{"id":20035,"date":"2026-01-13T12:23:13","date_gmt":"2026-01-13T11:23:13","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20035"},"modified":"2026-06-08T17:52:02","modified_gmt":"2026-06-08T15:52:02","slug":"tower-refurbishment","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment","title":{"rendered":"Tower refurbishment"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tower refurbishment refers to the planned repair, strengthening, or selective deconstruction of structures such as church towers, water towers, industrial chimneys, cooling towers, or silos. Such vertical structures place high demands on structural analysis, occupational safety, and logistics. For interventions in concrete, masonry, or steel, controlled, low-vibration methods have proven effective &#8211; especially where the fabric must be preserved, emissions minimized, and surrounding operations maintained. In these scenarios, <strong>concrete demolition shear<\/strong> as well as <a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a> from Darda GmbH are technically relevant tools because they enable precise, well-dosed interventions. Their use supports staged work sequences, predictable fragment sizes, and low secondary damage on sensitive or height-exposed components.<\/p>\n<h2>Definition: What is meant by tower refurbishment?<\/h2>\n<p>Tower refurbishment encompasses the set of measures to preserve, restore, or adapt a tower-like structure to current requirements for use, safety, and durability. This includes condition assessment, planning, temporary stabilization, material-appropriate removal of damaged areas, crack and edge repair, corrosion protection, concrete repair, strengthening (e.g., by cross-section enlargements), and, if necessary, <em>selective deconstruction<\/em> and reconstruction of individual sections. Refurbishment differs from routine maintenance in its depth and from restoration in its more technical focus. Tower structures are often made of reinforced concrete or masonry; industrial structures also feature steel components. Typical objectives are:<\/p>\n<ul>\n<li><strong>Structural safety and serviceability:<\/strong> restoration of load-bearing capacity, stiffness, and stability over the full height.<\/li>\n<li><strong>Durability:<\/strong> targeted protection against carbonation, chlorides, moisture ingress, and thermal cycling.<\/li>\n<li><strong>Adaptation:<\/strong> upgrades for new use cases or access systems while respecting the existing fabric.<\/li>\n<li><strong>Preservation:<\/strong> material-conserving methods where heritage value or architectural qualities are present.<\/li>\n<\/ul>\n<h2>Typical tower types and damage patterns<\/h2>\n<p>Tower constructions respond sensitively to wind, temperature changes, moisture, and chemical influences. Typical damage mechanisms differ depending on the type of construction, and may act locally at the head or cornices as well as globally through foundation settlements or eccentric loads.<\/p>\n<h3>Masonry towers<\/h3>\n<p>Cracks due to settlement, leaching in joints, freeze-thaw salt damage, loose stones in cornices and bearing zones. Removal is performed in sections, conserving substance and with load paths shored. Temporary ties, ring beams, and local bracing maintain stability during staged interventions.<\/p>\n<h3>Reinforced concrete towers<\/h3>\n<p><em>Concrete carbonation<\/em>, <em>chloride contamination<\/em>, <em>rebar oxidation<\/em>, spalling, edge break-offs, voids. Controlled concrete removal to expose reinforcement is often carried out with <strong>concrete demolition shear<\/strong> or by splitting technique to limit vibrations and microcracking. Particular attention is paid to cover depth, lap lengths, and anchorage zones at openings and heads.<\/p>\n<h3>Industrial chimneys and cooling towers<\/h3>\n<p>Corrosion damage on built-in parts, concrete degradation from exhaust gases, thermal stresses, and liner defects. In some cases, a <em>partial deconstruction from top to bottom<\/em> is technically advisable to renew head geometries, flue outlets, or ring beams with defined cycle sizes.<\/p>\n<h3>Silos and technical towers<\/h3>\n<p>Abrasion, local overloading, damage to steel cladding and connection elements. For steel-containing sections, depending on the component, steel shear or <a href=\"https:\/\/www.darda.de\/en\/product-overview\/multi-cutters\">Multi Cutters<\/a> from Darda GmbH may be considered. During interventions, buckling risks and product residues must be controlled by staging and cleaning plans.<\/p>\n<h2>Condition assessment and planning<\/h2>\n<p>A sound diagnosis is the basis of any tower refurbishment. It includes visual inspections (scaffolding, work platform, rope access), minimally destructive testing (rebar location, concrete carbonation depth, rebound hammer), core samples with laboratory analysis, crack monitoring, and geometric surveys. Based on the findings, a refurbishment concept, temporary stabilization, and a staged construction sequence are defined. The structural analysis considers load-bearing behavior, slenderness, imperfections, and construction stages during the interventions.<\/p>\n<ul>\n<li><strong>Supplementary investigation methods:<\/strong> UAV-based photogrammetry for fa\u00c3\u00a7ades and heads, ultrasonic pulse velocity and cover-meter scans, half-cell potential mapping, endoscopy of voids and annular spaces, and targeted pull-out tests on anchors.<\/li>\n<li><strong>Planning deliverables:<\/strong> method statements, risk assessments, permit-to-work procedures, and emergency rescue concepts adapted to height and access system.<\/li>\n<\/ul>\n<h2>Refurbishment and deconstruction methods on the tower<\/h2>\n<p>Depending on material and objectives, different methods are used. In practice, a combination is selected that reconciles the structure, surroundings, and occupational safety. Method selection is driven by component thickness, permissible vibration levels, access restrictions, and the need to control fragment size and fall paths.<\/p>\n<ul>\n<li>Concrete removal: local, controlled, and low-vibration with <strong>concrete demolition shear<\/strong>; material separation along defined crack patterns; exposing reinforcement with minimal edge damage.<\/li>\n<li>Splitting technique: <strong>concrete splitter<\/strong> or rock wedge splitter generate separating cracks in the component without impact loads. Suitable for massive heads, rings, cornices, foundation bearings.<\/li>\n<li>Steel separation: depending on the component, steel shear or Multi Cutters; for vessel attachments or steel platforms on towers.<\/li>\n<li>Relocation and strip-out: selective removal of built-in parts, lines, linings; cutting openings for inspection or new use.<\/li>\n<li><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">Hydraulic power units<\/a>: energy-efficient supply of attachments; positioning on site with consideration of noise control and exhaust routing.<\/li>\n<li>Sequencing and fragment control: pre-splitting followed by shearing to manage bite size, minimize free fall, and enable safe handling at height.<\/li>\n<\/ul>\n<h2>Tool selection in tower refurbishment: concrete demolition shear and splitting technique<\/h2>\n<p>The decision between <strong>concrete demolition shear<\/strong> and <strong>concrete splitter<\/strong> depends on component thickness, reinforcement ratio, target joint, and accessibility. Shears allow metered removal with good feedback, especially on edges, corbels, and ring-shaped heads. Splitting technique is advantageous for massive cross-sections, when vibrations must be minimized, or when separation should proceed from the inside out. In both cases, hydraulic power packs from Darda GmbH support a continuous, controlled work rhythm. Trial areas and mock-ups help calibrate removal rates, bite sizes, and emission limits under project conditions.<\/p>\n<h2>Process of a tower refurbishment step by step<\/h2>\n<ol>\n<li>Preliminary investigation and hazard analysis, definition of access and fall protection systems.<\/li>\n<li>Structural assessment, refurbishment concept, staging, and permits.<\/li>\n<li>Site setup, protective measures for the surroundings, emissions management.<\/li>\n<li>Temporary stabilization on the tower (shoring, ring beam (tie beam), internal scaffolding).<\/li>\n<li>Selective removal of damaged areas, e.g., with concrete demolition shear or splitting technique.<\/li>\n<li>Cleaning, corrosion protection of reinforcement, concrete repair, joint remediation.<\/li>\n<li>Strengthening (e.g., cross-section enlargement, jacketing, ring beam).<\/li>\n<li>Restoration of connections, built-in components, and surfaces.<\/li>\n<li>Inspection, documentation, monitoring, and handover.<\/li>\n<li>Quality assurance and acceptance tests (e.g., pull-off tests for repair mortars, coating checks, torque and anchor pull-out tests).<\/li>\n<li>Post-refurbishment monitoring plan with defined inspection intervals and trigger values.<\/li>\n<\/ol>\n<h2>Safety, emissions, and neighbor protection<\/h2>\n<p>Work on towers requires consistent measures against falls, falling objects, and uncontrolled load redistribution. In addition, <em>noise control, dust suppression, and low vibration levels<\/em> are crucial: water mist, protective enclosures, defined removal sizes, and material-appropriate tools reduce emissions. The combination of concrete demolition shear and splitting technique contributes to low vibration and dust development, which is advantageous in urban environments, near sensitive facilities, or on heritage-listed structures.<\/p>\n<ul>\n<li><strong>Exclusion zones and lifting plans:<\/strong> defined drop areas, tag lines, and certified lifting accessories.<\/li>\n<li><strong>Weather limits:<\/strong> wind speed thresholds, ice and lightning protocols, and safe stand-down criteria.<\/li>\n<li><strong>Hot work governance:<\/strong> permits and fire watch when separating steel elements.<\/li>\n<li><strong>Rescue and communication:<\/strong> height rescue procedures, radio discipline, and clear command structures.<\/li>\n<li><strong>Environmental protection:<\/strong> sediment control for wash water, noise time windows, and vibration monitoring at neighbors.<\/li>\n<\/ul>\n<h2>Special challenges: heritage conservation and documentation<\/h2>\n<p>For historic towers, preservation of substance, reversibility, and original material are paramount. Interventions are documented in detail, removable safeguards are preferred, and original geometries are respected. Controlled methods that release components in defined pieces facilitate careful handling of old fabric and reduce secondary damage. Material matching for mortars and stones, photographic logs, and 3D scans of profiles support accurate reconstruction and traceability.<\/p>\n<h2>Material-appropriate repair and strengthening<\/h2>\n<h3>Masonry<\/h3>\n<p>Consolidation of loose zones, repointing, replacement of damaged stones, crack injection with suitable systems. Rock wedge splitters allow the safe release of individual stones in critical areas. Lime-based mortars matched by analysis, stainless anchoring where necessary, and gentle cleaning methods preserve the character and function of the masonry.<\/p>\n<h3>Concrete<\/h3>\n<p>Removal to the load-bearing core, exposure of reinforcement, passivating measures, and reprofiling. <strong>Concrete demolition shear<\/strong> enables edge-by-edge and layer-by-layer work, allowing geometries to be maintained precisely. Test fields, substrate pull-off tests, and correct curing regimes are decisive for durable bond and surface quality.<\/p>\n<h3>Steel<\/h3>\n<p>Corrosion protection, replacement of weakened plates and sections, controlled separation with steel shear or Multi Cutters. For vessel attachments or tanks on tower heads, tank cutters can be relevant if boundary conditions require it. Hot work permits, spark containment, and temporary bracing safeguard adjacent components during separation and re-assembly.<\/p>\n<h2>Site setup and access methods<\/h2>\n<p>The choice between full scaffolding, climbing platforms, internal scaffolding, and rope access depends on height, geometry, and scope of refurbishment. Load paths for materials and removed components must be defined in advance. Handling of hydraulic power packs and attachments is carried out with regard to weight, locations, and the escape route. Rescue plans, anchor verification, and interface management with crane operations are coordinated before work starts.<\/p>\n<h2>Application areas within tower refurbishment<\/h2>\n<ul>\n<li><strong>Concrete demolition and special demolition:<\/strong> controlled removal of heads, ring beams, cantilevers; top-down deconstruction with defined cycle sizes.<\/li>\n<li><strong>Strip-out and cutting:<\/strong> openings, shafts, service routes; selective removal of built-in parts.<\/li>\n<li><strong>Rock breakout and tunnel construction:<\/strong> relevant for tower foundations in rocky subsoil or for accesses; splitting technique reduces vibrations.<\/li>\n<li><strong>Natural stone extraction:<\/strong> expertise from stone processing informs the careful release and placement of natural stones in historic towers.<\/li>\n<li><strong>Special deployment:<\/strong> confined interiors, sensitive neighbors, vibration-critical installations &#8211; quiet, precise methods with hydraulic tools from Darda GmbH are advantageous here.<\/li>\n<li><strong>Emergency stabilization:<\/strong> rapid shoring, pre-splitting to relieve stress, and controlled removal of loose material under time pressure.<\/li>\n<\/ul>\n<h2>Practical case scenarios<\/h2>\n<p>For a damaged chimney head, the ring-shaped concrete rim can be trimmed back in sections with <strong>concrete demolition shear<\/strong>, the internal reinforcement exposed, and then a new ring beam (tie beam) concreted. On a church tower with infilled cornices, individual stones can be released using splitting technique without affecting the layers below. On silo towers with steel superstructures, attachments are cut in a targeted manner with steel shear before concrete work begins.<\/p>\n<p>On a cooling tower with chloride-contaminated edges, pre-splitting from drill holes defines the separation plane, followed by controlled shearing to remove deteriorated zones. The sequence reduces vibration at sensitive equipment nearby and shortens shutdown windows through predictable cycle times.<\/p>\n<h2>Normative and organizational framework<\/h2>\n<p>Tower refurbishment is guided by applicable standards and technical rules for concrete, masonry, steel construction, occupational safety, and scaffolding. In addition, local requirements on emissions control and specifications from heritage authorities must be observed. Requirements for deconstruction, construction waste separation, and disposal are defined on a project-specific basis. Legal notices are always general and not binding for individual cases. Competence management, documented method statements, and independent inspection and test plans establish quality and compliance across all stages.<\/p>\n<h2>Sustainability and circular economy<\/h2>\n<p>Selective deconstruction with defined component separation supports source-separated collection of concrete, masonry, and metal. This reduces disposal effort and facilitates recycling. Methods with low energy consumption and low emissions &#8211; such as splitting technique and controlled shear removal &#8211; contribute to environmental compatibility and protection of the surroundings. Life-cycle considerations, recovery of reinforcing steel, and optimized logistics further reduce the carbon and noise footprint of the works.<\/p>\n<h2>Cost and schedule control<\/h2>\n<p>Costs arise from access methods, stabilization, work rate, emissions control, and quality assurance. A realistically paced construction sequence with clear work packages (e.g., defined removal meters per day) increases predictability. Tools with well-metered performance &#8211; such as <em>concrete demolition shear<\/em> and <em>concrete splitter<\/em> &#8211; support continuous progress while minimizing the risk of secondary damage. Transparent productivity metrics, learning curves on trial areas, weather contingencies, and risk allowances for unforeseen findings stabilize both budget and schedule.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tower refurbishment refers to the planned repair, strengthening, or selective deconstruction of structures such as church towers, water towers, industrial chimneys, cooling towers, or silos. Such vertical structures place high demands on structural analysis, occupational safety, and logistics. For interventions in concrete, masonry, or steel, controlled, low-vibration methods have proven <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20035","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tower Refurbishment | Concrete, Masonry &amp; Steel<\/title>\n<meta name=\"description\" content=\"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tower Refurbishment | Concrete, Masonry &amp; Steel\" \/>\n<meta property=\"og:description\" content=\"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-08T15:52:02+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tower-refurbishment\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tower-refurbishment\",\"name\":\"Tower Refurbishment | Concrete, Masonry & Steel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-13T11:23:13+00:00\",\"dateModified\":\"2026-06-08T15:52:02+00:00\",\"description\":\"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tower-refurbishment#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tower-refurbishment\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tower-refurbishment#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tower refurbishment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tower Refurbishment | Concrete, Masonry & Steel","description":"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment","og_locale":"en_US","og_type":"article","og_title":"Tower Refurbishment | Concrete, Masonry & Steel","og_description":"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-08T15:52:02+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment","url":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment","name":"Tower Refurbishment | Concrete, Masonry & Steel","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-13T11:23:13+00:00","dateModified":"2026-06-08T15:52:02+00:00","description":"Guide to tower refurbishment \u2713 safe structural repair for chimneys, silos, cooling towers with low vibration methods.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tower-refurbishment#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tower refurbishment"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20035","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20035"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20035\/revisions"}],"predecessor-version":[{"id":28162,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20035\/revisions\/28162"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20035"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}