{"id":20026,"date":"2026-01-12T14:28:52","date_gmt":"2026-01-12T13:28:52","guid":{"rendered":"https:\/\/www.darda.de\/?page_id=20026"},"modified":"2026-06-06T12:01:03","modified_gmt":"2026-06-06T10:01:03","slug":"tunnel-cut","status":"publish","type":"page","link":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut","title":{"rendered":"Tunnel cut"},"content":{"rendered":"<div class=\"wissen-inhaltsbereich\">\n<p>The term tunnel cut describes both the geometric cross-section of a tunnel and the methodological division of the excavation into individual cut phases. It is therefore a central planning element in <em><a href=\"https:\/\/www.darda.de\/en\/applications\/rock-demolition-and-tunnel-construction\">rock demolition and tunnel construction<\/a><\/em> and extends into <em><a href=\"https:\/\/www.darda.de\/en\/applications\/concrete-demolition-and-special-deconstruction\">concrete demolition and special deconstruction<\/a><\/em>. From the choice of the profile and the sequence of crown, bench, and invert to profile finishing, the tunnel cut determines safety, construction time, costs, and the suitability of tools\u2014ranging from drill-and-blast to hydraulic handheld devices such as <strong>concrete demolition shears<\/strong> or <strong>stone and concrete splitters<\/strong>, which are used for precise contouring and deconstruction. As a planning parameter, it also interacts with excavation advance, support classes, and quality assurance to achieve predictable tolerances and low emissions.<\/p>\n<h2>Definition: What is meant by tunnel cut?<\/h2>\n<p>Tunnel cut refers to the geometric and constructional configuration of the tunnel cross-section as well as the sequence in which the rock mass or the existing structure is excavated or separated. The tunnel cut therefore comprises:<\/p>\n<ul>\n<li>the profile shape (circular, horseshoe-shaped, rectangular with arch, special profiles),<\/li>\n<li>the sizing (clear width, excavation cross-section, over-profile),<\/li>\n<li>the advance segmentation (crown-bench-invert slot, side drifts, pilot tunnel),<\/li>\n<li>the support sequence (shotcrete, lattice girders, anchors, inner lining),<\/li>\n<li>the profile control and finishing (removal of overbreak, planing\/cutting of the inner lining, separation cuts for alteration and refurbishment),<\/li>\n<li>the interfaces to waterproofing and drainage (sealing concept, construction joints, penetrations).<\/li>\n<\/ul>\n<p>In practice, geology, groundwater, intended use, construction method (drill-and-blast, partial-face machine, tunnel boring machine) and boundary conditions such as vibration and noise control influence the tunnel cut. For profile corrections, removal of residual concrete, or selective deconstruction, hydraulic tools are frequently used, including <strong>concrete demolition shears<\/strong> and <strong>stone and concrete splitters<\/strong> by Darda GmbH. Clear interface definitions between excavation, temporary support, waterproofing, and inner lining reduce rework, emissions, and schedule risk.<\/p>\n<h2>Fundamentals and typical cross-sections<\/h2>\n<p>The profile shape follows the loading from ground pressure, usage, and construction method. Circular and horseshoe-shaped cross-sections distribute loads favorably and are common in rock and mixed ground. Rectangular shapes occur in short urban and utility tunnels, often with a reinforced inner lining. Groundwater pressure and settlement sensitivity often favor arching profiles, while utility and access constraints may require local rectangular segments or niches.<\/p>\n<h3>Construction elements of the cross-section<\/h3>\n<ul>\n<li>Excavation profile: geometric target contour including over-profile for shotcrete and tolerances.<\/li>\n<li>Shotcrete support: temporary or permanent layer for stabilization, combined with anchors and reinforcement.<\/li>\n<li>Inner lining: cast-in-place concrete or precast segments, possibly with waterproofing membrane and drainage.<\/li>\n<li>Installations: cable ducts, ventilation structures, escape routes, track or roadway structure.<\/li>\n<li>Interfaces: construction joints, penetrations, rebates for membranes, and tolerances for fixtures.<\/li>\n<\/ul>\n<p>Profile fidelity is crucial: overbreak increases material and time requirements; under-profile jeopardizes installation dimensions. For finishing, capacity-appropriate, low-vibration tools are preferred, such as <em>concrete demolition shears<\/em> for concrete layers and <em>stone and concrete splitters<\/em> for controlled release of rock or massive concrete. Increasingly, scan-to-model workflows with laser scanning support rapid conformance checks and targeted rework.<\/p>\n<h2>Tunnel cut in rock: Crown-Bench-Invert<\/h2>\n<p>In rock excavation, the advance is often subdivided into three stages:<\/p>\n<ol>\n<li>Crown: upper section, secured early, largely defines the contour.<\/li>\n<li>Bench: middle section, relieves the tunnel face and allows progress of support.<\/li>\n<li>Invert: final base section, forms the definitive position for roadway or track.<\/li>\n<\/ol>\n<p>This sequence enables short, secured advance cycles. Round length, support timing, and temporary invert closures are adapted to stability and deformation behavior. During profiling, local overbreaks are removed, joints are straightened, and a suitable bearing surface for shotcrete and formwork skins is created. In confined conditions and sensitive environments (vibration limits), <strong>stone and concrete splitters<\/strong> are used, which propagate cracks in a controlled manner via wedge or cylinder splitting pressure, as well as <strong>concrete demolition shears<\/strong> for edge corrections on concrete layers.<\/p>\n<h2>Tunnel cut in loose ground with shotcrete support<\/h2>\n<p>In loose ground, short rounds and rapid shotcrete support secure the tunnel face. Advance patterns such as forepoling, pipe umbrellas, or side drifts stabilize the surroundings. Here, the tunnel cut is strongly determined by the support sequence; profile finishing focuses on the shotcrete and separation joints to the inner lining. Concepts aligned with observational methods ensure that the excavation sequence and support measures can be adjusted promptly to measured deformations.<\/p>\n<h3>Practical aspects<\/h3>\n<ul>\n<li>Low vibrations and low-dust methods are beneficial; hydraulic shears reduce impact impulses.<\/li>\n<li>For anchor heads and protruding reinforcement, <em><a href=\"https:\/\/www.darda.de\/en\/product-overview\/steel-shears\">Steel Shears<\/a><\/em> or <em>multi cutters<\/em> are used for rebar.<\/li>\n<li>For precise separation cuts on the inner lining, <em>combination shears<\/em> support the selective deconstruction of local defects.<\/li>\n<li>Sequence design must maintain face stability and ensure uninterrupted ventilation and access.<\/li>\n<li>Remote operation options can increase safety in zones with restricted access or elevated exposure.<\/li>\n<\/ul>\n<h2>Mechanical tunnel cut: TBM, partial-face, and milling<\/h2>\n<p>With tunnel boring machines, the profile is predetermined. Partial-face machines and roadheaders allow a flexible contour but can produce irregular surfaces depending on the rock. Finishing to meet tolerances and to install waterproofing membranes is common. Where machine-induced under-profile occurs, targeted enlargements are executed with low-vibration hydraulic tools to protect adjacent support and membranes.<\/p>\n<p>In areas with launch and reception openings, cross passages, or niches, transitions must be processed precisely. <strong>Concrete demolition shears<\/strong> enable contour-accurate removal on concrete elements, while <strong>stone and concrete splitters<\/strong> release massive blocks without creating additional blast-induced cracks. Local stiffeners, ribs, or penetrations are shaped to specification while maintaining the designed construction joints.<\/p>\n<h2>Surveying, profile control, and tolerances<\/h2>\n<p>The tunnel cut is monitored by tachymetric and laser-scanning methods. Tolerance bands apply to the excavation profile, lining, and installations. Deviations are documented and corrected promptly. For corrections, well-dosed tools are essential to meet the design contour without impairing subsequent works. Georeferenced point clouds and automated deviation maps accelerate decision-making and enable consistent documentation across construction stages.<\/p>\n<h3>Recommendations for profile finishing<\/h3>\n<ul>\n<li>Small removals: <em>concrete demolition shears<\/em> on shotcrete or inner lining, clean edges without large-area damage.<\/li>\n<li>Major corrections: <em>stone and concrete splitters<\/em> for block-wise release; reduces secondary damage and vibrations.<\/li>\n<li>Installation openings: <em>combination shears<\/em> and <em>multi cutters<\/em> for reinforcement, plates, or lattice girders.<\/li>\n<li>Membrane interfaces: check edge geometry and roughness class before sealing and lining works.<\/li>\n<\/ul>\n<h2>Cutting strategy in existing tunnels and refurbishments<\/h2>\n<p>In existing structures, tunnel cuts are used for cross-section enlargement, niches, cross passages, or replacement of the inner lining. Deconstruction is performed selectively to preserve load reserves and minimize structural vibrations. Constraints from ongoing operations, heritage protection, and limited access often govern the feasible sequence and equipment choice.<\/p>\n<p>Typical steps include exposing the inner lining, opening joints, removing defective zones, and trimming connection edges. Hydraulic <strong>concrete demolition shears<\/strong> are suitable for defined demolition edges on the inner lining. <strong>Stone and concrete splitters<\/strong> separate thick concrete bodies or natural stone masonry in a controlled manner. <em>Steel shears<\/em> cut reinforcement or steel sections; for complex installations, <em>multi cutters<\/em> help. For special tasks in <em>special operations<\/em>, <em>tank cutters<\/em> on piped vessels or shafts can enable precise separation cuts, provided the boundary conditions permit.<\/p>\n<h2>Tools and methods in the context of the tunnel cut<\/h2>\n<p>The choice of tool follows material, spatial constraints, and emission requirements. In tunnels, short setup times, low weight, and reliable energy supply are central. Hydraulic handheld tools are powered by <strong>hydraulic power packs<\/strong> matched to the required flow rates and pressures. Compatibility of hose couplings and adherence to the specified flow-pressure window prevent performance losses and overheating.<\/p>\n<h3>Selection criteria<\/h3>\n<ul>\n<li>Material: shotcrete, cast-in-place concrete, rock, masonry, steel.<\/li>\n<li>Work environment: tight niches, overhead, moisture, ventilation.<\/li>\n<li>Emission control: noise, dust, vibrations; hydraulic methods are often advantageous.<\/li>\n<li>Separation task: edge precision, controlled crack propagation, protection of adjacent components.<\/li>\n<li>Logistics: transport routes, access restrictions, and available staging areas underground.<\/li>\n<\/ul>\n<p>In <em>concrete demolition and special deconstruction<\/em>, <strong>concrete demolition shears<\/strong> have proven themselves for precise contours and <strong>stone and concrete splitters<\/strong> for low-vibration block separation. <em>Combination shears<\/em>, <em>multi cutters<\/em>, and <em>steel shears<\/em> complement the cutting of metal inserts. <em>Rock splitting cylinders<\/em> support the release of large cross-sections in hard rock. Planned maintenance intervals and contamination control of hydraulic oil increase tool life and availability.<\/p>\n<h2>Occupational safety, emissions, and environmental protection<\/h2>\n<p>The tunnel cut requires measures for tunnel face stability, protection against rockfall, and control of dust and noise. Appropriate supports, barriers, ventilation, and a coordinated emergency plan must be provided. Recommendations may vary by project; binding requirements result from the applicable regulations.<\/p>\n<ul>\n<li>Reduce emissions: work with low dust, use extraction and water spray, prefer low-vibration methods.<\/li>\n<li>Loads and ergonomics: select tools with favorable handling and appropriate performance.<\/li>\n<li>Hazardous substances: consider mist, silica-bearing dust, and old coatings; implement suitable protective measures.<\/li>\n<li>Monitoring: gas detection, heat stress management, and permit-to-work procedures in confined spaces.<\/li>\n<\/ul>\n<h2>Planning, logistics, and energy supply<\/h2>\n<p>An efficient tunnel cut requires coordinated logistics. Material flow, intermediate storage, disposal of excavation and deconstruction material, and the positioning of the <strong>hydraulic power packs<\/strong> are determined early. Short hose runs, clear routing, and a defined maintenance plan increase equipment availability. Preassembly zones and safe changeover points for tools reduce downtime and congestion underground.<\/p>\n<h3>Practical notes<\/h3>\n<ul>\n<li>Select the sequence planning so that support and finishing occur promptly.<\/li>\n<li>Fix measurement and documentation points for profile controls permanently.<\/li>\n<li>Dimension energy and media management (hydraulics, power, water, compressed air) for peak loads.<\/li>\n<li>Coordinate shift handovers and access windows to minimize idle times and interference.<\/li>\n<\/ul>\n<h2>Quality assurance and documentation<\/h2>\n<p>Profile quality is checked section by section. Deviations are classified and remedied with appropriate methods. Complete documentation facilitates acceptance and later maintenance. A coordinated catalog for tolerances, repair methods, and acceptance processes is helpful, especially for complex cutting sequences or refurbishments. Inspection and test plans, hold points, and as-built scans support transparent approval and reduce rework.<\/p>\n<h2>Common defect patterns and remedies<\/h2>\n<ul>\n<li>Overbreak due to unfavorable blasting or milling parameters: correct with controlled removals, preferably hydraulic and low-vibration.<\/li>\n<li>Under-profile at critical points: local widening, post-doweling, and profile matching.<\/li>\n<li>Ragged edges at inner lining openings: re-cut with <em>concrete demolition shears<\/em>, trim reinforcement ends flush with <em>steel shears<\/em>.<\/li>\n<li>Crack formation due to uncontrolled load redistribution: graded cutting strategy, use of <em>stone and concrete splitters<\/em> with defined crack propagation.<\/li>\n<li>Damage to waterproofing or insufficient edge quality: verify substrate condition, re-trim edges, restore membrane continuity with approved details.<\/li>\n<\/ul>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>The term tunnel cut describes both the geometric cross-section of a tunnel and the methodological division of the excavation into individual cut phases. It is therefore a central planning element in rock demolition and tunnel construction and extends into concrete demolition and special deconstruction. From the choice of the profile <a class=\"moretag\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut\">read more&#8230;<\/a><\/p>\n","protected":false},"author":9,"featured_media":0,"parent":14846,"menu_order":0,"comment_status":"open","ping_status":"open","template":"tmpl\/template-wissen.php","meta":{"_acf_changed":false,"footnotes":"","_members_access_role":[],"_members_access_error":""},"class_list":["post-20026","page","type-page","status-publish","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tunnel Cut - Tunneling Cross-Section &amp; Phases<\/title>\n<meta name=\"description\" content=\"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tunnel Cut - Tunneling Cross-Section &amp; Phases\" \/>\n<meta property=\"og:description\" content=\"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut\" \/>\n<meta property=\"og:site_name\" content=\"Darda GmbH\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/DardaDemolition\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-06T10:01:03+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-cut\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-cut\",\"name\":\"Tunnel Cut - Tunneling Cross-Section & Phases\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\"},\"datePublished\":\"2026-01-12T13:28:52+00:00\",\"dateModified\":\"2026-06-06T10:01:03+00:00\",\"description\":\"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-cut#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-cut\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\\\/tunnel-cut#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Knowledge\",\"item\":\"https:\\\/\\\/www.darda.de\\\/en\\\/knowledge\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Tunnel cut\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#website\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"name\":\"Darda GmbH\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\"},\"alternateName\":\"Abbruchwerkzeuge\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.darda.de\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#organization\",\"name\":\"Darda GmbH\",\"url\":\"https:\\\/\\\/www.darda.de\\\/en\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"contentUrl\":\"https:\\\/\\\/www.darda.de\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/android-icon-192x192-1.png\",\"width\":192,\"height\":192,\"caption\":\"Darda GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/www.darda.de\\\/en#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/DardaDemolition\",\"https:\\\/\\\/www.instagram.com\\\/darda_demolition\",\"https:\\\/\\\/www.youtube.com\\\/user\\\/DardaGmbH\",\"https:\\\/\\\/www.xing.com\\\/pages\\\/darda-gmbh\",\"https:\\\/\\\/de.linkedin.com\\\/company\\\/darda-gmbh\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tunnel Cut - Tunneling Cross-Section & Phases","description":"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut","og_locale":"en_US","og_type":"article","og_title":"Tunnel Cut - Tunneling Cross-Section & Phases","og_description":"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.","og_url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut","og_site_name":"Darda GmbH","article_publisher":"https:\/\/www.facebook.com\/DardaDemolition","article_modified_time":"2026-06-06T10:01:03+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut","url":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut","name":"Tunnel Cut - Tunneling Cross-Section & Phases","isPartOf":{"@id":"https:\/\/www.darda.de\/en#website"},"datePublished":"2026-01-12T13:28:52+00:00","dateModified":"2026-06-06T10:01:03+00:00","description":"Guide to tunnel cut in civil engineering \u2713 cross-section design and excavation sequencing for safe, efficient projects.","breadcrumb":{"@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.darda.de\/en\/knowledge\/tunnel-cut#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.darda.de\/en"},{"@type":"ListItem","position":2,"name":"Knowledge","item":"https:\/\/www.darda.de\/en\/knowledge"},{"@type":"ListItem","position":3,"name":"Tunnel cut"}]},{"@type":"WebSite","@id":"https:\/\/www.darda.de\/en#website","url":"https:\/\/www.darda.de\/en","name":"Darda GmbH","description":"","publisher":{"@id":"https:\/\/www.darda.de\/en#organization"},"alternateName":"Abbruchwerkzeuge","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.darda.de\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.darda.de\/en#organization","name":"Darda GmbH","url":"https:\/\/www.darda.de\/en","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/","url":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","contentUrl":"https:\/\/www.darda.de\/wp-content\/uploads\/2017\/09\/android-icon-192x192-1.png","width":192,"height":192,"caption":"Darda GmbH"},"image":{"@id":"https:\/\/www.darda.de\/en#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/DardaDemolition","https:\/\/www.instagram.com\/darda_demolition","https:\/\/www.youtube.com\/user\/DardaGmbH","https:\/\/www.xing.com\/pages\/darda-gmbh","https:\/\/de.linkedin.com\/company\/darda-gmbh"]}]}},"_links":{"self":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20026","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/comments?post=20026"}],"version-history":[{"count":2,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20026\/revisions"}],"predecessor-version":[{"id":28118,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/20026\/revisions\/28118"}],"up":[{"embeddable":true,"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/pages\/14846"}],"wp:attachment":[{"href":"https:\/\/www.darda.de\/en\/wp-json\/wp\/v2\/media?parent=20026"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}