can be deployed to align with emission and access constraints.<\/p>\n<h3>Steel shears, combination shears, and multi cutters<\/h3>\n<p>For steel components such as frames, grating, railings, cover structures, and support scaffolds, steel shears, combination shears, and multi cutters are an option. They enable safe sectioning of profiles, plates, and reinforcement &#8211; especially in connection with step-by-step, controlled removal. Cold cutting techniques help minimize sparks and reduce the need for hot-work precautions in sensitive environments.<\/p>\n<h3>Rock splitting cylinders<\/h3>\n<p>Rock splitting cylinders transfer the advantages of splitting technology to rocky ground. For extensions or new cable routes in rocky terrain, these cylinders can open corridors and excavations with low vibration &#8211; particularly where blasting or impact tools are excluded for environmental or permitting reasons. Directional crack control protects nearby buried cables, pipes, and drainage systems.<\/p>\n<h3>Tank cutters<\/h3>\n<p>Tank cutters are used for specialized deconstruction tasks on cleared, cleaned, and emptied steel vessels or inserts. In the context of substations, this concerns exclusively structural or secondary steel components, not operational systems filled with media. Gas-free verification and appropriate hot-work permits are prerequisites before sectioning.<\/p>\n<h2>Application areas and typical scenarios in and around substations<\/h2>\n<p>Practical tasks touch on several recognized application areas and can be covered with suitable methods:<\/p>\n<ul>\n<li><strong><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">Concrete demolition and special deconstruction<\/a>:<\/strong> Selective removal of foundation edges, wall openings, deconstruction of oil containment basins and transformer pedestals with concrete pulverizers and splitters.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> Removal of installations in operations buildings; cutting of steel frames, cable duct covers, and secondary steel parts with shears and multi cutters.<\/li>\n<li><strong>Rock excavation and tunneling:<\/strong> Low-vibration opening of cable routes or expansion areas in rocky subsoil with rock splitting cylinders.<\/li>\n<li><strong>Natural stone extraction:<\/strong> Transferred technique: splitting methods in natural stone provide experience that can be applied to hard, stony soils around the facility.<\/li>\n<li><strong>Special operations:<\/strong> Work in confined spaces, in sensitive areas with stringent noise and dust minimization requirements, and under complex logistics.<\/li>\n<\/ul>\n<h2>Safety, environment, and permits<\/h2>\n<p>Work in or on substations requires careful planning and authorization. Fundamental are a robust safety concept, coordination with the operator, and compliance with relevant regulations. Structural interventions take place only within an authorized work zone. Environmental aspects &#8211; such as protection of soil and water, the safe handling of potentially contaminated construction materials, and low-emission work with respect to dust, noise, and vibration &#8211; are integral to planning. Mechanical methods such as splitting and pulverizer-based removal support these goals through low secondary emissions and precise controllability. Legal frameworks can vary regionally and must be observed on a project-specific basis.<\/p>\n<ul>\n<li>Define switching schedules, isolation, and earthing, and verify permits before civil work begins.<\/li>\n<li>Establish exclusion zones, lifting plans, and tool-specific risk assessments for each work step.<\/li>\n<li>Plan waste handling and material segregation early to meet environmental and recycling objectives.<\/li>\n<li>Monitor emissions as required and adapt methods if threshold values are approached.<\/li>\n<\/ul>\n<h2>Materials and construction methods in the context of deconstruction work<\/h2>\n<p>Substation structures consist of dense concretes, reinforcing steel, possibly coated steels, and mineral backfills. For deconstruction, understanding the matrix and bonding is crucial: splitting exploits natural separation planes; concrete pulverizers reduce components into transportable fractions; steel shears cut profiles and reinforcement. The result is purer material streams and an improved basis for recycling and recovery, aligning with the requirements of sustainable construction. Early decontamination where needed and pre-separation of reinforcement reduce cross-contamination and improve recycling yields.<\/p>\n<h2>Planning, documentation, and quality assurance<\/h2>\n<p>Structured documentation &#8211; from as-built survey through deconstruction concept to verification &#8211; ensures quality and traceability. In practice, a step-by-step approach with clean cuts and defined work cycles has proven effective. Tools from Darda GmbH support this through compact designs and the ability to control removal quantities precisely. Complete photo documentation, measurements of emissions, and coordination of logistics (access routes, intermediate storage, haul routes) round off quality management.<\/p>\n<ol>\n<li>Survey and investigate: drawings, utilities, reinforcement scans, and condition assessments.<\/li>\n<li>Method definition: splitting patterns, cutting lines, tool selection, and sequencing.<\/li>\n<li>Permitting and safety: work permits, isolation plans, exclusion zones, and monitoring concept.<\/li>\n<li>Execution and control: measurable targets per shift, documentation, and immediate QA checks.<\/li>\n<li>Handover: verification, as-built updates, and recycling evidence.<\/li>\n<\/ol>\n<h2>Emission and immission control in sensitive areas<\/h2>\n<p>Substations are often located near residential or commercial areas. Therefore, <strong>noise mitigation<\/strong>, <em>dust reduction<\/em>, and the limitation of vibrations are critical. Mechanical methods such as splitting and pulverizer-based removal offer advantages here. They can be combined with water misting, shielding, and a coordinated construction schedule to protect the surroundings as effectively as possible. Temporary enclosures, negative-pressure zones in interior works, tool selection with low sound power levels, and time-of-day controls contribute to compliance with site-specific limits.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A substation &#8211; often also called a switchyard or transformer station &#8211; is a central node in the power grid. Voltage levels are converted here, electrical energy is distributed, and switching operations are coordinated. Beyond high-voltage technology, massive structural works define the setting: concrete foundations, cable ducts, switchgear buildings, noise <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/substation\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20041","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Substation - Electrical Power Grid Overview<\/title>\n<meta name=\"description\" content=\"Power grid substation guide \u2713 transformation, switching, civil works &amp; low vibration, low dust deconstruction.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/substation\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Substation - Electrical Power Grid Overview\" \/>\n<meta property=\"og:description\" content=\"Power grid substation guide \u2713 transformation, switching, civil works &amp; low vibration, low dust deconstruction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/substation\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-08T13:25:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation\",\"name\":\"Substation - Electrical Power Grid Overview\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-14T14:29:09+00:00\",\"dateModified\":\"2026-06-08T13:25:03+00:00\",\"description\":\"Power grid substation guide \u2713 transformation, switching, civil works & low vibration, low dust deconstruction.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/substation#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Substation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Substation - Electrical Power Grid Overview","description":"Power grid substation guide \u2713 transformation, switching, civil works & low vibration, low dust deconstruction.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/substation","og_locale":"en_US","og_type":"article","og_title":"Substation - Electrical Power Grid Overview","og_description":"Power grid substation guide \u2713 transformation, switching, civil works & low vibration, low dust deconstruction.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/substation","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-08T13:25:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/substation","url":"https:\/\/www.darda.de\/en\/knowledge\/substation","name":"Substation - Electrical Power Grid Overview","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-14T14:29:09+00:00","dateModified":"2026-06-08T13:25:03+00:00","description":"Power grid substation guide \u2713 transformation, switching, civil works & low vibration, low dust deconstruction.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/substation#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/substation"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/substation#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Substation"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20041","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20041"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20041\/revisions"}],"predecessor-version":[{"id":28156,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20041\/revisions\/28156"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20041"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}