{"id":20029,"date":"2026-01-13T13:08:44","date_gmt":"2026-01-13T12:08:44","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20029"},"modified":"2026-06-08T15:35:03","modified_gmt":"2026-06-08T13:35:03","slug":"tunnel-technology","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology","title":{"rendered":"Tunnel technology"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>Tunnel technology encompasses the planning, construction, stabilization, fit-out, and maintenance of underground voids for transportation, utilities, and mining purposes. It integrates geology, construction methods, machine technology, occupational safety, and logistics into a precise interplay. In all phases &#8211; from heading through lining to refurbishment &#8211; specialized tools and hydraulic systems play a central role. Especially in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/em> as well as in <em>concrete demolition and special demolition<\/em>, <strong>concrete pulverizers<\/strong> and <strong><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-rock-and-concrete-splitters\">hydraulic rock and concrete splitters<\/a><\/strong> from Darda GmbH make a significant contribution when controlled, low-vibration work and exact profile adjustments are required. Clear interface management between excavation, support, and finishing trades, as well as observance of applicable standards and approvals, supports predictable, verifiable outcomes.<\/p>\n<h2>Definition: What is meant by tunnel technology?<\/h2>\n<p>Tunnel technology refers to the entirety of scientific, planning, and practical methods for the construction and use of underground structures. This includes geological investigation, selection and execution of the excavation method (mechanical or blasting), temporary and permanent supports (e.g., anchors, shotcrete, linings), the fit-out, construction and haulage logistics, as well as maintenance, strengthening, and deconstruction. The goal is a stable, durable, economical, and safe tunnel with minimal impacts on people and the environment. It builds on codified design approaches, risk and monitoring concepts, and life-cycle strategies to ensure performance and serviceability over the structure&#8217;s life.<\/p>\n<h2>Fundamentals, methods and equipment of tunnel technology<\/h2>\n<p>The choice of methods in tunnel technology depends on geology, hydrogeological conditions, overburden, intended use, and construction constraints. In hard rock, drill-and-blast and partial-face cutting machines are used; in soft ground, shield machines, ground freezing or compressed air predominate. Regardless of the method, precise supports (anchors, lattice ribs, shotcrete), reliable logistics (haulage, ventilation, energy) and, on the tool side, <em>powerful yet finely metered<\/em> systems are required. <strong>Rock and concrete hydraulic wedge splitters<\/strong> are suitable for controlled release of rock and high-strength concrete within tight tolerances, for example at the tunnel face or for profile corrections, while <strong>concrete pulverizers<\/strong> enable precise, low-vibration shaping during deconstruction, breakthroughs, niches and fillets. Hydraulic power packs supply these tools with energy and allow compact, safe use in the confined tunnel cross-section.<\/p>\n<ul>\n<li>Selection is refined via trials and monitoring to balance advance rate, stability, and profile accuracy.<\/li>\n<li>Instrumentation and observational methods provide feedback for timely adjustments to support and excavation.<\/li>\n<li>Tooling is chosen for controllability, low emissions, and repeatable edge quality to minimize rework.<\/li>\n<\/ul>\n<h2>Geology and subsoil: influence on methods and support<\/h2>\n<p>Geological layers, jointing, strength and water inflow determine whether mechanical excavation, drill-and-blast or a shield method is economical and safe. Hard rock with high compressive strength generally permits drill-and-blast or partial-face cutting; fractured zones require early support, e.g., with anchors and shotcrete. With variable ground, a flexible support concept is decisive. For local adjustments &#8211; such as removing overbreaks, releasing wedges or trimming spalls &#8211; <strong>rock wedge splitters<\/strong> and <strong>concrete pulverizers<\/strong> have an advantage, as they work in a controlled, pinpoint manner.<\/p>\n<p>Groundwater management &#8211; by pre-grouting, drainage galleries, or sealing systems &#8211; often governs feasibility, safety, and schedule. Characterizing discontinuities and anisotropy informs the sequencing of excavation and support to prevent uncontrolled block release.<\/p>\n<h2>Overview of excavation methods<\/h2>\n<h3>Drill-and-blast in rock<\/h3>\n<ul>\n<li>Investigation and borehole layout: drilling patterns depending on rock, target profile, and crown\/bench cut.<\/li>\n<li>Charging and blasting: sequence and delay to achieve profile accuracy and reduce vibrations.<\/li>\n<li>Excavation and mucking: loading, haulage, surveying; profile control with surveying and scanner.<\/li>\n<li>Finishing: removing remaining ridges, fillets, connections; here <strong>rock and concrete hydraulic wedge splitters<\/strong> are helpful for <em>low-vibration<\/em> shaping.<\/li>\n<\/ul>\n<h3>Mechanical excavation<\/h3>\n<ul>\n<li>Partial-face cutting machines: segment-wise removal in rock; suitable for variable ground and variable cross-sections.<\/li>\n<li>Tunnel boring machines (TBM\/shield): continuous excavation from soft ground to hard rock; segmental lining in a cyclic system.<\/li>\n<li>Profile correction and installations: <strong>concrete pulverizers<\/strong>, <strong>Multi Cutters<\/strong> and <strong>combination shears<\/strong> support openings for installations, cable ducts or drainage grooves.<\/li>\n<\/ul>\n<h3>Removal, profile control and adjustments<\/h3>\n<p>After each advance step, the profile is checked. Where overbreak or local irregularities occur, <em>targeted splitting<\/em> with <strong>rock wedge splitters<\/strong> enables vibration-reduced removal. <strong>Concrete pulverizers<\/strong> cut precisely in high-strength concrete, for example at floor slabs, columns or cross-passage connections.<\/p>\n<p>Modern measurement &#8211; total stations, laser scanning, and photogrammetry &#8211; enables fast as-built comparison with design tolerances. Controlled splitting and precise cutting limit microcracking and protect adjacent supports and installations.<\/p>\n<h2>Support, fit-out and lining<\/h2>\n<p>Early supports stabilize the tunnel cross-section. Typical are shotcrete, fiber reinforcement, anchors and steel ribs. The permanent lining is executed as cast-in-place concrete or segmental lining. For openings, widenings or subsequent connections, <strong>concrete pulverizers<\/strong> and <strong>rock and concrete hydraulic wedge splitters<\/strong> provide precise work without impairing sensitive support elements. In strengthening or refurbishment, selective exposure of reinforcement is important; here <strong>Multi Cutters<\/strong> and <strong>steel shears<\/strong> assist with material-specific cutting.<\/p>\n<p>Waterproofing membranes, segment gaskets, fire protection layers, drainage, and cable or ventilation interfaces must be coordinated with tolerances and sequence. Low-vibration techniques help to maintain membrane integrity and prevent damage to embedded components.<\/p>\n<h2>Construction logistics, energy and hydraulics in the tunnel<\/h2>\n<p><a href=\"https:\/\/www.darda.de\/en\/product-overview\/hydraulic-power-units\">compact hydraulic power units<\/a> feed mobile tools via short hose runs, which increases responsiveness and safety. The transport of muck, materials and precast elements is staged; tight cross-sections require light, easy-to-handle components. Tools from Darda GmbH are tailored to such constraints and can be integrated into existing logistics chains &#8211; from handheld tools to integration on carrier machines.<\/p>\n<ul>\n<li>Staged ventilation and dust management aligned with excavation cycles improve visibility and health protection.<\/li>\n<li>Energy concepts consider heat rejection, hose routing, and potential for low-emission operation in confined spaces.<\/li>\n<li>Standardized couplings and color-coded lines reduce connection errors and setup time in shift changes.<\/li>\n<\/ul>\n<h2>Occupational safety, emissions and vibration protection<\/h2>\n<p>Dust, noise, vibration and diesel exhaust are central issues. <em>Low-vibration<\/em> methods such as splitting instead of impact or wide-area chiseling protect the structure and its surroundings. In urban projects or sensitive neighborhoods, controlled removal methods offer a decisive advantage. Good ventilation, tidy hose routing and secure hydraulic couplings minimize risks.<\/p>\n<ul>\n<li>Lockout-tagout procedures for hydraulic systems and clear emergency stop access increase operational safety.<\/li>\n<li>Explosion protection and ignition control are considered in gassy or high-risk sections; equipment selection follows applicable zoning.<\/li>\n<li>Water mist or localized extraction reduces respirable dust; exposure is tracked and documented.<\/li>\n<li>Evacuation concepts and redundant egress routes are embedded in shift planning and drills.<\/li>\n<\/ul>\n<h2>Deconstruction, refurbishment and maintenance of tunnel structures<\/h2>\n<p>Existing structures are upgraded, expanded or deconstructed in an orderly manner. Typical measures: removing lining elements, opening cross passages, enlarging niches, concrete repair. <strong>Concrete pulverizers<\/strong> remove layers while protecting the remaining structure; <strong>rock and concrete hydraulic wedge splitters<\/strong> release massive sections in a controlled way. <strong>Combination shears<\/strong> and <strong>Multi Cutters<\/strong> cover changing materials, while <strong>steel shears<\/strong> cut reinforcement, profiles and embedded parts. In special situations (<em>special application<\/em>) &#8211; for example where access is limited &#8211; the compact design of the tools is advantageous.<\/p>\n<p>Prior structural assessments, instrumentation, and method statements define sequencing and hold points to keep loads within allowable limits during intervention.<\/p>\n<h2>Typical applications for concrete pulverizers and rock and concrete hydraulic wedge splitters in tunnel construction<\/h2>\n<ul>\n<li>Profile corrections at crown, bench and sidewall without transmitting unnecessary vibrations.<\/li>\n<li>Creating recesses for cable routes, drainage, ventilation niches (<em>stripping-out and cutting<\/em>).<\/li>\n<li>Selective deconstruction of linings and secondary components in <em>concrete demolition and special demolition<\/em>.<\/li>\n<li>Releasing wedges and blocky rock in <em>rock breakout<\/em> at a confined tunnel face.<\/li>\n<li>Opening cross passages and emergency exits with controlled edge quality.<\/li>\n<li>Refurbishment steps: removing damaged concrete layers, exposing reinforcement, preparatory removal prior to shotcrete application.<\/li>\n<\/ul>\n<h2>Selection criteria for equipment in tunnel technology<\/h2>\n<ul>\n<li>Ground and strengths: compressive-tensile ratios, joint spacing, water ingress.<\/li>\n<li>Cross-section and accessibility: equipment dimensions, weight, handling in the tunnel.<\/li>\n<li>Emission targets: noise and vibration limits, dust management.<\/li>\n<li>Power demand and energy: compatibility with <strong>hydraulic power packs<\/strong>, hose lengths, heat dissipation.<\/li>\n<li>Precision and edge quality: minimize rework, protect supports.<\/li>\n<li>Safety: low kickback, emergency stop, secure couplings, ergonomic operation.<\/li>\n<li>Integration: carrier compatibility, transport paths, setup times, and maintainability under tunnel constraints.<\/li>\n<li>Documentation: availability of performance data, certificates, and service support for compliance.<\/li>\n<\/ul>\n<h2>Quality assurance, monitoring and documentation<\/h2>\n<p>Quality in tunnel construction arises from continuous measurement and documentation: profile scans, vibration and noise measurements, shotcrete thicknesses, anchor pull-out tests, water ingress. Precise, repeatable removal results achieved with <strong>concrete pulverizers<\/strong> and <strong>rock and concrete hydraulic wedge splitters<\/strong> make it easier to meet tolerances and reduce rework. Cleanly separated materials improve recycling.<\/p>\n<p>Digital documentation and model-based coordination enable traceability from design intent to as-built, with measured values linked to location and time for auditable records.<\/p>\n<h2>Environmental and resource aspects<\/h2>\n<p>Reduced vibrations protect neighboring buildings and existing infrastructure. Selective deconstruction facilitates the separation of concrete, steel and fit-out components. Targeted splitting lowers energy consumption and tool wear. In <em>natural stone extraction<\/em> and in mining development, similar advantages apply: high dimensional accuracy, minimal damage to existing structures and efficient material use.<\/p>\n<p>Noise abatement, groundwater protection, and the reduction of embodied energy through selective methods contribute to permitting goals and long-term sustainability.<\/p>\n<h2>Drive, maintenance and operation of hydraulic systems<\/h2>\n<p><strong>Hydraulic power packs<\/strong> provide the required performance. Important are oil quality, filtration, temperature management and regular seal inspections. Short downtimes through preventive maintenance increase availability. In tunnels, compact, easy-to-transport units with clear connection points and reliable quick couplings are advantageous.<\/p>\n<ul>\n<li>Condition monitoring of temperatures, pressures, and filter status supports predictive maintenance.<\/li>\n<li>Standardized quick-connects and labeling reduce contamination risk and setup errors.<\/li>\n<li>Protected enclosures and appropriate ingress protection improve reliability in humid, dusty environments.<\/li>\n<\/ul>\n<h2>Planning and process in the project<\/h2>\n<ol>\n<li>Pre-investigation and geotechnics: probing, laboratory tests, numerical models.<\/li>\n<li>Method selection: excavation, support, lining, logistics, emergency concepts.<\/li>\n<li>Site setup: power supply, ventilation, haulage equipment, storage areas.<\/li>\n<li>Execution: takt planning, measurement systems, documentation, quality assurance.<\/li>\n<li>Deconstruction and maintenance: life-cycle perspective, inspection, refurbishment strategies.<\/li>\n<\/ol>\n<p>Early coordination of utilities, permissions, and interfaces with existing infrastructure reduces change risk; contingency allowances and adaptive cycles account for geological uncertainty.<\/p>\n<h2>Roles of Darda GmbH products in the context of tunnel technology<\/h2>\n<p><strong>Concrete pulverizers<\/strong> excel in precise deconstruction and adjustment work in concrete; <strong>rock and concrete hydraulic wedge splitters<\/strong> offer controlled release in rock and reinforced concrete; <strong>rock wedge splitters<\/strong> address high strengths in tight spaces; <strong>combination shears<\/strong> and <strong>Multi Cutters<\/strong> enable cross-material cutting; <strong>steel shears<\/strong> focus on metallic inserts; <strong>tank cutters<\/strong> are intended for special cutting tasks in <em>special application<\/em>; <strong>hydraulic power packs<\/strong> supply the devices with the required power &#8211; always with a view to safety, precision and low emissions in the tunnel environment. Their compact build and controllable force application support efficient, low-impact work in confined cross-sections.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Tunnel technology encompasses the planning, construction, stabilization, fit-out, and maintenance of underground voids for transportation, utilities, and mining purposes. It integrates geology, construction methods, machine technology, occupational safety, and logistics into a precise interplay. In all phases &#8211; from heading through lining to refurbishment &#8211; specialized tools and hydraulic systems <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-20029","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Technology | Construction Methods &amp; Safety<\/title>\n<meta name=\"description\" content=\"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe &amp; precise.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Technology | Construction Methods &amp; Safety\" \/>\n<meta property=\"og:description\" content=\"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe &amp; precise.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-08T13:35:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-technology\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-technology\",\"name\":\"Tunnel Technology | Construction Methods & Safety\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-13T12:08:44+00:00\",\"dateModified\":\"2026-06-08T13:35:03+00:00\",\"description\":\"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe & precise.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-technology#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-technology\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-technology#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel technology\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Technology | Construction Methods & Safety","description":"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe & precise.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology","og_locale":"en_US","og_type":"article","og_title":"Tunnel Technology | Construction Methods & Safety","og_description":"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe & precise.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-08T13:35:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology","name":"Tunnel Technology | Construction Methods & Safety","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-13T12:08:44+00:00","dateModified":"2026-06-08T13:35:03+00:00","description":"Guide to tunnel technology for underground construction with excavation, support and hydraulics \u2713 Safe & precise.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-technology#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel technology"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20029"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20029\/revisions"}],"predecessor-version":[{"id":28158,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20029\/revisions\/28158"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}